{"meta":{"updated":"2026-11-05","count":584,"counts":{"proposed":189,"under_construction":169,"operational":156,"permitted":42,"cancelled":28},"jurisdiction":{"city":30,"uninc":23,"unverified":531,"unknown":0},"sources":["Compute Atlas — github.com/ek33450505/compute-atlas (CC BY 4.0)","Epoch AI — epoch.ai/data/ai-data-centers (CC BY 4.0)"]},"fac":[{"id":"usaf-eielson-ai-data-center-eul-ak","n":"Eielson Air Force Base AI Data Center Enhanced Use Lease Site","op":"U.S. Department of the Air Force (lessor; developer not selected)","s":"proposed","st":"AK","co":"Fairbanks North Star Borough","lat":64.6657,"lon":-147.1015,"pre":"approximate","cf":"reported","ann":"2026-04-10","upd":"2026-10-18","nt":"Five potential sites in the Eielson area: one near southeast North Pole, two across the Richardson Highway, one mid-installation and one on the north side. Coordinates are approximate (base location). The multi-installation acreage total is not attributed to this site.","src":[{"u":"https://www.newsminer.com/news/local_news/proposed-air-force-data-center-land-leases-raise-some-concerns/article_98cbed0c-6574-464a-8097-c054c46cb699.html","t":"Proposed Air Force data center land leases raise some concerns","p":"Fairbanks Daily News-Miner"},{"u":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/","t":"USAF Offers Land for AI Data Centers on Three Alaska Bases","p":"Air & Space Forces Magazine"}],"j":"uninc","jc":"Fairbanks North Star Borough","jn":"Eielson AFB","ju":"approx"},{"id":"usaf-jber-ai-data-center-eul-anchorage-ak","n":"Joint Base Elmendorf-Richardson AI Data Center Enhanced Use Lease Site","op":"U.S. Department of the Air Force (lessor; developer not selected)","s":"proposed","st":"AK","city":"Anchorage","co":"Municipality of Anchorage","lat":61.251,"lon":-149.8065,"pre":"approximate","cf":"reported","ann":"2026-04-10","upd":"2026-10-18","nt":"Enhanced Use Lease offering: 5 sites at JBER of about 60 to nearly 200 acres each (per ADN). The ~4,700 acres and 12 parcels are totals across all three Alaska installations, not this site. Coordinates are approximate (base location).","src":[{"u":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/","t":"USAF Offers Land for AI Data Centers on Three Alaska Bases","p":"Air & Space Forces Magazine"},{"u":"https://www.adn.com/alaska-news/military/2026/05/05/the-military-wants-to-host-data-centers-in-alaska-raising-questions-about-whether-theres-enough-gas-to-power-them/","t":"The military wants to host data centers in Alaska, raising questions about whether there's enough gas to power them","p":"Anchorage Daily News"}],"j":"city","jc":"Anchorage Municipality","jn":"Anchorage","jd":"municipality","ju":"approx"},{"id":"stak-energy-north-slope-ak","n":"Stak Energy North Slope Data Center","op":"Stak Energy","s":"proposed","st":"AK","co":"North Slope","lat":69.84,"lon":-148.5,"pre":"approximate","cf":"reported","mw":3000,"ac":715,"inv":500000000,"ann":"2026-05","upd":"2026-10-30","pb":"On-site natural gas generation (off-grid, new pipeline from North Slope reserves)","nt":"Preliminary state land lease approval covers 715.4 acres (corrected from 640; one square mile = 640 acres exactly but the approved lease footprint is 715.4 acres per Alaska Beacon). Campus is approximately 26 miles south of Deadhorse/Prudhoe Bay off the Dalton Highway (corrected from 25 miles). Supports AI training, cloud computing, and HPC. 3 GW is the project's claimed ultimate potential; $500M is Phase 1 capital. Coordinates estimated (~26 miles south of Prudhoe Bay 70.2N/148.5W); exact site not publicly disclosed.","src":[{"u":"https://alaskapublic.org/news/economy/energy/2026-05-26/alaskas-north-slope-proposed-as-home-for-massive-ai-data-center","t":"Alaska's North Slope Proposed as Home for Massive AI Data Center","p":"Alaska Public Media"},{"u":"https://www.adn.com/business-economy/2026/05/18/a-huge-data-center-could-rise-on-alaskas-north-slope/","t":"A Huge Data Center Could Rise on Alaska's North Slope","p":"Anchorage Daily News"}],"j":"uninc","jc":"North Slope Borough","ju":"approx"},{"id":"applied-digital-delta-forge-2-brookwood-al","n":"Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)","op":"Applied Digital","s":"proposed","st":"AL","city":"Brookwood","co":"Tuscaloosa","lat":33.2557,"lon":-87.3208,"pre":"approximate","cf":"confirmed","mw":210,"ac":1300,"inv":3200000000,"ann":"2026-06-08","upd":"2026-10-18","nt":"The site is about 160 acres within a 1,300-acre tract north of the 17,000 block of Brookwood Parkway. The tenant is an unnamed U.S. hyperscaler. This is separate from the tracked Youngwoo & Associates 'Project Brookwood', which lies west of the Applied Digital tract. Lat/lon is the Brookwood town centroid (OSM Nominatim), not the parcel.","src":[{"u":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","t":"Applied Digital Signs 210 MW Lease at Delta Forge 2","p":"Applied Digital"},{"u":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","t":"County Board Unanimously OKs Incentives for $3.2 Billion Applied Digital Data Center in Brookwood","p":"Tuscaloosa Thread"}],"j":"city","jc":"Tuscaloosa County","jn":"Brookwood","jd":"city","ju":"approx"},{"id":"beacon-calvert-al","n":"Calvert Infrastructure Hub","op":"Beacon Data Centers","s":"proposed","st":"AL","city":"Calvert","co":"Mobile","lat":31.1552,"lon":-88.01,"pre":"approximate","cf":"confirmed","ac":650,"inv":6000000000,"upd":"2026-10-28","nt":"Developer's campus page states verbatim: \"A 95 acre development out of a 650 acre lot\" with \"less than 15% of the site planned for development\"; \"$6 billion\"; two data center buildings plus supporting infrastructure; \"2027 First Building Completed\"; currently in a \"planning, engineering, and community engagement phase\"; \"up to 1,000 construction workers at peak construction\" and \"250 staff for operations\" at an \"average salary of $115,000\". The recorded land area is the 650-acre site; the built footprint is 95 acres. No capacity is recorded: the campus page states no MW figure. Secondary coverage attributes 6 GW to Beacon's whole portfolio of six-plus campuses across Alberta, New Brunswick, Tom Green County TX, Kern County CA and Calvert; that is a portfolio figure, not this site's capacity, and is not recorded. County ambiguity: Beacon's own page places the hub in Mobile County and that is what is recorded, but Calvert is an unincorporated community straddling Mobile and Washington counties, and the OSM village node used for the coordinate sits on the Washington County side. As of September 2026, the county had not been confirmed against the parcel. Subsidy: no incentive or abatement is mentioned on the developer's page; Mobile County and Alabama Commerce records had not been checked as of September 2026, so this is an unchecked gap, not an audited negative. Coordinates are the Calvert community centroid, not the 650-acre parcel.","src":[{"u":"https://beacondatacenters.com/campuses/calvert/","t":"Calvert - Beacon Data Centers (developer's campus page)","p":"Beacon Data Centers"},{"u":"https://nominatim.openstreetmap.org/search?q=Calvert%2C+Alabama&format=json&limit=2","t":"Nominatim geocode of Calvert, Alabama — returns both a census place spanning Mobile and Washington counties and a village node (31.1551748, -88.0099997) in Washington County","p":"OpenStreetMap / Nominatim"}],"j":"uninc","jc":"Washington County","jn":"Calvert","ju":"approx"},{"id":"core-scientific-auburn-al","n":"Core Scientific Auburn Data Center (AUBix)","op":"Core Scientific","s":"under_construction","st":"AL","city":"Auburn","co":"Lee","lat":32.6089,"lon":-85.4879,"pre":"approximate","cf":"confirmed","mw":16,"inv":400000000,"upd":"2026-10-18","nt":"As of September 2026, the status is kept at under construction, though two sources found then point toward the site already serving customers: Core Scientific sells it as a current product, and the February 2026 $55M permit is framed as an expansion of an existing facility rather than a first build. Neither states outright that the data center is energized and serving load, and this is a pre-existing AUBix building that Core Scientific leased, so the boundary between the incumbent facility and Core Scientific's fit-out is unclear. Status was not promoted to operational on marketing tense alone.","src":[{"u":"https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility","t":"Core Scientific Announces Expansion into Auburn, Alabama with New High-Performance Computing Facility","p":"Core Scientific IR (BusinessWire-syndicated)"},{"u":"https://alabamanewscenter.com/2025/02/20/core-scientific-bringing-high-performance-computing-operation-to-auburn-alabama/","t":"Core Scientific bringing high-performance computing operation to Auburn, Alabama","p":"Alabama News Center"}],"j":"city","jc":"Lee County","jn":"Auburn","jd":"city","ju":"approx"},{"id":"dc-blox-birmingham-al","n":"DC BLOX Birmingham Data Center Campus","op":"DC BLOX","s":"operational","st":"AL","city":"Birmingham","co":"Jefferson","lat":33.5007,"lon":-86.8208,"pre":"exact","cf":"confirmed","mw":60,"upd":"2026-10-28","nt":"Operator spec page states verbatim: \"Up to 5MW critical load; expandable up to 60MW\" and \"31,000 sq. ft. initially; expandable up to 200,000 sq. ft.\", with a planned expansion building of 263,000 SF. A campus-level stat block on the same page reads \"4 Data Centers (Operational & in Development)\", \"294,000 Square Feet\", \"49 Critical MW (Committed & Planned)\" — the 60MW and 49MW figures are stated on the same page and are not reconciled by DC BLOX; both are recorded verbatim rather than normalized. Cooling: the source's cooling list says only \"N+1 cooling\", \"Hot aisle containment\" and \"High efficiency Direct Expansion (DX)\", and its high-density section adds \"Water-cooled rear-door heat exchangers per cabinet\"; as of October 2026, it does not state how the facility rejects heat or whether any cooling water is evaporated, so the cooling type is recorded as unknown. Site is the former Ingalls Ironworks building; DC BLOX states it is the first multi-tenant data center in Alabama to hold Uptime Institute Tier III Certification of Constructed Facility. Coordinates are the OSM building polygon centroid for the parcel, which OSM independently tags as a data centre named \"DC Blox Data Center\". As of September 2026, investment, jobs and subsidies were not stated in any source found and had not been checked at the Jefferson County / City of Birmingham tier, so their absence here is a gap in the research, not an audited negative.","src":[{"u":"https://www.dcblox.com/data-centers/birmingham/","t":"Birmingham Data Center - Alabama Colocation","p":"DC BLOX"},{"u":"https://nominatim.openstreetmap.org/search?q=433+6th+Street+South%2C+Birmingham%2C+AL+35233&format=json&limit=1","t":"Nominatim geocode of 433 6th Street South, Birmingham AL 35233 — returns OSM way 1019816009, building tagged type=data_center, name \"DC Blox Data Center\"","p":"OpenStreetMap / Nominatim"}],"j":"city","jc":"Jefferson County","jn":"Birmingham","jd":"city"},{"id":"dc-blox-huntsville-al","n":"DC BLOX Huntsville Data Center","op":"DC BLOX","s":"operational","st":"AL","city":"Huntsville","co":"Madison","lat":34.7104,"lon":-86.6922,"pre":"approximate","cf":"confirmed","mw":13.5,"upd":"2026-10-28","nt":"Operator spec page states verbatim: \"Expandable up to 13.5MW critical load\" and \"9,000 sq. ft. expandable up to 52,400 sq. ft.\"; a campus stat block states 2 data centers operational and in development with 9 critical MW committed and planned. Because only the expandable ceiling is stated, 13.5 is recorded as planned and no operational MW is claimed. Cooling stated only as \"N+1 cooling\", \"High efficiency Direct Expansion (DX)\", \"Hot aisle containment\"; direct-expansion cooling has no cooling water circuit, so it is recorded as air-cooled. Coordinates are an address-point geocode of the street address DC BLOX publishes, not a confirmed parcel footprint. Distinct from the Meta Huntsville Data Center Campus, tracked separately as of September 2026 (different operator, different site). Investment, jobs and subsidies not stated in the source fetched.","src":[{"u":"https://www.dcblox.com/data-centers/huntsville/","t":"Huntsville Data Center - Alabama Colocation","p":"DC BLOX"},{"u":"https://nominatim.openstreetmap.org/search?q=333+Diamond+Drive+NW%2C+Huntsville%2C+AL+35806&format=json&limit=1","t":"Nominatim geocode of 333 Diamond Drive NW, Huntsville AL 35806 (Madison County)","p":"OpenStreetMap / Nominatim"}],"j":"city","jc":"Madison County","jn":"Huntsville","jd":"city","ju":"approx"},{"id":"dc-blox-montgomery-al","n":"DC BLOX Montgomery Data Center","op":"DC BLOX","s":"proposed","st":"AL","city":"Montgomery","co":"Montgomery","lat":32.2641,"lon":-86.3729,"pre":"approximate","cf":"confirmed","mw":32,"inv":30000000,"ann":"2024-11","upd":"2026-10-31","nt":"Announced November 2024 as one of four DC BLOX southeastern hyperscale edge-node sites. Chamber release states verbatim: \"$30 million data center investment\", \"5MW of capacity for a hyperscale anchor tenant, with the potential to scale up to 40MW for additional tenants\", \"Located in Interstate Industrial Park\". Alabama Department of Commerce (Made in Alabama) repeats the 5MW-to-40MW figure. Status is proposed: no cited source states that construction has begun, and DC BLOX's own live location map (checked 2026-09-09) lists only Birmingham and Huntsville in Alabama with no Montgomery entry. An aggregator (servercountry.org) lists this as 40 MW under construction; that is unverified and not cited. The street address 7610 Bill Joseph Pkwy, Hope Hull, AL 36043 is taken from DC BLOX's 2025 campus brochure (Montgomery MGM1, status Planned); WSFA places the site at the Interstate Industrial Park off the Hope Hull exit on Interstate 65. The coordinates are the Nominatim point for Bill Joseph Parkway, a street-level approximation, not a surveyed lot. The brochure's MGM1 block lists \"Total SF (Buildable) 80,000 SF\", \"Available Power 32cMW/48gMW\" and \"Initial Move-In Contract + 36 months\", and WSFA reports the data center is \"expected to start being built in June 2025\"; no acreage, job count or incentive figures appear in any cited source. Distinct from Meta Montgomery Data Center (different operator and site).","src":[{"u":"https://www.montgomerychamber.com/blog/press-releases-3604/post/dc-blox-announces-30m-investment-in-new-montgomery-data-center-40072","t":"DC BLOX announces $30M investment in new Montgomery data center","p":"Montgomery Regional Chamber of Commerce"},{"u":"https://www.madeinalabama.com/2024/11/dc-blox-plans-new-advanced-data-centers-in-montgomery-and-huntsville/","t":"DC BLOX plans new advanced data centers in Montgomery and Huntsville","p":"Made in Alabama (Alabama Department of Commerce)"}],"j":"city","jc":"Montgomery County","jn":"Montgomery","jd":"city","ju":"approx"},{"id":"digi-power-x-columbiana-al","n":"Digi Power X Columbiana AI Data Center","op":"Digi Power X","s":"under_construction","st":"AL","city":"Columbiana","co":"Shelby","lat":33.1811,"lon":-86.6228,"pre":"approximate","cf":"confirmed","mw":40,"inv":371500000,"ann":"2025-01","upd":"2026-10-28","nt":"Subsidy: the Columbiana City Council \"unanimously rejected a tax abatement proposal for Digi Power X\", and the article states \"The only governmental body that has the jurisdiction to give an abatement on taxes for the Columbiana data center is the City Council.\" So as of 29 May 2026 this site had no local tax abatement, and by the reporter's account no other body could have granted one. Digi Power X had requested abatement on \"all state and local non-educational property taxes on the project's industrial development property\" plus construction-related transaction taxes through 2027. WBRC reported on 24 July 2026 that the council had later voted to grant DigiPowerX \"a 12-month sales and use tax abatement, but only during construction to help cover the cost of equipment for expansion\", in return for a $3.5 million \"community impact payment\" to the city. Anchor tenant: 10-year master services agreement with Cerebras Systems for colocation of the 40 MW AI data center, \"valued at approximately $1.1 billion with potential for the contract value to reach $2.5 billion, inclusive of renewal terms\" — that $1.1B is contract value, not capital investment, and is not recorded as the investment figure; the $371.5M figure is the stated \"total investment ... in building, machinery and personal property\" from the abatement filing. Bham Now (June 2026) instead reports a 55 MW two-phase plan, with 22 MW and $176 million for the first phase and $440 million in total; those figures differ from the 40 MW colocation agreement and the abatement-filing figure and are not recorded. Jobs: \"Digi Power X plans to start out with two jobs at a total annual payroll of $200,000 and to expand to 45 permanent jobs by year three with a total payroll of $4.5 million\" — the 2 is the year-one headcount, not a construction workforce, so no construction job count is recorded; the source states no construction-worker count. Site history: property purchased by Digihost Technology Inc from Grede II LLC on 21 June 2022 after the Grede Foundry closed in 2020, and run as a bitcoin-mining operation until the January 2025 conversion announcement. Air emissions to be monitored by ADEM. Coordinates are the OSM industrial-park polygon centroid for Industrial Parkway, not a confirmed parcel footprint.","src":[{"u":"https://www.shelbycountyreporter.com/news/columbiana-data-center-signs-1b-agreement-future-plans-revealed-f520ff1b/","t":"Columbiana data center signs $1B agreement, future plans revealed (29 May 2026)","p":"Shelby County Reporter"},{"u":"https://nominatim.openstreetmap.org/search?q=130+Industrial+Parkway%2C+Columbiana%2C+AL+35051&format=json&limit=2","t":"Nominatim geocode of 130 Industrial Parkway, Columbiana AL 35051 (Shelby County) — resolves to OSM way 471834867, landuse=industrial \"Industrial Parkway\"","p":"OpenStreetMap / Nominatim"}],"j":"city","jc":"Shelby County","jn":"Columbiana","jd":"city","ju":"approx"},{"id":"edged-gateway-prichard-al","n":"Edged Prichard Data Center (Project Gateway)","op":"Edged US","s":"proposed","st":"AL","city":"Prichard","co":"Mobile","lat":30.7388,"lon":-88.0789,"pre":"approximate","cf":"confirmed","mw":8,"inv":93000000,"upd":"2026-10-18","nt":"Developer site states verbatim: \"8MW, 57,000 SF building – roughly the size of a football field\", \"$93 million investment in the local community\", \"150–200 construction jobs supported during an approximately 18-month construction period\", \"20 permanent full-time positions upon completion\", and \"Approximately $16.7 million in projected annual economic impact, including $8.3 million supporting local schools\". The recorded construction jobs figure is the low end (150) of the stated 150-200 range rather than a midpoint. FOX10 adds the ~20 jobs pay \"over $70,000 annually\". Subsidy: no incentive or abatement is mentioned on the developer's project site or in FOX10's coverage; Prichard and Mobile County records had not been checked as of September 2026, so that is an unchecked gap, not an audited negative. The $16.7M annual economic impact and $8.3M schools figure are developer projections, not incentives, and are not recorded as subsidies. Status: the developer's own site calls the project \"proposed\" and \"being evaluated\"; no construction start is reported. Coordinates are the Prichard municipal centroid. WKRG reports that the developer wants to build on Telegraph Road, but no street address or parcel appeared in any source retrieved as of October 2026.","src":[{"u":"https://projectgatewayal.com/","t":"Project Gateway | Sustainable Data Center Development in Prichard, AL (developer's project site)","p":"Edged US"},{"u":"https://www.fox10tv.com/2026/06/01/proposed-data-center-prichard-draws-mixed-reactions/","t":"Proposed data center in Prichard draws mixed reactions (1 June 2026)","p":"FOX10 News (WALA)"}],"j":"city","jc":"Mobile County","jn":"Prichard","jd":"city","ju":"approx"},{"id":"google-jackson-county-stevenson-al","n":"Google Jackson County Campus","op":"Google","s":"operational","st":"AL","city":"Stevenson","co":"Jackson","lat":34.8842,"lon":-85.755,"pre":"approximate","cf":"confirmed","ac":360,"inv":1500000000,"ann":"2015-06-24","upd":"2026-10-30","pb":"Tennessee Valley Authority (TVA)","nt":"Campus operational since 2019 at the former TVA Widows Creek coal-plant site (~4.8 mi east of Stevenson). Recorded status is operational (the campus is built and running); a $1.5B expansion announced June 15 2026 is under construction for 2026-2027 (captured in the status history). Capacity is omitted: the widely cited 300 MW is Google's contracted new generation across the Tennessee Valley region, not a campus-specific figure. TVA partnership also includes a 2025 Kairos Power agreement for up to 50 MW of advanced nuclear for Google's AL/TN data centers (~2035). The construction workforce of 1,000+ is a projection for the expansion (Alabama Reporter: \"More than 1,000 contract workers are expected to participate during various phases of the expansion.\") and is recorded as 1,000 construction jobs. Baxtel labels this 'Google Bridgeport'; TVA, Wikipedia and the postal code (35772) place Widows Creek near Stevenson, so Stevenson is used. 360-acre site; coordinates from the Widows Creek plant.","src":[{"u":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/","t":"Google Blog: Alabama Investment - Jackson County Campus Expansion (June 2026)","p":"Google"},{"u":"https://www.datacenterdynamics.com/en/news/google-to-spend-15bn-expanding-its-data-center-campus-in-jackson-county-alabama/","t":"Google to spend $1.5bn expanding Jackson County campus","p":"Data Center Dynamics"}],"j":"uninc","jc":"Jackson County","ju":"approx"},{"id":"meta-huntsville-al","n":"Meta Huntsville Data Center Campus","op":"Meta","s":"operational","st":"AL","city":"Huntsville","co":"Madison","lat":34.726,"lon":-86.647,"pre":"approximate","cf":"confirmed","inv":1500000000,"ann":"2018","upd":"2026-10-22","nt":"Address: 5400 Prosperity Dr NW, Huntsville, AL. The pin is approximate and does not mark the campus, which Baxtel places in the North Huntsville Industrial Park and the Huntsville Business Journal places \"in north Huntsville near Toney.\" Original 2.5M sq ft campus operational; expansion to 3.5M sq ft paused December 2022 for AI architecture redesign; Meta stated no intent to abandon site. Over 85 grants and $4.2M in sponsorships to Huntsville-area schools since 2019. Meta's stated investment rose to more than $1.5B with the June 2022 expansion (original 2018 build ~$750M); the 3.5M-sq-ft expansion was later paused for AI redesign, so the ultimately realized figure is uncertain. Alabama's standard data-center abatement (Chapter 9B) likely applies, but no dollar figure was found in public sources. Status is operational: the 'expansion next to be stopped amid AI pivot' story dates from December 2022 and describes a temporary construction pause of a portion of the expansion pending a redesign; Meta explicitly did not cancel the project (unlike its Denmark site). The campus itself broke ground in 2018 and has been operating since 2021; Meta's current info sheet still describes operational buildings there. The operating campus and the paused expansion phase are two different things, and the campus is what is tracked here. The 2022 partial-expansion pause is context, not a status change. As of September 2026, no source published after 2022 was found stating that the paused portion has either resumed or been cancelled, so that phase's present state is unresolved. The Huntsville Business Journal (23 September 2026) repeats the June 2022 plan to add two buildings, \"bringing the campus to nearly 3.5 million square feet\", without saying whether that work resumed; a local group quoted in the article asked \"what phase this development is in now.\"","src":[{"u":"https://www.datacenterdynamics.com/en/news/metas-huntsville-alabama-data-center-expansion-next-to-be-stopped-amid-ai-pivot/","t":"Meta's Huntsville, Alabama, data center expansion next to be stopped amid AI pivot","p":"Data Center Dynamics"},{"u":"https://baxtel.com/data-center/meta-huntsville-campus","t":"Meta Huntsville Campus Data Center","p":"Baxtel"}],"j":"city","jc":"Madison County","jn":"Huntsville","jd":"city","ju":"approx"},{"id":"meta-montgomery-al","n":"Meta Montgomery Data Center","op":"Meta","s":"under_construction","st":"AL","city":"Montgomery","co":"Montgomery","lat":32.185,"lon":-86.273,"pre":"approximate","cf":"confirmed","inv":1500000000,"ann":"2024-05","upd":"2026-10-22","nt":"Located off I-65 in southern Montgomery County across from Hyundai Motor Manufacturing Alabama (HMMA) plant (Hope Hull area, approximately I-65 Exit 164). The pin (~32.185 N, ~86.273 W) is approximate and does not mark the site, which the governor's announcement places off Interstate 65 \"across from the Hyundai automotive assembly plant\". Originally announced as $800M, expanded September 2025 to $1.5B with 1.3M sq ft footprint. Expected online end of 2026. Meta's 24th global data hub and 20th in the US. Subsidies: no subsidy is recorded for any of the seven Alabama records, not just this one, for a statewide reason. Alabama's Data Processing Center incentive program has no per-company reporting requirement, and neither the state nor its agencies publish which data center operators receive abatements or in what amount. Meta is named as a beneficiary of the sales-tax exemption but no dollar figure attaches to it. This is a disclosure gap, not a GASB 77 audited negative: no municipal ACFR tax-abatement note was obtained, so it does not establish that a particular city has no agreement with a particular operator. Any future subsidy entry for an Alabama site will most likely have to come from a city or county resolution rather than from a state source.","src":[{"u":"https://governor.alabama.gov/newsroom/2024/05/governor-ivey-announces-meta-plans-to-build-800-million-next-generation-data-center-in-montgomery/","t":"Governor Ivey Announces Meta Plans to Build $800 Million Data Center in Montgomery","p":"Office of the Governor, Alabama"},{"u":"https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/","t":"Meta to expand Montgomery data center, upping local investments to $1.5 billion","p":"Alabama Reporter"}],"j":"uninc","jc":"Montgomery County","ju":"approx"},{"id":"nebius-bhm01-birmingham-al","n":"Nebius Birmingham AI Factory (BHM01)","op":"Nebius Group","s":"under_construction","st":"AL","city":"Birmingham","co":"Jefferson","lat":33.4556,"lon":-86.8131,"pre":"approximate","cf":"confirmed","mw":300,"ac":75,"ann":"2025-09-30","upd":"2026-10-28","pb":"Alabama Power (APCO)","nt":"Nebius Group's Birmingham AI Factory (site code BHM01); distinct from the Nebius Vineland Data Center and the Nebius AI Factory (Independence). Capacity phased: Phase I = 100 MW (targeted H2 2026), Phase II adds 200 MW (full 300 MW by 2027-2028). Land acquisition $90M confirmed (2025-09-30); ~$855M in construction permits issued (April 2026) with $2.1B more under review; total capex described as 'tens of billions' (a projection) - so no investment figure is recorded. Reported job figures vary: BirminghamWatch (April 2026) reported Nebius representatives saying the AI factory would provide more than 100 jobs; Bham Now (May 2026) reported that officials said the center would employ approximately 100 people; al.com, republished by GovTech (September 2026), reported 78 jobs. No permanent-job count is recorded because the reported figures conflict and two of them are approximate or open-ended. Nebius's own Birmingham page says in one place that the project will create 1,000+ skilled construction jobs and in its FAQ that it will create hundreds. Site: former Regions Lakeshore Operations Center (about 75 acres per Nebius's project page, Yellowhammer News and GovTech; Baxtel lists 80) acquired from UAB, Regions Bank, and U.S. Steel; general contractor Hoar Construction. Coordinates address-approximate (201 Milan Pkwy, Oxmoor Corporate Park).","src":[{"u":"https://nebius.com/birminghamal","t":"Nebius x Birmingham, Alabama - Official Project Page","p":"Nebius Group"},{"u":"https://www.datacenterdynamics.com/en/news/nebius-targets-data-center-development-in-birmingham-alabama/","t":"Nebius targets data center development in Birmingham, Alabama","p":"Data Center Dynamics"}],"j":"city","jc":"Jefferson County","jn":"Homewood","jd":"city","ju":"approx"},{"id":"patmos-fairfield-al","n":"Patmos Fairfield Colocation Data Center","op":"Patmos","s":"proposed","st":"AL","city":"Fairfield","co":"Jefferson","lat":33.4917,"lon":-86.915,"pre":"approximate","cf":"confirmed","mw":45,"ac":16,"inv":150000000,"upd":"2026-10-28","nt":"Retrofit of a former Walmart Supercenter in Fairfield into a colocation data center. WBRC states: \"Patmos would bring around 50 long-term jobs, plus roughly 120 construction workers during the build\" and \"If approved, construction could start in September, with the first phase completed by January or February 2027 and a larger expansion planned for 2028.\" WBRC gives no capacity or investment figure. WBHM (14 Aug 2026) reports that Patmos expects an initial 20 MW phase costing about $150 million and a site that eventually reaches 45 MW; the record carries the 45 MW full-buildout figure, and the $150 million investment figure covers only the initial 20 MW phase. WBRC attributes about 120 construction workers to the Fairfield build, while WBHM reports that figure as the peak construction workforce at Patmos's Kansas City project, so no construction-job figure is recorded. As of October 2026, the only street address, 7201 Aaron Aronov Dr, comes from the Baxtel listing; neither news account repeats it, and it geocodes to Western Hills Mall in OpenStreetMap, so it is not confirmed as the former Walmart and no street address is recorded. Coordinates are the Fairfield municipal centroid, not the building: the news sources identify the site only as \"the former Walmart Supercenter\" without a street address, and as of September 2026 no Walmart-named or former-retail building was found in OpenStreetMap within Fairfield's bounds. Status: the record is listed as proposed — construction was conditional on approval as of 13 Aug 2026, and as of September 2026 it was not confirmed whether the September 2026 groundbreaking happened. This is a genuinely distinct site from QTS Bessemer (Project Marvel) — different operator, different city — though both sit in the same Birmingham-west corridor.","src":[{"u":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","t":"Hundreds pack Fairfield town hall over proposed data center inside former Walmart (13 Aug 2026)","p":"WBRC FOX6 News"},{"u":"https://nominatim.openstreetmap.org/search?q=Fairfield%2C+Jefferson+County%2C+Alabama&format=json&limit=1","t":"Nominatim geocode of Fairfield, Jefferson County, Alabama (municipal centroid)","p":"OpenStreetMap / Nominatim"}],"j":"city","jc":"Jefferson County","jn":"Fairfield","jd":"city","ju":"approx"},{"id":"cloverleaf-red-clay-lowndes-al","n":"Project Red Clay","op":"Cloverleaf Infrastructure","s":"proposed","st":"AL","co":"Lowndes","lat":32.27,"lon":-86.5128,"pre":"approximate","cf":"confirmed","ac":800,"inv":1500000000,"upd":"2026-11-04","nt":"Subsidy: no formal abatement request had been filed as of 24 July 2026, according to Yellowhammer News, which reports that the granting body would be the Lowndes County Commission. Under legislation signed by Gov. Kay Ivey in April 2026, an abatement approved before 1 January 2027 could run up to 30 years; after that date the maximum is 20 years. In October 2026 the Lowndes County Commission voted 3-2 to approve the tax abatements and project agreement; AL.com, republished by GovTech, reports the county granted \"more than $1.1 billion in tax abatements\", including 50% of the county non-educational property tax and the construction and server equipment refresh sales and use tax. No named tenant: Yellowhammer describes Cloverleaf as a Houston- and Seattle-based speculative developer assembling land for an unnamed future operator; the AI classification is therefore likely, not confirmed. Investment is \"$1.5 billion\" per WSFA and Route Fifty (\"at least $1.5 billion in the development stage\"), which is the floor recorded. The developer's own site, which said \"Over a $1 billion taxable investment in Lowndes County\" in September 2026, states no investment figure as of October 2026. Jobs: as of October 2026 the developer's site says the project will employ \"more than 1,000 construction workers\" and that full-time roles \"will grow from 225 initially to over 300 at full scale\"; the recorded figures are those floors (more than 1,000 construction jobs, over 300 full-time jobs at full scale). Other coverage that could not be retrieved as of September 2026 cites 1,000-1,500 construction and over 200 permanent jobs. Footprint: \"more than 800 acres in northeast Lowndes County\" and \"2.88 million square feet\" (Yellowhammer). Zoning: reporting notes Cloverleaf could buy and develop here because Lowndes County has no planning or zoning authority. Coordinates are the OSM-confirmed U.S. 80 / AL 21 junction that WSFA names as the site vicinity, not a parcel boundary; the actual footprint is somewhere in northeast Lowndes County near that junction.","src":[{"u":"https://redclaydatacenter.com/","t":"Home - Project Red Clay (developer's project site)","p":"Cloverleaf Infrastructure"},{"u":"https://www.wsfa.com/2026/06/04/cloverleaf-responds-lowndes-county-data-center-concerns-after-weeks-resident-pushback/","t":"Cloverleaf responds to Lowndes County data center concerns after weeks of resident pushback (4 June 2026)","p":"WSFA 12 News"}],"j":"uninc","jc":"Lowndes County","ju":"approx"},{"id":"qts-marvel-bessemer-al","n":"QTS Bessemer (Project Marvel)","op":"QTS Data Centers","s":"proposed","st":"AL","city":"Bessemer","co":"Jefferson","lat":33.44,"lon":-86.97,"pre":"approximate","cf":"reported","mw":1200,"ac":1607,"inv":14500000000,"ann":"2025","upd":"2026-11-04","pb":"Alabama Power","nt":"Codename: Project Marvel. 18-building hyperscale campus on Red Ridge near I-459 and I-20/59 interchange in Bessemer (Jefferson County). Announced capacity: up to 1,200 MW at full build-out — reported as a planned ceiling, roughly 9% of Alabama Power's current generating capacity; recorded as a planned capacity of 1,200 MW (an announced 'up to' full-build-out ceiling, consistent with how the dataset records other announced full-build-out figures). Investment: TPA Group's Adam Rashid told the Bessemer City Council in November 2025 that the overall capital investment is expected to be $14.5 billion (WBRC), and that figure is recorded as the investment figure; other reports put it at about $14–14.4B (Logistics Land Investment anticipated 'close to $14.4B'; DCD reported ~$14B), and QTS's own July 2026 statement gives no dollar amount. Land: ~1,607.42 acres total after two rezoning rounds (initial ~700 acres November 2025 + 914-acre expansion April 2026). QTS affiliate purchased land from TPA Group affiliate for $431.73M. Chapter 9B statutory eligibility would have provided a 30-year abatement estimated at $500M+; QTS committed not to seek local property tax incentives (per WBRC July 2026) — no subsidy is recorded, as eligibility does not equal award and QTS renounced pursuit. Full buildout timeline: 7+ years. Birmingham Business Alliance estimated ~$4B net benefit over 30 years; Bessemer City Schools projected ~$25M/year. AI framing not officially confirmed by QTS or the city as of July 2026 — size and scale (hyperscale, cloud/AI demand framing in QTS statement) support an AI classification of likely. Coordinates are approximate for the Red Ridge parcel area. Jobs: ~1,000 construction and ~330 permanent are projected figures for the proposed (not-yet-built) campus (WBRC, Nov 2025), and are recorded as the construction and permanent jobs figures. QTS Data Centers is owned by Blackstone (2021 take-private). Status: Bessemer approved land-use rezonings for this campus in November 2025 and again (914 acres) in April 2026, which, if a rezoning approval is treated as permitted, could argue for permitted rather than proposed. Status is kept at proposed because the cited source dated 2026-07-02 postdates both rezonings and still describes the campus as proposed, and no building permit or site-preparation start was found in any cited source.","src":[{"u":"https://www.wbrc.com/2026/07/02/qts-confirms-plans-proposed-data-center-campus-bessemer/","t":"QTS confirms plans for proposed data center campus in Bessemer","p":"WBRC Fox6"},{"u":"https://constructionreviewonline.com/purported-developer-of-14bn-project-marvel-data-center-in-bessemer-alabama-unveiled-as-qts/","t":"Purported Developer of $14bn Project Marvel Data Center in Bessemer Unveiled as QTS","p":"Construction Review Online"}],"j":"uninc","jc":"Jefferson County","ju":"approx"},{"id":"university-of-alabama-hpc-tuscaloosa-al","n":"University of Alabama High Performance Computing and Data Center","op":"University of Alabama","s":"under_construction","st":"AL","city":"Tuscaloosa","co":"Tuscaloosa","lat":33.2121,"lon":-87.5397,"pre":"approximate","cf":"confirmed","mw":14.6,"inv":96000000,"ann":"2024-11","upd":"2026-10-18","nt":"University research computing facility on the eastern edge of the Tuscaloosa campus, not a commercial colocation or hyperscale site. UA states verbatim: \"The facility's 40,000 square feet will allow for a substantial increase in UA's computing power\" and \"an estimated $25 million of computing power\"; it will host a \"petascale computing system, meaning it will be capable of performing quadrillions of calculations per second\" and be the \"only system in Alabama to meet the benchmarks for the Top500 list\". The University of Alabama News article names a U.S. Department of Commerce NIST disbursement plus an Alabama Education Trust Fund appropriation approved by the legislature and Gov. Ivey in 2023, but states no dollar totals for either. The university's Building Bama project page lists a \"BOT Budget $96,000,000\" with funding sources \"Federal NIST Grant (2023-NIST-CICGP-01) : $44,550,000\", \"State Appropriation (Act #2023-378/SB-87) : $46,000,000\" and \"UA Central Reserves : $5,450,000\"; the $96 million budget is recorded as the investment figure. The $25M is computing equipment, not construction investment, and is not used as the investment figure. No MW figure appears in the University of Alabama News article. The planned capacity is from the university's HPC center About page, which states \"The building is master-planned for 14.6 MW of computing power\" and lists \"5 mW+ of HPC power available, scalable to 16 mW+\". Status is recorded as under construction: the university's Building Bama project page lists the project as active construction with a scheduled construction end of November 2026, and the HPC center page says \"Opening in early 2027\". Coordinates are the campus centroid, not the building on the eastern edge of campus.","src":[{"u":"https://news.ua.edu/2024/11/stage-iv-approval-for-high-performance-computing-center/","t":"High Performance Computing and Data Center Construction Ready to Begin","p":"University of Alabama News"},{"u":"https://nominatim.openstreetmap.org/search?q=University+of+Alabama%2C+Tuscaloosa%2C+Alabama&format=json&limit=1","t":"Nominatim geocode of the University of Alabama campus, Tuscaloosa","p":"OpenStreetMap / Nominatim"}],"j":"city","jc":"Tuscaloosa County","jn":"Tuscaloosa","jd":"city","ju":"approx"},{"id":"western-hospitality-childersburg-al","n":"Western Hospitality Childersburg Campus","op":"Western Hospitality Partners","s":"proposed","st":"AL","city":"Childersburg","co":"Talladega","lat":33.2782,"lon":-86.355,"pre":"approximate","cf":"reported","ac":486,"inv":6000000000,"upd":"2026-09-09","nt":"This record is weakly sourced. The only cited source is Baxtel, a data-center marketplace aggregator, which states: Childersburg Industrial Park (formerly the Alabama Ordnance Works), 486 acres, \"a $6 billion proposed investment\", \"advanced glycol-based closed-loop cooling\", \"over 200 permanent positions and approximately 2,000 construction jobs\", status \"Future facility in planning with land secured\", year planned 2029, currently in due-diligence assessment of environmental readiness for the former military site. Confidence is therefore \"reported\", not \"confirmed\". Figures omitted because no cited source states them: a 500 MW capacity (asserted by cleanview.co and servercountry.org, neither cited here) and a ~$17 million city land-purchase agreement for the 486 acres (search-summary only). As of September 2026, primary coverage by Inside Climate News (23 Jan 2026, \"This Small Alabama Town Was Part of the Manhattan Project...\") and its WBHM syndication could not be retrieved, so neither is cited. Coordinates are the Childersburg municipal centroid, not the industrial-park parcel — \"Childersburg Industrial Park\" and \"Alabama Ordnance Works\" both return empty from Nominatim. Site history: the Alabama Ordnance Works / Alabama Army Ammunition Plant, a WWII-era Manhattan Project-adjacent munitions site, which is why environmental due diligence is the gating step. Sylacauga News reported on 18 November 2025 that the Childersburg City Council approved Resolution 2025-29 authorizing the mayor, as Local Redevelopment Authority chairman, to execute a purchase sales agreement for about 487 acres in the industrial park, subject to review and approval of the final agreement; the report does not name the buyer. WVTM reported in July 2026 that council members said no offer to purchase the property had been made.","src":[{"u":"https://baxtel.com/data-center/western-hospitality-childersburg-campus","t":"Western Hospitality: Childersburg Campus","p":"Baxtel"}],"j":"city","jc":"Talladega County","jn":"Childersburg","jd":"city","ju":"approx"},{"id":"avaio-digital-leo-little-rock-ar","n":"AVAIO Digital Leo Campus","op":"AVAIO Digital Partners","s":"proposed","st":"AR","co":"Pulaski","lat":34.68,"lon":-92.296,"pre":"approximate","cf":"confirmed","ac":760,"inv":6000000000,"ann":"2026-01","upd":"2026-10-28","nt":"Location: off Interstate 530 near 145th Street, Pulaski County; coordinates are approximate for the I-530 corridor south of Little Rock. Named after the Leo constellation. Initial $6B investment may grow to $21B through full build-out. First phase completion targeted June 2027. Campus sits near long-haul fiber routes connecting Dallas, Atlanta, and Memphis. A Q1 2026 construction start was planned as of announcement. As of October 2026, AVAIO's development page says AVAIO \"has broken ground\" on the campus, while at a July 13, 2026 community meeting AVAIO's project manager said construction was expected to begin in early 2027, with the permits needed to start earthworks in hand (Arkansas Times); the record is listed as proposed. The 760-acre land area is the site size given in the January 2026 announcement and the July 2026 Arkansas Times account; as of October 2026, AVAIO's development page describes a 296-acre project located about 7.7 km from the map pin, which stays approximate. The January 2026 announcement says AVAIO anticipates power demand of up to 1 GW as the facility grows; that is a ceiling on power demand, not IT capacity, so no planned capacity is recorded. The energy source is mixed rather than on-site gas. The 150 MW figure is the Entergy Arkansas grid supply contract, not on-site generation, and as of July 2026 on-site gas capacity was unquantified in sources. The recorded 500 MW of on-site generation is from AVAIO's development page for the campus, which lists \"500 MW Total Baseload BTM\" (behind the meter) alongside \"570 MW Total Grid Power\" and \"1,070 MW Total Baseload Power\"; as of October 2026, the page does not name the fuel for the behind-the-meter capacity. Arkansas's data-center sales-and-use tax exemption (Act 819 of 2023, expanded by Act 548 of 2025) likely applies given the investment scale. AVAIO's development page states that \"the State of Arkansas offers substantial Sales and Use Tax incentives for data center tenants, reducing total cost of ownership on qualifying capital expenditures\", but as of October 2026 names no award or amount; as of July 2026 no AVAIO-specific incentive award had been published.","src":[{"u":"https://www.arkansasedc.com/news-events/newsroom/detail/2026/01/12/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock--arkansas","t":"AVAIO Digital Announces New Large-Scale AI-Ready Data Center and Power Campus in Little Rock, Arkansas","p":"Arkansas Economic Development Commission"},{"u":"https://www.prnewswire.com/news-releases/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock-arkansas-302658354.html","t":"AVAIO Digital Announces New Large-Scale AI-Ready Data Center and Power Campus in Little Rock, Arkansas","p":"PR Newswire"}],"j":"city","jc":"Pulaski County","jn":"Little Rock","jd":"city","ju":"approx"},{"id":"bentaus-chadbourn-miller-county-ar","n":"Bentaus Texarkana AI Data Center (Chadbourne Ranch site)","op":"Bentaus","s":"proposed","st":"AR","co":"Miller","lat":33.4818,"lon":-93.9641,"pre":"approximate","cf":"reported","mw":200,"ac":2700,"ann":"2026-02-03","upd":"2026-11-04","nt":"Coordinates are the OpenStreetMap point for Mandeville, the nearest named community inside the block of parcels described by the Texarkana Gazette - 'bordered on the west by U.S. 71, on the north by Arkansas 108 and on the south roughly by Interstate 49.' This is a nearest-community approximation only; no source gives coordinates or a street address, and the pin has not been confirmed to fall inside the assembled tract. Landowner and co-developer: Fort Chadbourne Farm LLC and Chadbourn Infrastructure Partners LLC, both with Michael 'Jacques' Davison of Bradley, Arkansas as sole corporate officer; a third entity, Chadbourn Energy Park LLC, was formed in February 2026. About 2,300 acres were marketed as Chadbourne Ranch and sold in October 2025 for $5.165 million. The record is marked reported rather than confirmed because the two newspaper accounts are from the same ownership group and the developer has not confirmed status; the 200 MW figure is the developer's own announcement, not a utility or permit record.","src":[{"u":"https://www.texarkanagazette.com/news/2026/aug/15/public-records-reveal-site-of-planned-ai-data/","t":"Public records reveal site of planned AI data center north of Texarkana, Arkansas","p":"Texarkana Gazette"},{"u":"https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/","t":"Records reveal planned data center site in Miller County north of Texarkana","p":"Arkansas Democrat-Gazette"}],"j":"uninc","jc":"Miller County","ju":"approx"},{"id":"google-west-memphis-ar","n":"Google West Memphis Data Center Campus","op":"Google","s":"under_construction","st":"AR","city":"West Memphis","co":"Crittenden","lat":35.156,"lon":-90.175,"pre":"approximate","cf":"confirmed","ac":1178,"inv":4000000000,"ann":"2025-10","upd":"2026-11-05","nt":"Campus on Bolliger Road, West Memphis. Coordinates approximate for the Bolliger Road industrial area. $4B is Phase 1 through 2027; total planned investment is $10B, which would be the largest private capital investment in Arkansas history. Five data center buildings on 920-acre campus footprint within a 1,178-acre site (per U.S. Army Corps of Engineers filing). A 5,000 construction-jobs figure, unsourced as of July 2026, is not recorded: AEDC states only 'thousands'. The facility draws from Entergy Arkansas, so the energy source is the grid; Arkansas Cypress Solar is a companion renewable project. The site area is 1,178 acres per the Army Corps filing, not 1,200.","src":[{"u":"https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment","t":"Google Locating New Data Center in West Memphis, Arkansas with Multi-Billion Dollar Investment","p":"Arkansas Economic Development Commission"},{"u":"https://arkansasadvocate.com/2025/10/02/google-state-and-local-officials-mark-start-of-4-billion-ai-data-center-in-west-memphis/","t":"Google, state and local officials mark start of $4 billion AI data center in West Memphis","p":"Arkansas Advocate"}],"j":"city","jc":"Crittenden County","jn":"West Memphis","jd":"city","ju":"approx"},{"id":"undisclosed-lollie-road-conway-ar","n":"Lollie Road Data Center Campus","op":"Undisclosed","s":"proposed","st":"AR","city":"Conway","co":"Faulkner","lat":35.0887,"lon":-92.4421,"pre":"approximate","cf":"reported","ac":700,"inv":1000000000,"ann":"2025-06","upd":"2026-08-25","nt":"More than 700 acres on Lollie Road, bought in June 2025 and in engineering and design. The buyer has not been identified publicly, which is why the operator reads Undisclosed — and why residents reporting this site wrote that they did not know who was behind it. About $1bn to build and another $1bn to equip a 300,000 sq ft building with support structures; later phases could take it to $10bn, but only the first phase is recorded. Roughly 50 jobs, against a 65% tax abatement for 30 years.","src":[{"u":"https://www.datacenterdynamics.com/en/news/plans-for-300000-sq-ft-data-center-put-forward-in-conway-arkansas/","t":"Plans for 300,000 sq ft data center put forward in Conway, Arkansas","p":"Data Center Dynamics"},{"u":"https://www.arkansasbusiness.com/article/data-boom-proposed-data-center-would-bring-historic-investment-and-revenue/","t":"Data Boom: Proposed data center would bring historic investment and revenue","p":"Arkansas Business"}],"j":"city","jc":"Faulkner County","jn":"Conway","jd":"city","ju":"approx"},{"id":"serverfarm-clarksville-ar","n":"Serverfarm Clarksville Campus (ARK)","op":"Serverfarm","s":"under_construction","st":"AR","city":"Clarksville","co":"Johnson","lat":35.4539,"lon":-93.4816,"pre":"approximate","cf":"confirmed","ac":135,"inv":6600000000,"ann":"2025","upd":"2026-08-25","nt":"Six buildings of 360,000 sq ft each on 135 acres, secured in early 2025 through the affiliate SF ARK1 LLC, with construction started in 2026 and the first two buildings due by January 2028. Investment is reported as $6.6bn locally and $8bn elsewhere; the lower, locally sourced figure is recorded. Projected at about $558m in local public benefit through 2060, mostly PILOT payments. No megawatt figure is published.","src":[{"u":"https://arkansasadvocate.com/2026/07/20/mixed-opinions-limited-information-about-6-6-billion-data-center-in-arkansas-river-valley/","t":"Mixed opinions, limited information about $6.6 billion data center in Arkansas River Valley","p":"Arkansas Advocate"},{"u":"https://www.datacenterdynamics.com/en/news/serverfarm-targets-135-acre-data-center-campus-in-arkansas/","t":"Serverfarm targets 135-acre data center campus in Arkansas","p":"Data Center Dynamics"}],"j":"city","jc":"Johnson County","jn":"Clarksville","jd":"city","ju":"approx"},{"id":"aws-laveen-az","n":"AWS Laveen Data Center Campus","op":"Amazon Web Services","s":"proposed","st":"AZ","city":"Laveen","co":"Maricopa","lat":33.3727,"lon":-112.1669,"pre":"approximate","cf":"reported","ac":220,"ann":"2024-10","upd":"2026-10-22","nt":"~220-acre land acquisition ($277M) near Loop 202 & Dobbins Rd, Laveen (Phoenix), Maricopa County. No capacity, utility, or AI-specific program announced as of July 2026 — recorded as proposed, with a mixed-use AI classification, pending a construction announcement. Coordinates are the Laveen area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-acquires-220-acres-in-phoenix-arizona-for-possible-data-center/","t":"Amazon acquires 220 acres in Phoenix, Arizona for possible data center","p":"Data Center Dynamics"},{"u":"https://www.aztechcouncil.org/amazon-buys-massive-valley-site-for-potential-data-center/","t":"Arizona Technology Council — Amazon buys massive Valley site","p":""}],"j":"city","jc":"Maricopa County","jn":"Phoenix","jd":"city","ju":"approx"},{"id":"aligned-phx-01-02-03-az","n":"Aligned PHX-01/02/03","op":"Aligned Data Centers","s":"operational","st":"AZ","city":"Phoenix","co":"Maricopa","lat":33.6591,"lon":-112.1112,"pre":"exact","cf":"reported","ac":55,"upd":"2026-09-02","pb":"APS grid + 63MW on-site microgrid (natural gas generation)","nt":"Confirmed operational via Aligned's Phoenix directory page; 55-acre Union Hills campus, PHX-01/02/03/05 buildings. AI/HPC (likely): Phoenix hosts Aligned Advanced Cooling Lab; DeltaFlow supports highest-density GPUs.","src":[{"u":"https://aligneddc.com/phoenix/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/155739337","t":"OpenStreetMap way/155739337","p":"OpenStreetMap"}],"j":"city","jc":"Maricopa County","jn":"Phoenix","jd":"city"},{"id":"aligned-phx13-glendale-az","n":"Aligned PHX-13","op":"Aligned Data Centers","s":"under_construction","st":"AZ","city":"Glendale","co":"Maricopa","lat":33.5387,"lon":-112.186,"pre":"approximate","cf":"confirmed","mw":72,"ann":"2025-04","upd":"2026-10-28","nt":"PHX-13, a 72 MW facility in Glendale, Maricopa County, the first of four planned facilities on Aligned's 100-acre Glendale campus. The 100 acres cover the whole campus, so no land area is recorded for this facility. Coordinates are the Glendale area centroid. Data Center Dynamics reports that Aligned acquired 100 acres at 8785 N Reems Rd in December 2024 for $86.5M from LXP Industrial Trust, and also reports that PHX-13 is reportedly at 8805 N Reems Rd while another Aligned facility, PHX-07, is at 8785; as of October 2026, no cited source confirms that the purchase is the PHX-13 site. The $86.5M is land cost, not campus capex -> no investment figure is recorded. No job counts disclosed -> no job count is recorded. The campus likely uses Arizona's statutory data-center TPT exemption (A.R.S. 41-1519), but no ACA certification or GPLET agreement for this campus is public -> no subsidy is recorded.","src":[{"u":"https://news.constructconnect.com/aligned-data-centers-breaks-ground-in-glendale-expanding-arizona-infrastructure","t":"Aligned Data Centers breaks ground in Glendale, expanding Arizona infrastructure","p":"ConstructConnect"},{"u":"https://dcnnmagazine.com/data-centres/aligned-data-centers-breaks-ground-on-glendale-facility/","t":"Aligned Data Centers breaks ground on Glendale facility (APS 230 kV line; closed-loop cooling)","p":"DCNN Magazine"}],"j":"city","jc":"Maricopa County","jn":"Glendale","jd":"city","ju":"approx"},{"id":"apple-mesa-az","n":"Apple Mesa Data Center (Global Command Center)","op":"Apple","s":"operational","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.3615,"lon":-111.6012,"pre":"approximate","cf":"confirmed","ac":83.17,"inv":2000000000,"ann":"2015","upd":"2026-08-31","pb":"Bonnybrooke Solar Farm (Florence, AZ), 50MW, delivered via SRP under a 25-year wholesale PPA","nt":"Apple's Global Data and Command Center at 3740 S Signal Butte Rd, Mesa, Maricopa County — a converted former GT Advanced sapphire plant (~1.3M sq ft), operational in the ~2016-2018 window, a $2B investment (Mesa Now / Data Center Knowledge), solar-powered. Functions as Apple's worldwide data-center monitoring/command hub. Apple's Feb 2025 newsroom names Arizona among states for continued data-center capacity expansion. As of July 2026, no site-specific IT-load MW is disclosed. A January 2014 Federal Register notice from the Foreign-Trade Zones Board describes the proposed subzone at 3740 S. Signal Butte Rd as 83.17 acres. Coordinates are an approximate geocode of the Signal Butte Rd address, not a surveyed building footprint.","src":[{"u":"https://mesanow.org/news/public/article/2149","t":"Grand opening for Apple's Arizona Data and Global Command Center in Mesa — $2B, 1.3M sq ft","p":"Mesa Now (Mesa economic development)"},{"u":"https://www.datacenterknowledge.com/business/step-inside-apple-s-data-center-in-arizona-courtesy-of-the-arizona-republic","t":"Step Inside Apple's Data Center in Arizona — 1.3M sq ft, latest expansion completed April 2018","p":"Data Center Knowledge"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"tract-buckeye-tech-corridor-az","n":"Buckeye Tech Corridor","op":"Tract","s":"permitted","st":"AZ","city":"Buckeye","co":"Maricopa","lat":33.4136,"lon":-112.7203,"pre":"approximate","cf":"reported","mw":1800,"ac":2069,"inv":20000000000,"ann":"2025-02","upd":"2026-11-04","nt":"Master-planned data center park on a ~2,069-acre former residential (Cipriani) parcel Tract acquired for ~$136M, south of I-10 in Buckeye; planned for up to ~20M sq ft across as many as 40 data centers at full build-out over ~15 years (~$20B). Coordinates are an approximate town-level geocode (Buckeye, south of I-10), not a parcel-confirmed point. The City of Buckeye executed a development agreement with AZLCO Buckeye, LLC (Ordinance No. 08-24, adopted unanimously 2024-08-06). It reimburses the developer for six enumerated regional infrastructure components it builds and dedicates to the city — two public-safety sites, temporary and permanent public-safety facilities, $15M toward the Johnson Road interchange, and oversized regional water infrastructure — funded by 20% of the tax revenue the project itself generates, beginning only after the city has received $60M cumulatively and terminating 20 years from the effective date. It is capped at \"the lesser of\" the developer's verified costs or $50,000,000, so it cannot exceed what the developer actually spent; it is cost recovery for public infrastructure rather than an incentive, abatement or credit, and is therefore not recorded as a subsidy. Nothing has been paid to date. Buckeye's economic-development director has projected \"more than 360 jobs at full build out\" — an end-state across as many as 40 separate future data centers, none yet leased, permitted or built, and so not recorded as a permanent-jobs figure for this site. A search of 226 Buckeye Council and P&Z agendas (Feb 2024 – Aug 2026) found no GPLET and no Foreign Trade Zone instrument.","src":[{"u":"https://www.datacenterdynamics.com/en/news/tract-plans-1700-acre-data-center-campus-in-phoenix-arizona/","t":"Tract plans 1,700-acre data center campus in Phoenix, Arizona","p":"Data Center Dynamics"},{"u":"https://azbigmedia.com/real-estate/2069-acre-parcel-will-become-a20-billion-data-center-park-in-buckeye/","t":"2,069-acre parcel will become a $20 billion data center park in Buckeye","p":"AZ Big Media"}],"j":"city","jc":"Maricopa County","jn":"Buckeye","jd":"city","ju":"approx"},{"id":"digital-realty-phx15-az","n":"Digital Realty PHX15","op":"Digital Realty","s":"operational","st":"AZ","city":"Chandler","co":"Maricopa","lat":33.2749,"lon":-111.8866,"pre":"exact","cf":"reported","upd":"2026-07-23","nt":"Directory confirms address 2121 S Price Road, Chandler AZ; site supports high-density AI/HPC deployments per operator page.","src":[{"u":"https://www.digitalrealty.com/data-centers/americas/phoenix/phx15","t":"Digital Realty official facility page (PHX15, 2121 S Price Road, Chandler)","p":"Digital Realty"},{"u":"https://www.openstreetmap.org/way/300952513","t":"OpenStreetMap way/300952513","p":"OpenStreetMap"}],"j":"city","jc":"Maricopa County","jn":"Chandler","jd":"city"},{"id":"edgecore-mesa-az","n":"EdgeCore Mesa Data Center Campus","op":"EdgeCore Digital Infrastructure","s":"operational","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.375,"lon":-111.6497,"pre":"approximate","cf":"confirmed","mw":450,"ac":84,"ann":"2022-01","upd":"2026-10-22","nt":"Elliot Road Technology Corridor, Mesa. CEO stated 'Greater Phoenix is fast becoming the AI center of the West.' Expansion land purchase adds 43.87 acres to 40-acre original site. EdgeCore raised $2B equity and $2B debt in 2024. Coordinates approximate for Elliot Road corridor. Arizona's data-center sales/use-tax exemption (A.R.S. Sec. 41-1519) applies by statute, but no campus-specific certified award was publicly verifiable (eligibility != confirmed award); the $150M cited is first-building capex and the $2B equity + $2B debt EdgeCore raised in 2024 is corporate financing, not Mesa-campus capex.","src":[{"u":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","t":"EdgeCore Announces Metro Phoenix Expansion to 450MW","p":"EdgeCore Digital Infrastructure"},{"u":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","t":"EdgeCore expands Mesa data center campus in Arizona","p":"Data Center Dynamics"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"edged-mesa-az","n":"Edged Mesa Data Center","op":"Edged US","s":"operational","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.4152,"lon":-111.8315,"pre":"approximate","cf":"reported","ann":"2026-04-01","upd":"2026-08-28","nt":"Operator-stated densities of 400+ kW per rack with liquid cooling and 120+ kW per rack with air cooling support an AI-capable classification, though no named AI tenant is disclosed. PUE, water-savings and density figures are the operator's own claims from its launch release and are not independently verified. Street address not published.","src":[{"u":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor","t":"Edged US Opens Waterless, AI-Ready Data Center in Arizona's Silicon Desert Tech Corridor","p":"Edged US"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"google-redhawk-mesa-az","n":"Google Redhawk Mesa Data Center Campus","op":"Google","s":"operational","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.3764,"lon":-111.6199,"pre":"approximate","cf":"confirmed","mw":400,"ac":187,"inv":1000000000,"ann":"2019-01","upd":"2026-11-04","pb":"400MW solar and wind (Salt River Project)","nt":"Three-phase campus through 2030; originally filed anonymously as Project Red Hawk via LLC Stone Applications. Phase 1 operational July 2025. Phase 2 under construction. Coordinates at Elliot and Sossaman roads, SE Mesa. 2019 development agreement requires >=$600M capex by 2025, >=$1B by 2029, 750,000 sq ft built by 2030, and a >=$65,000 average full-time data-center salary; construction workforce has been cited around 1,200 (an estimate, not a permanent-jobs count). Status reflects Phase 1 (Redhawk 1), operational since July 2025; Phases 2 and 3 remain under construction, which is why Google's own US locations index still lists Mesa under sites in development.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/","t":"Google breaks ground on Mesa data center campus in Arizona","p":"Data Center Dynamics"},{"u":"https://azbex.com/planning-development/google-planning-next-phase-of-mesa-data-center-facility/","t":"Google Planning Next Phase of Mesa Data Center Facility","p":"AZBEX"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"arizona-land-consulting-hassayampa-ranch-tonopah-az","n":"Hassayampa Ranch Data Center","op":"Arizona Land Consulting","s":"proposed","st":"AZ","city":"Tonopah","co":"Maricopa","lat":33.5116,"lon":-112.7694,"pre":"approximate","cf":"reported","mw":1500,"ac":2000,"inv":25000000000,"ann":"2025-12","upd":"2026-10-22","nt":"~$25B proposed data center campus led by Arizona Land Consulting (Anita Verma-Lallian) with investor Chamath Palihapitiya, on ~2,000 acres of far-western Maricopa County near Tonopah (acquired in a ~$51M deal). Maricopa County approved industrial rezoning Dec 10, 2025; zoning applications pending. Coordinates are an approximate town-level geocode near Tonopah, not a parcel-confirmed point.","src":[{"u":"https://www.connectcre.com/stories/25b-data-center-greenlit-near-buckeye/","t":"$25B Data Center Greenlit Near Buckeye","p":"Connect CRE"},{"u":"https://fortune.com/2025/12/27/ai-data-centers-arizona-hassayampa-ranch/","t":"At the edges of the AI data center boom, rural America is up against Silicon Valley billions (Hassayampa Ranch)","p":"Fortune"}],"j":"uninc","jc":"Maricopa County","ju":"approx"},{"id":"vermaland-la-osa-eloy-az","n":"La Osa Data Center Park","op":"Vermaland LLC","s":"cancelled","st":"AZ","city":"Eloy","co":"Pinal","lat":32.75,"lon":-111.55,"pre":"approximate","cf":"reported","ac":3300,"ann":"2025","upd":"2026-10-30","pb":"WAPA grid interconnect; on-site natural gas (phase 1); solar (planned)","nt":"Vermaland LLC is a Phoenix-area land developer and land-banking company (CEO Kuldip 'Ken' Verma, founded 2006, controls ~25,000 acres of metro Phoenix land). DCD explicitly noted 'it is unclear whether Vermaland would operate its own data center facilities' — Vermaland plans to sell or rent parcels/buildings to tenants. No end tenants or hyperscaler operators have been named as of July 2026. Original plan: 59 data centers, up to 3 GW capacity ceiling, up to $33B investment ceiling, 3,300-acre site south of Eloy along the Greene Canal. A separate adjacent 1,700-acre parcel already holds Industrial-2 zoning for data centers, gas plants, battery storage, and solar. After strong public opposition (all ~60 public comments opposed), operator announced May 2026 scale-back to 11 data centers and 1 GW ceiling. Board of Supervisors hearing scheduled August 26, 2026; no permits issued as of record date. Site lies adjacent to a Qualified Opportunity Zone (investor tax benefit; not a direct subsidy to Vermaland — no subsidy award confirmed, omitted). Coordinates are approximate (parcel south of Eloy city center along Greene Canal; no precise APN published). $33B investment and all GW figures are announced ceilings, not firm commitments.","src":[{"u":"https://www.datacenterdynamics.com/en/news/land-developer-vermaland-plans-33bn-data-center-in-arizona/","t":"Land developer Vermaland pitches $33bn data center in Arizona","p":"Data Center Dynamics"},{"u":"https://azbigmedia.com/business/33-billion-data-center-industrial-park-coming-to-pinal-county/","t":"$33 billion data center industrial park coming to Pinal County","p":"AZ Big Media"}],"j":"city","jc":"Pinal County","jn":"Eloy","jd":"city","ju":"approx"},{"id":"fremont-peak-luckett-road-marana-az","n":"Luckett Road Data Centers (Fremont Peak Properties)","op":"Fremont Peak Properties LLC (Beale Infrastructure)","s":"proposed","st":"AZ","city":"Marana","co":"Pima","lat":32.495,"lon":-111.198,"pre":"approximate","cf":"reported","mw":1500,"ac":661,"inv":5000000000,"ann":"2025-10","upd":"2026-11-04","nt":"Two parcels along Luckett Road: north parcel owned by the Church of Jesus Christ of Latter-day Saints (borders Pinal County); south parcel owned by the Kai Family Trust. Fremont Peak Properties LLC (also referenced as 'Humphrey's Peak Properties' in some coverage) is a subsidiary of Beale Infrastructure, backed by Blue Owl Capital; connected to, but a distinct site from, the separately-tracked 'Project Blue' Beale/Blue Owl effort in unincorporated Pima County near Tucson, and from Beale's separately-tracked Project Pilot in De Soto, KS. Developer projects ~400 permanent and ~4,200 temporary construction jobs (Chamber of Southern Arizona estimate) - not yet delivered, so no jobs figure is recorded. No explicit AI/GPU branding found in coverage; the AI classification is likely given Blue Owl Capital's profile as a major AI-datacenter-era infrastructure investor. Coordinates are approximate for the Luckett Road parcels.","src":[{"u":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html","t":"Rezoning approved for Marana data center campus","p":"Tucson.com / Arizona Daily Star"},{"u":"https://news.azpm.org/s/102313-marana-planning-commission-backs-rezoning-for-600-acre-data-center-project/","t":"Marana Planning Commission backs rezoning for 600-acre data center project","p":"AZPM"}],"j":"city","jc":"Pima County","jn":"Marana","jd":"town","ju":"approx"},{"id":"meta-mesa-az","n":"Meta Mesa Data Center","op":"Meta","s":"operational","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.3375,"lon":-111.6355,"pre":"approximate","cf":"confirmed","ac":396,"inv":1000000000,"ann":"2021","upd":"2026-11-04","pb":"Eleven Mile Solar Center (300 MW + 300 MW/4hr battery, Pinal County) + West Line Solar (50 MW allocation, Eloy) + Brittlebush Solar (Coolidge) via SRP","nt":"Meta data center at 3841 S Ellsworth Rd in the Elliot Road Technology Corridor, Mesa, Maricopa County — land acquired 2021 (shell entity 'Redale LLC'), came online in 2025, and was redesigned for AI workloads during construction (baxtel). Meta states 'more than $1 billion' invested in Arizona. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Ellsworth Rd address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://datacenters.atmeta.com/2025/01/mesa-we-are-online/","t":"Mesa, we are online! — Meta's Mesa data center serving traffic (Jan 2025), $1B+ in Arizona","p":"Meta Data Centers"},{"u":"https://baxtel.com/data-center/meta-mesa-az-campus","t":"Meta Mesa, AZ Campus — came online 2025, redesigned for AI workloads, ~396 acres","p":"Baxtel"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"microsoft-el-mirage-az","n":"Microsoft El Mirage Data Center Campus","op":"Microsoft","s":"operational","st":"AZ","city":"El Mirage","co":"Maricopa","lat":33.5695,"lon":-112.3204,"pre":"approximate","cf":"confirmed","ac":433,"inv":258000000,"ann":"2024-10","upd":"2026-10-22","nt":"The investment figure is land-purchase cost only; total campus investment is higher. PHX-83 is the fifth building on existing El Mirage campus. Coordinates are El Mirage city centroid; site is at SE corner of Dysart Rd and Olive Ave. Arizona's Sec. 41-1519 sales/use-tax exemption applies by statute but no campus-specific certified award was found; published job figures cover the combined West Valley (El Mirage/Goodyear) campus, not El Mirage alone.","src":[{"u":"https://azbex.com/planning-development/microsoft-data-center-new-spec-industrial-planned-in-el-mirage/","t":"Microsoft Data Center Planned in El Mirage — PHX-83 fifth building","p":"AZBEX"},{"u":"https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/","t":"Microsoft acquires nearly 300 acres for data center growth in El Mirage","p":"Arizona Technology Council"}],"j":"city","jc":"Maricopa County","jn":"El Mirage","jd":"city","ju":"approx"},{"id":"microsoft-goodyear-az","n":"Microsoft Goodyear Data Center Campus","op":"Microsoft","s":"operational","st":"AZ","city":"Goodyear","co":"Maricopa","lat":33.4353,"lon":-112.39,"pre":"approximate","cf":"confirmed","ac":550,"inv":1500000000,"ann":"2018-01","upd":"2026-10-22","nt":"Near Citrus and Indian School roads, Goodyear (address: 3785 Citrus Rd per industry sources). Two-million sq ft of existing or under-construction data centers. The investment figure is reported campus value; land-only spend is additional. Coordinates approximate; exact site is west Goodyear near airport. First land purchase corrected to April 2019 / 150 acres / $37.11M per DCD primary source; intermediate purchases brought pre-2025 footprint to approximately 450 acres before the 100-acre 2025 expansion to 550+ total.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/","t":"Microsoft purchases 100 acres next to Goodyear campus","p":"Data Center Dynamics"},{"u":"https://www.goodyearaz.gov/Home/Components/News/News/9847/1127?arch=1","t":"Microsoft Builds World-Class Datacenter Campus in Goodyear","p":"City of Goodyear"}],"j":"city","jc":"Maricopa County","jn":"Goodyear","jd":"city","ju":"approx"},{"id":"ntt-global-mesa-az","n":"NTT Global Data Centers Mesa — Pacific Proving Technology Park","op":"NTT Global Data Centers","s":"proposed","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.3025,"lon":-111.62,"pre":"approximate","cf":"reported","mw":360,"ac":173,"inv":300000000,"ann":"2023-11","upd":"2026-11-04","nt":"The investment figure is $300M land purchase only; total buildout investment is substantially higher. NE corner of Pecos and Crismon roads, far SE Mesa. Seven two-story buildings totaling 1.7M sq ft + warehouse + office. NTT's second Phoenix-area campus (existing 102-acre, 240MW campus is ~4 miles north on Elliot Road). Phase 1 targeted November 2028. Coordinates approximate for Pecos/Crismon intersection. Status as of 2026-08-08: the Planning & Zoning Board recommended approval 4-0 in mid-May 2026; the article (updated 2026-06-08) said the proposal \"will likely be heard in late July or mid-August by council\". As of August 2026, no source consulted records a Council vote, so the record stays listed as proposed — the 2026-07-20 date carried in earlier notes was an expected hearing date, not a decision.","src":[{"u":"https://www.datacenterdynamics.com/en/news/ntt-acquires-173-acre-planned-data-center-park-in-mesa-arizona-for-300m/","t":"NTT acquires 173-acre planned data center park in Mesa for $300m","p":"Data Center Dynamics"},{"u":"https://coppercourier.com/news/politics/mesa-residents-fight-data-center/","t":"Mesa residents are fighting a Tokyo tech giant's data center","p":"Copper Courier"}],"j":"uninc","jc":"Maricopa County","ju":"approx"},{"id":"novva-mesa-az","n":"Novva Mesa Data Center Campus","op":"Novva Data Centers","s":"under_construction","st":"AZ","city":"Mesa","co":"Maricopa","lat":33.3717,"lon":-111.6747,"pre":"approximate","cf":"confirmed","mw":300,"ac":160,"inv":3000000000,"ann":"2024-08","upd":"2026-10-22","nt":"Located near Ellsworth and Warner roads, southeast Mesa. Five data halls, 1.3M sq ft data hall space, 200,000 sq ft office, two-phase buildout over ~10 years. Sixth Novva campus nationally, first in Arizona. Architectural design honors Hohokam heritage. Coordinates approximate. Public-reception check (2026-09-10): Checked Novva's own announcement page (2026-09-10); it markets design amenities ('dedicated acreage offering public pathways for the community') but documents no actual public hearing, resident feedback, or official statement of support/opposition. No community-reception record found in this source.","src":[{"u":"https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/","t":"Novva Data Centers Announces New Campus in Mesa","p":"Novva Data Centers"},{"u":"https://www.datacenterdynamics.com/en/news/novva-confirmed-as-behind-project-borealis-data-center-campus-in-phoenix-arizona/","t":"Novva confirmed as behind Project Borealis data center campus in Phoenix","p":"Data Center Dynamics"}],"j":"city","jc":"Maricopa County","jn":"Mesa","jd":"city","ju":"approx"},{"id":"takanock-project-baccara-maricopa-county-az","n":"Project Baccara","op":"Takanock, LLC","s":"permitted","st":"AZ","co":"Maricopa","lat":33.5685,"lon":-112.3703,"pre":"approximate","cf":"confirmed","mw":700,"ac":160,"inv":36000000000,"upd":"2026-10-28","nt":"Unincorporated Maricopa County near Surprise, AZ, north of Luke AFB. Construction targeted Q3 2026, first building online 2028. Coordinates are approximate. Coordinates corrected 2026-08-31 to the filed parcel (501-43-016A) in the southwest quarter of Section 28, Township 3 North, Range 1 West. The previously stored point fell roughly 8.2 miles NNW, in a different township. The 160-acre parcel holds the turbine yard, the data center buildings and the APS substation together, so a single approximate point represents the whole campus.","src":[{"u":"https://www.abc15.com/news/region-southwest-valley/surprise/maricopa-county-supervisors-approve-controversial-surprise-area-data-center","t":"Maricopa County supervisors approve controversial data center","p":"ABC15"},{"u":"https://www.projectbaccara.com/","t":"Project Baccara - official project site","p":"Takanock, LLC"}],"j":"uninc","jc":"Maricopa County","ju":"approx"},{"id":"beale-project-blue-pima-county-az","n":"Project Blue","op":"Beale Infrastructure","s":"under_construction","st":"AZ","co":"Pima","lat":32.1,"lon":-110.75,"pre":"approximate","cf":"confirmed","ac":290,"inv":3600000000,"upd":"2026-11-04","nt":"Unincorporated Pima County, west of Houghton Rd, near Tucson. Construction Review Online lists \"Up to 286–600 MW (initial phases lower)\" across \"approximately 2 million square feet at full build-out\", and the Pima County Administrator's memo of September 17, 2025 describes Tucson Electric Power's proposed Energy Supply Agreement as \"supplying 286 megawatts (MW) of electricity from existing TEP capacity for the initial phase\"; no single planned total is recorded. AWS confirmed as end-customer via an NDA obtained by AZ Luminaria. Distinct site from Beale Infrastructure's Fremont Peak Properties/Luckett Road project in the Town of Marana (also AZ, and also tracked as of August 2026) - same developer family, different parcel. Coordinates are approximate. The 180 permanent jobs figure is a projection for the third year of operations in 2029, published by Pima County and by the developer. Beale's own letter of 2025-09-17 adds a qualifier the county FAQ omits: the figure \"include[s] full-time contractors and support personnel\", and at least 75 of the roles will be directly employed by the end user. Beale has also stated it \"is not asking for property tax incentives, often a necessary component of a data center project's cost competitiveness\", and the utility agreement with Tucson Electric Power carries no financial incentives or discounts, which is unusual for a project of this size. Subsidies are therefore recorded as absent rather than merely unsearched.","src":[{"u":"https://azluminaria.org/2025/10/01/pima-county-nda-confirms-amazon-is-behind-project-blue-data-center/","t":"Pima County NDA confirms Amazon is behind Project Blue data center","p":"AZ Luminaria"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Pima County","jn":"Tucson","jd":"city","ju":"approx"},{"id":"beale-project-blue-tucson-az","n":"Project Blue","op":"Beale Infrastructure","s":"under_construction","st":"AZ","city":"Tucson","co":"Pima","lat":32.153,"lon":-110.8708,"pre":"approximate","cf":"confirmed","ac":290,"inv":3600000000,"ann":"2025-06","upd":"2026-08-25","nt":"290 acres west of Houghton Road, north of the Pima County Fairgrounds, bought from Pima County for $20m after a 3-2 rezoning vote in June 2025. Amazon walked away and Tucson rejected annexation, but Beale closed on the land and work began. Switched to closed-loop air cooling in September, which uses no water and considerably more power. No capacity figure appears in the primary coverage, so none is recorded.","src":[{"u":"https://www.kold.com/2026/04/25/construction-begins-first-hyper-scale-data-center-pima-county/","t":"Construction begins on first hyper-scale data center in Pima County","p":"KOLD"},{"u":"https://www.tucsonsentinel.com/local/report/122425_project_blue_close/","t":"Project Blue developers close on purchase of Pima County land","p":"Tucson Sentinel"}],"j":"city","jc":"Pima County","jn":"Tucson","jd":"city","ju":"approx"},{"id":"stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az","n":"Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)","op":"Stream Data Centers","s":"operational","st":"AZ","city":"Goodyear","co":"Maricopa","lat":33.4195,"lon":-112.36,"pre":"exact","cf":"reported","mw":280,"ac":157,"upd":"2026-08-31","nt":"Operator's own Phoenix page names this campus 'PHXA (Phoenix I-VII)' at 2950 S. Litchfield Road, Goodyear, AZ 85338, Maricopa County. 157-acre, 7-building planned campus; 2 of 7 buildings currently operational, remaining 5 under development, so campus-level status is mixed-build but the entity is live/operational overall. Site markets '100% AI-ready infrastructure' but, as of July 2026, no confirmed GPU/HPC tenant or workload was found, so the AI classification is marked likely rather than confirmed -- marketing language alone is not workload evidence. Note the official name differs from OSM tag 'PHX-1'; corrected to operator's own 'PHXA'. AI/HPC (likely): Stream's own Phoenix/Goodyear campus page carries a facility-specific '100% AI-Ready' key-stat badge alongside its 280 MW critical capacity.","src":[{"u":"https://www.streamdatacenters.com/locations/phoenix/","t":"Stream Data Centers - Phoenix/Goodyear locations page","p":"Stream Data Centers"},{"u":"https://www.openstreetmap.org/way/468707940","t":"OpenStreetMap way/468707940","p":"OpenStreetMap"}],"j":"city","jc":"Maricopa County","jn":"Goodyear","jd":"city"},{"id":"avaio-perseus-pittsburg-ca","n":"AVAIO Digital Perseus","op":"AVAIO Digital Partners","s":"permitted","st":"CA","city":"Pittsburg","co":"Contra Costa","lat":38.0114,"lon":-121.911,"pre":"approximate","cf":"confirmed","mw":99,"ac":76,"inv":800000000,"ann":"2024-12","upd":"2026-11-04","nt":"Redevelopment of the former Delta View Golf Course (76 acres) into a 3-phase Pittsburg Technology Park; Phase 1 is the ~300,000 sq ft Perseus Data Center, targeting first occupancy in 2027. The record is listed as permitted, not proposed: the project holds a CEC opt-in certification (99 MW, Dec 8 2025) and a City of Pittsburg Commercial Design Review approval (Dec 11 2025, modified Feb 12 2026); no source confirms groundbreaking/construction has started. The planned capacity of 99 MW reflects the CEC-certified figure. AVAIO's December 2025 release says the Pittsburg Technology Park Specific Plan \"allows AVAIO to develop up to 500MW\"; that is a ceiling the plan permits, not a planned capacity, so it is not recorded. Investment ($800M+) is AVAIO's own Dec 2024 disclosure, widely syndicated but not independently audited. Jobs figures are not disclosed in any source found and are omitted. The AI classification is recorded as likely: AVAIO's own materials use explicit 'AI and cloud-driven deployments' language but do not publish GPU/HPC-specific technical specs. The Center for Biological Diversity's CEQA lawsuit (Case No. N24-2162, filed Dec 2024) was settled in Dec 2025 (CBD agreed not to oppose Phase 1 in exchange for 100% renewable/carbon-free electricity, rooftop solar, 100% recycled water for cooling, wildlife monitoring, and a $750,000 community climate-resiliency payment) - it is not an active legal threat, though broader public opposition continues (see community).","src":[{"u":"https://www.avaiodigital.com/developments/pittsburg-california","t":"AVAIO Perseus (Pittsburg, CA) project page","p":"AVAIO Digital Partners"},{"u":"https://www.avaiodigital.com/updates/avaio-digital-marks-major-milestone-as-cec-approves-99mw-for-bay-area-data-center-project-perseus","t":"AVAIO Digital marks major milestone as CEC approves 99MW for Bay Area data center project Perseus","p":"AVAIO Digital Partners"}],"j":"city","jc":"Contra Costa County","jn":"Pittsburg","jd":"city","ju":"approx"},{"id":"amazon-gilroy-ca","n":"Amazon AWS Gilroy Data Center","op":"Amazon Web Services","s":"under_construction","st":"CA","city":"Gilroy","co":"Santa Clara","lat":36.997,"lon":-121.541,"pre":"approximate","cf":"confirmed","mw":98,"ac":56,"inv":2000000000,"ann":"2025-07","upd":"2026-10-30","nt":"Status updated to under construction: grading permit issued December 11, 2025; building permit issued March 19, 2026; City of Gilroy lists project as Under Construction as of July 2026. Site at 8050 Camino Arroyo in east Gilroy along Hwy 101. Full build-out: 438,000 sq ft across 56 acres. Amazon cites a ~$2 billion investment for the Gilroy project (recorded as the investment figure); its broader Northern California investment of ~$5.1B and ~1,890 jobs since 2009 is regional and not attributable to this site. The 2020 land purchase was $31.3M. Operational job figures conflict and are unconfirmed: the FEIR says employment 'may grow to 50 full-time employees' (a ceiling), the permit application lists 25, and Amazon's promotional materials cite ~90 on-site; the construction workforce is not disclosed.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-data-services-gains-approval-for-data-center-on-56-acres-in-gilroy-california/","t":"Amazon Data Services Gains Approval for Data Center on 56 Acres in Gilroy, California","p":"Data Center Dynamics"},{"u":"https://www.cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS","t":"Gilroy Data Center (by Amazon Web Services) — Official City Project Page","p":"City of Gilroy"}],"j":"city","jc":"Santa Clara County","jn":"Gilroy","jd":"city","ju":"approx"},{"id":"nygc-buena-vista-ai-factory-ione-ca","n":"Buena Vista AI Factory","op":"NewYork GreenCloud","s":"proposed","st":"CA","city":"Ione","co":"Amador","lat":38.2782,"lon":-120.9116,"pre":"approximate","cf":"reported","inv":171000000,"upd":"2026-09-21","nt":"About $4 million had been spent on plant renovation as of July 2026, with roughly $171 million planned for modernisation and data center construction; a soft operational test of the repowered plant was targeted for August 2026. Recorded as a data center rather than power generation because the generation is dedicated to the co-located compute; no IT capacity figure has been published, so no capacity is recorded.","src":[{"u":"https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html","t":"Biomass-fueled data center project planned in Amador County","p":"myMotherLode.com"},{"u":"https://biomassmagazine.com/articles/newyork-greencloud-acquires-buena-vista-biomass-power-facility-to-launch-first-carbon-negative-ai-factory","t":"NewYork GreenCloud acquires Buena Vista Biomass Power facility to launch first carbon-negative AI factory","p":"Biomass Magazine"}],"j":"uninc","jc":"Amador County","ju":"approx"},{"id":"calethos-lithium-valley-imperial-county-ca","n":"CalEthos Lithium Valley Data Center Campus","op":"CalEthos, Inc.","s":"proposed","st":"CA","city":"El Centro","co":"Imperial","lat":32.79,"lon":-115.56,"pre":"approximate","cf":"reported","ac":315,"upd":"2026-10-22","nt":"First phase now ~300-420MW (expanded from an original 80-acre/300MW plan; a range, so no capacity is recorded); part of a planned 1M sq ft, 3-4 phase campus. Land purchase completed; permitting/engineering underway with American Dark Fiber. Distinct, competing developer from the Imperial Valley Computer Manufacturing (Sebastian Rucci/IVCM) project in the same county, also tracked as of July 2026. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/calethos-expands-data-center-plans-for-lithium-valley-california-with-315-acre-land-purchase/","t":"CalEthos expands data center plans for Lithium Valley, California, with 315-acre land purchase","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Imperial County","jn":"El Centro","jd":"city","ju":"approx"},{"id":"coresite-bowers-santa-clara-ca","n":"CoreSite Bowers Data Center","op":"CoreSite","s":"permitted","st":"CA","city":"Santa Clara","co":"Santa Clara","lat":37.389,"lon":-121.974,"pre":"approximate","cf":"confirmed","mw":72,"ac":5,"ann":"2024-08","upd":"2026-11-04","pb":"Silicon Valley Power (SVP) grid; new on-site substation planned","nt":"Coordinates approximate based on 2805 Bowers Ave address. Originally a GI Partners project; CoreSite (owned by American Tower) acquired in Feb 2026 and is expected to redevelop under existing permit. CoreSite already operates a dense interconnection campus nearby in Santa Clara. No construction timeline announced as of mid-2026.","src":[{"u":"https://www.datacenterdynamics.com/en/news/gi-partners-secures-planning-permission-for-72mw-data-center-in-santa-clara-california/","t":"GI Partners Secures Planning Permission for 72MW Data Center in Santa Clara","p":"Data Center Dynamics"},{"u":"https://www.datacenterdynamics.com/en/news/coresite-acquires-silicon-valley-office-property-zoned-for-data-center-redevelopment/","t":"CoreSite Acquires Silicon Valley Office Property Zoned for Data Center Redevelopment","p":"Data Center Dynamics"}],"j":"city","jc":"Santa Clara County","jn":"Santa Clara","jd":"city","ju":"approx"},{"id":"coresite-la2-los-angeles-ca-ca","n":"CoreSite LA2 - Los Angeles, CA","op":"CoreSite","s":"operational","st":"CA","city":"Los Angeles","co":"Los Angeles","lat":34.0585,"lon":-118.2359,"pre":"approximate","cf":"reported","upd":"2026-07-24","pb":"Grid — Los Angeles Department of Water & Power","nt":"Confirmed: 900 N. Alameda St, LA 90012, operational retrofit of 1940s mail facility. AI/HPC (likely): Site page: liquid cooling capabilities offered at LA2/LA3.","src":[{"u":"https://www.coresite.com/data-center/la2-los-angeles-ca","t":"CoreSite facility directory","p":"CoreSite"},{"u":"https://www.openstreetmap.org/node/13042311881","t":"OpenStreetMap node/13042311881","p":"OpenStreetMap"}],"j":"city","jc":"Los Angeles County","jn":"Los Angeles","jd":"city","ju":"approx"},{"id":"cyrusone-nas-lemoore-ca","n":"CyrusOne AI Data Center at NAS Lemoore","op":"CyrusOne","s":"proposed","st":"CA","co":"Kings","lat":36.303,"lon":-119.953,"pre":"approximate","cf":"confirmed","mw":100,"ann":"2025-09","upd":"2026-10-28","pb":"Off-grid microgrid (engine generators built by Ameresco; potential 425MW solar farm on adjacent 920 acres)","nt":"Located at Naval Air Station Lemoore on the Kings/Fresno county border. Ameresco leads energy infrastructure via its Intelliscale platform; CyrusOne operates the data center for federal and defense AI workloads (FedRAMP, FISMA High, DoD IL5/IL6). Land leased from DOD. Announced September 9, 2025; first phase expected online 2027. Coordinates approximate.","src":[{"u":"https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data","t":"Ameresco and U.S. Navy Partner to Build AI-Optimized Data Center and Energy Infrastructure at NAS Lemoore","p":"Ameresco, Inc."},{"u":"https://www.datacenterdynamics.com/en/news/ameresco-partners-with-cyrusone-to-develop-offgrid-ai-data-center-at-naval-air-station-lemoore-in-california/","t":"Ameresco Partners with CyrusOne to Develop Offgrid AI Data Center at Naval Air Station Lemoore in California","p":"Data Center Dynamics"}],"j":"uninc","jc":"Kings County","ju":"approx"},{"id":"databank-san1-san-diego-ca","n":"DataBank San Diego SAN1","op":"DataBank","s":"operational","st":"CA","city":"San Diego","co":"San Diego","lat":32.9886,"lon":-117.0732,"pre":"approximate","cf":"reported","mw":3.2,"upd":"2026-08-16","nt":"Capacity corrected/clarified: DataBank's current live product page states 7.2MW critical IT load / 55,239 IT sq ft (independently corroborated by a DataCenterMap aggregator listing); DataBank's own 2022-2023 expansion press materials instead cite a 7.5MW/60,000 sq ft total-capacity target, which is not a contradiction but an older total-capacity framing rather than the current critical-IT-load figure. The AI classification is set to likely on the strength of an 'HPC Capable' designation and '40kW+ Cab Density Air' cooling spec on DataBank's own page, though this is a general multi-tenant colo facility rather than a dedicated AI/GPU campus. Distinct from EdgeConneX SDG01 (5761 Copley Drive, Kearny Mesa; tracked separately as of August 2026) - different operator and neighborhood (this site is in Rancho Bernardo/Carmel Mountain Ranch). Coordinates are an approximate geocode, not a parcel-confirmed point.","src":[{"u":"https://www.databank.com/data-centers/san-diego/12270-world-trade-drive/","t":"DataBank San Diego (SAN1), 12270 World Trade Drive - facility page","p":"DataBank"},{"u":"https://www.databank.com/resources/press-releases/databank-expands-capacity-of-san1-data-center-in-san-diego/","t":"DataBank expands capacity of SAN1 data center in San Diego","p":"DataBank"}],"j":"city","jc":"San Diego County","jn":"San Diego","jd":"city","ju":"approx"},{"id":"ecl-csc1-santa-clara-ca","n":"ECL CSC-1 FlexGrid AI Data Center","op":"ECL","s":"proposed","st":"CA","city":"Santa Clara","co":"Santa Clara","lat":37.354,"lon":-121.955,"pre":"approximate","cf":"reported","mw":35,"ann":"2026-04","upd":"2026-10-22","pb":"FlexGrid hybrid: SVP on-grid electricity + natural gas + hydrogen fuel cells","nt":"Exact street address not publicly disclosed. Coordinates are Santa Clara city centroid (approximate). Announced April 21, 2026. First phase targets Q4 2026 delivery. ECL CEO Yuval Bachar stated the project addresses SVP grid capacity constraints that have forced other data center developers into multi-year interconnection queues. Project targets AI training and inference workloads.","src":[{"u":"https://www.businesswire.com/news/home/20260421198659/en/ECL-35MW-FlexGrid-Powered-Data-Center-in-Santa-Clara-Builds-Atop-On-Grid-Power-for-High-Density-AI-Delivery","t":"ECL 35MW FlexGrid-Powered Data Center in Santa Clara Builds Atop On-Grid Power for High-Density AI Delivery","p":"BusinessWire"},{"u":"https://www.datacenterdynamics.com/en/news/ecl-plans-35mw-data-center-in-california-that-will-use-some-hydrogen-power/","t":"ECL Plans 35MW Data Center in California That Will Use Some Hydrogen Power","p":"Data Center Dynamics"}],"j":"city","jc":"Santa Clara County","jn":"Santa Clara","jd":"city","ju":"approx"},{"id":"eagle-mountain-data-oc1-anaheim-ca","n":"Eagle Mountain Data OC1 (Anaheim Data Center)","op":"Eagle Mountain Data Inc","s":"operational","st":"CA","city":"Anaheim","co":"Orange","lat":33.8366,"lon":-117.9143,"pre":"approximate","cf":"confirmed","upd":"2026-10-22","nt":"Operator describes OC1 as \"fully energized\" and pre-leasing high-density AI GPU capacity: pre-deployed NVIDIA GB300 clusters, up to 135kW/rack (engineered for 200kW+), direct-to-chip liquid cooling, <1.15 PUE target, zero-water cooling, 100% green utility power, with direct AWS Direct Connect / Azure ExpressRoute connectivity. The operator states OC1 is the first phase of a planned 45MW multi-facility Southern California development — that 45MW figure covers the whole planned program, not this single site, so the capacity is omitted rather than misapplied. No exact street address appears in the cited sources: a datacenters.com listing for this facility exists but could not be retrieved as of September 2026 and is not used as a source. Location is city-level (Anaheim) only.","src":[{"u":"https://eaglemountain.ai/post/eagle-mountain-data-now-offering-high-density-ai-gpu-capacity-at-fully-energized-anaheim-data-center","t":"Eagle Mountain Data Now Offering High Density AI GPU Capacity at Fully Energized Anaheim Data Center","p":"Eagle Mountain Data"}],"j":"city","jc":"Orange County","jn":"Anaheim","jd":"city","ju":"approx"},{"id":"raeden-grand-crossing-south-city-of-industry-ca","n":"Grand Crossing South - Building 10","op":"Raeden","s":"proposed","st":"CA","city":"City of Industry","co":"Los Angeles","lat":34.0051,"lon":-117.8333,"pre":"approximate","cf":"reported","upd":"2026-11-05","nt":"December 2025: Raeden Inc. proposed leasing 'Building 10' (110 Marcellin Drive) within Majestic Realty's 290-acre Grand Crossing South business park for a data center, requesting up to 30 MVA (an apparent-power unit, not converted to a MW figure since no source discloses one). No lease is confirmed executed; City of Industry directed consultants to plan the site as a future data center 'whether with Raeden or another tenant.' An AI classification of likely is recorded on the strength of Raeden's company-wide AI/HPC/neocloud-focused business model (150kW+/rack, liquid cooling, GPU-cloud tenants), though no site-specific tenant or spec has been disclosed yet. Investment/acreage/jobs not disclosed for this specific building (Grand Crossing South's 290 acres covers the whole multi-building park, not this parcel alone) and are omitted. ZIP 91789 spans both City of Industry and Diamond Bar - jurisdiction resolved to City of Industry via the city government body actively considering this project, not postal city alone. Distinct from the unrelated Puente Hills Mall/MARICI battery-storage project in the same city (rezoned for battery storage, not a data center, in Feb 2026). Coordinates are an approximate representative point within the Grand Crossing master-planned development (the specific private road 'Marcellin Drive' is not indexed in OpenStreetMap), not a parcel-confirmed point. Proposed tenant; developer: Majestic Realty.","src":[{"u":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","t":"City of Industry discussed data center sites months before zoning vote","p":"Investigate LA"},{"u":"https://investigatela.org/2026/02/11/nobody-is-really-paying-attention-city-of-industry-zoning-and-energy-moves-raise-data-center-concerns/","t":"Nobody is really paying attention: City of Industry zoning and energy moves raise data center concerns","p":"Investigate LA"}],"j":"city","jc":"Los Angeles County","jn":"Industry","jd":"city","ju":"approx"},{"id":"ivcm-imperial-county-ca","n":"Imperial Valley Computer Manufacturing AI Data Center","op":"Imperial Valley Computer Manufacturing (IVCM)","s":"proposed","st":"CA","city":"Imperial","co":"Imperial","lat":32.847,"lon":-115.569,"pre":"approximate","cf":"reported","mw":330,"ac":75,"inv":10000000000,"upd":"2026-10-22","nt":"Coordinates approximate; actual site is near Aten Road and Clark Road just outside Imperial city limits. Developer Sebastian Rucci (Imperial Valley Computer Manufacturing) proposes ~950,000 sq ft facility described by developer as 'designed exclusively for advanced artificial intelligence and machine learning operations.' Imperial County Board of Supervisors was deliberating an emergency moratorium on new data center approvals as of June 4, 2026 — adoption not confirmed by cited source. Annual promised tax revenue: ~$28M.","src":[{"u":"https://inewsource.org/2026/04/05/data-center-developer-imperial-county/","t":"California's Largest Data Center Plan Rouses Imperial County","p":"inewsource"},{"u":"https://inewsource.org/2026/06/04/imperial-county-data-center-moratorium-vote-supervisors-ceqa/","t":"Data Center Moratorium? Imperial County Considers It","p":"inewsource"}],"j":"city","jc":"Imperial County","jn":"Imperial","jd":"city","ju":"approx"},{"id":"prime-lax01-vernon-ca","n":"Prime Data Centers LAX01","op":"Prime Data Centers","s":"operational","st":"CA","city":"Vernon","co":"Los Angeles","lat":34.0014,"lon":-118.2303,"pre":"approximate","cf":"reported","upd":"2026-09-21","nt":"Opened November 14, 2024; 33MW of critical IT power at full build-out across six data halls, 100% leased at opening to two initially-unnamed AI companies. Lambda was named as a tenant via a separate press release approximately one year later (November 13, 2025), leasing 21MW of the 33MW total for NVIDIA Blackwell-based AI infrastructure - these are two distinct announcements, not one event. One of at least three independent data-center developments in Vernon (a small, ~200-resident, all-industrial city), alongside a separate Digital Realty land purchase (4400 Pacific Blvd) and the DataBank/Goodman Group 'Vernon LA Campus' - driven by Vernon Public Utilities offering industrial power at roughly half the rate of neighboring investor-owned utilities.","src":[{"u":"https://primedatacenters.com/news/prime-opens-los-angeles-data-center/","t":"Prime opens Los Angeles data center","p":"Prime Data Centers"},{"u":"https://www.prnewswire.com/news-releases/prime-data-centers-announces-the-opening-of-its-hyperscale-data-center-in-vernon-california-302305195.html","t":"Prime Data Centers announces opening of its hyperscale data center in Vernon, California","p":"PR Newswire"}],"j":"city","jc":"Los Angeles County","jn":"Vernon","jd":"city","ju":"approx"},{"id":"prime-smf02-sacramento-ca","n":"Prime Data Centers SMF02","op":"Prime Data Centers","s":"under_construction","st":"CA","city":"Sacramento","co":"Sacramento","lat":38.671,"lon":-121.399,"pre":"approximate","cf":"confirmed","mw":18,"ac":8.6,"ann":"2026-05","upd":"2026-10-22","pb":"Sacramento Municipal Utility District (SMUD) grid","nt":"Address: 2408 AK Street, McClellan Park, Sacramento, CA 95652. Coordinates approximate (McClellan Business Park). Adjacent to operational SMF01 (8MW at 2407 AK Street). Combined campus: 26MW across 215,000 sq ft on 8.6 acres. Marketed for hyperscale and AI-ready deployments. Certifications: ISO 27001, SOC 2 Type 2.","src":[{"u":"https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-second-sacramento-data-center-expanding-regional-campus-footprint/","t":"Prime Data Centers Breaks Ground on Second Sacramento Data Center, Expanding Regional Campus Footprint","p":"Prime Data Centers"},{"u":"https://www.datacenterdynamics.com/en/news/prime-breaks-ground-on-latest-data-center-in-sacramento-california/","t":"Prime Breaks Ground on Latest Data Center in Sacramento, California","p":"Data Center Dynamics"}],"j":"uninc","jc":"Sacramento County","jn":"McClellan Park","ju":"approx"},{"id":"prologis-stem-park-zanker-road-san-jose-ca","n":"Prologis STEM Park","op":"Prologis","s":"proposed","st":"CA","city":"San Jose","co":"Santa Clara","lat":37.423,"lon":-121.943,"pre":"approximate","cf":"reported","mw":396,"ac":159,"ann":"2025-11","upd":"2026-11-04","pb":"Grid — Pacific Gas & Electric (PG&E)","nt":"159-acre city-owned parcel at Hwy 237 & Zanker Road, North San Jose (bounded by Los Esteros Energy Center, Artesian Slough, Hwy 237, and the Silicon Valley Advanced Water Purification Center). Prologis selected as preferred developer by San Jose City Council (unanimous vote, Nov 18 2025) over Catellus-Deca and Trammell Crow proposals; CEQA review and ground-lease negotiation still pending as of source dates — not yet approved. 'STEM Park' = Sustainable Technology, Engineering and Manufacturing Park: four 99MW data-center buildings (1.68M sq ft total, reflected in the recorded capacity) plus a separate ~785,000 sq ft / 100MW advanced-manufacturing component (not counted in the recorded capacity, different use). PG&E has committed initial 250MW via dual feed from the Los Esteros 230kV substation within 30-36 months. ~$25B investment widely reported (DCD et al.) but not confirmed directly by Prologis — no investment figure is recorded. Projected 6,000+ jobs and $30M/yr city tax revenue are projections tied to a not-yet-approved project, not delivered counts — no jobs figure is recorded. Two other Prologis San Jose sites in this dataset as of July 2026 (Prologis Silver Creek Valley Road Data Center and Prologis 5853 Rue Ferrari) are distinct parcels, not duplicates.","src":[{"u":"https://www.datacenterdynamics.com/en/news/400mw-prologis-data-center-campus-chosen-as-preferred-project-on-city-owned-land-in-san-jose-california/","t":"400MW Prologis data center campus chosen as preferred project on city-owned land in San Jose, California","p":"Data Center Dynamics"},{"u":"https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/","t":"Prologis Inc. Wins Bid for One of the Largest Economic Development Projects in South Bay","p":"San José Inside"}],"j":"city","jc":"Santa Clara County","jn":"San Jose","jd":"city","ju":"approx"},{"id":"prologis-silver-creek-valley-san-jose-ca","n":"Prologis Silver Creek Valley Road Data Center","op":"Prologis","s":"proposed","st":"CA","city":"San Jose","co":"Santa Clara","lat":37.25,"lon":-121.79,"pre":"approximate","cf":"reported","mw":99,"ac":15,"ann":"2026-07","upd":"2026-10-22","pb":"Grid — Pacific Gas & Electric (PG&E)","nt":"5977 Silver Creek Valley Road, South San Jose. Three-story facility, 516,000 sq ft. Permit filed July 2026; ~2-year buildout once approved. Prologis states it will self-fund substation/transmission costs. Distinct from Prologis's already-tracked Project Sail, Project Cardinal, and Project Mila entries. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/prologis-files-to-build-99mw-data-center-in-san-jose-california/","t":"Prologis files to build 99MW data center in San Jose, California","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Santa Clara County","jn":"San Jose","jd":"city","ju":"approx"},{"id":"rb-inyokern-data-center-ca","n":"RB Inyokern Data Center","op":"R&L Capital, Inc.","s":"proposed","st":"CA","city":"Inyokern","co":"Kern","lat":35.6318,"lon":-117.8079,"pre":"approximate","cf":"reported","mw":99,"ac":55.54,"inv":250000000,"ann":"2026-05-08","upd":"2026-09-29","nt":"Unincorporated Kern County site south of West Inyokern Road (Hwy 178) and west of North Brown Road (APNs 084-010-43, -44, -45 portion; broader ~95-acre study area across 19 APNs). The CEC SPPE docket formally governs 40 diesel backup generator sets rated to 99 MW combined backup capacity, described by the CEC as not electrically interconnected to the transmission or distribution grid; primary power is a separate 115 kV interconnection to Southern California Edison. Proposer entities per the primary CEC filing: Intuva Inc. and Valley Wide Engineering & Construction, alongside applicant R&L Capital, Inc. (CEO Robbie Barker). Unconfirmed pending a direct read of the CEC Basis-of-Design filing: press claims of '6 modular data halls' and on-site canopy solar. Jobs figures are inconsistent across sources (30-60 permanent, 1,600 temporary construction, and a softer 530-total-including-indirect claim, all secondary/company-sourced) and are omitted from the structured jobs field for that reason. Investment (~$250M) is a company estimate reported by Tehachapi News, not seen in a primary filing. A Phase I cultural resources survey found no CRHR-eligible or tribal cultural resources (NAHC response negative, 2026-03-16). Distinct from the already-tracked Golden Valley Technology Hub (Beacon/CRC, Elk Hills) - different operator, site, capacity, and power model. Coordinates are an approximate road-intersection geocode near North Brown Road, not a parcel-confirmed point.","src":[{"u":"https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center","t":"RB Inyokern Data Center - CEC backup generating system docket page","p":"California Energy Commission"},{"u":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01","t":"CEC Docket Log - 26-SPPE-01","p":"California Energy Commission"}],"j":"uninc","jc":"Kern County","jn":"Inyokern","ju":"approx"},{"id":"scalematrix-san-diego-ca","n":"ScaleMatrix San Diego","op":"ScaleMatrix","s":"operational","st":"CA","city":"San Diego","co":"San Diego","lat":32.8377,"lon":-117.1326,"pre":"approximate","cf":"reported","mw":20,"upd":"2026-09-21","nt":"ScaleMatrix's own site discloses '5MW aggregate availability; 20MW+ utility upgrade capacity' - the widely-repeated flat '20MW' figure on aggregator sites is the future upgrade ceiling, not installed/operational capacity; cross-validated by an independent SDG&E-sourced interconnection record showing <10MW. A May 2026 expansion added 46,000 sq ft to the ~50,000 sq ft Kearny Mesa campus (~96,000 sq ft total) - this 'doubling' is square footage, not MW capacity. The AI classification is set to likely: ScaleMatrix markets GPU-as-a-Service explicitly for HPC/deep learning/AI workloads, and this San Diego site is confirmed as the location of a ScaleMatrix/HPE 'Hybrid HPC Center of Excellence.' Address confirmed via a Washington-state LLC filing and parcel records; this is the company's headquarters campus, operating since approximately 2011-2012 in the Kearny Mesa neighborhood of the City of San Diego.","src":[{"u":"https://www.scalematrix.com/san-diego-data-center.html","t":"ScaleMatrix San Diego data center","p":"ScaleMatrix"},{"u":"https://www.scalematrix.com/press/scalematrix-announces-gpu-service-solution-ideal-hpc-deepmachine-learning-and-artificial.html","t":"ScaleMatrix announces GPU-as-a-Service solution ideal for HPC, deep/machine learning, and AI workloads","p":"ScaleMatrix"}],"j":"city","jc":"San Diego County","jn":"San Diego","jd":"city","ju":"approx"},{"id":"serverfarm-lax1-el-segundo-ca","n":"Serverfarm LAX1","op":"Serverfarm","s":"operational","st":"CA","city":"El Segundo","co":"Los Angeles","lat":33.9218,"lon":-118.3865,"pre":"approximate","cf":"reported","upd":"2026-10-19","nt":"Formerly T5 Data Centers (T5@LA), built 2011 (~$30M construction cost); sold to Serverfarm + NantWorks for $71M in April 2021 and rebranded LAX1. Capacity corrected: Serverfarm's own current site discloses 17.3MW IT capacity / 26MVA utility capacity (not the 22MW figure some discovery leads cite, which conflates the 2021 acquisition press release's '22 MVA' apparent-power figure with real MW); datacenterHawk independently corroborates ~18.3MW commissioned. The AI classification is set to likely on the strength of facility-specific 'AI-ready... liquid cooling... 200 W/sq ft' language on Serverfarm's current site, though no named AI/HPC tenant was confirmed. Distinct from an unrelated, separate 2026 community-opposition story at 750 North Nash Street (a different, proposed, since-withdrawn project) - no opposition attaches to this facility.","src":[{"u":"https://www.serverfarmllc.com/los-angeles-data-center/","t":"Serverfarm Los Angeles (LAX1) data center page","p":"Serverfarm"},{"u":"https://www.serverfarmllc.com/press-releases/serverfarm-acquires-los-angeles-data-center/","t":"Serverfarm acquires Los Angeles data center (press release)","p":"Serverfarm"}],"j":"city","jc":"Los Angeles County","jn":"El Segundo","jd":"city","ju":"approx"},{"id":"blusky-ai-walsenburg-co","n":"BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center","op":"BluSky AI Inc.","s":"proposed","st":"CO","city":"Walsenburg","co":"Huerfano","lat":37.6235,"lon":-104.781,"pre":"approximate","cf":"reported","mw":15,"ac":36,"ann":"2025-09-02","upd":"2026-08-26","nt":"BluSky AI Inc. (OTCID: BSAI), Salt Lake City, announced a purchase and sale agreement dated 2025-08-26 for LOT 1 INDIAN POOL RANCH, 36.06 acres north of Walsenburg, for up to 15 MW of modular 'SkyMod' compute. As of the Gazette's reporting in early 2026 the sale had not closed and the site remained under agreement with owner Snowy River Ranches. Coordinates are the Walsenburg town centroid (approximate); the parcel is north of town.","src":[{"u":"https://finance.yahoo.com/news/blusky-ai-inc-executes-purchase-141700082.html","t":"BluSky AI Inc. Executes Purchase and Sale Agreement for its Fifth AI Factory Location","p":"BluSky AI Inc. (news release)"},{"u":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","t":"AI data center plans baffle small southern Colorado town (read via Internet Archive)","p":"Colorado Springs Gazette"}],"j":"city","jc":"Huerfano County","jn":"Walsenburg","jd":"city","ju":"approx"},{"id":"coresite-de3-denver-co","n":"CoreSite DE3","op":"CoreSite","s":"under_construction","st":"CO","city":"Denver","co":"Denver","lat":39.7392,"lon":-104.9903,"pre":"approximate","cf":"confirmed","mw":60,"ann":"2025-10","upd":"2026-10-22","nt":"DE3 Denver campus expansion: ~600,000 sq ft, 60 critical MW. CoreSite is a colocation/interconnection operator hosting AI/cloud tenants → an AI classification of mixed-use. Coordinates are the Denver centroid. Owned by American Tower.","src":[{"u":"https://www.businesswire.com/news/home/20251006047627/en/CoreSite-Achieves-Key-Construction-Milestone-for-New-DE3-Data-Center-in-Denver","t":"CoreSite Achieves Key Construction Milestone for New DE3 Data Center in Denver","p":"CoreSite / American Tower"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Denver County","jn":"Denver","jd":"city","ju":"approx"},{"id":"global-ai-windsor-co","n":"Global AI Windsor Data Center (former Kodak/Carestream campus)","op":"Global AI","s":"under_construction","st":"CO","city":"Windsor","co":"Weld","lat":40.4653,"lon":-104.909,"pre":"approximate","cf":"confirmed","mw":27.5,"ac":41,"ann":"2025-11","upd":"2026-09-30","nt":"Global AI, a New York-based firm, bought a 438-acre former Kodak/Carestream property in unincorporated Weld County near Windsor in November 2025 and is developing a 41-acre data center on it. Phase 1 is stated at 27.5 MW with an ambition to reach 1 GW; no timeline for later phases has been shared. The company says it plans to operate the site alongside Nvidia and Humain. Coordinates are approximate (former Kodak campus, Eastman Park Drive area), not parcel-confirmed.","src":[{"u":"https://www.cpr.org/2026/08/07/weld-county-ai-data-center/","t":"Weld County officials have told an AI company to stop construction on a new data center. Three times. (read via Internet Archive)","p":"Colorado Public Radio"},{"u":"https://www.windsorco.gov/1452/AI-Data-Center-Project-Information","t":"AI Data Center Project Information — Town of Windsor","p":"Town of Windsor, Colorado"}],"j":"city","jc":"Weld County","jn":"Windsor","jd":"town","ju":"approx"},{"id":"broadstone-project-primestone-colorado-springs-co","n":"Project Primestone (Vineyards Research Park) GPU Test Facility","op":"Broadstone Net Lease (developer/owner); operations partner Emergent Data Centers; tenant undisclosed","s":"proposed","st":"CO","city":"Colorado Springs","co":"El Paso","lat":38.7898,"lon":-104.7932,"pre":"approximate","cf":"reported","ac":33.8,"inv":303000000,"upd":"2026-10-19","nt":"Two 110,000 sq ft buildings for GPU burn-in, benchmarking and reliability testing for an unnamed 'Fortune 20' technology tenant. The developer's project statement says it is 'not a data center' because it does not sell compute. It is tracked here as a GPU compute facility. The Pikes Peak Bulletin reports a 100 MW initial building with an option to reach 200 MW, but The Gazette attributes the 100 MW figure to T5's 2013 plans, so no capacity is recorded.","src":[{"u":"https://gazette.com/?p=2039973","t":"High-tech graphics card testing facility eyeing former golf course, vineyard for $303M development","p":"The Gazette (Colorado Springs)"},{"u":"https://pikespeakbulletin.org/?p=20887","t":"Project Primestone isn't a data center – it will just look and feel like one","p":"Pikes Peak Bulletin"}],"j":"city","jc":"El Paso County","jn":"Colorado Springs","jd":"city","ju":"approx"},{"id":"qts-aurora-co","n":"QTS Aurora-Denver Data Center Campus (DEN1)","op":"QTS Data Centers","s":"under_construction","st":"CO","city":"Aurora","co":"Arapahoe","lat":39.7113,"lon":-104.7241,"pre":"approximate","cf":"reported","mw":177,"ac":67,"ann":"2022-05","upd":"2026-11-04","nt":"1160 N. Gun Club Rd, Aurora, CO 80018; eastern Aurora near E-470. Former JPMorgan data center site. Four-building campus on 67 acres. Colorado's first hyperscale facility at this scale. Coordinates based on Gun Club Rd address. Investment amount and specific job counts (previously $1B, 500 construction, 77 permanent) removed — not confirmed by cited sources. QTS Data Centers is owned by Blackstone (2021 take-private). As of 2026-07-08, one of the campus's three buildings is complete, a second is nearly finished, and site work has begun on the third. A July 2025 permit application seeks 98 additional diesel backup generators on top of the existing 40.","src":[{"u":"https://www.datacenterdynamics.com/en/news/qts-plans-15m-sq-ft-expansion-at-henrico-virginia-campus-and-denver-build-out/","t":"QTS plans Denver build-out at 177MW Aurora campus","p":"Data Center Dynamics"},{"u":"https://milehighcre.com/denver-data-center-market-capturing-growing-interest/","t":"Denver Data Center Market Capturing Growing Interest","p":"Mile High CRE"}],"j":"city","jc":"Arapahoe County","jn":"Aurora","jd":"city","ju":"approx"},{"id":"raeden-taurus-colorado-springs-co","n":"Raeden Project Taurus","op":"Raeden","s":"permitted","st":"CO","city":"Colorado Springs","co":"El Paso","lat":38.8339,"lon":-104.8214,"pre":"approximate","cf":"confirmed","mw":50,"upd":"2026-10-22","nt":"50 MW data center at the former Intel plant in Colorado Springs, El Paso County. Coordinates are the Colorado Springs area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/50mw-data-center-could-be-built-in-colorado-springs/","t":"50MW data center could be built in Colorado Springs","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"El Paso County","jn":"Colorado Springs","jd":"city","ju":"approx"},{"id":"cognovum-trumbull-ct","n":"CogNovum Data Center (80 Merritt Boulevard)","op":"CogNovum","s":"operational","st":"CT","city":"Trumbull","lat":41.2407,"lon":-73.1474,"pre":"exact","cf":"confirmed","inv":200000000,"upd":"2026-10-19","nt":"Existing 228,000 sq ft building at 80 Merritt Blvd, Trumbull, CT, built in 1960 (originally for Nasdaq per the operator's account); currently operated by CogNovum. Aphorio Carter acquired the property in 2024. On 2026-05-06, 365 Data Centers and Aphorio Carter announced a ~200MW AI-ready data-center pipeline across six US markets; Trumbull is named as a site 'under evaluation' for AI-focused upgrades to this existing building, with letters of intent not yet signed for it (only Aurora, CO and Simpsonville, KY had signed LOIs as of the release). The operator's CEO described the plan as upgrading an existing facility on existing power infrastructure, not new construction: \"We are simply updating an existing, historic facility to ensure we can continue serving our customers effectively, while supporting the town with local jobs and substantial tax revenue.\" No MW, investment, or job-count figures were published for the current facility. Coordinates cross-checked: US Census geocoder (41.240871, -73.146313) and the OSM building footprint (41.2407281, -73.1474121) agree within ~100m; the OSM point is used per the mapped-building preference. Flagging for awareness, not asserted as fact: OSM's building tag for this address (as retrieved 2026-09-12) reads \"Digital Realty New York HVN10,\" which is not corroborated by any 2026 source found in this search and may reflect a prior/stale ownership label rather than current fact.","src":[{"u":"https://finance.yahoo.com/sectors/technology/articles/trumbull-data-center-eyed-ai-100000924.html","t":"Trumbull data center eyed for AI-driven upgrades in nationwide expansion","p":"Hartford Business Journal (via Yahoo Finance)"},{"u":"https://www.globenewswire.com/news-release/2026/05/06/3288919/0/en/365-data-centers-and-aphorio-carter-launch-200-mw-ai-ready-data-center-pipeline.html","t":"365 Data Centers and Aphorio Carter Launch ~200 MW AI-Ready Data Center Pipeline","p":"GlobeNewswire"}],"j":"uninc","jc":"Greater Bridgeport Planning Region","jm":"Trumbull town"},{"id":"ne-edge-millstone-ct","n":"NE Edge Millstone Nuclear Data Center","op":"NE Edge","s":"cancelled","st":"CT","city":"Waterford","co":"New London","lat":41.3218,"lon":-72.1582,"pre":"approximate","cf":"confirmed","mw":300,"ann":"2023-01","upd":"2026-10-30","pb":"Nuclear (Millstone Units 2 and 3, Dominion Energy)","nt":"Connecticut has no hyperscale data centers. Governor Lamont's administration has since required new data centers to bring their own power generation rather than draw from the grid, and has proposed a PILOT framework in lieu of the prior tax incentive structure. Only one company (Cigna) used Connecticut's data center tax incentive since its enactment.","src":[{"u":"https://ctmirror.org/2024/01/19/millstone-power-plant-ct-data-center-nuclear/","t":"Millstone Nuclear Plant Would Power Proposed CT Data Center","p":"CT Mirror"},{"u":"https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/","t":"Opinion: Tale of a Defeated Data Center in CT","p":"CT Mirror"}],"j":"uninc","jc":"Southeastern Connecticut Planning Region","jm":"Waterford town","ju":"approx"},{"id":"starwood-digital-project-washington-de","n":"Project Washington (Starwood Digital Ventures)","op":"Starwood Digital Ventures","s":"proposed","st":"DE","city":"Delaware City","co":"New Castle","lat":39.578,"lon":-75.593,"pre":"approximate","cf":"reported","mw":1200,"ac":580,"ann":"2025-07","upd":"2026-11-04","nt":"Largest proposed data center in Delaware history. 11 two-story buildings, 5 substations, 1 switch station, 516 emergency diesel generators on 580 acres. CZA permit denied February 4, 2026; denial unanimously upheld by Coastal Zone Industrial Control Board March 26, 2026. Appeal to Delaware Superior Court anticipated. Delaware Building Trades Council exclusive union labor agreement in place. Original $9.7B investment figure removed — not confirmed in any cited source. Coordinates approximate for Delaware City area.","src":[{"u":"https://spotlightdelaware.org/2026/02/04/delaware-city-data-center-faces-major-setback-after-environmental-denial/","t":"Delaware City data center faces major setback after environmental denial","p":"Spotlight Delaware"},{"u":"https://www.delawarepublic.org/politics-government/2026-03-24/starwood-digital-ventures-makes-its-case-to-overturn-coastal-zone-ruling-against-its-data-center-plan","t":"Starwood Digital Ventures makes its case to overturn Coastal Zone ruling against its data center plan","p":"Delaware Public Media"}],"j":"city","jc":"New Castle County","jn":"Delaware City","jd":"city","ju":"approx"},{"id":"atlas-compute-ai-data-center-campus-fort-pierce-fl","n":"Atlas Compute AI Data Center Campus","op":"Atlas Compute (infrastructure by Penguin Solutions)","s":"proposed","st":"FL","city":"Fort Pierce","co":"St. Lucie","lat":27.44,"lon":-80.33,"pre":"approximate","cf":"confirmed","mw":240,"upd":"2026-10-20","nt":"Land and utilities secured. Targeting operational Q4 2026-Q1 2027. Up to 1 GW expansion capacity. Distinct from the withdrawn Sentinel Grove/Project Jarvis project in the same county.","src":[{"u":"https://www.globenewswire.com/news-release/2025/11/06/3182873/0/en/Atlas-Compute-Secures-Land-and-Utilities-for-240-MW-AI-Data-Center-Campus-in-Central-Florida-with-1-GW-Expansion-Capacity.html","t":"Atlas Compute secures land and utilities for 240 MW AI data center campus","p":"GlobeNewswire"},{"u":"https://www.wflx.com/2026/03/12/florida-based-company-announced-plans-build-ai-data-center-fort-pierce/","t":"Florida-based company announces plans to build AI data center in Fort Pierce","p":"WFLX"}],"j":"city","jc":"St. Lucie County","jn":"Fort Pierce","jd":"city","ju":"approx"},{"id":"cielo-haines-city-fl","n":"Cielo Haines City Data Center","op":"Cielo Digital Infrastructure","s":"proposed","st":"FL","city":"Haines City","co":"Polk","lat":28.1114,"lon":-81.6198,"pre":"approximate","cf":"reported","mw":300,"ac":74,"ann":"2026-06","upd":"2026-10-20","nt":"300 MW planned, ~74-acre site along Marion Road and State Road 544 East, Haines City, Polk County -- pre-application stage (no site plan, zoning request, or development agreement filed as of Aug 2026), distinct from the Lakeland (Ryan Companies/Project Swan) and Fort Meade (Stonebridge/Florida Ecopark) Polk County sites, both tracked as of August 2026. As of August 2026, no precise parcel address, investment figure, or jobs figure was disclosed in any source found; coordinates are the Haines City area centroid, not the actual site. The Data Center Dynamics original report could not be retrieved directly as of August 2026; the story is corroborated via Yahoo Finance syndication and independent Citrus Tea investigative reporting citing city commission records. Multiple other independent local outlets (WFLA, Fox 13 Tampa Bay, Bay News 9) covered the same story at headline level.","src":[{"u":"https://finance.yahoo.com/technology/ai/articles/florida-data-center-project-stalls-180033586.html","t":"Florida data center project stalls amid water permit fight","p":"Yahoo Finance (syndicating Data Center Dynamics)"},{"u":"https://thecitrustea.com/2026/07/02/haines-city-data-center-new-documents-show-what-commissioners-were-told-before-the-public-and-when/","t":"Haines City data center: new documents show what commissioners were told before the public, and when","p":"The Citrus Tea"}],"j":"city","jc":"Polk County","jn":"Haines City","jd":"city","ju":"approx"},{"id":"dcblox-palm-coast-cls-fl","n":"DC BLOX Palm Coast Cable Landing Station","op":"DC BLOX","s":"under_construction","st":"FL","city":"Palm Coast","co":"Flagler","lat":29.5389,"lon":-81.2456,"pre":"approximate","cf":"confirmed","ann":"2025-07-10","upd":"2026-08-25","nt":"A subsea cable landing station campus in Palm Coast's Town Center rather than a conventional AI campus, which is why it is classified mixed_use. Google owns the first cable, Sol, running to Europe; the site is built to land up to eight. Phase one is due operational in Q1 2027. A DC BLOX executive said the build will reach two buildings totalling 100,000 sq ft against the single 35,000 sq ft building city planners approved, which is the dispute behind the city's clarification.","src":[{"u":"https://flaglerlive.com/data-center-records/","t":"Records reveal some details as construction starts on scaled down data center in Palm Coast's Town Center","p":"FlaglerLive"},{"u":"https://www.flaglercounty.gov/News-articles/2025-07-10-DC-BLOX-and-Google-to-Bring-Cutting-Edge-Connectivity-to-Flagler-County","t":"DC BLOX and Google bring cutting-edge connectivity to Flagler County","p":"Flagler County"}],"j":"city","jc":"Flagler County","jn":"Palm Coast","jd":"city","ju":"approx"},{"id":"stonebridge-fort-meade-fl","n":"Florida Ecopark AI Data Center Campus","op":"Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)","s":"proposed","st":"FL","city":"Fort Meade","co":"Polk","lat":27.7525,"lon":-81.8024,"pre":"approximate","cf":"reported","mw":1200,"ac":200,"inv":2600000000,"ann":"2026-03","upd":"2026-11-04","nt":"1,300-acre former phosphate mine site; 200-acre data center footprint. 20-year development agreement approved by Fort Meade City Commission approximately April 15, 2026. Requires 1.2 GW of electricity. No identified lessee or buyer publicly disclosed. Water use reduced in plans from 140,000 to 50,000 gallons daily; Southwest Florida Water Management District approval pending separately. Florida SB 484 signed May 2026 added new state-level data center siting requirements. Coordinates are Fort Meade city centroid; actual site is former phosphate mine outside city limits. As of 2026-09-10, the record remains listed as proposed. The 20-year development agreement was unanimously approved by Fort Meade commissioners (2026-04-15), but two resident lawsuits filed 2026-05-14 seek to void that approval and block construction-permit issuance (trial scheduled November 2027), and a recall effort against three commissioners is itself now in litigation (Commissioner Matthew Taylor sued 2026-09-09 to stop the recall). No groundbreaking reported. An exact street address has not been found in public reporting (site described only as 'west of US-98' on former phosphate-mine land). The Florida Department of Commerce letter of April 15, 2026 describes the project as \"nestled off SR-17\" and within the vicinity of US 98, SR 62, and SR 64.","src":[{"u":"https://www.wusf.org/environment/2026-04-08/fort-meade-is-one-step-closer-to-building-floridas-first-hysperscale-ai-data-center","t":"Fort Meade is one step closer to building Florida's first hyperscale AI data center","p":"WUSF"},{"u":"https://www.tampabay.com/news/florida-politics/2026/04/16/florida-data-center-fort-meade-desantis-utilities-water-ai/","t":"DeSantis admin hits Florida city over hyperscale data center proposal","p":"Tampa Bay Times"}],"j":"city","jc":"Polk County","jn":"Fort Meade","jd":"city","ju":"approx"},{"id":"la-rosa-holdings-saint-cloud-fl","n":"La Rosa Holdings Tier III AI Data Center — St. Cloud","op":"La Rosa Holdings Corp.","s":"proposed","st":"FL","city":"Saint Cloud","co":"Osceola","lat":28.1896,"lon":-81.2784,"pre":"approximate","cf":"confirmed","mw":1.5,"ann":"2026-02-05","upd":"2026-09-14","nt":"Small enterprise/AI facility: up to 10,000 sq ft at Tier III with roughly 1.5 MW of IT load. The transaction is conditional — the company's own filing states there can be no assurance the acquisition is consummated, and it carried a 75-day due diligence exit. The $675,000 in the 8-K is the land purchase price, not a facility investment, so an investment figure is deliberately omitted.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1879403/000121390026013369/ea0275797-8k_larosa.htm","t":"La Rosa Holdings Corp. Form 8-K (filed 6 February 2026) — contract to purchase 2570 AmeraTrails Lot 6D, Saint Cloud FL 34772 for $675,000 with a 75-day due diligence period; closing set for 15 June 2026; intent to develop a Tier III AI data center","p":"U.S. Securities and Exchange Commission (EDGAR)"},{"u":"https://www.globenewswire.com/news-release/2026/02/05/3233097/0/en/La-Rosa-Holdings-Corp-Signs-Contract-to-Acquire-Development-Site-for-Up-to-10-000-Sq-Ft-Tier-III-AI-Data-Center-in-Central-Florida-s-Fastest-Growing-Region.html","t":"La Rosa Holdings Corp. press release, 5 February 2026 — up to 10,000 sq ft Tier III AI data center in Osceola County supporting an estimated IT load of ~1,500 kW","p":"GlobeNewswire / La Rosa Holdings Corp."}],"j":"city","jc":"Osceola County","jn":"St. Cloud","jd":"city","ju":"approx"},{"id":"metrobloks-mia-a1-miami-fl","n":"Metrobloks MIA-A1 (MB01)","op":"Metrobloks","s":"proposed","st":"FL","city":"Miami","co":"Miami-Dade","lat":25.79,"lon":-80.41,"pre":"approximate","cf":"confirmed","mw":15.2,"ac":4.05,"inv":150000000,"ann":"2025-04","upd":"2026-09-21","nt":"500 NW 137th Avenue, Miami-Dade County (Airport West submarket, near Miami International Airport). Land acquisition closed March 31, 2025; targeting operations by end of 2026, but as of August 2026 no permit or construction-start source had been located, so the status is proposed rather than under construction. Capacity is disputed between the operator's own two pages: 15.2 MW at the press-release/land-acquisition stage (independently corroborated by Cushman & Wakefield) vs. 16.8 MW critical IT on the current site page, which separately claims ~40,500 sq ft of total whitespace across two 15,200 sq ft halls (an internal arithmetic inconsistency on the operator's own page). The better-corroborated 15.2 MW figure is recorded. The operator's site page states ~21ms round-trip latency to the NAP of the Americas and Uptime Tier III design intent with liquid cooling to 150kW/rack. As of August 2026, no confirmed total-building square footage or jobs figure had been located, so neither is recorded; Miami AI News (August 2026) cites a Miami Herald report of a 112,900-square-foot data center. The recorded $150 million investment is the figure Miami-Dade Beacon Council CEO Rodrick T. Miller gave in the operator's March 2025 press release; Miami AI News describes the same amount as the purchase price of the 4.05-acre site. As of August 2026, no opposition or permit coverage was found; Airport West is a commercial/industrial submarket. Coordinates are an approximate Airport West-area estimate, not a parcel-confirmed geocode of the street address.","src":[{"u":"https://www.metrobloks.com/press-release/metrobloks-acquires-land-in-miami-fl-to-build-15-2mw-ai-ready-data-center","t":"Metrobloks acquires land in Miami, FL to build 15.2MW AI-ready data center","p":"Metrobloks"},{"u":"https://www.metrobloks.com/sites/mia-mb01","t":"MIA A1 (MB01) site page","p":"Metrobloks"}],"j":"city","jc":"Miami-Dade County","jn":"Sweetwater","jd":"city","ju":"approx"},{"id":"okee-one-irsc-okeechobee-fl","n":"Okee-One Data Center Campus","op":"Indian River State College","s":"cancelled","st":"FL","city":"Okeechobee","co":"Okeechobee","lat":27.2467,"lon":-80.8303,"pre":"approximate","cf":"confirmed","ac":205,"upd":"2026-10-02","nt":"Indian River State College's 'Okee-One' project on the former Florida School for Boys site off US 441, a 205-acre site reported by WLRN as a 9-to-10-megawatt facility (figure given as a range, not a single confirmed number, so no capacity is recorded). Effectively shut down after Okeechobee County commissioners voted April 23, 2026 to remove the 'Special Technology Opportunity Centers' designation from the county's comprehensive economic growth plan, following a petition against the project that gathered more than 3,000 signatures. The state had previously granted IRSC $1.5M from the Rural Infrastructure Fund for the project; DeSantis administration officials later told Tampa Bay Times they felt misled about its scale and AI-data-center purpose.","src":[{"u":"https://www.wlrn.org/government-politics/2026-04-29/scrapped-data-center-in-okeechobee-county-mirrors-rising-opposition-to-data-centers-in-south-florida","t":"Scrapped data center in Okeechobee County mirrors rising opposition to data centers in South Florida","p":"WLRN"},{"u":"https://www.tampabay.com/news/environment/2026/04/24/florida-data-center-desantis-okeechobee-college-campus/","t":"Future uncertain for Florida data center campus project in Okeechobee","p":"Tampa Bay Times"}],"j":"city","jc":"Okeechobee County","jn":"Okeechobee","jd":"city","ju":"approx"},{"id":"project-tango-loxahatchee-fl","n":"Project Tango AI Data Center Campus","op":"PBA Holdings (end tenant undisclosed)","s":"cancelled","st":"FL","city":"Loxahatchee","co":"Palm Beach","lat":26.6284,"lon":-80.39,"pre":"approximate","cf":"reported","ac":202,"ann":"2025-12","upd":"2026-10-22","pb":"Florida Power and Light (adjacent to West County Energy Center, 3,750 MW)","nt":"202 acres on Southern Boulevard, approximately 3.7 miles west of Seminole Pratt Whitney Road, Loxahatchee. Phillips Inc. and TPA Group involved in development under PBA Holdings. Original 2016 zoning covered 206,000 sq ft; current application for 1.79M sq ft data center plus 1.9M sq ft warehouse. MW capacity not disclosed. End user likely a major hyperscaler but not publicly identified. Coordinates are approximate site location. As of 2026-09-10, cancelled status is confirmed. Palm Beach County commissioners denied the development order amendment 5-1 on 2026-07-15 ('without prejudice', meaning the developer could refile); a previously approved warehouse/data-center plan for the same site under the separate Central Park Commerce Center development remains in place.","src":[{"u":"https://www.datacenterdynamics.com/en/news/37-million-sq-ft-data-center-campus-gets-initial-ok-from-officials-in-florida/","t":"3.7 million sq ft data center campus gets initial OK from officials in Florida","p":"Data Center Dynamics"},{"u":"https://www.wlrn.org/government-politics/2025-12-10/project-tango-ai-data-center-palm-beach-county","t":"Palm Beach County postpones 200-acre Project Tango AI data center after community outrage","p":"WLRN"}],"j":"uninc","jc":"Palm Beach County","ju":"approx"},{"id":"readysetfundgrow-fishbowl-homestead-fl","n":"ReadySetFundGrow FishBowl AI Edge Micro-Datacenter","op":"ReadySetFundGrow (subsidiary of Farrington Capital Group)","s":"proposed","st":"FL","city":"Homestead","co":"Miami-Dade","lat":25.5525,"lon":-80.3947,"pre":"approximate","cf":"reported","ann":"2026-03-04","upd":"2026-10-20","nt":"The planned 10-rack micro-datacenter (the 'FishBowl') would sit in a 2,295 sq ft building on a 20,000 sq ft parcel fronting US-1. It is part of a campus that also includes a tech incubator, a virtual office hub and a 15-port EV charging hub. Development depends on closing $1,000,000 in senior secured financing, followed by a phased buildout of about 9 months. The March 20 release cites 1,600-amp power capacity. All figures are self-reported by the company. Coordinates are a street-address geocode.","src":[{"u":"https://www.mediabistro.com/media-news/remergify-farrington-capital-group-announce-plans-to-develop-readysetfundgrow-south-miami-dades-first-micro-datacenter-tech-incubator-ev-charging-hub/","t":"Remergify & Farrington Capital Group announce plans to develop ReadySetFundGrow, South Miami-Dade's first micro-datacenter, tech incubator & EV charging hub (ACCESS Newswire release, Mar 4 2026)","p":"ACCESS Newswire via Mediabistro"},{"u":"https://www.mediabistro.com/media-news/readysetfundgrow-announces-south-dade-ai-edge-micro-datacenter-and-opportunity-zone-investment-platform/","t":"ReadySetFundGrow announces South Dade AI edge micro-datacenter and Opportunity Zone investment platform (Mar 20 2026)","p":"ACCESS Newswire via Mediabistro"}],"j":"uninc","jc":"Miami-Dade County","jn":"Goulds","ju":"approx"},{"id":"silver-fox-606-indiantown-fl","n":"Silver Fox 606 AI Data Center Campus","op":"Silver Fox 606 LLC","s":"proposed","st":"FL","city":"Indiantown","co":"Martin","lat":27.04,"lon":-80.5173,"pre":"approximate","cf":"reported","mw":1000,"ac":606,"upd":"2026-10-30","nt":"A roughly 2-million-sq-ft AI data center campus proposed in the Village of Indiantown. The applicant withdrew its master site plan application in April 2026; a revised plan was presented at a public open house in September 2026. Separate from FPL's Tesoro Groves PUD on Kanner Highway, which FPL states is \"a planning framework for future development, not a specific project\" and, as of September 2026, is therefore not tracked here as a facility.","src":[{"u":"https://www.wptv.com/news/region-martin-county/indiantown/indiantown-data-center-plans-scrapped-as-village-sets-record-straight-on-undeveloped-land","t":"WPTV — Indiantown data center plans scrapped: Silver Fox 606, 13820 Silver Fox Road, 2 million sq ft, withdrawn after community pushback","p":"WPTV News Channel 5"},{"u":"https://www.yahoo.com/news/us/articles/florida-data-center-developers-host-012531808.html","t":"Florida data center developers host open house to praise benefits","p":"TCPalm (via Yahoo News)"}],"j":"city","jc":"Martin County","jn":"Indiantown","jd":"village","ju":"approx"},{"id":"university-of-florida-data-center-gainesville-fl","n":"University of Florida Data Center (East Campus, HiPerGator)","op":"University of Florida","s":"operational","st":"FL","city":"Gainesville","co":"Alachua","lat":29.6723,"lon":-82.3014,"pre":"approximate","cf":"confirmed","upd":"2026-10-02","nt":"The Alligator reports that HiPerGator is housed in the UF Data Center on East Campus. Whiting-Turner describes 10,000 sq ft of computing space, split between a Tier 3 data center and 5,000 sq ft of data center research space, plus 4,400 sq ft of standby administrative space. The building has 2.5 MW of generator capacity and an on-site central utility plant. UF's Board of Trustees approved a $24M HiPerGator upgrade in December 2024; the system costs about $6M a year to operate. That $24M is a hardware upgrade, not facility investment. Classed as mixed-use because the building also hosts general enterprise and research computing alongside the NVIDIA AI supercomputer. The building's exact street address is not confirmed, so coordinates are the East Campus centroid and approximate.","src":[{"u":"https://www.alligator.org/article/2025/04/hipergator-fourth-generation-in-motion","t":"Fourth generation of UF supercomputer, HiPerGator, approved with sustainability in mind","p":"The Independent Florida Alligator"},{"u":"https://news.ufl.edu/2025/05/the-fourth-generation-model-of-ufs-hipergator/","t":"The fourth-gen model of UF's HiPerGator, available to users in June, is built to reshape AI education and research","p":"University of Florida News"}],"j":"city","jc":"Alachua County","jn":"Gainesville","jd":"city","ju":"approx"},{"id":"aws-butts-county-ga","n":"AWS Butts County Data Center Campus","op":"Amazon Web Services","s":"proposed","st":"GA","city":"Jackson","co":"Butts","lat":33.2946,"lon":-83.9663,"pre":"approximate","cf":"confirmed","ann":"2025-01-07","upd":"2026-08-28","nt":"Deliberately no site-level investment or job figure: the $11B and the \"at least 550 new high-skilled jobs\" in Amazon's release are entity-level totals covering BOTH the Butts County and Douglas County projects, and cannot be attributed to either site alone.","src":[{"u":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","t":"AWS plans to invest at least $11 billion in Georgia to expand infrastructure to support AI and cloud technologies","p":"Amazon"},{"u":"https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/","t":"Amazon plans $11 billion data center expansion in Georgia","p":"The Atlanta Journal-Constitution"}],"j":"city","jc":"Butts County","jn":"Jackson","jd":"city","ju":"approx"},{"id":"aligned-atl-01-lithia-springs-ga","n":"Aligned Data Centers ATL-01","op":"Aligned Data Centers","s":"operational","st":"GA","city":"Lithia Springs","co":"Douglas","lat":33.7943,"lon":-84.6602,"pre":"approximate","cf":"reported","upd":"2026-08-28","nt":"Capacity intentionally omitted: a 100 MW figure appears in third-party directories but is not stated on any cited page.","src":[{"u":"https://aligneddc.com/atlanta-data-centers/","t":"Atlanta Data Centers — Aligned Data Centers (ATL-01)","p":"Aligned Data Centers"}],"j":"uninc","jc":"Douglas County","jn":"Lithia Springs","ju":"approx"},{"id":"4am-burkhalter-road-statesboro-ga","n":"Burkhalter Road Data Center","op":"4AM Development, LLC","s":"proposed","st":"GA","city":"Statesboro","co":"Bulloch","lat":32.4377,"lon":-81.7756,"pre":"approximate","cf":"reported","ac":27,"ann":"2026-08-19","upd":"2026-08-25","nt":"A two-story building of about 115,000 sq ft per floor on nearly 27 acres at 6539 Burkhalter Road, just inside Statesboro's city limits. The planning commission recommended the rezoning 5-1 on 4 August 2026 and the city council approved it on 19 August, from high-density residential to Office and Business District. Residents reported this one by street address — 6539 Burkhalter Road appears in this export as a first-time location.","src":[{"u":"https://www.wtoc.com/2026/08/19/statesboro-city-council-approves-rezoning-data-center-amid-protests/","t":"Statesboro City Council approves rezoning for data center amid protests","p":"WTOC"},{"u":"https://www.wtoc.com/2026/08/04/statesboro-planning-commission-backs-proposed-data-center-rezoning-5-1-vote/","t":"Statesboro Planning Commission backs proposed data center rezoning in 5-1 vote","p":"WTOC"}],"j":"city","jc":"Bulloch County","jn":"Statesboro","jd":"city","ju":"approx"},{"id":"dcblox-atlanta-east-conyers-ga","n":"DC BLOX Atlanta East Hyperscale Data Center Campus","op":"DC BLOX","s":"under_construction","st":"GA","city":"Conyers","co":"Rockdale","lat":33.66,"lon":-84.02,"pre":"approximate","cf":"reported","mw":216,"ac":72,"ann":"2023","upd":"2026-10-22","pb":"Georgia Power","nt":"Coordinates approximate; physical address is 1726 Farmer Road NW, Conyers GA 30012. Land: 72 acres acquired per press release; Georgia EPD permit SAS-2024-00075 references 52.84-acre development footprint with three 40MW buildings. Capacity: 216MW total committed by Georgia Power per utility agreement and DRI filing; DC BLOX facility page cites 154 critical/IT MW (1 × 10MW + 3 × 48MW buildings = 154MW IT load). Phase 1 targeted Q4 2025 delivery (hyperscale anchor + 160,000 sq ft available to additional tenants); non-water-quality construction began December 2025; water-quality permitted work may begin October 2026 with full build taking ~1 year. Dark fiber metro ring planned around Atlanta connecting Atlanta East and Atlanta West campuses and continuing to Myrtle Beach cable landing station. AI/ML applications explicitly cited in press materials as key driver of Atlanta hyperscale demand. DISTINCT from DC BLOX Atlanta West campus in Douglas County (Lithia Springs, ~55 acres, 180MW). Investment amount not publicly disclosed. Job counts not disclosed.","src":[{"u":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","t":"DC BLOX announces Rockdale County hyperscale campus (Dec 12 2023)","p":"DC BLOX"},{"u":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","t":"DC BLOX Atlanta East facility page","p":"DC BLOX"}],"j":"city","jc":"Rockdale County","jn":"Conyers","jd":"city","ju":"approx"},{"id":"dc-blox-atlanta-west-ga","n":"DC BLOX Atlanta West (ATL1)","op":"DC BLOX","s":"under_construction","st":"GA","city":"Lithia Springs","co":"Douglas","lat":33.7882,"lon":-84.6608,"pre":"approximate","cf":"confirmed","mw":120,"ac":100,"inv":1150000000,"ann":"2025-08","upd":"2026-10-22","pb":"Greystone Power Cooperative","nt":"Initial 120 MW phase (Building A); site plan includes additional 80 MW Building B (delivery early 2028) and 80 MW Building C (early 2029) totaling 200+ MW. The investment figure reflects green loan construction financing announced August 11, 2025. Located adjacent to Microsoft Douglasville campus, 2.5 miles from Google facility. Coordinates are Lithia Springs area centroid. The original DCD source URL was no longer available as of July 2026 and was replaced with the DC BLOX official press release, which supports all claims. The $98M Douglasville abatement was granted for the campus in the Riverside West Business Park (New River Road); city/authority filings cite 25 permanent jobs (~$130k average) and up to 500 construction jobs over five years — projections, not confirmed headcounts.","src":[{"u":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","t":"DC BLOX Secures $1.15 Billion Green Loan for Atlanta Data Center Campus Development","p":"DC BLOX"},{"u":"https://www.dcblox.com/data-centers/douglas-county-ga-hyperscale-data-center-campus/","t":"Atlanta West Hyperscale Data Center Campus – DC BLOX official page","p":"DC BLOX"}],"j":"uninc","jc":"Douglas County","jn":"Lithia Springs","ju":"approx"},{"id":"databank-indo-cartersville-ga","n":"DataBank Project Indo","op":"DataBank","s":"proposed","st":"GA","city":"Cartersville","co":"Bartow","lat":34.1651,"lon":-84.7996,"pre":"approximate","cf":"reported","mw":200,"ac":69,"inv":2400000000,"ann":"2026","upd":"2026-10-22","nt":"Project Indo: a 200 MW campus on 69 acres at 218 Industrial Park Rd, Cartersville, Bartow County (~288 MW grid connection filed); DRI submitted, first phase targeted 2032. Coordinates are the Cartersville area centroid. Public-reception check (2026-09-10): Checked a DCD-sourced writeup (2026-09-10, DCD's own page could not be read directly) covering the Development of Regional Impact filing (69 acres, 200MW, $2.4B at full build-out, first phase possibly 2032). No public hearing, resident reaction, or official statement of support/opposition documented in this source.","src":[{"u":"https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/","t":"DataBank files for 200MW data center campus outside Atlanta, Georgia","p":"Data Center Dynamics"},{"u":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","t":"The Daily Tribune (Cartersville, GA) — Data center eyes Cartersville industrial site","p":""}],"j":"city","jc":"Bartow County","jn":"Cartersville","jd":"city","ju":"approx"},{"id":"duos-edge-ai-columbus-campus-ga","n":"Duos Edge AI Columbus Campus","op":"Duos Edge AI (Duos Technologies Group)","s":"operational","st":"GA","city":"Columbus","co":"Muscogee","lat":32.461,"lon":-84.9877,"pre":"approximate","cf":"reported","mw":20,"upd":"2026-10-14","nt":"Duos raised $55M to acquire the Columbus facility. The first 10 MW was expected to begin generating revenue in August 2026. A five-year, $111M+ agreement with an unnamed investment-grade hyperscaler takes critical IT load to 20 MW by end of Q4 2026. An MSA with Nistar covers up to 2 MW. The street address is from an aggregator; coordinates are the Columbus city centroid.","src":[{"u":"https://finviz.com/news/369071/duos-edge-ai-signs-five-year-10-mw-colocation-agreement-with-investment-grade-hyperscaler-valued-at-111-million-in-contracted-revenue","t":"Duos Edge AI Signs Five-Year 10 MW Colocation Agreement with Investment-Grade Hyperscaler","p":"Duos Technologies Group (via Finviz)"},{"u":"https://insidethedatacenter.com/articles/georgia-data-centers/","t":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","p":"Inside the Datacenter"}],"j":"city","jc":"Muscogee County","jn":"Columbus","jd":"city","ju":"approx"},{"id":"edged-atlanta-tilford-yard-ga","n":"Edged Atlanta (ATL01)","op":"Edged Energy (Endeavour)","s":"operational","st":"GA","city":"Atlanta","co":"Fulton","lat":33.749,"lon":-84.388,"pre":"approximate","cf":"reported","mw":168,"ann":"2024-08-21","upd":"2026-08-28","nt":"First of three planned buildings on the campus; building one is 27 MW, full campus planned at 168 MW. Supports up to 70 kW/rack air-cooled and 200 kW/rack with liquid cooling.","src":[{"u":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","t":"Edged Data Centers Celebrates Grand Opening of New Ultra-Efficient, Sustainable Data Center in Atlanta","p":"Edged Energy via PR Newswire"}],"j":"city","jc":"Fulton County","jn":"Atlanta","jd":"city","ju":"approx"},{"id":"flexential-atlanta-douglasville-1-ga","n":"Flexential Atlanta - Douglasville 1","op":"Flexential","s":"operational","st":"GA","city":"Douglasville","co":"Douglas","lat":33.7311,"lon":-84.6161,"pre":"exact","cf":"reported","upd":"2026-09-21","nt":"1700 N River Rd, 205,000 sqft, 22.5MW, Gen 5 design. AI/HPC (confirmed): DigitalOcean GPU Droplets on NVIDIA H200 + AMD Instinct, two data halls.","src":[{"u":"https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center","t":"Flexential facility directory","p":"Flexential"},{"u":"https://www.openstreetmap.org/way/1097502168","t":"OpenStreetMap way/1097502168","p":"OpenStreetMap"}],"j":"city","jc":"Douglas County","jn":"Douglasville","jd":"city"},{"id":"grindcap-marietta-bells-ferry-ga","n":"GrindCap Marietta Campus (Bells Ferry Road)","op":"Grind Capital Group","s":"proposed","st":"GA","city":"Marietta","co":"Cobb","lat":33.9526,"lon":-84.5499,"pre":"approximate","cf":"confirmed","mw":108,"ac":31,"ann":"2025-06-17","upd":"2026-08-25","nt":"Two two-story buildings totalling 347,200 sq ft on 31.4 acres at 1751 Bells Ferry Road — DC-1 at 213,600 sq ft and 48 MW IT load, DC-2 at 133,600 sq ft and 24 MW. Marietta City Council rezoned the site 7-0 from Community Retail Commercial to Light Industrial on 17 June 2025. Closed-loop cooling and an on-site substation; the 105-foot structures are to be screened from neighbouring homes by grading and trees.","src":[{"u":"https://www.datacenterdynamics.com/en/news/108mw-data-center-campus-granted-zoning-approval-outside-atlanta-georgia/","t":"108MW data center campus granted zoning approval outside Atlanta, Georgia","p":"Data Center Dynamics"},{"u":"https://eastcobbnews.com/citizens-urge-marietta-city-council-to-scuttle-data-center/","t":"Citizens urge Marietta City Council to scuttle data center","p":"East Cobb News"}],"j":"city","jc":"Cobb County","jn":"Marietta","jd":"city","ju":"approx"},{"id":"meta-stanton-springs-newton-ga","n":"Meta Newton Data Center (Stanton Springs)","op":"Meta Platforms","s":"operational","st":"GA","city":"Social Circle","co":"Newton","lat":33.6551,"lon":-83.7182,"pre":"approximate","cf":"reported","ann":"2021-03-14","upd":"2026-08-28","nt":"970,000 sq ft as described by Meta. As of August 2026, the only source is operator-primary, so the record is marked reported rather than confirmed; the campus has since been reported as expanded, but no expansion figure is asserted here.","src":[{"u":"https://datacenters.atmeta.com/2021/03/hello-georgia/","t":"Hello, Georgia! — Meta Data Centers (Newton County / Stanton Springs)","p":"Meta"}],"j":"city","jc":"Walton County","jn":"Social Circle","jd":"city","ju":"approx"},{"id":"microsoft-firecracker-rome-ga","n":"Microsoft Data Center Campus – Rome, GA","op":"Microsoft","s":"permitted","st":"GA","city":"Rome","co":"Floyd","lat":34.27,"lon":-85.16,"pre":"approximate","cf":"reported","ac":347,"inv":1000000000,"ann":"2023","upd":"2026-10-28","nt":"Data Center Dynamics reports that the Rome Floyd County Development Authority (RFCDA) announced a '$1 billion' campus; AllOnGeorgia's account of the announcement says Microsoft is 'investing over $1,000,000,000'. The recorded investment of $1 billion is therefore a floor (AllOnGeorgia's wording is 'over'), not a final cost. Completion targeted 2027–2028. Site is 347 acres on Huffaker Road, east of Fouche Gap Road, in unincorporated Floyd County, adjacent to Georgia Power-owned land; land purchased at $40,000/acre (~$13.9M). Microsoft stated site selection was driven by 'Rome and Floyd County's industrial zoning and strong infrastructure.' Microsoft committed to covering all costs for additional infrastructure (power, water, roads) so ratepayers and taxpayers are not burdened. Part of Microsoft's broader East US 3 Georgia cloud build-out; announced to bolster Azure cloud services. Floyd County enacted an 80-day moratorium on new data center permits (2025) but explicitly noted previously filed projects including Microsoft's can proceed. Capacity MW not disclosed. Coordinates are approximate; actual parcel is on Huffaker Road in unincorporated Floyd County.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/","t":"Microsoft to develop 350-acre data center campus in Rome, Georgia","p":"Data Center Dynamics"},{"u":"https://www.northwestgeorgianews.com/rome/news/local/updated-microsoft-to-invest-1-billion-in-data-center-in-floyd-county/article_128f3c2c-772f-11ee-a991-7fb8d4f28f86.html","t":"Microsoft To Invest $1 Billion In Data Center in Floyd County","p":"Northwest Georgia News"}],"j":"city","jc":"Floyd County","jn":"Rome","jd":"city","ju":"approx"},{"id":"microsoft-douglasville-ga","n":"Microsoft Douglasville Data Center Campus","op":"Microsoft","s":"under_construction","st":"GA","city":"Douglasville","co":"Douglas","lat":33.7547,"lon":-84.7427,"pre":"approximate","cf":"confirmed","ac":160,"ann":"2024-01","upd":"2026-10-22","pb":"Georgia Power grid (Douglas County service area)","nt":"Four 245,000 sq ft technology facilities totaling ~980,000 sq ft on 160-acre parcel at 1601 North River Road, Douglasville. Part of Azure East US 3 region alongside facilities in East Point and Palmetto. Coordinates are Douglasville city centroid; actual site is northern Douglasville.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-to-launch-new-cloud-region-in-atlanta-georgia-in-2027/","t":"Microsoft to launch new cloud region in Atlanta, Georgia, in 2027","p":"Data Center Dynamics"},{"u":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","t":"Details Emerge On Microsoft's $1.8 Billion Investment In Atlanta Data Centers","p":"Data Center Frontier"}],"j":"city","jc":"Douglas County","jn":"Douglasville","jd":"city","ju":"approx"},{"id":"microsoft-fairwater-fayetteville-ga","n":"Microsoft Fairwater Atlanta (Azure AI Superfactory)","op":"Microsoft","s":"operational","st":"GA","city":"Fayetteville","co":"Fayette","lat":33.4487,"lon":-84.4549,"pre":"approximate","cf":"confirmed","mw":1500,"ac":615,"ann":"2025","upd":"2026-10-22","pb":"Georgia Power","nt":"615-acre, up-to-13-building QTS-built campus on Hwy 54W near Fayetteville, Fayette County (Microsoft's materials say 'Atlanta'). Began operation Oct 2025 as Fairwater 2 — a 'multi-gigawatt' AI campus. ~1,500 MW is the anticipated ultimate Georgia Power load across all buildings (planned figure; ~433 MW cited as initially online). Distinct from Microsoft's smaller Tyrone, GA campus. Two-story design with no UPS or backup generators. Coordinates are the Fayetteville area centroid. Microsoft has not disclosed tenant capex for the Fairwater Fayetteville space; the ~$1B/$6.5B figures are QTS developer build-out estimates for the full multi-tenant campus, and the widely-cited $14.5M abatement / $1.8B / $75M figures attach to different Microsoft/Fulton-County sites (the $75M was FCDA land-sale proceeds, not a subsidy to QTS) -> no investment figure is recorded.","src":[{"u":"https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/","t":"From Wisconsin to Atlanta, Microsoft connects datacenters to build its first AI superfactory","p":"Microsoft"},{"u":"https://www.datacenterdynamics.com/en/news/microsoft-launches-atlanta-fairwater-data-center-two-stories-no-ups-or-gen-sets/","t":"Microsoft launches Atlanta Fairwater data center, two stories, no UPS or gen sets","p":"Data Center Dynamics"}],"j":"city","jc":"Fayette County","jn":"Fayetteville","jd":"city","ju":"approx"},{"id":"microsoft-tyrone-ga","n":"Microsoft Tyrone Campus (Project Rita)","op":"Microsoft","s":"permitted","st":"GA","city":"Tyrone","co":"Fayette","lat":33.494,"lon":-84.588,"pre":"approximate","cf":"confirmed","mw":96,"ac":161,"ann":"2023-11","upd":"2026-10-22","nt":"Two-building campus (two 48 MW buildings = 96 MW, ~490,000-500,000 sq ft) plus an on-site substation; codename Project Rita. Part of Microsoft's East US 3 Azure region (planned 2027). Total site ~161 acres (~146.4 in Tyrone + ~14.5 in Fairburn). As of June 2 2026 no site plan or building permits filed. Microsoft requested no tax abatements (none offered). No investment figure disclosed. Coordinates approximate (address-derived; 2044 GA-74). Estimated ~4,000 gallons/day operational water use.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-confirms-plans-for-data-center-in-tyrone-georgia/","t":"Microsoft confirms plans for data center in Tyrone, Georgia","p":"Data Center Dynamics"},{"u":"https://www.datacenterdynamics.com/en/news/96mw-data-center-campus-proposed-in-tyrone-georgia/","t":"96MW data center campus proposed in Tyrone, Georgia","p":"Data Center Dynamics"}],"j":"city","jc":"Fayette County","jn":"Tyrone","jd":"town","ju":"approx"},{"id":"northern-data-maysville-jackson-ga","n":"Northern Data Maysville Data Center","op":"Northern Data Group","s":"permitted","st":"GA","city":"Maysville","co":"Jackson","lat":34.2527,"lon":-83.5613,"pre":"approximate","cf":"reported","mw":120,"ac":63,"upd":"2026-09-23","nt":"Sited in the Maysville Industrial Park in Jackson County (Maysville straddles the Jackson/Banks county line). Investment figures circulating in regional coverage could not be retrieved from a primary page as of September 2026 and are not recorded. The planned capacity is from Northern Data Group's December 2024 announcement, which states the 63-acre site \"will deliver 120MW, with capacity to expand to 180MW\" and gives no investment figure. Coordinates are approximate to Maysville.","src":[{"u":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","t":"Maysville rezoning controversy just got more controversial","p":"97.5 Glory FM (WGTJ)"},{"u":"https://www.prnewswire.co.uk/news-releases/northern-data-group-to-develop-best-in-class-us-data-center-for-high-performance-computing-302321720.html","t":"Northern Data Group to Develop Best-in-Class U.S. Data Center for High Performance Computing","p":"PR Newswire (Northern Data Group)"}],"j":"city","jc":"Jackson County","jn":"Maysville","jd":"town","ju":"approx"},{"id":"northern-data-maysville-ga","n":"Northern Data Maysville HPC Campus","op":"Northern Data Group","s":"proposed","st":"GA","city":"Maysville","co":"Jackson","lat":34.2551,"lon":-83.5531,"pre":"approximate","cf":"confirmed","mw":180,"ac":63,"ann":"2025-01","upd":"2026-08-25","nt":"An AI and HPC facility 70 miles northeast of Atlanta, approved by the city in January 2025 and targeted to be fully operational in Q1 2027, though construction had not begun at the time of the latest coverage. 120 MW at completion with room to expand to 180 MW; the larger figure is recorded as planned capacity. High-density liquid-cooled infrastructure, up to 100 jobs. Residents raised noise reaching Maysville Elementary School, electricity use and city water.","src":[{"u":"https://www.datacenterdynamics.com/en/news/northern-data-to-develop-120mw-hpc-data-center-in-georgia/","t":"Northern Data to develop 120MW HPC data center in Georgia","p":"Data Center Dynamics"},{"u":"https://digitalinfranetwork.com/news/northern-data-group-maysville-hpc-data-center/","t":"Northern Data Group to develop US data center for high performance computing","p":"Digital Infra Network"}],"j":"city","jc":"Banks County","jn":"Maysville","jd":"town","ju":"approx"},{"id":"openai-project-camellia-effingham-ga","n":"Project Camellia (OpenAI Effingham County Campus)","op":"OpenAI","s":"proposed","st":"GA","city":"Rincon","co":"Effingham","lat":32.296,"lon":-81.2354,"pre":"approximate","cf":"confirmed","mw":3200,"ac":1400,"inv":20000000000,"ann":"2026-07-22","upd":"2026-11-04","nt":"Four data center buildings on roughly 1,400 acres inside the 2,600-acre Savannah Gateway Industrial Hub near Rincon. Effingham County values the project at $20B; OpenAI's VP of Compute Strategy has said full build-out will exceed $30B. Permanent staffing is described as ~400 at the 2028 opening rising to about 1,000 by 2032. Part of OpenAI's Stargate program.","src":[{"u":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","t":"Project Camellia (OpenAI Data Center) — official county project page","p":"Effingham County, Georgia"},{"u":"https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/","t":"$20 billion OpenAI data center to open in Effingham County","p":"The Current"}],"j":"city","jc":"Effingham County","jn":"Rincon","jd":"city","ju":"approx"},{"id":"prologis-project-sail-coweta-ga","n":"Project Sail – Prologis Data Center Campus","op":"Prologis","s":"permitted","st":"GA","city":"Newnan","co":"Coweta","lat":33.3807,"lon":-84.7974,"pre":"approximate","cf":"confirmed","mw":900,"ac":800,"inv":17000000000,"ann":"2026-04","upd":"2026-11-04","nt":"Nine buildings, 4.3 million sq ft. End tenant not publicly identified; project marketed to hyperscalers. Rezoning includes decommissioning and site restoration plan requirement if dormant over one year. Coordinates are Newnan city centroid; actual site is along US-27 southwest of Newnan. A developer-commissioned fiscal study modeled roughly $488M in county and school property-tax abatements over 18 years, but the Coweta County Development Authority reported no incentive negotiations had occurred as of January 2025; no confirmed incentive agreement or job count has been published.","src":[{"u":"https://www.ajc.com/business/2026/04/coweta-votes-to-turn-this-800-acre-forest-into-17b-data-center-campus/","t":"$17B Project Sail data center project approved south of Atlanta","p":"Atlanta Journal-Constitution"},{"u":"https://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-project-sail-data-center/","t":"Coweta Residents Sue to Block Project Sail Data Center","p":"The Citizen"}],"j":"city","jc":"Coweta County","jn":"Newnan","jd":"city","ju":"approx"},{"id":"qts-blue-hole-blakely-ga","n":"QTS Project Blue Hole","op":"QTS Data Centers","s":"permitted","st":"GA","city":"Blakely","co":"Early","lat":31.3763,"lon":-84.9346,"pre":"approximate","cf":"confirmed","mw":1000,"upd":"2026-10-22","nt":"Project Blue Hole in Blakely, Early County; DRI filed 2026, ~12M sq ft at full buildout by ~2035. ~1 GW+ is an estimate of ultimate scale (in notes). Coordinates are the Blakely area centroid. QTS Data Centers is owned by Blackstone (2021 take-private).","src":[{"u":"https://www.datacenterdynamics.com/en/news/qts-targets-two-data-center-campuses-in-georgia/","t":"QTS targets two data center campuses in Georgia","p":"Data Center Dynamics"},{"u":"https://riverdalestandard.com/early-county-georgia-data-center-ordinance-vote/","t":"Riverdale Standard — Early County Georgia Data Center Ordinance Vote","p":""}],"j":"city","jc":"Early County","jn":"Blakely","jd":"city","ju":"approx"},{"id":"qts-eisenhower-augusta-ga","n":"QTS Project Eisenhower","op":"QTS Data Centers","s":"under_construction","st":"GA","city":"Augusta","co":"Richmond","lat":33.4735,"lon":-82.0105,"pre":"approximate","cf":"confirmed","ac":170,"inv":2000000000,"upd":"2026-10-22","nt":"Project Eisenhower in Augusta, Richmond County — 6 buildings across ~170 acres, $2B+ project. Rezoned 2024-25 with preliminary grading underway. Estimated 300-500 MW (not officially disclosed — omitted from capacity). Coordinates are the Augusta area centroid. The ~$2B figure was stated by the applicant's attorney at a June 2024 zoning hearing (building permits not yet issued) and is recorded as the investment figure. QTS projects ~1,000 construction and ~160-220 permanent jobs (projections), so no job count is recorded. Georgia's high-technology data-center sales-tax exemption and an Augusta EDA bond/PILOT are available programs, but as of July 2026 no confirmed award for this campus was found, so no subsidy is recorded. QTS Data Centers is owned by Blackstone (2021 take-private).","src":[{"u":"https://www.wrdw.com/2025/12/26/flying-under-radar-new-data-center-will-twice-big-augusta-mall/","t":"New data center will be twice as big as Augusta Mall","p":"WRDW"},{"u":"https://www.wrdw.com/2026/05/11/qts-data-center-project-raises-questions-about-savannah-river-water-use/","t":"QTS data center project raises questions about Savannah River water use","p":"WRDW"}],"j":"city","jc":"Richmond County","jn":"Augusta-Richmond County consolidated government (balance)","jd":"city","ju":"approx"},{"id":"tpa-social-circle-technology-park-ga","n":"Social Circle Technology Park","op":"TPA Group (developer; end tenant undisclosed)","s":"proposed","st":"GA","city":"Social Circle","co":"Newton","lat":33.6562,"lon":-83.7182,"pre":"approximate","cf":"reported","ac":317,"inv":5000000000,"ann":"2025-01","upd":"2026-10-22","nt":"Nine buildings, 2.56 million sq ft near I-20/SR-11 intersection. Construction planned to begin 2028; first phase operational target 2031. Formerly filed as Newton County Technology Park; renamed after jurisdictional ambiguity surfaced. Coordinates corrected to Social Circle city centroid (33.6562°N, 83.7182°W); original record had 33.5912°N which is approximately 4.5 miles south of the actual city center per multiple geocoding sources.","src":[{"u":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","t":"TPA Group Plans Massive Newton County Data Center Complex","p":"Bisnow"},{"u":"https://www.datacenterdynamics.com/en/news/another-25-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/","t":"Another 2.5 million sq ft data center campus proposed outside Atlanta, Georgia","p":"Data Center Dynamics"}],"j":"city","jc":"Walton County","jn":"Social Circle","jd":"city","ju":"approx"},{"id":"switch-atlanta-the-keep-ga","n":"Switch Atlanta: The KEEP","op":"Switch","s":"operational","st":"GA","city":"Lithia Springs","co":"Douglas","lat":33.755,"lon":-84.5873,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Southern Company / Georgia Power grid; company-wide '100% renewable' pledge with no site-specific PPA found","nt":"Confirmed at 1 Switch Way, Lithia Springs GA (Douglas County) via datacentermap, datacenters.com, baxtel. AI/HPC (likely): The Keep: Tier 5 Platinum exascale campus, high-density AI/HPC-capable.","src":[{"u":"https://www.datacentermap.com/usa/georgia/atlanta/switch-the-keep-campus/","t":"Switch facility directory","p":"Switch"},{"u":"https://www.openstreetmap.org/way/975064004","t":"OpenStreetMap way/975064004","p":"OpenStreetMap"}],"j":"uninc","jc":"Douglas County"},{"id":"t5-atlanta-iv-palmetto-ga","n":"T5 @ Atlanta IV","op":"T5 Data Centers","s":"proposed","st":"GA","city":"Palmetto","co":"Fulton","lat":33.548,"lon":-84.724,"pre":"approximate","cf":"reported","mw":300,"ac":91,"ann":"2024-08-28","upd":"2026-10-28","nt":"City discrepancy: the ledger cited Fairburn, but T5's own page and PR Newswire list Palmetto, GA; DCD describes it as Fairburn/Fulton County with a 91-acre site in Palmetto - site is on the Fairburn/Palmetto border in South Fulton County (I-85 and Gullatt Rd). Capacity: T5's page lists '200 MW available' (Phase 1) while the Aug 2024 land-acquisition PR cites '300 MW' campus total - 300 MW recorded as planned. No tenant disclosed (T5 is a wholesale/build-to-suit developer targeting hyperscalers; page cites AI/liquid-cooling suitability). Phase 1 construction targeted Q2 2027; on-site substation expected 2026. No jobs figure disclosed as of July 2026. T5 has disclosed no investment figure, so none is recorded. The Newnan Times-Herald reports that Project Pegasus, a 2.95-million-square-foot, seven-building, 200-acre project proposed by T5@Atlanta IV, LP at Weldon and Palmetto-Tyrone roads in Coweta County (regional-impact review completed February 2024), is estimated to be valued at $1.5 billion at buildout; as of October 2026, no source read shows that project is the 91-acre campus described here, so the figure is not recorded. Coordinates approximate (I-85/Gullatt Rd corridor).","src":[{"u":"https://www.datacenterdynamics.com/en/news/t5-files-to-develop-data-center-campus-outside-atlanta-georgia/","t":"T5 files to develop data center campus outside Atlanta, Georgia","p":"Data Center Dynamics"},{"u":"https://t5datacenters.com/locations/t5-atlanta-iv/","t":"T5 @ Atlanta IV - Official Operator Location Page","p":"T5 Data Centers"}],"j":"city","jc":"Fulton County","jn":"Chattahoochee Hills","jd":"city","ju":"approx"},{"id":"white-oak-technology-park-columbia-county-ga","n":"White Oak Technology Park","op":"Trammell Crow Company (CBRE subsidiary)","s":"permitted","st":"GA","city":"Appling","co":"Columbia","lat":33.6,"lon":-82.28,"pre":"approximate","cf":"confirmed","ac":1945,"inv":11600000000,"upd":"2026-10-22","pb":"Grid — Georgia Power","nt":"8.076M sq ft across up to 29 buildings; 10-year build-out. Zoning rezoned to S-1 (Feb 2026), the first of several required approval steps. Described as a mixed-use tech park (data centers, R&D, cybersecurity), not AI-branded. A second, separate 'Pumpkin Technology Campus' was approved at the same Feb 2026 hearing in nearby Harlem, Columbia County GA - as of October 2026, it is tracked as its own record, which lists Cloverleaf Infrastructure as operator. Coordinates are approximate (near Augusta).","src":[{"u":"https://www.datacenterdynamics.com/en/news/plans-filed-for-8-million-sq-ft-data-center-and-technology-park-outside-augusta-georgia/","t":"Plans filed for 8 million sq ft data center and technology park outside Augusta, Georgia","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Columbia County","ju":"approx"},{"id":"servpac-mtp2-mililani-hi","n":"Servpac MTP Building 2","op":"Servpac","s":"under_construction","st":"HI","city":"Mililani","co":"Honolulu","lat":21.448,"lon":-158.017,"pre":"approximate","cf":"confirmed","ac":5,"inv":13000000,"ann":"2026-01","upd":"2026-10-30","nt":"Located in Mililani Technology Park, Central O'ahu, 10 miles inland and 850 feet above sea level, outside major flood, tsunami, and hurricane zones. Building 2 will approximately 10x the existing 1MW IT capacity of MTP Building 1 (Hawaii's only Uptime Institute Tier IV certified facility). Designed to withstand Category 5 hurricane-force winds. Primary use is enterprise colocation; no AI-specific tenant announced. DCD (February 2026) reports project is in design phase; 'broke ground' claim in original record is unsupported by the cited source. Hawaii's structural barriers (highest US electricity costs, limited grid capacity) make large-scale hyperscale AI builds unlikely; Servpac MTP2 is the only Hawaii project of note found.","src":[{"u":"https://www.datacenterdynamics.com/en/news/hawaii-based-cloud-provider-servpac-expands-data-center/","t":"Hawaii-Based Cloud Provider Servpac Expands Data Center","p":"Data Center Dynamics"},{"u":"https://www.prnewswire.com/news-releases/servpacs-mtp-data-center-celebrates-groundbreaking-for-building-2-302694909.html","t":"Servpac's MTP Data Center Celebrates Groundbreaking for Building 2","p":"PR Newswire"}],"j":"uninc","jc":"Honolulu County","jn":"Mililani Town","ju":"approx"},{"id":"uh-cancer-center-medai-core-honolulu-hi","n":"UH Cancer Center Data Center – Medical AI Core (PAC-AID)","op":"University of Hawaiʻi Cancer Center","s":"under_construction","st":"HI","city":"Honolulu","co":"Honolulu","lat":21.2952,"lon":-157.8637,"pre":"approximate","cf":"confirmed","inv":300000,"ann":"2026-06","upd":"2026-10-21","nt":"UH is renovating the Cancer Center's existing garage-sized, air-conditioned, ground-floor data center room in Kakaʻako into the Medical AI Core (MedAI Core), which will provide high-performance computing for the new Pacific Center for Artificial Intelligence and Data Science in Medicine (PAC-AID). PAC-AID is funded by a $12M, five-year NIH COBRE grant, awarded 2026-06-04 and running through February 2031. About $300,000 of that money is going to renovate and equip the room. The Star-Advertiser (via GovTech) calls it a first-of-its-kind AI data center for Hawaiʻi. This is a single room in an existing building, not a campus. No MW, GPU count or cooling method was published. The investment figure covers only the ~$300K room renovation, not the $12M research grant. Coordinates are the OSM feature for the UH Cancer Center building at 701 Ilalo St, the address the Cancer Center publishes.","src":[{"u":"https://www.hawaii.edu/news/article.php?aId=14654","t":"University of Hawaiʻi researchers awarded $12M grant to advance AI, data science in medicine","p":"University of Hawaiʻi News"},{"u":"https://www.govtech.com/education/higher-ed/university-of-hawaii-to-build-data-center-for-healthcare","t":"University of Hawaii to Build Data Center for Healthcare","p":"Government Technology (via Honolulu Star-Advertiser)"}],"j":"uninc","jc":"Honolulu County","jn":"Urban Honolulu","ju":"approx"},{"id":"uh-information-technology-center-honolulu-hi","n":"University of Hawaiʻi Information Technology Center Data Center","op":"University of Hawaiʻi (Information Technology Services)","s":"operational","st":"HI","city":"Honolulu","co":"Honolulu","lat":21.2987,"lon":-157.8168,"pre":"approximate","cf":"confirmed","upd":"2026-10-02","nt":"An 8,000 sq ft data center with Tier II redundancy, backup batteries and generator, inside the six-story, 74,000 sq ft, LEED Gold IT Center on the UH Mānoa campus. The building is hardened against Category III hurricane winds. UH offers colocation there at $3,700 per cabinet per year. Under a 2016 agreement, it also houses part of the State of Hawaiʻi's executive-branch IT systems moved from the aging Kalanimoku Building data center, with ETS reimbursing UH's costs. It hosts UH's Mana HPC cluster, which as of 2022 had 8,964 cores and 120 GPUs that the source calls critical for machine-learning and AI research; about $4.5M had been invested in the cluster since 2014. That cluster figure is not a facility investment, so no investment figure is recorded. The AI classification is mixed-use: AI/ML work on the GPU cluster is one named use alongside enterprise university and state systems. No MW figure was published. Coordinates are the Census geocode of 2520 Correa Rd.","src":[{"u":"https://www.hawaii.edu/its/leed-about-the-building/","t":"About the Building (Information Technology Center)","p":"University of Hawaiʻi Information Technology Services"},{"u":"https://www.hawaii.edu/its/servers-data-center-storage-services/colocation/","t":"Colocation (ITC Data Center)","p":"University of Hawaiʻi Information Technology Services"}],"j":"uninc","jc":"Honolulu County","jn":"Urban Honolulu","ju":"approx"},{"id":"apple-waukee-ia","n":"Apple Waukee Data Center","op":"Apple","s":"operational","st":"IA","city":"Waukee","co":"Dallas","lat":41.6194,"lon":-93.9258,"pre":"approximate","cf":"confirmed","ac":2000,"inv":1300000000,"ann":"2017","upd":"2026-09-16","pb":"MidAmerican Energy grid (general renewable commitment, no site-specific named wind PPA located)","nt":"Apple data center near the intersection of Hickman Rd and S Avenue, Waukee, Dallas County — announced by Tim Cook in 2017; first building became operational in October 2024 on a 2,000-acre site, a $1.3B investment (AppleInsider). Apple's Feb 2025 newsroom names Iowa among states for continued data-center capacity expansion. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://appleinsider.com/articles/24/10/16/seven-years-on-iowas-apple-data-center-finally-opens","t":"Seven years on, Iowa's Apple data center finally opens — $1.3B, 2,000 acres, first building operational Oct 2024, announced 2017","p":"AppleInsider"},{"u":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/","t":"Apple $500B U.S. investment release — names Iowa among states for continued data-center capacity expansion","p":"Apple Newsroom"}],"j":"city","jc":"Dallas County","jn":"Waukee","jd":"city","ju":"approx"},{"id":"octopus-investments-fort-madison-ia","n":"Burlington Hill AI Data Center (Fort Madison)","op":"Octopus Investments, LLC","s":"proposed","st":"IA","city":"Fort Madison","co":"Lee","lat":40.63,"lon":-91.31,"pre":"approximate","cf":"reported","upd":"2026-10-28","nt":"Property is mostly in unincorporated Lee County, which has a data center moratorium. The Fort Madison Planning and Zoning Commission took no action. The operator name comes from the third-party tracker; the local article names only the individual developer. The point is the town center.","src":[{"u":"https://www.pencitycurrent.com/stories/spillover-crowd-talks-to-panel-on-data-center-project,178367","t":"Spillover crowd talks to panel on data center project","p":"Pen City Current"},{"u":"https://morethanjustparks.com/data-center-tracker/burlington-hill-ai-data-center-octopus-investments-ia--a812c871-415b-4413-bdf1-63eda324ae2d","t":"Burlington Hill AI Data Center (Octopus Investments) tracker listing","p":"More Than Just Parks"}],"j":"city","jc":"Lee County","jn":"Fort Madison","jd":"city","ju":"approx"},{"id":"google-cedar-rapids-ia","n":"Google Cedar Rapids Data Center Campus","op":"Google","s":"under_construction","st":"IA","city":"Cedar Rapids","co":"Linn","lat":41.936,"lon":-91.723,"pre":"approximate","cf":"confirmed","ac":1391,"inv":576000000,"ann":"2025-05","upd":"2026-10-22","nt":"Coordinates approximate for Big Cedar Industrial Center at 76th Ave SW and Edgewood Rd SW in SW Cedar Rapids. Cedar Rapids campus investment ~$576M; part of Google's $7B+ total Iowa commitment announced May/June 2025. Adjacent to QTS campus in same 1,391-acre industrial park. Also exploring a second Linn County campus near Duane Arnold nuclear plant in Palo.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-pledges-7bn-to-expand-iowa-data-center-footprint/","t":"Google pledges $7bn to expand Iowa data center footprint","p":"Data Center Dynamics"},{"u":"https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement","t":"Google Announces Data Center Project at Big Cedar Industrial Center — Alliant Energy","p":"Alliant Energy"}],"j":"city","jc":"Linn County","jn":"Cedar Rapids","jd":"city","ju":"approx"},{"id":"google-council-bluffs-ia","n":"Google Council Bluffs Data Center","op":"Google","s":"operational","st":"IA","city":"Council Bluffs","co":"Pottawattamie","lat":41.1674,"lon":-95.793,"pre":"approximate","cf":"confirmed","inv":2500000000,"ann":"2007","upd":"2026-09-21","pb":"MidAmerican Energy Wind VIII program (up to 407 MW wind, REC-tracked)","nt":"Google's flagship Iowa data center in Council Bluffs, Pottawattamie County — operational since 2007, heavily expanded across multiple buildings (the Southlands campus on Bunge Ave among them). Distinct from Google's tracked Cedar Rapids campus and from the separate proposed Google/Tenaska Nebraska project. Per Google's own location page, Google has invested $20B+ across Iowa since 2007 (Council Bluffs + Cedar Rapids combined — not a site-specific figure). No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of a disclosed campus address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://datacenters.google/locations/iowa/","t":"Google Iowa — official location page: Council Bluffs operational since 2007, multi-building campus","p":"Google"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Pottawattamie County","jn":"Council Bluffs","jd":"city","ju":"approx"},{"id":"meta-altoona-ia","n":"Meta Altoona Data Center Campus","op":"Meta","s":"operational","st":"IA","city":"Altoona","co":"Polk","lat":41.6459,"lon":-93.4696,"pre":"approximate","cf":"confirmed","inv":2500000000,"ann":"2013","upd":"2026-10-28","pb":"MidAmerican Energy","nt":"Operational since 2013; 5M+ sq ft after seven expansions — Meta's largest cloud campus. Meta's engineering blog documents Altoona as a GenAI infrastructure / LLaMA training site. INVESTMENT: 'more than $2.5 billion' is a cumulative multi-year figure across all expansions, recorded as the campus investment. Meta says more than 400 people work on-site in data center operations each day, and its info sheet lists \"400+\" operational jobs supported; the recorded permanent-job figure of 400 is that stated floor. As of October 2026, no cited source states the campus's operational capacity; ~350 MW per a third-party index is not recorded. Coordinates are the Altoona town centroid. Meta cites a cumulative capital investment of 'more than $2.5 billion' across seven Altoona expansions since 2013 (Data Center Frontier); the 2019 Building 5 phase was ~$400M (IEDA). Meta's Altoona info sheet lists '$2.5B+' as data center investment in Iowa. The recorded investment is the cumulative figure for the whole campus; the ~$400M figure covers the 2019 Building 5 phase alone and is not recorded.","src":[{"u":"https://www.datacenterfrontier.com/cloud/article/11427725/meta-adds-more-data-centers-in-iowa-pushing-campus-to-5-million-sf","t":"Meta Adds More Data Centers in Iowa, Pushing Campus to 5 Million SF","p":"Data Center Frontier"},{"u":"https://engineering.fb.com/2024/03/12/data-center-engineering/building-metas-genai-infrastructure/","t":"Building Meta's GenAI Infrastructure","p":"Engineering at Meta"}],"j":"city","jc":"Polk County","jn":"Altoona","jd":"city","ju":"approx"},{"id":"microsoft-ginger-west-ia","n":"Microsoft Project Ginger West Data Center","op":"Microsoft","s":"under_construction","st":"IA","city":"West Des Moines","co":"Polk","lat":41.551,"lon":-93.782,"pre":"approximate","cf":"reported","ac":188,"inv":1650000000,"ann":"2021","upd":"2026-10-30","nt":"Site at 11100 Booneville Rd area, West Des Moines (Polk County). 1.8M sq ft planned across multiple buildings. Turner Construction is general contractor; completion estimated summer 2028. Companion Ginger East campus (124 acres, 5 buildings) is a separate site in West Des Moines. Part of Microsoft's multi-billion dollar total Iowa investment since 2009. Planned MW capacity not confirmed from primary sources; 444 MW figure removed as unsupported. Iowa's Sec. 423.3(95) data-center sales-tax exemption applies, but Iowa data-center incentive awards are not publicly disclosed; no Ginger West-specific job count is published.","src":[{"u":"https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/","t":"Ginger West datacenter construction update — Microsoft Local","p":"Microsoft"},{"u":"https://www.datacenterdynamics.com/en/news/microsofts-project-ginger-west-data-center-in-west-des-moines-gets-planning-approval/","t":"Microsoft Project Ginger West data center in West Des Moines gets planning approval","p":"Data Center Dynamics"}],"j":"city","jc":"Polk County","jn":"West Des Moines","jd":"city","ju":"approx"},{"id":"qts-cedar-rapids-ia","n":"QTS Cedar Rapids Data Center Campus","op":"QTS Data Centers","s":"under_construction","st":"IA","city":"Cedar Rapids","co":"Linn","lat":41.932,"lon":-91.718,"pre":"approximate","cf":"confirmed","mw":1050,"ac":612,"inv":10000000000,"ann":"2025-02","upd":"2026-10-22","nt":"Coordinates approximate for Big Cedar Industrial Center; parcel is adjacent to Google's campus in the same 1,391-acre industrial park. $10B investment is total planned across 7 phases over up to 25 years; minimum $250M per phase, each requiring a 300,000 sq ft building. 7 buildings planned at full build-out. Permanent jobs figure is minimum per phase. QTS Co-CEO Tag Greason stated the completed seven-building campus will ultimately draw about 1,050 MW of power from Alliant Energy (planned, full build-out). QTS Data Centers is owned by Blackstone (2021 take-private).","src":[{"u":"https://cedar-rapids.org/news_detail_T6_R2180.php","t":"City of Cedar Rapids, Alliant Energy, and QTS Collaborate on New Data Center Campus","p":"City of Cedar Rapids"},{"u":"https://www.datacenterdynamics.com/en/news/qts-breaks-ground-on-data-center-campus-in-iowa/","t":"QTS breaks ground on data center campus in Iowa","p":"Data Center Dynamics"}],"j":"uninc","jc":"Linn County","jm":"Fairfax township","ju":"approx"},{"id":"qts-clinton-clinton-county-ia","n":"QTS Clinton Data Center Campus","op":"QTS Data Centers","s":"proposed","st":"IA","city":"Clinton","co":"Clinton","lat":41.88,"lon":-90.24,"pre":"approximate","cf":"reported","ac":1200,"inv":10000000000,"upd":"2026-10-22","nt":"North of US Highway 30, near Clinton's airport. QTS has not filed a formal site plan; the city is still drafting a data-center ordinance. No confirmed MW or $ figure exists yet - local coverage describes it only as a potential 'multibillion-dollar investment.' Local TV coverage frames this as an 'AI data center' but QTS's own statements avoid the AI label. Coordinates are approximate.","src":[{"u":"https://q.com/data-centers/clinton/","t":"QTS Clinton, Iowa - In Consideration","p":"QTS Data Centers"},{"u":"https://www.kwqc.com/2026/05/26/clinton-discuss-data-center-concerns-amid-ai-growth/","t":"Clinton residents voice concerns on potential AI data center coming to town","p":"KWQC"}],"j":"uninc","jc":"Clinton County","jm":"Hampshire township","ju":"approx"},{"id":"midamerican-salix-ia","n":"Salix Data Center Site (MidAmerican)","op":"MidAmerican Energy","s":"proposed","st":"IA","city":"Salix","co":"Woodbury","lat":42.3119,"lon":-96.2922,"pre":"approximate","cf":"rumored","ac":900,"ann":"2026-04","upd":"2026-08-25","nt":"Salix annexed roughly 900 acres of farmland in April 2026 for a data center site initiated by MidAmerican Energy. Google was named in early August as the prospective customer and has said it is exploring the site, but no deal is set and the land still needs rezoning — so the operator here is the utility that started it, not Google, and confidence is 'rumored' deliberately. Recorded because 18 residents reported on it and the annexation is a matter of public record and active litigation.","src":[{"u":"https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/","t":"Google is considering a data center in Salix, IA","p":"KTIV"},{"u":"https://www.iowapublicradio.org/ipr-news/2026-08-21/salix-data-center-moratorium-fails","t":"Northwest Iowa town votes against a data center moratorium","p":"Iowa Public Radio"}],"j":"city","jc":"Woodbury County","jn":"Salix","jd":"city","ju":"approx"},{"id":"deep-atomic-inl-ai-data-center-id","n":"Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)","op":"Deep Atomic","s":"proposed","st":"ID","lat":43.5333,"lon":-112.9447,"pre":"approximate","cf":"reported","ann":"2025-12-04","upd":"2026-10-21","nt":"Proposal only. Deep Atomic submitted it to the DOE Office of Nuclear Energy in late November 2025 and it awaited DOE approval as of February 2026. The consortium includes Parker Tide, Clayco, Future-tech, Paragon Energy Solutions and Moonlite. Data-centre operations would start within 24-36 months on existing INL grid power plus solar and geothermal, while the MK60 SMR goes through design certification and commissioning; MK60 series manufacturing is targeted for the end of 2029. No data-centre IT capacity is stated. The 60 MW figure is the reactor's electrical output, so no capacity is recorded. Sources describe Deep Atomic differently: NucNet calls it Switzerland-based and NEI calls it Swiss-American. Coordinates are Wikipedia's centroid for the whole INL reservation, the same convention as the Aalo Atomics INL record. No specific parcel has been disclosed, so precision is approximate and county is omitted. This is a different operator and project from the tracked Aalo Atomics and Oklo INL records.","src":[{"u":"https://smr.nucnet.org/news/swiss-reactor-company-submits-nuclear-powered-data-centre-proposal-to-us-doe-12-4-2025","t":"Swiss reactor company submits nuclear-powered data centre proposal to US DOE","p":"NucNet"},{"u":"https://www.neimagazine.com/?p=102396","t":"Deep Atomic consortium proposes nuclear-powered AI data centre at INL","p":"Nuclear Engineering International"}],"j":"uninc","jc":"Butte County","ju":"approx"},{"id":"lex-developments-pocatello-id","n":"Lex Developments AI Data Center (former Hoku polysilicon site)","op":"Lex Developments","s":"cancelled","st":"ID","city":"Pocatello","co":"Bannock","lat":42.8713,"lon":-112.4455,"pre":"approximate","cf":"reported","ac":49,"upd":"2026-10-28","nt":"BoiseDev (14 May 2026) described the developer's application, later denied, as a $2.6 billion data center, with a headline of \"$2 billion+\"; it was not a built or committed project. As of October 2026, no investment figure is recorded: BoiseDev's valuation is a press figure that no other readable cited source corroborates. As of October 2026, no MW capacity or secured tenant was stated in the KIFI report. BoiseDev (14 May 2026) gives the site as 49 acres and reports an Idaho Power letter citing a load increase of more than 100 MW, with the site expected to use 100 MW by 2031. As of October 2026, none of the three cited sources names a secured tenant. This pin is a Pocatello city-centroid placeholder (approximate): as of October 2026, the KIFI report gives a street address for the former Hoku polysilicon site (1800 River Park Way), but neither BoiseDev nor KIFI gave parcel boundaries or coordinates, and OpenStreetMap has no feature for it. It is not a claim about where on the Hoku parcel the proposal sat, and it is not co-located with the FBI Grey Wolf Data Center (tracked separately as of September 2026), whose pin was corrected to its own OSM building POI 4.0 km north.","src":[{"u":"https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html","t":"Pocatello hearing examiner denies Hoku site data center permit but Lex Developments vows return","p":"Idaho State Journal"},{"u":"https://localnews8.com/news/2026/07/16/pocatello-city-council-upholds-hearing-examiners-decision-says-no-to-proposed-ai-data-center/","t":"Pocatello City Council Upholds Hearing Examiner's Decision, says \"no\" to Proposed AI Data Center","p":"KIFI Local News 8"}],"j":"city","jc":"Bannock County","jn":"Pocatello","jd":"city","ju":"approx"},{"id":"meta-kuna-id","n":"Meta Kuna Data Center","op":"Meta","s":"operational","st":"ID","city":"Kuna","co":"Ada","lat":43.491,"lon":-116.418,"pre":"approximate","cf":"confirmed","ac":485,"inv":800000000,"ann":"2022-09","upd":"2026-10-22","pb":"100% renewable energy","nt":"960,000 sq ft campus (Meta's 15th US data center). Originally Project Peregrine. Construction paused December 2022, restarted October 2023 with AI-optimized architecture; new design 31% cheaper and half the build time. Peak construction employed 1,400 workers. Expected operational end of 2026. Water infrastructure cost sourced to CEG ($70M) but Idaho Business Review cites $100M — discrepancy unresolved; use CEG figure as primary. Coordinates are Kuna city centroid; exact site is west of city center. As of December 2025, the campus was in the \"final stages\" of construction; local reporting notes power demand will not be clear until the site comes online.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-resumes-construction-of-texas-and-idaho-data-centers-with-new-ai-design/","t":"Meta Resumes Construction of Idaho Data Center with New AI Design","p":"Data Center Dynamics"},{"u":"https://www.constructionequipmentguide.com/meta-hits-peak-construction-on-800m-idaho-data-center/70046","t":"Meta Hits Peak Construction on $800M Idaho Data Center","p":"Construction Equipment Guide"}],"j":"city","jc":"Ada County","jn":"Kuna","jd":"city","ju":"approx"},{"id":"lex-portneuf-pocatello-id","n":"Portneuf Data Center (former Hoku plant)","op":"Lex Developments","s":"cancelled","st":"ID","city":"Pocatello","co":"Bannock","lat":42.8727,"lon":-112.4638,"pre":"approximate","cf":"confirmed","mw":100,"ac":59,"inv":2600000000,"ann":"2026-05","upd":"2026-08-25","nt":"A seven-building campus on 59 acres at the former Hoku Materials polysilicon factory, expected to draw 100 MW by 2031. The hearing examiner denied it on 14 May 2026 for failing to show it would not harm community health, safety or welfare, and the city council upheld that 4-1 on 16 July. Recorded as cancelled — the registry carries refused and abandoned projects, and 17 residents reported on this one.","src":[{"u":"https://www.datacenterdynamics.com/en/news/officials-in-pocatello-idaho-deny-data-center-application-appeal/","t":"Officials in Pocatello, Idaho, deny data center application appeal","p":"Data Center Dynamics"},{"u":"https://boisedev.com/news/2026/07/20/city-denies-2-6-billion-data-center-but-developer-vows-to-appeal/","t":"City denies $2.6 billion data center, but developer vows to appeal","p":"BoiseDev"}],"j":"city","jc":"Bannock County","jn":"Pocatello","jd":"city","ju":"approx"},{"id":"aligned-ord-01-il","n":"Aligned ORD-01","op":"Aligned Data Centers","s":"operational","st":"IL","city":"Northlake","co":"Cook","lat":41.914,"lon":-87.9175,"pre":"exact","cf":"reported","ac":18.5,"upd":"2026-10-15","pb":"Grid — ComEd","nt":"Confirmed via Aligned Chicago page and DatacenterDynamics ('Aligned completes first Chicago data center'); 505 Northwest Ave, Northlake, IL; 48MW, operational. AI/HPC (likely): Northlake ORD-01 hyperscale, adaptive AI/HPC cooling platform.","src":[{"u":"https://aligneddc.com/chicago/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/1217649348","t":"OpenStreetMap way/1217649348","p":"OpenStreetMap"}],"j":"city","jc":"Cook County","jn":"Northlake","jd":"city"},{"id":"cyrusone-chi1-chi3-aurora-il","n":"CyrusOne CHI1-CHI3 (Aurora)","op":"CyrusOne","s":"operational","st":"IL","city":"Aurora","co":"DuPage","lat":41.7966,"lon":-88.2438,"pre":"exact","cf":"reported","upd":"2026-10-15","nt":"Confirmed at 2905 Diehl Road, Aurora, IL via aggregator cross-reference; operator directory page also lists Aurora IL: CHI1-CHI3. AI/HPC (likely): Aurora campus AI-optimized via CyrusOne Intelliscale high-density design.","src":[{"u":"https://www.cyrusone.com/data-centers/north-america/aurora-il","t":"CyrusOne facility directory","p":"CyrusOne"},{"u":"https://www.openstreetmap.org/way/199252950","t":"OpenStreetMap way/199252950","p":"OpenStreetMap"}],"j":"city","jc":"DuPage County","jn":"Aurora","jd":"city"},{"id":"edgeconnex-chi02-il","n":"EdgeConneX CHI02","op":"EdgeConneX","s":"operational","st":"IL","city":"Elk Grove Village","co":"Cook","lat":42.0015,"lon":-87.9526,"pre":"exact","cf":"reported","upd":"2026-10-15","nt":"Confirmed distinct from CHI01 (osm_id 174242795) on the same official page: CHI02 operational, 7MW N+1, 282,000 sq ft raised floor for tenants. AI/HPC (likely): EdgeConneX and Lambda announced a 23MW single-tenant liquid-cooled AI Factory on EdgeConneX's Chicago (Elk Grove Village) campus for high-density AI/HPC workloads.","src":[{"u":"https://www.edgeconnex.com/locations/americas/chicago-il/","t":"EdgeConneX official locations page - Chicago","p":"EdgeConneX"},{"u":"https://www.openstreetmap.org/way/377032058","t":"OpenStreetMap way/377032058","p":"OpenStreetMap"}],"j":"city","jc":"Cook County","jn":"Elk Grove Village","jd":"village"},{"id":"edged-aurora-il","n":"Edged Chicago Campus — Aurora (ORD01)","op":"Edged US","s":"under_construction","st":"IL","city":"Aurora","co":"DuPage","lat":41.807,"lon":-88.2433,"pre":"approximate","cf":"confirmed","mw":72,"ann":"2025-11","upd":"2026-10-22","nt":"Address: 2835 Bilter Rd, Aurora IL (DuPage County). Total campus planned at 96 MW across three buildings. Explicitly purpose-built for high-density AI workloads. Coordinates approximate for Bilter Rd area of north Aurora; address confirmed in operator press release. A confirmed capex figure of ~$300M covers the first building (ORD01-1) only, not the ~96 MW three-building campus; construction-workforce figures (~2,000 full campus) are projections. No Illinois DCEO data-center exemption certification was found for Edged.","src":[{"u":"https://edged.us/news/edged-us-expands-chicagoland-campus","t":"Edged US Expands Chicagoland Campus with Second AI Data Center Groundbreaking","p":"Edged US"},{"u":"https://www.nprillinois.org/2026-03-26/aurora-passes-some-of-the-strongest-data-center-regulations-in-illinois","t":"Aurora passes some of the strongest data center regulations in Illinois","p":"NPR Illinois"}],"j":"city","jc":"DuPage County","jn":"Aurora","jd":"city","ju":"approx"},{"id":"equinix-ch8-minooka-il","n":"Equinix CH8 Minooka","op":"Equinix","s":"proposed","st":"IL","city":"Minooka","co":"Grundy","lat":41.4506,"lon":-88.262,"pre":"approximate","cf":"confirmed","ac":300,"upd":"2026-10-22","nt":"Proposed ~300-acre, $1B+ Equinix campus in Minooka, Grundy County. Capacity not disclosed (omitted). Coordinates are the Minooka area centroid.","src":[{"u":"https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx","t":"Equinix proposes billion-dollar data center investment in Minooka","p":"Patch"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Grundy County","jn":"Minooka","jd":"village","ju":"approx"},{"id":"hut8-batavia-il","n":"Hut 8 Batavia Data Center","op":"Batavia DC Corp (Hut 8 Corp subsidiary)","s":"under_construction","st":"IL","city":"Batavia","co":"Kane","lat":41.859,"lon":-88.275,"pre":"approximate","cf":"confirmed","mw":50,"ac":7.2,"inv":500000000,"upd":"2026-08-03","src":[{"u":"https://www.shawlocal.com/kane-county-chronicle/2025/08/01/batavia-data-center-gets-nod-as-residents-worry-about-it-gobbling-up-energy-reserves/","t":"Batavia data center gets nod as residents worry about it 'gobbling up' energy reserves","p":"Shaw Local / Kane County Chronicle"},{"u":"https://www.shawlocal.com/kane-county-chronicle/2025/09/02/500m-batavia-data-center-could-be-limited-to-1k-gallons-of-water-per-day/","t":"$500M Batavia data center could be limited to 1K gallons of water per day","p":"Shaw Local / Kane County Chronicle"}],"j":"city","jc":"Kane County","jn":"Batavia","jd":"city","ju":"approx"},{"id":"hydravault-chicago-il","n":"HydraVault Chicago","op":"HydraVault","s":"under_construction","st":"IL","city":"Chicago","co":"Cook","lat":41.8465,"lon":-87.6255,"pre":"approximate","cf":"confirmed","mw":20,"inv":270000000,"ann":"2025-10-28","upd":"2026-10-15","nt":"Purpose-built for AI training/inference and low-latency trading, at densities up to 200kW per rack. Subsidy value is the state's estimated tax benefit on a $270,000,000 investment commitment. Coordinates geocoded from the published street address.","src":[{"u":"https://www.prnewswire.com/news-releases/hydravault-secures-construction-permit-for-downtown-chicagos-first-purpose-built-ai-facility-power-construction-to-commence-work-immediately-302596035.html","t":"HydraVault Secures Construction Permit for Downtown Chicago's First Purpose-Built AI Facility","p":"HydraVault via PR Newswire"},{"u":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","t":"Data Center Investment Program 2025 Annual Report (HydraVault LLC, Chicago, 2025 MOU)","p":"Illinois Department of Commerce and Economic Opportunity"}],"j":"city","jc":"Cook County","jn":"Chicago","jd":"city","ju":"approx"},{"id":"joliet-technology-center-il","n":"Joliet Technology Center","op":"HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)","s":"permitted","st":"IL","city":"Joliet","co":"Will","lat":41.432,"lon":-88.128,"pre":"approximate","cf":"confirmed","mw":1800,"ac":795,"inv":20000000000,"ann":"2025-10","upd":"2026-11-04","nt":"Coordinates approximate Jackson Township at Rowell and Bernhard Rds, south Joliet (~40 mi SW of Chicago), near Chicagoland Speedway. 24 two-story buildings planned. No confirmed hyperscale tenant as of permit date. Construction start targeted early 2027; first sub-campus by 2028. Construction jobs range reported as 7,000-10,000; permanent approximately 700.","src":[{"u":"https://www.datacenterdynamics.com/en/news/data-center-planned-on-795-acres-of-farmland-in-south-joliet-illinois/","t":"Data center planned on 795 acres of farmland in south Joliet, Illinois","p":"Data Center Dynamics"},{"u":"https://www.nbcchicago.com/news/local/city-of-joliet-approves-plans-for-what-could-be-the-largest-data-center-in-illinois/3910932/","t":"City of Joliet approves plans for what could be the largest data center in Illinois","p":"NBC Chicago"}],"j":"city","jc":"Will County","jn":"Elwood","jd":"village","ju":"approx"},{"id":"lambda-chicago-edgeconnex-il","n":"Lambda Chicago EdgeConneX AI Factory","op":"Lambda","s":"under_construction","st":"IL","city":"Chicago","co":"Cook","lat":41.8781,"lon":-87.6298,"pre":"approximate","cf":"confirmed","mw":23,"ann":"2025-08-21","upd":"2026-10-22","pb":"Grid — ComEd","nt":"EdgeConneX is the developer/facility owner; Lambda is the sole tenant in a build-to-suit, single-tenant, purpose-built 23 MW building for Lambda's AI workloads (600+ kW/rack, hybrid liquid-to-chip + air cooling). Distinct from the excluded CoreWeave/Flexential colo tenancy (a shared multi-tenant colo cage) - this is a dedicated purpose-built building. Press releases say 'Chicago' but EdgeConneX's Chicago-area campus is in Elk Grove Village, IL (Cook County); the Lambda building address is unpublished, so coordinates use the Chicago centroid. Ready-for-Service targeted 2026; operational status as of 2026-07-07 unconfirmed (may already be online - revisit).","src":[{"u":"https://lambda.ai/blog/lambda-edgeconnex-dc-pr","t":"Lambda/EdgeConneX joint press release - AI Factory in Chicago and Atlanta","p":"Lambda.ai"},{"u":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","t":"EdgeConneX press release - AI Factory in Chicago and Atlanta","p":"EdgeConneX"}],"j":"city","jc":"Cook County","jn":"Chicago","jd":"city","ju":"approx"},{"id":"hut8-logan-prairie-latham-il","n":"Logan Prairie Data Center","op":"Hut 8 Corp","s":"proposed","st":"IL","city":"Latham","co":"Logan","lat":39.9672,"lon":-89.1614,"pre":"approximate","cf":"reported","mw":500,"inv":5000000000,"upd":"2026-10-15","nt":"AI/cloud campus proposed near Latham in Logan County; estimated up to $65M/year in property tax revenue and a project labor agreement with local trades. No land area is recorded: the operator page states 50 acres while press accounts describe roughly 200 acres of farmland. Public-reception check (2026-09-10): Hut 8's own project page documents a real community-engagement process -- a public meeting before the Logan County Board's Zoning and Economic Development Committee (2026-01-05), a local radio interview (2026-01-15), and a community open house at the Lincoln Banquet Center (2026-02-04) -- but records no resident reaction, vote outcome, or opposition/support statement from any of those events. Checked: operator project page only; Logan County meeting minutes not checked.","src":[{"u":"https://www.hut8.com/data-centers/logan-prairie","t":"Logan Prairie Data Center — Hut 8","p":"Hut 8 Corp"},{"u":"https://www.illinoistimes.com/news/future-uncertain-for-logan-county-data-center/","t":"Future uncertain for Logan County data center","p":"Illinois Times"}],"j":"city","jc":"Logan County","jn":"Latham","jd":"village","ju":"approx"},{"id":"eagle-rock-meridian-technology-park-taylorville-il","n":"Meridian Technology Park","op":"Eagle Rock Partners","s":"cancelled","st":"IL","city":"Clarksdale","co":"Christian","lat":39.4898,"lon":-89.3679,"pre":"approximate","cf":"reported","mw":1000,"ac":475,"upd":"2026-10-30","nt":"Proposed 475-acre, 10-building (100MW each, ~1,000MW total) data center campus in unincorporated Christian County, ~2 miles southwest of Taylorville near Clarksdale. Estimated cost $6B-$8.8B. Earliest construction would not begin before 2028-2029. No formal application had been filed with the county as of the board's first briefing on the proposal; zoning board and county board votes are still pending. Not yet listed on major public data center trackers.","src":[{"u":"https://mlq.ai/news/eagle-rock-partners-proposes-88b-1gw-data-center-campus-in-christian-county-illinois/","t":"Eagle Rock Partners Proposes $8.8B, 1GW Data Center Campus in Christian County, Illinois","p":"MLQ News"},{"u":"https://www.datacenterdynamics.com/en/news/property-developer-eagle-rock-proposes-1gw-data-center-in-christian-county-illinois/","t":"Property developer Eagle Rock proposes 1GW data center in Christian County, Illinois","p":"Data Center Dynamics"}],"j":"uninc","jc":"Christian County","jm":"Bear Creek township","ju":"approx"},{"id":"meta-dekalb-data-center-il","n":"Meta DeKalb Data Center","op":"Meta","s":"operational","st":"IL","city":"DeKalb","co":"DeKalb","lat":41.909,"lon":-88.792,"pre":"approximate","cf":"confirmed","inv":1000000000,"ann":"2020","upd":"2026-09-12","nt":"~2.3 million sq ft hyperscale data center; broke ground 2020, brought online November 2023.","src":[{"u":"https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/","t":"Meta — DeKalb Data Center info sheet","p":"Meta"},{"u":"https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/","t":"Meta launches data center in DeKalb, Illinois","p":"DatacenterDynamics"}],"j":"uninc","jc":"DeKalb County","jm":"DeKalb township","ju":"approx"},{"id":"ntt-chicago-ch2-data-center-il","n":"NTT Chicago CH2 Data Center","op":"NTT Global Data Centers","s":"operational","st":"IL","city":"Itasca","co":"DuPage","lat":41.989,"lon":-88.0072,"pre":"exact","cf":"reported","upd":"2026-10-15","pb":"Grid — ComEd","nt":"Confirmed via NTT's own Chicago CH2 facility page (services.global.ntt), 275 Pierce Rd, Itasca, IL; as of October 2026 the page states 36MW of critical IT load and 126,000 sq ft of IT space and gives no opening date. NTT markets it as supporting AI/HPC workloads, so its AI classification is mixed-use rather than confirmed (no dedicated GPU-cluster tenant named).","src":[{"u":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch2-data-center","t":"NTT Global Data Centers Americas facility directory","p":"NTT Global Data Centers Americas"},{"u":"https://www.openstreetmap.org/way/1271571726","t":"OpenStreetMap way/1271571726","p":"OpenStreetMap"}],"j":"city","jc":"DuPage County","jn":"Itasca","jd":"village"},{"id":"project-cardinal-yorkville-il","n":"Project Cardinal Data Center Campus","op":"Pioneer Development LLC","s":"permitted","st":"IL","city":"Yorkville","co":"Kendall","lat":41.7,"lon":-88.461,"pre":"approximate","cf":"confirmed","mw":1800,"ac":1037,"upd":"2026-11-04","nt":"Coordinates approximate NW of IL Rt 47 and Galena Rd in Yorkville; exact parcel spans ~1,037 acres. 14 two-story buildings at 17 million sq ft total. No confirmed hyperscale tenant named. Companion project 'Project Steel' (Prologis, 540 acres, 24 buildings) also approved in same Yorkville corridor. First data center operational target: 2029.","src":[{"u":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","t":"Project Cardinal Data Center Campus — City of Yorkville official permit page","p":"City of Yorkville, IL"},{"u":"https://www.shawlocal.com/kendall-county-now/2026/03/12/yorkville-data-center-approval-comes-after-nearly-6-hour-contentious-city-council-meeting/","t":"Yorkville data center approval after nearly 6-hour contentious City Council meeting","p":"Shaw Local / Kendall County Now"}],"j":"uninc","jc":"Kendall County","jm":"Bristol township","ju":"approx"},{"id":"t5-chicago-iv-grayslake-il","n":"T5 Chicago IV (CHI IV)","op":"T5 Data Centers","s":"under_construction","st":"IL","city":"Grayslake","co":"Lake","lat":42.3442,"lon":-88.0417,"pre":"approximate","cf":"confirmed","mw":1200,"ac":473,"inv":250000000,"ann":"2026","upd":"2026-10-28","pb":"ComEd","nt":"CHI IV in Grayslake, Lake County (~40 mi north of Chicago): up to 1.2 GW IT capacity with 1.6 GW secured ComEd power; envisions 20 × 60 MW buildings, Phase 1 (3 × 60 MW) targeted Q4 2027. Earthmoving had started on the first piece of the site by May 2026 (Hoodline), and the record is listed as under construction. The Village of Grayslake's FAQ, updated August 18, 2026, says the approved campus is located on 473 acres in the Peterson Road corridor; T5's May 2024 announcement described a 160-acre site supporting up to 480 MW of critical IT capacity, which is a planned figure, not capacity in operation. Distinct from T5's Palmetto, GA campus. Coordinates are the Grayslake area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/t5-plans-five-gigawatt-scale-data-center-campuses-announces-chicago-campus/","t":"T5 plans five gigawatt-scale data center campuses, announces Chicago campus","p":"Data Center Dynamics"},{"u":"https://www.dailyherald.com/20260608/news/despite-village-approvals-legal-action-expected-against-grayslake-data-center/","t":"Despite village approvals, legal action expected against Grayslake data center","p":"Daily Herald"}],"j":"city","jc":"Lake County","jn":"Grayslake","jd":"village","ju":"approx"},{"id":"chirisa-volo-data-center-il","n":"Volo Data Center","op":"Chirisa Technology Parks","s":"operational","st":"IL","city":"Volo","co":"Lake","lat":42.3486,"lon":-88.1382,"pre":"approximate","cf":"reported","ac":50,"inv":262000000,"upd":"2026-10-28","nt":"160,000 sq ft leased facility; tenant is CoreWeave, Inc. (public GPU/AI-cloud compute provider) -- every source frames this explicitly as an AI data center supporting AI computing operations. 14 MW is the disclosed power supply (the articles do not name its source), not an IT capacity figure, so no operational capacity is recorded; a planned on-site Bloom Energy fuel-cell/microgrid buildout was targeted for Q3 2025 commissioning but its MW capacity is not disclosed in any source found and is omitted (a distinct figure from the 14 MW supply, not additive to it here). Acreage (~50 acres) and the exact street address/postal code are corroborated only via a single aggregator/cached-search path (Data Center Dynamics coverage of the site's HSBC/Capital One former-tenant history could not be retrieved), so they are single-path and not independently cross-verified; treat address/acreage as approximate. Former site occupant: HSBC (built ~2007), later Capital One (acquired HSBC's US card operations, 2012), vacant and auctioned ~2023 before Chirisa's redevelopment. As of August 2026, no SEC filing or Bloom Energy investor press release had been located to corroborate, and neither is cited as a source. The investment and jobs figures are the commitments listed for Chirisa Volo LLC's 2023 agreement in the Illinois DCEO Data Center Investment Program 2025 Annual Report: a $262,000,000 investment and 20 new jobs.","src":[{"u":"https://www.datacenterfrontier.com/energy/article/55127752/coreweave-chirisa-illinois-data-center-project-taps-bloom-energy-for-fuel-cell-power-leans-into-microgrids","t":"CoreWeave, Chirisa Tap Bloom Energy For Illinois AI Data Center Project","p":"Data Center Frontier"},{"u":"https://www.microgridknowledge.com/data-center-microgrids/article/55126611/bloom-energy-bringing-fuel-cell-power-to-coreweave-data-center-project-in-illinois","t":"Bloom Energy Bringing Fuel Cell Power to CoreWeave Data Center Project","p":"Microgrid Knowledge"}],"j":"uninc","jc":"Lake County","jm":"Grant township","ju":"approx"},{"id":"aws-hobart-in","n":"AWS Hobart Campus","op":"Amazon Web Services","s":"under_construction","st":"IN","city":"Hobart","co":"Lake","lat":41.517,"lon":-87.263,"pre":"approximate","cf":"confirmed","ann":"2025-11-24","upd":"2026-11-04","pb":"NIPSCO (GenCo subsidiary)","nt":"One of AWS's Northwest Indiana campuses (part of a $15B NW Indiana / 2.4 GW umbrella; distinct from Amazon Project Rainier and the separate Wheatfield IN campus). Capacity omitted: the 2.4 GW figure is the NW Indiana total, not Hobart-specific. Investment omitted: $15B is the NW Indiana total, no Hobart-specific figure. Up to 25 buildings ('Hobart Tech Park'), per the mayor's statement to NBC Chicago. As of October 2026 no land area is recorded: the only acreage figure found is a resident's remark quoted by NBC Chicago (\"if we think this is going to stop at 725 acres\"), not an official or operator figure; shell entities include Hobart Devco, Hobart Owner LLC, TUHAUS LLC/Wylie Capital. ~400 permanent jobs ($37-44/hr) are projections (noted here, not recorded as a jobs figure). $47M upfront community payment is city revenue, not facility capex. Coordinates estimated from 61st Ave/Colorado St. Active litigation: 'No Data Centers Hobart Indiana' sought a TRO on the fill permit (unresolved).","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-data-center-coming-to-hobart-indiana/","t":"AWS data center coming to Hobart, Indiana","p":"Data Center Dynamics"},{"u":"https://wsbt.com/news/local/amazon-data-center-15-billion-data-center-jobs-ai-nipsco-electric-grid-governor-mike-braun-northern-indiana-hobart-lake-county-indiana","t":"Newly announced Amazon data center to be built in Hobart","p":"WSBT 22"}],"j":"city","jc":"Lake County","jn":"Hobart","jd":"city","ju":"approx"},{"id":"aws-wheatfield-in","n":"AWS Wheatfield Campus (Project Rise)","op":"Amazon Web Services","s":"permitted","st":"IN","city":"Wheatfield","co":"Jasper","lat":41.1955,"lon":-87.0586,"pre":"approximate","cf":"confirmed","ac":304,"inv":7000000000,"ann":"2026-06-03","upd":"2026-10-28","pb":"NIPSCO (Northern Indiana Public Service Company)","nt":"Codename Project Rise. Nine-building campus on 304 acres of NIPSCO-owned land ~0.5 mi from the R.M. Schahfer Generating Station; part of AWS's $15B Northern Indiana commitment. Capacity omitted: data-center IT load not disclosed; the 400 MW figure is NIPSCO's new gas peaker plant, not the facility's load. DCD reports AWS is 'estimating an investment of around $7 billion'; after the June 17, 2026 county approval, Northwest Indiana Business Magazine reported 'Amazon will invest $7 billion in the community, including $98 million paid in advance.' The record carries the $7 billion figure. Northwest Indiana Business Magazine reported 'The facility is expected to create 250 jobs.' That source does not say the jobs are permanent and the figure is a projection, so no jobs figure is recorded. AWS commits to restore 425 acres of Kankakee River watershed habitat and provide $25M for Wheatfield Township water access; AWS committed $1.25B to offset NIPSCO ratepayer impacts across the broader buildout. Coordinates are the Wheatfield centroid. Distinct from Project Rainier (New Carlisle) and the Hobart IN campus.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-plans-nine-building-data-center-campus-in-wheatfield-indiana/","t":"Amazon plans nine-building data center campus in Wheatfield, Indiana","p":"Data Center Dynamics"},{"u":"https://www.insideindianabusiness.com/articles/jasper-county-approves-amazon-web-services-7b-data-center-project","t":"Jasper County approves $7B Amazon Web Services data center project","p":"Inside INdiana Business"}],"j":"city","jc":"Jasper County","jn":"Wheatfield","jd":"town","ju":"approx"},{"id":"amazon-project-rainier-new-carlisle-in","n":"Amazon Project Rainier","op":"Amazon Web Services","s":"operational","st":"IN","city":"New Carlisle","co":"St. Joseph","lat":41.6978,"lon":-86.5117,"pre":"approximate","cf":"confirmed","ac":1200,"inv":11000000000,"ann":"2024-04-25","upd":"2026-10-28","pb":"grid (Indiana Michigan Power) + natural gas","nt":"No operational capacity is recorded because neither Amazon nor the utility has stated one. Measured AI estimated the first nine buildings at \"an estimated 590 MW of IT capacity\" (June 2026), and Epoch AI estimates 910 MW of IT power from satellite imagery (updated July 2026); both are outside estimates. No planned capacity is recorded either: the 2,200 MW is the full-site electricity draw reported at the October 2025 opening (\"30 buildings drawing up to 2.2 gigawatts (GW) of electricity\", Converge Digest), an upper limit on grid draw, not IT load; Measured AI later gives 32 buildings and 2.25 GW of grid draw at full build-out.","src":[{"u":"https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","t":"Amazon opens $11B AI data center Project Rainier in Indiana — CNBC","p":"CNBC"},{"u":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","t":"Gov. Holcomb announces AWS plans to invest $11B in Northern Indiana — IEDC","p":"Indiana Economic Development Corporation"}],"j":"city","jc":"St. Joseph County","jn":"New Carlisle","jd":"town","ju":"approx"},{"id":"coreweave-digital-crossroads-hammond-in","n":"CoreWeave Digital Crossroads","op":"CoreWeave","s":"cancelled","st":"IN","city":"Hammond","co":"Lake","lat":41.5836,"lon":-87.5,"pre":"approximate","cf":"confirmed","mw":180,"ann":"2025-06","upd":"2026-10-22","pb":"NIPSCO","nt":"180 MW facility at the Digital Crossroads campus in Hammond, Lake County; city approved June 2025, NIPSCO lease pending, targeted 2027. Coordinates are the Hammond area centroid. UPDATE (2026-07): the City of Hammond announced the CoreWeave / Decennial development agreement EXPIRED June 30, 2026 - required milestones were not met and no extensions were offered; no groundbreaking occurred. The June 2025 city approval, the 10-year real-property and 20-year personal-property tax abatements, and the ~$2B construction / ~$5B equipment figures were all tied to this now-lapsed agreement (never triggered). Status corrected from under construction to cancelled.","src":[{"u":"https://www.datacenterdynamics.com/en/news/coreweave-to-develop-180mw-data-center-at-digital-crossroads-campus-in-hammond-indiana/","t":"CoreWeave to develop 180MW data center at Digital Crossroads campus in Hammond, Indiana","p":"Data Center Dynamics"},{"u":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","t":"Hammond announces expiration of data center development agreement","p":"City of Hammond"}],"j":"city","jc":"Lake County","jn":"Hammond","jd":"city","ju":"approx"},{"id":"dc-blox-warren-township-marion-county-in","n":"DC BLOX Warren Township Data Center","op":"DC BLOX","s":"permitted","st":"IN","city":"Warren Township","co":"Marion","lat":39.78,"lon":-86.05,"pre":"approximate","cf":"confirmed","mw":78,"ac":150,"inv":2000000000,"upd":"2026-10-22","pb":"Grid — AES Indiana","nt":"Three-building campus, scaled back from an original 28MW-larger plan. Capex breakout: $700-800M construction + $1.3-1.4B in 'servers, networking equipment, and AI hardware' per the developer's own figures. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/dc-blox-data-center-in-eastern-indianapolis-receives-recommendation-for-approval/","t":"DC Blox data center in eastern Indianapolis receives recommendation for approval","p":"Data Center Dynamics"},{"u":"https://www.wfyi.org/wfyi-news/2026-07-15/east-side-data-center-wins-approval-despite-community-opposition","t":"East side data center wins approval, despite community opposition","p":"WFYI"}],"j":"city","jc":"Marion County","jn":"Warren Park","jd":"town","ju":"approx"},{"id":"google-fort-wayne-in","n":"Google Fort Wayne Data Center (Project Zodiac)","op":"Google","s":"operational","st":"IN","city":"Fort Wayne","co":"Allen","lat":40.99,"lon":-85.056,"pre":"approximate","cf":"confirmed","ac":700,"inv":2000000000,"ann":"2024-04","upd":"2026-10-22","pb":"Grid (Indiana Michigan Power); 188 MW solar PPA (Honeysuckle Solar)","nt":"Site near East Tillman Road and Adams Center Road, SE Fort Wayne (Allen County). 700+ acres, multi-building campus explicitly optimized for Gemini AI platform and machine learning. Google STAR workforce program launched with Ivy Tech Community College. Coordinates are approximate site area; exact parcel centroid not verified from public permit records. Previous inkfreenews.com source replaced with WANE 15 which confirmed the same Dec 11 2025 operational story.","src":[{"u":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","t":"Gov. Holcomb announces Google is building a $2B Data Center in Northeast Indiana","p":"State of Indiana"},{"u":"https://www.datacenterdynamics.com/en/news/google-announces-2bn-campus-in-fort-wayne-indiana/","t":"Google announces $2bn data center campus in Fort Wayne, Indiana","p":"Data Center Dynamics"}],"j":"uninc","jc":"Allen County","jm":"Marion township","ju":"approx"},{"id":"google-project-louie-monrovia-in","n":"Google Project Louie (Morgan County)","op":"Google","s":"under_construction","st":"IN","city":"Monrovia","co":"Morgan","lat":39.57,"lon":-86.35,"pre":"approximate","cf":"confirmed","ac":550,"inv":1000000000,"ann":"2025","upd":"2026-11-04","pb":"AES Indiana","nt":"Codename 'Project Louie'; Google initially concealed via shell company 'Woodland Caribou LLC'. Campus totals approximately 550 acres in Morgan Township east of Monrovia (bounded by Keller Hill Rd, N Antioch Rd, SR-42, W Union Church Rd); additional ~80 acres acquired within Monrovia town limits, bringing total Google holdings to ~628 acres. Planned 1,200 MW AES Indiana substation per IURC Cause No. 46394 (filed Apr 22 2026); that figure is the utility substation capacity ceiling, not a confirmed steady-state data center load — so it is noted here rather than recorded as capacity. Six buildings plus substation planned. Total investment is reported as $1 billion: the Indiana Daily Student cites documents submitted during Terri Moore's lawsuit over the rezoning, and the Daily Journal, reprinting an Indianapolis Business Journal report (October 2025), says Google has promised to spend at least $1 billion on the campus. Land acquisition spend: ~$78 million for ~15 parcels Sep–Nov 2025. Coordinates approximate (site east of Monrovia near SR-42/Keller Hill Rd area). Annexation dispute with Town of Monrovia active July 2026: county transferred Google parcels to RDC under IC 36-4-3-4.3 to block annexation; Google offered $12M sewer plant upgrade to Monrovia to drop the effort.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-behind-390-acre-data-center-development-in-morgan-county-indiana/","t":"Google behind 390-acre data center development in Morgan County, Indiana","p":"Data Center Dynamics"},{"u":"https://specials.idsnews.com/data-center-morgan-county-indiana-billion-dollar/","t":"The billion-dollar neighbor: Data center special report","p":"Indiana Daily Student"}],"j":"uninc","jc":"Morgan County","jm":"Brown township","ju":"approx"},{"id":"jefferson-proving-ground-data-center-jefferson-county-in","n":"Jefferson Proving Ground Data Center","op":"Undisclosed","s":"permitted","st":"IN","city":"Madison","co":"Jefferson","lat":38.82,"lon":-85.4,"pre":"approximate","cf":"reported","ac":549,"ann":"2026","upd":"2026-11-04","nt":"Proposed hyperscale campus of nine buildings totaling ~7.2 million sq ft on 549 acres of the former Jefferson Proving Ground airfield, on land owned by the Ford family (Daniel Ford); the end-user/operator has not been publicly disclosed. Reported to draw hundreds of megawatts and be roughly 78% larger than Meta's Lebanon campus; projected 300-450 permanent jobs and ~$60M in annual county tax revenue. Coordinates are an approximate geocode of the former proving-ground airfield north of Madison. As of 2026-09-10, no official capacity, utility partner, or anchor-company figure has been released for this site. Independent, unofficial estimates cited in the same article range widely: one expert (Chien) says 9 GW 'is not unreasonable' for a power-dense AI training facility, while another (Inskeep) is 'very confident' it will need at least 1 GW. Neither is a project-stated figure, so no capacity is recorded. The site is 549 acres of the former Jefferson Proving Grounds Army base, ~8 miles north of Madison, IN.","src":[{"u":"https://www.whas11.com/article/news/local/indiana/commissioners-uphold-decision-data-center-550-acres-jefferson-proving-grounds/417-10524221-dc8a-4566-96db-ebcf4cf4bdc2","t":"Commissioners uphold decision to allow a data center on 550 acres at Jefferson Proving Grounds","p":"WHAS11"},{"u":"https://www.wdrb.com/news/zoning-board-allows-controversial-madison-data-center-project-to-move-forward/article_e55a1071-bbe7-425a-98b5-d88c7a94d2b4.html","t":"Zoning board allows controversial Madison data center project to move forward","p":"WDRB"}],"j":"uninc","jc":"Jefferson County","jm":"Madison township","ju":"approx"},{"id":"meta-jeffersonville-in","n":"Meta Jeffersonville Data Center","op":"Meta","s":"under_construction","st":"IN","city":"Jeffersonville","co":"Clark","lat":38.33,"lon":-85.715,"pre":"approximate","cf":"confirmed","mw":407,"ac":619,"inv":800000000,"ann":"2024-01","upd":"2026-10-22","pb":"Heirloom Solar Project (60 MWac, Pike County IN, Arevon Energy) + Solarpack solar projects (~210 MW combined)","nt":"River Ridge Commerce Center, Jeffersonville IN (Clark County, across Ohio River from Louisville KY). ~700,000 sq ft; AI-native design with liquid cooling from the start. Coordinates are approximate River Ridge Commerce Center area.","src":[{"u":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","t":"Hello, Jeffersonville! - Meta Data Centers","p":"Meta Data Centers"},{"u":"https://www.bloomberg.com/news/articles/2024-01-25/meta-building-new-800-million-ai-focused-data-center-in-indiana","t":"Meta Building New $800 Million AI-Focused Data Center in Indiana","p":"Bloomberg"}],"j":"city","jc":"Clark County","jn":"Jeffersonville","jd":"city","ju":"approx"},{"id":"meta-lebanon-in","n":"Meta Lebanon (Project Domino)","op":"Meta","s":"under_construction","st":"IN","city":"Lebanon","co":"Boone","lat":40.07,"lon":-86.45,"pre":"approximate","cf":"confirmed","mw":1000,"ac":1500,"inv":10000000000,"ann":"2026-02","upd":"2026-11-04","pb":"Grid (100% renewable matching; 400+ MW new Indiana clean energy projects backed by Meta)","nt":"LEAP Innovation and Research District, Lebanon IN (Boone County, ~30 mi NW of Indianapolis). 1,500 acres, 4 million sq ft total; 13 buildings. Among Meta's largest single infrastructure investments. Coordinates are approximate LEAP District area north of Lebanon.","src":[{"u":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","t":"Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment","p":"Meta (about.fb.com)"},{"u":"https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/","t":"Details on long-expected Meta data center campus unveiled","p":"Indiana Capital Chronicle"}],"j":"uninc","jc":"Boone County","jm":"Center township","ju":"approx"},{"id":"microsoft-granger-in","n":"Microsoft Granger Data Center","op":"Microsoft","s":"under_construction","st":"IN","city":"Granger","co":"St. Joseph","lat":41.73,"lon":-86.13,"pre":"approximate","cf":"reported","mw":1000,"ac":939,"ann":"2024","upd":"2026-10-28","pb":"Grid","nt":"Former St. Joe Farm, near Bittersweet Road and Currant Road, Granger IN (St. Joseph County). 939 acres; 5-6 buildings planned; ~1 GW power load estimated by county officials. Microsoft not seeking local tax incentives. WSBT reported on February 18, 2026 that a formal site plan had not been submitted and that many project details still had to be worked out before construction could begin; WNDU March 2026 MOU covers pre-development evaluation only. WVPE reported on May 30, 2026 that construction was underway, with water trucked in for dust suppression. The record is marked reported. Coordinates are approximate Granger unincorporated community area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-buys-900-acre-st-joe-farm-indiana-for-data-center-build/","t":"Microsoft buys 900-acre St. Joe Farm, Indiana, for data center build","p":"Data Center Dynamics"},{"u":"https://www.wndu.com/2026/03/17/microsoft-data-center-mou-approved-st-joseph-county-amid-resident-concerns/","t":"Microsoft data center MOU approved in St. Joseph County amid resident concerns","p":"WNDU NBC South Bend"}],"j":"uninc","jc":"St. Joseph County","jn":"Granger","jm":"Harris township","ju":"approx"},{"id":"microsoft-laporte-in","n":"Microsoft La Porte Data Center","op":"Microsoft","s":"under_construction","st":"IN","city":"La Porte","co":"La Porte","lat":41.595,"lon":-86.735,"pre":"approximate","cf":"confirmed","ac":489,"inv":1000000000,"ann":"2024-06","upd":"2026-10-22","pb":"Grid — NIPSCO","nt":"Radius Industrial Park, La Porte IN (La Porte County, NW Indiana). Initial plan 245,000 sq ft on 489 acres; expanded to 17 buildings with adjacent rezoning sought. First-phase six data centers plus substation. Microsoft stated 'Community-First AI Infrastructure' principles. Coordinates are approximate Radius Industrial Park area. Announcement date corrected from 2024-09 to 2024-06 per IEDC press release dated June 4, 2024.","src":[{"u":"https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana","t":"Gov. Holcomb announces plans for new $1B Microsoft Data Center in Northwest Indiana","p":"City of La Porte, IN"},{"u":"https://www.datacenterdynamics.com/en/news/microsoft-expands-plans-for-la-porte-indiana-data-center-campus/","t":"Microsoft expands plans for La Porte, Indiana, data center campus","p":"Data Center Dynamics"}],"j":"city","jc":"LaPorte County","jn":"La Porte","jd":"city","ju":"approx"},{"id":"project-shirley-eagle-creek-township-lake-county-in","n":"Project Shirley","op":"Sentinel Data Centers","s":"proposed","st":"IN","city":"Eagle Creek Township","co":"Lake","lat":41.31,"lon":-87.3,"pre":"approximate","cf":"reported","mw":500,"ac":160,"inv":5000000000,"upd":"2026-10-22","nt":"Unincorporated, SR-2/Clay St. 4 buildings across 160 largely agricultural acres. Coordinates are approximate.","src":[{"u":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","t":"In Indiana, an anatomy of data center opposition","p":"Latitude Media"}],"j":"uninc","jc":"Lake County","jm":"Eagle Creek township","ju":"approx"},{"id":"sabey-decatur-technology-park-marion-county-in","n":"Sabey Decatur Technology Park","op":"Sabey Data Centers","s":"permitted","st":"IN","city":"Decatur Township","co":"Marion","lat":39.7,"lon":-86.28,"pre":"approximate","cf":"confirmed","mw":250,"ac":130,"inv":4000000000,"upd":"2026-10-22","pb":"Grid — AES Indiana","nt":"More than one million sq ft, 250MW over a 5-year period. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/sabey-targets-indianapolis-for-250mw-data-center-campus/","t":"Sabey targets Indianapolis for 250MW data center campus","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Marion County","jn":"Indianapolis city (balance)","jd":"city","ju":"approx"},{"id":"beale-gardner-johnson-county-ks","n":"Beale Infrastructure Gardner Campus","op":"Beale Infrastructure","s":"cancelled","st":"KS","city":"Gardner","co":"Johnson","lat":38.81,"lon":-94.93,"pre":"approximate","cf":"reported","ac":300,"upd":"2026-10-22","nt":"Near 191st St & S Clare Rd. Up to 16 data halls. Distinct from Beale's existing tracked Project Pilot in De Soto, KS. Coordinates are approximate.","src":[{"u":"https://bealeinfra.com/gardner-kansas/","t":"Gardner, Kansas project page","p":"Beale Infrastructure"},{"u":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","t":"KCUR","p":"KCUR / Johnson County Post"}],"j":"city","jc":"Johnson County","jn":"Gardner","jd":"city","ju":"approx"},{"id":"beale-project-pilot-de-soto-ks","n":"Beale Project Pilot (De Soto)","op":"Beale Infrastructure","s":"under_construction","st":"KS","city":"De Soto","co":"Johnson","lat":38.966,"lon":-94.967,"pre":"approximate","cf":"confirmed","ac":290,"inv":3100000000,"ann":"2025-08","upd":"2026-10-22","pb":"Evergy","nt":"Developer (Mount Sunflower Properties LLC / Beale Infrastructure, backed by Blue Owl) has pre-leased the entire campus to an unnamed large technology company. Attorney described the tenant as among 'the strongest, most financially profitable companies in the world.' Four buildings of 285,000 sq ft each (1.14M sq ft total); full build-out in 7–9 years. Kansas's first announced hyperscale data center. Permanent job figure of 100 is sourced from Johnson County Post ('over 100 long-term jobs paying six figures'); DCD separately cited 50 operational jobs for the first phase only. Coordinates are De Soto city centroid; exact site is at NW corner of 103rd St and Edgerton Rd.","src":[{"u":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","t":"De Soto advances $3.1B data center project near Panasonic plant","p":"Johnson County Post"},{"u":"https://www.datacenterdynamics.com/en/news/beale-targets-two-campuses-outside-kansas-city-kansas/","t":"Beale targets two campuses outside Kansas City, Kansas","p":"Data Center Dynamics"}],"j":"city","jc":"Johnson County","jn":"De Soto","jd":"city","ju":"approx"},{"id":"kanza-flint-hills-digital-campus-emporia-ks","n":"Flint Hills Digital Campus","op":"Kanza Park Place LLC","s":"proposed","st":"KS","city":"Emporia","co":"Lyon","lat":38.4019,"lon":-96.1917,"pre":"approximate","cf":"reported","ac":1000,"ann":"2026-06-02","upd":"2026-08-25","nt":"A gigawatt-scale campus of up to 1,000 acres in Emporia's Industrial Park IV, announced on 2 June 2026 without public consultation, an environmental impact statement or a safety plan, and still pending zoning recommendations and city commission approval. 'Gigawatt-scale' is how the coverage describes it; no specific megawatt figure is published, so none is recorded.","src":[{"u":"https://kvoe.com/2026/06/02/plans-announced-for-flint-hills-digital-campus-in-west-emporia/","t":"Plans announced for Flint Hills Digital Campus 'gigawatt-scale' data center in west Emporia","p":"KVOE"},{"u":"https://www.datacenterdynamics.com/en/news/gigawatt-scale-data-center-campus-proposed-in-kansas/","t":"Gigawatt-scale data center campus proposed in Kansas","p":"Data Center Dynamics"}],"j":"city","jc":"Lyon County","jn":"Emporia","jd":"city","ju":"approx"},{"id":"alcove-project-catalyst-osawatomie-ks","n":"Project Catalyst","op":"Alcove Development","s":"proposed","st":"KS","city":"Osawatomie","co":"Miami","lat":38.4999,"lon":-94.9459,"pre":"approximate","cf":"reported","mw":500,"ac":283,"inv":1000000000,"ann":"2026-05-29","upd":"2026-08-25","nt":"A 500+ MW campus on 283 acres inside Osawatomie city limits, announced 29 May 2026 as the largest economic development project in Miami County history. The city gave Alcove a three-year exclusive development right and agreed to a million gallons of water and 150 MW a day plus a 50% property tax abatement for ten years. Investment is reported as a $900m-$1.1bn range; the midpoint is recorded. Miami County was considering a construction pause in response.","src":[{"u":"https://www.kctv5.com/2026/05/29/osawatomie-moves-forward-with-500-megawatt-data-center-campus/","t":"Osawatomie moves forward with 500-megawatt data center campus","p":"KCTV5"},{"u":"https://www.kshb.com/news/local-news/kansas/miami-county/project-catalyst-data-center-developer-in-osawatomie-offers-update-touting-economic-opportunity","t":"'Project Catalyst' data center developer in Osawatomie offers update","p":"KSHB"}],"j":"city","jc":"Miami County","jn":"Osawatomie","jd":"city","ju":"approx"},{"id":"cave-point-commerce-center-cave-city-ky","n":"Cave Point Commerce Center","op":"Kentucky Industrial Alliance (landowner)","s":"proposed","st":"KY","city":"Cave City","co":"Barren","lat":37.1395,"lon":-85.9644,"pre":"approximate","cf":"reported","ac":600,"upd":"2026-08-25","nt":"A multi-building hyperscale campus of about 600 acres across Cave City and unincorporated Barren County, ten buildings of roughly 200,000 sq ft each, near Mammoth Cave. Kentucky Industrial Alliance LLC is the landowner and seller rather than the operator — the developer is not named in the public record — so it is recorded in the operator slot with that qualification. The application covering about 380 acres on Doyle Avenue was filed on 11 May 2026.","src":[{"u":"https://www.datacenterdynamics.com/en/news/data-center-moratorium-blocking-gigawatt-campus-challenged-in-cave-city-kentucky/","t":"Data center moratorium blocking gigawatt campus challenged in Cave City, Kentucky","p":"Data Center Dynamics"},{"u":"https://www.wbko.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/","t":"Developer sues Cave City over data center zoning moratorium","p":"WBKO"}],"j":"city","jc":"Barren County","jn":"Cave City","jd":"city","ju":"approx"},{"id":"terawulf-hawesville-ky","n":"Justified Data Campus","op":"TeraWulf","s":"under_construction","st":"KY","city":"Hawesville","co":"Hancock","lat":37.8999,"lon":-86.7569,"pre":"approximate","cf":"confirmed","mw":401,"ac":750,"ann":"2026","upd":"2026-11-04","pb":"Big Rivers Electric Corporation","nt":"Brownfield redevelopment of former Century Aluminum smelter. Site acquired February 2026 from Century Aluminum subsidiary; acquisition price reported by multiple outlets as $200M cash plus a 6.8% minority equity interest in TeraWulf (not confirmed in the official press release text as of July 2026). Lease entity: TeraWulf's Raylan Data LLC to Anthropic PBC. The ~$19B is contracted lease revenue over the 20-year term — not capex; not recorded as an investment figure. TeraWulf indicated a $3B–$4B construction investment for two data center buildings (range, not a firm single figure; not recorded as an investment figure). Site has ~480 MW of existing power availability; 401 MW is the Anthropic lease capacity. Total site ~750 acres per news sources; TeraWulf's official PR cited 'over 250 buildable acres.' Coordinates are approximate (Hawesville town center). The Fluidstack/Abernathy JV is a separate unrelated transaction and is not part of this record.","src":[{"u":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","t":"TeraWulf Announces Anthropic Lease at Justified Data Campus","p":"TeraWulf Inc."},{"u":"https://www.globenewswire.com/news-release/2026/07/06/3322382/0/en/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","t":"TeraWulf Announces Anthropic Lease at Justified Data Campus (GlobeNewswire)","p":"GlobeNewswire"}],"j":"city","jc":"Hancock County","jn":"Hawesville","jd":"city","ju":"approx"},{"id":"brookfield-nextera-paducah-site-mccracken-ky","n":"Paducah Site AI Data Center Campus","op":"Brookfield","s":"proposed","st":"KY","city":"Kevil","co":"McCracken","lat":37.1139,"lon":-88.8103,"pre":"approximate","cf":"confirmed","mw":1800,"inv":100000000000,"upd":"2026-11-04","pb":"On-site NextEra generation: 2 GW natural gas plus 2.6 GW battery storage (tracked as nextera-paducah-generation-mccracken-ky)","nt":"Announced 2026-07-29 on part of DOE's former Paducah Gaseous Diffusion Plant (a Superfund site). Brookfield develops/operates the AI/HPC campus; NextEra builds dedicated adjacent generation (see the linked power-generation record, NextEra Paducah Site Dedicated Generation). First components could come online as soon as 2028; construction expected complete 2031. Investment reported as 'more than $100 billion' — recorded as $100,000,000,000.","src":[{"u":"https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power","t":"Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky","p":"U.S. Department of Energy"},{"u":"https://www.wbko.com/2026/07/29/ai-data-center-coming-western-kentucky/","t":"AI data center coming to Western Kentucky","p":"WBKO"}],"j":"uninc","jc":"McCracken County","ju":"approx"},{"id":"powerhouse-louisville-ky","n":"PowerHouse Data Centers – Louisville (Camp Ground Road)","op":"PowerHouse Data Centers","s":"under_construction","st":"KY","city":"Louisville","co":"Jefferson","lat":38.1953,"lon":-85.8485,"pre":"approximate","cf":"reported","mw":402,"ac":153,"inv":11000000000,"ann":"2025-01","upd":"2026-10-30","nt":"Address: 6001 Camp Ground Road, Louisville, KY; near Shively and the Rubbertown industrial district, less than 1 mile from the Ohio River. 153 acres confirmed by DCD. 1.6M sq ft total campus across seven buildings. Operator discussing tenants including major hyperscalers (Google, Amazon, Microsoft named in reports). End tenant not publicly disclosed at time of research. Fix: removed unconfirmed '50-year' duration from tax exemption description — program exists per Kentucky 2024 legislation but specific term length was not confirmed by any fetched source.","src":[{"u":"https://www.datacenterdynamics.com/en/news/planning-commission-recommends-approval-for-16m-sq-ft-planned-data-center-in-louisville-kentucky/","t":"Planning Commission recommends approval for 1.6m sq ft planned data center in Louisville, Kentucky","p":"Data Center Dynamics"},{"u":"https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition","t":"West Louisville data center approved despite opposition","p":"Louisville Public Media"}],"j":"city","jc":"Jefferson County","jn":"Louisville/Jefferson County metro government (balance)","jd":"city","ju":"approx"},{"id":"tenkey-franklin-ky","n":"TenKey LandCo Project Lionsgate – Franklin Data Center","op":"TenKey LandCo I LLC","s":"proposed","st":"KY","city":"Franklin","co":"Simpson","lat":36.703,"lon":-86.591,"pre":"approximate","cf":"reported","ac":200,"inv":4800000000,"ann":"2024","upd":"2026-10-22","pb":"Grid — Warren Rural Electric Co-op Corp","nt":"Site: 421 Steele Road (Steele Road near Exit 2 on I-65), Franklin, Simpson County, KY. Coordinates are approximate for that I-65 exit area within Franklin city limits. Three 200,000 sq ft buildings plus on-site natural gas power generation planned. End hyperscaler not publicly identified; Simpson County Judge-Executive Mason Barnes refused to sign NDA and called the pitch full of red flags. Data center opposition became a factor in May 2026 local primary elections in Simpson County. Fix: investment figure corrected from $1.6B to $4.8B — LPM confirms total project is 'nearly $5 billion'; the $1.6B figure in the original record is the per-building cost (each of three 200,000 sq ft facilities costs approximately $1.6B, totaling ~$4.8B).","src":[{"u":"https://www.wkyufm.org/news/2026-04-14/second-lawsuit-filed-over-proposed-data-center-in-simpson-county","t":"Second lawsuit filed over proposed data center in Simpson County","p":"WKYU Public Media"},{"u":"https://www.lpm.org/news/2026-01-28/data-center-developer-sues-simpson-county-government-over-land-use-ordinance","t":"Data center developer sues Simpson County government over land use ordinance","p":"Louisville Public Media"}],"j":"uninc","jc":"Simpson County","ju":"approx"},{"id":"terawulf-muskie-eastpark-ky","n":"TeraWulf Muskie Data Campus (EastPark)","op":"TeraWulf","s":"proposed","st":"KY","city":"Ashland","co":"Greenup","lat":38.4042,"lon":-82.79,"pre":"approximate","cf":"confirmed","mw":1000,"ac":285,"ann":"2026-05-26","upd":"2026-10-28","pb":"Kentucky Power (AEP)","nt":"TeraWulf's second Kentucky campus (alongside the Justified/Hawesville campus, tracked separately as of July 2026). TeraWulf (Nasdaq: WULF), historically a bitcoin miner, repositioning toward HPC/AI. Muskie is a 285-acre site at EastPark Industrial Park (a 1,000-acre former strip mine). Planned 1+ GW phased: initial 500 MW ramp H2 2028, additional 500 MW targeted H2 2030. County discrepancy: local TV cites Boyd County, but Wikipedia places EastPark at the junction of Boyd, Greenup and Carter counties, with most of the park in Greenup County; Greenup used, city Ashland retained as the regional reference. Investment omitted: the $4B figure came from a Boyd County official, not TeraWulf's investor PR or 8-K. Sources give different long-term job figures: a WCHS report cites around 300 long-term positions, while TeraWulf told a community meeting reported by the Herald-Dispatch that it expects to employ up to 100 workers once the campus is online, with tenants possibly creating about 100 more jobs; both are estimates or ceilings, so no permanent job count is recorded. TeraWulf stated it will pay the full standard industrial tariff with no subsidies. Coordinates are the EastPark park centroid.","src":[{"u":"https://www.wowktv.com/news/kentucky/boyd-county-ky/new-ai-data-center-coming-to-eastern-kentucky/","t":"New AI data center coming to eastern Kentucky","p":"WOWK-TV"},{"u":"https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus","t":"TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus","p":"TeraWulf Inc."}],"j":"uninc","jc":"Boyd County","ju":"approx"},{"id":"aws-benton-bossier-parish-la","n":"Amazon Web Services Bossier Parish Campus (Benton)","op":"Amazon Web Services","s":"under_construction","st":"LA","city":"Benton","co":"Bossier","lat":32.77,"lon":-93.74,"pre":"approximate","cf":"confirmed","ann":"2026-02","upd":"2026-08-27","nt":"One of the two campuses covered by Amazon's $12 billion northwest Louisiana announcement; the other is just north of Blanchard Latex Road in Caddo Parish. KSLA places this campus about five miles north of Benton on the west side of Highway 3. STACK Infrastructure is the developer partner and each campus is approximately 2-3 million sq ft. Program-level figures are deliberately not attributed to this site: the $12 billion investment and the roughly 1,500 construction / 540 permanent job figures cover both campuses jointly, and Amazon's up-to-$400 million public water-infrastructure commitment covers all of its northwest Louisiana campuses. The separately announced Resilient Technology Park campus in west Shreveport is, as of August 2026, tracked as Amazon Web Services Shreveport Campus (Resilient Technology Park); KSLA reported on 2026-02-24 that it is not part of the $12 billion investment. Coordinates are derived from the published road description and are approximate; no parcel coordinate has been published.","src":[{"u":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","t":"Amazon Selects Louisiana for $12 Billion Data Center Campuses in Major U.S. Expansion","p":"Louisiana Economic Development"},{"u":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","t":"Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed","p":"KSLA News 12"}],"j":"uninc","jc":"Bossier Parish","ju":"approx"},{"id":"aws-blanchard-caddo-parish-la","n":"Amazon Web Services Caddo Parish Campus (Blanchard)","op":"Amazon Web Services","s":"under_construction","st":"LA","city":"Blanchard","co":"Caddo","lat":32.6,"lon":-94.04,"pre":"approximate","cf":"confirmed","ann":"2026-02","upd":"2026-08-27","nt":"One of the two campuses covered by Amazon's $12 billion northwest Louisiana announcement; the other is roughly five miles north of Benton in Bossier Parish. KSLA places this campus just north of Blanchard Latex Road on State Line Road. STACK Infrastructure is the developer partner and each campus is approximately 2-3 million sq ft. Program-level figures are deliberately not attributed to this site: the $12 billion investment and the roughly 1,500 construction / 540 permanent job figures cover both campuses jointly, and Amazon's up-to-$400 million public water-infrastructure commitment covers all of its northwest Louisiana campuses. The separately announced Resilient Technology Park campus in west Shreveport is, as of August 2026, tracked as Amazon Web Services Shreveport Campus (Resilient Technology Park); KSLA reported on 2026-02-24 that it is not part of the $12 billion investment. Coordinates are derived from the published road description and are approximate; no parcel coordinate has been published.","src":[{"u":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","t":"Amazon Selects Louisiana for $12 Billion Data Center Campuses in Major U.S. Expansion","p":"Louisiana Economic Development"},{"u":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","t":"Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed","p":"KSLA News 12"}],"j":"uninc","jc":"Caddo Parish","ju":"approx"},{"id":"applied-digital-delta-forge-1-la","n":"Applied Digital Delta Forge 1 AI Factory Campus","op":"Applied Digital Corporation","s":"under_construction","st":"LA","city":"Boyce","co":"Rapides","lat":31.4,"lon":-92.65,"pre":"approximate","cf":"confirmed","mw":300,"ac":300,"inv":3600000000,"ann":"2026-05","upd":"2026-10-30","pb":"Grid (Cleco)","nt":"Anchor tenant is an undisclosed investment-grade U.S. hyperscaler under a $7.5B, 15-year lease. Two initial facilities totaling 300 MW across 300 acres (of 672-acre secured site). Initial operations targeted mid-2027. Applied Digital HQ in Dallas, TX.","src":[{"u":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","t":"Central Louisiana secures $3.6B Applied Digital AI Factory Campus","p":"Louisiana Economic Development"},{"u":"https://rapidesparishjournal.com/2026/05/27/rapides-parish-lands-massive-3-6-billion-ai-data-center-project/","t":"Rapides Parish lands massive $3.6B AI data center project","p":"Rapides Parish Journal"}],"j":"uninc","jc":"Grant Parish","ju":"approx"},{"id":"stack-bossier-parish-la","n":"Bossier Parish Campus (with Amazon)","op":"STACK Infrastructure","s":"under_construction","st":"LA","city":"Benton","co":"Bossier","lat":32.69,"lon":-93.74,"pre":"approximate","cf":"confirmed","upd":"2026-09-15","nt":"Companion site to the Blanchard/Caddo Parish campus; same ~$12,000,000,000 combined Amazon/STACK investment.","src":[{"u":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","t":"Campuses of newly-announced Amazon data center spanning Bossier, Caddo parishes confirmed","p":"KSLA"},{"u":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","t":"Louisiana Economic Development (LED) — official announcement","p":"Louisiana Economic Development"}],"j":"city","jc":"Bossier Parish","jn":"Benton","jd":"town","ju":"approx"},{"id":"stack-caddo-parish-la","n":"Caddo Parish Campus (with Amazon)","op":"STACK Infrastructure","s":"under_construction","st":"LA","city":"Blanchard","co":"Caddo","lat":32.58,"lon":-93.9,"pre":"approximate","cf":"confirmed","upd":"2026-09-15","nt":"Part of a ~$12,000,000,000 combined Amazon/STACK investment spanning this Caddo Parish campus and the companion Bossier Parish campus (Benton, LA).","src":[{"u":"https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/","t":"Campuses of newly-announced Amazon data center spanning Bossier, Caddo parishes confirmed","p":"KSLA"},{"u":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","t":"Amazon selects Louisiana for $12 billion data center campuses in major U.S. expansion","p":"Opportunity Louisiana"}],"j":"uninc","jc":"Caddo Parish","ju":"approx"},{"id":"hut8-river-bend-west-feliciana-la","n":"Hut 8 River Bend AI Data Center Campus","op":"Hut 8","s":"under_construction","st":"LA","city":"St. Francisville","co":"West Feliciana","lat":30.79,"lon":-91.38,"pre":"approximate","cf":"confirmed","mw":330,"ac":611,"inv":10000000000,"ann":"2025-01","upd":"2026-10-22","pb":"Grid (Entergy Louisiana); campus adjacent to River Bend Nuclear Generating Station","nt":"River Bend campus on 611 acres in West Feliciana Parish. Fluidstack (backed by Google) is primary tenant; Anthropic also signed a long-term lease. Phase I: two 450,000 sq ft facilities. Phase II (additional facilities) targeted by end of 2026. Coordinates approximate St. Francisville area.","src":[{"u":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","t":"Hut 8 selects Southeast Louisiana for $10B AI data center","p":"Louisiana Economic Development"},{"u":"https://www.datacenterdynamics.com/en/news/planned-hut-8-data-center-in-west-feliciana-parish-louisiana-gets-green-light/","t":"Planned Hut 8 data center in West Feliciana Parish gets green light","p":"Data Center Dynamics"}],"j":"city","jc":"West Feliciana Parish","jn":"St. Francisville","jd":"town","ju":"approx"},{"id":"meta-hyperion-richland-parish-la","n":"Meta Hyperion","op":"Meta","s":"under_construction","st":"LA","city":"Delhi vicinity","co":"Richland","lat":32.4442,"lon":-91.4906,"pre":"approximate","cf":"reported","mw":2000,"ac":2250,"inv":10000000000,"ann":"2025-01","upd":"2026-11-04","pb":"grid (Entergy Louisiana) + planned renewables","nt":"A second, larger Meta data center development at the same Richland Parish complex is in progress under the internal name 'Project Evest' (Evest LLC, a Meta subsidiary and Laidley affiliate), the subject of a new, not-yet-docketed LPSC certification application (Direct Testimony of Laura K. Beauchamp on behalf of Entergy Louisiana, filed March 2026, public-redacted version). The testimony states Evest 'seeks to develop adjacent to Laidley's data center in Richland Parish, Louisiana, that was the subject of the proceedings in LPSC Docket No. U-37425' (i.e., the already-tracked Hyperion project). To serve Evest, Entergy is seeking certification of seven new 754 MW 1x1 CCCT generators (four near the Richland Parish site, three sited near the existing Big Cajun site in Pointe Coupee Parish) plus battery storage co-located at the Bogalusa West Solar and Cypress Harvest Solar facilities -- on top of the three CCCTs (Franklin Farms 1&2, Waterford 5) already approved for Hyperion itself. Investigative coverage (The Lens, 2026-04-14) puts the combined Hyperion+Evest generation build at 10 new gas plants, 7,000+ MW, and $16B+ in new fossil-fuel infrastructure serving this one customer, and reports the underlying Entergy-Meta commercial agreements are not fully public. As of September 2026, Evest's own docket number and site-specific coordinates were not yet public.","src":[{"u":"https://www.reuters.com/technology/meta-build-ai-data-center-louisiana-2025-01-24/","t":"Meta to build AI data center in Louisiana — Reuters","p":"Reuters"},{"u":"https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","t":"Meta Selects Northeast Louisiana as Site of $10 Billion AI-Optimized Data Center","p":"Louisiana Economic Development"}],"j":"city","jc":"Richland Parish","jn":"Delhi","jd":"town","ju":"approx"},{"id":"coresite-bo1-boston-ma-ma","n":"CoreSite BO1 - Boston, MA","op":"CoreSite","s":"operational","st":"MA","city":"Somerville","co":"Middlesex","lat":42.3767,"lon":-71.0798,"pre":"exact","cf":"reported","upd":"2026-09-15","nt":"Directory confirms CoreSite operates a single Boston-market facility (BO1); could not load a dedicated BO1 facility page to verify Somerville vs Boston-proper address, so citing the directory page rather than a fabricated per-facility URL. AI/HPC (likely): Site page: BO1 Boston offers liquid cooling capabilities.","src":[{"u":"https://www.coresite.com/data-centers/locations","t":"CoreSite facility directory","p":"CoreSite"},{"u":"https://www.openstreetmap.org/way/29827954","t":"OpenStreetMap way/29827954","p":"OpenStreetMap"}],"j":"city","jc":"Middlesex County","jn":"Somerville","jd":"city"},{"id":"markley-lowell-ma","n":"Markley Group One Lowell Data Center","op":"Markley Group","s":"operational","st":"MA","city":"Lowell","co":"Middlesex","lat":42.6334,"lon":-71.3162,"pre":"approximate","cf":"confirmed","mw":50,"ac":14,"inv":350000000,"ann":"2015-01","upd":"2026-10-28","pb":"Grid; 27 on-site diesel backup generators","nt":"Coordinates are approximate city centroid (Sacred Heart/Back Central neighborhoods, Lowell). Facility serves 100+ customers including hospitals, universities, and police departments. Expansion includes land purchases by Markley near old power plant. Expansion plans stalled by moratorium. AI demand cited as driver of expansion since 2022. Delivered permanent-job counts are disputed - the abatement promised 100 jobs; the city and critics count ~26-30 full-time local workers while Markley cites ~100 total, with construction peaking ~120 (IBEW Local 103); recorded as unresolved (honest-zero). In September 2024, Markley executive vice president Jeff Flanagan said the company is committed to investing more than $350 million in the Lowell data center, of which more than $225 million had already been developed (The Sun of Lowell, via GovTech). The investment figure recorded here is that stated floor of $350 million. Massachusetts' 2024 sales-tax exemption is statutory eligibility, not a confirmed Markley award.","src":[{"u":"https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/","t":"Lowell Residents File Massachusetts' First Lawsuit Against a Data Center","p":"Boston.com"},{"u":"https://www.thecrimson.com/article/2026/5/5/ai-data-center-lowell-water/","t":"Lessons From Lowell: How a Data Center's Expansion Has Choked a Small Town","p":"The Harvard Crimson"}],"j":"city","jc":"Middlesex County","jn":"Lowell","jd":"city","ju":"approx"},{"id":"aws-calvert-cliffs-md","n":"AWS Calvert County Data Center Campus","op":"Amazon Web Services","s":"cancelled","st":"MD","city":"Lusby","co":"Calvert","lat":38.437,"lon":-76.443,"pre":"approximate","cf":"reported","ac":2050,"ann":"2026-03","upd":"2026-10-22","nt":"Very early-stage: AWS states no formal proposal submitted as of DCD article date. Site plan application filed May 2026. Concept design shared at community open house shows up to 8 buildings south and west of Calvert Cliffs nuclear plant. Capacity not disclosed by AWS. Coordinates approximate for Calvert Cliffs area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-proposes-data-center-campus-next-to-nuclear-plant-in-calvert-county-maryland/","t":"AWS proposes data center campus next to nuclear plant in Calvert County, Maryland","p":"Data Center Dynamics"},{"u":"https://thebaynet.com/amazon-introduces-potential-calvert-county-data-center-emphasizes-infrastructure-workforce-and-growth/","t":"Amazon Introduces Potential Calvert County Data Center, Emphasizes Infrastructure, Workforce And Growth","p":"The BayNet"}],"j":"uninc","jc":"Calvert County","ju":"approx"},{"id":"aligned-quantum-frederick-md","n":"Aligned Data Centers IAD-04 Frederick","op":"Aligned Data Centers","s":"under_construction","st":"MD","city":"Adamstown","co":"Frederick","lat":39.263,"lon":-77.387,"pre":"approximate","cf":"confirmed","mw":72,"ac":75,"ann":"2025-02","upd":"2026-10-22","nt":"Part of TPG Real Estate / Catellus Development's 2,100-acre Quantum Frederick campus on former Alcoa Eastalco aluminum plant (closed 2010, demolished 2017) in Frederick County MD. Coordinates are approximate for campus area near Buckeystown/Adamstown. Location.city set to Adamstown per the more recent, project-specific Frederick News-Post coverage (2025-11-11, via Yahoo Finance); the 2021 Maryland Dept. of Commerce announcement had said \"near Buckeystown\" — recorded here so the choice is auditable rather than looking arbitrary.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-72mw-maryland-data-center-in-quantum-frederick-park/","t":"Aligned breaks ground on 72MW Maryland data center in Quantum Frederick Park","p":"Data Center Dynamics"},{"u":"https://www.datacenterfrontier.com/hyperscale/article/55261511/circling-back-what-now-for-quantum-loophole-and-the-quantum-frederick-data-center-campus","t":"What Now for Quantum Loophole and the Quantum Frederick Data Center Campus?","p":"Data Center Frontier"}],"j":"uninc","jc":"Frederick County","ju":"approx"},{"id":"aligned-iad-06-frederick-md","n":"Aligned Data Centers IAD-06 Frederick","op":"Aligned Data Centers","s":"under_construction","st":"MD","city":"Frederick","co":"Frederick","lat":39.3417,"lon":-77.5089,"pre":"approximate","cf":"confirmed","mw":72,"ann":"2025-10","upd":"2026-10-22","nt":"Two-story, 450,000 sq ft, 72 MW building — the second of four planned on Aligned's 75-acre, roughly 264 MW campus inside Quantum Frederick. About 345 skilled workers were on site at topping out with more than 80,000 craft hours logged.","src":[{"u":"https://www.turnerconstruction.com/insights/turner-celebrates-topping-out-of-aligned-iad-06-data-center-in-frederick-maryland","t":"Turner Celebrates Topping Out of Aligned IAD-06 Data Center in Frederick, Maryland","p":"Turner Construction Company"},{"u":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","t":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3","p":"Nature Forward"}],"j":"uninc","jc":"Frederick County","ju":"approx"},{"id":"lerner-brightseat-tech-park-md","n":"Brightseat Tech Park","op":"Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)","s":"permitted","st":"MD","city":"Landover","co":"Prince George's","lat":38.931,"lon":-76.868,"pre":"approximate","cf":"confirmed","mw":820,"ac":87,"inv":5000000000,"ann":"2024-03","upd":"2026-10-30","nt":"2101 Brightseat Road, Landover MD. Project has final plan approvals but is politically frozen pending task force report. Five buildings on 87 acres of former mall site. As a permitted-but-frozen project, no facility-specific water design, subsidy award, or committed job figures have been disclosed; job figures circulating in press are Maryland Tech Council sector benchmarks, not Brightseat commitments. As of 2026-09-10, status remains permitted (the status vocabulary has no value for 'construction paused by opposition/moratorium'). Groundbreaking has not occurred; community opposition (more than 23,000 petition signatures) and PG County Council ordinances CB-019-2026/CB-020-2026 (introduced March 2026 to repeal the qualified-data-center site-plan-review exemption) continue to threaten the timeline. Subsidies: as of September 2026, only a general-program reference was found (MD/PG County 2020 sales-and-use tax exemption for qualified data centers, Tax-General Article Sec.11-239(a)(5)(i)) with no site-specific dollar figure for this project, so no subsidy is recorded; the exemption is a program-level fact only. As of September 2026, no street address had been independently sourced; the status history cites 2101 Brightseat Road from an earlier source.","src":[{"u":"https://www.datacenterdynamics.com/en/news/lerners-maryland-data-center-campus-could-total-820mw/","t":"Lerner's Maryland data center campus could total 820MW","p":"Data Center Dynamics"},{"u":"https://afrotech.com/prince-georges-county-pauses-landover-mall-data-center-project","t":"Prince George's County Executive Orders Temporary Halt to Landover Mall Data Center Project","p":"AfroTech"}],"j":"city","jc":"Prince George's County","jn":"Glenarden","jd":"city","ju":"approx"},{"id":"mountain-branch-joppa-md","n":"Mountain Branch AI Energy Campus (proposed)","op":"Bill and Gus Vasilakopoulos (Mountain Branch Golf Course owners)","s":"cancelled","st":"MD","city":"Joppa","co":"Harford","lat":39.467,"lon":-76.3709,"pre":"approximate","cf":"reported","mw":672,"ac":275,"upd":"2026-08-25","nt":"Preliminary plans, obtained by residents and never formally submitted to the county, showed a seven-building, 672 MW campus on the 275-acre golf course. The owner described it on the record as an AI project that would generate its own power. Harford County's permanent ban leaves it no path, hence cancelled. Joppa is not a Census place and the course sits outside every CDP, so there is no Gazetteer centroid to use. The point is the course's street address (1827 Mountain Rd) run through the Census geocoder, which returns Harford County.","src":[{"u":"https://www.thebanner.com/community/local-news/harford-county-data-center-ban-EXHKIBRN35AO3IHMMVITZLI7KI/","t":"How 2 political outsiders led the push for Maryland's first data center ban","p":"The Baltimore Banner"},{"u":"https://foxbaltimore.com/news/local/harford-county-data-center-mountain-branch-golf-course-owner-proposed-ai-project","t":"As Harford County eyes data center ban, golf course owner defends proposed AI project","p":"FOX45 Baltimore"}],"j":"uninc","jc":"Harford County","ju":"approx"},{"id":"rowan-digital-frederick-md","n":"Rowan Digital Infrastructure Frederick Campus (Bauxite I)","op":"Rowan Digital Infrastructure","s":"under_construction","st":"MD","city":"Adamstown","co":"Frederick","lat":39.265,"lon":-77.394,"pre":"approximate","cf":"confirmed","mw":300,"ac":151,"ann":"2024","upd":"2026-10-28","nt":"Rowan (Quinbrook Infrastructure Partners + Birch Infrastructure JV) serves as AWS hyperscale host at Quantum Frederick. Three campuses planned on-site total; Bauxite I is Phase 1 at 300MW. 777,150 sq ft total campus footprint. Coordinates approximate for same Quantum Frederick campus area as the Aligned Data Centers record there (as of August 2026). The city is given as Adamstown per the more recent, project-specific Frederick News-Post coverage (2025-11-11, via Yahoo Finance); the 2021 Maryland Dept. of Commerce announcement had said \"near Buckeystown\". AWS is the confirmed tenant of Bauxite I on this former Alcoa Eastalco Works site — AWS's first Maryland data center. The record is listed as under construction. Rowan's CEO message of December 23, 2025 says the company \"successfully energized and turned over\" Bauxite I; Nature Forward's overview of the park, published June 26, 2026, states \"As of June 2026, none of Quantum Frederick data centers are yet operational\".","src":[{"u":"https://www.datacenterdynamics.com/en/news/rowan-secures-12bn-for-maryland-data-center-campus-build-out/","t":"Rowan secures $1.2bn for Maryland data center campus build-out","p":"Data Center Dynamics"},{"u":"https://thetechcapital.com/rowan-digital-infrastructure-is-building-awss-maryland-availability-zone-at-the-quantum-frederick-campus/","t":"Rowan Digital Infrastructure is building AWS's Maryland availability zone at Quantum Frederick Campus","p":"The Tech Capital"}],"j":"uninc","jc":"Frederick County","ju":"approx"},{"id":"terawulf-morgantown-charles-county-md","n":"TeraWulf Morgantown Generating Station AI Campus","op":"TeraWulf","s":"proposed","st":"MD","co":"Charles","lat":38.3617,"lon":-76.9797,"pre":"approximate","cf":"confirmed","mw":1000,"ac":250,"ann":"2026-02","upd":"2026-10-22","nt":"Morgantown Generating Station is on the Potomac River near the Governor Harry W. Nice Memorial Bridge, Charles County MD. Acquisition funding and TeraWulf financial stability questioned by Maryland Office of People's Counsel (net losses $660M+ in 2025, 90% revenue from Bitcoin mining). Coordinates approximate. TeraWulf sought about $100M in Maryland state funds toward the Morgantown acquisition; the purchase price is withheld from FERC as confidential (FOIA Exemption 4), which Public Citizen is petitioning to disclose. No cooling design, water-withdrawal figure, confirmed subsidy, or job count has been publicly disclosed for the proposed AI campus. As of 2026-09-10 the overall status remains proposed. Material development after 2026-07-23: FERC ruled 2026-07-29 that the ownership transfer of Morgantown Generating Station to TeraWulf is consistent with the public interest, but the order explicitly does not authorize data-center construction, new/repowered generation, or interconnection changes -- so the status remains proposed. Purchase price was kept confidential by FERC order (no investment figure obtainable). No water, cooling or jobs figures were found.","src":[{"u":"https://technical.ly/entrepreneurship/terawulf-maryland-power-plant-acquistion/","t":"TeraWulf buys Maryland coal plant to fuel AI data centers","p":"Technical.ly"},{"u":"https://thebaynet.com/charles-countys-morgantown-plant-being-bought-by-data-infrastructure-company/","t":"Charles County's Morgantown Plant Being Bought By Data Infrastructure Company","p":"The BayNet"}],"j":"uninc","jc":"Charles County","ju":"approx"},{"id":"liquidcool-loring-afb-me","n":"Loring LiquidCool Data Center (Green 4 Maine Campus)","op":"LiquidCool Solutions / Green 4 Maine","s":"proposed","st":"ME","city":"Limestone","co":"Aroostook","lat":46.9502,"lon":-67.8849,"pre":"approximate","cf":"confirmed","mw":50,"ann":"2025-10","upd":"2026-10-30","pb":"Canadian hydropower (New Brunswick); immersion cooling (no water consumed)","nt":"115,000 sq ft leased within Green 4 Maine's 450-acre innovation hub on former USAF base. LiquidCool Solutions is a Minnesota-based technology company. First phase starts at 5-6MW; 50MW total available at base. Project marketed as cross-border US/Canada AI hub.","src":[{"u":"https://www.bangordailynews.com/2025/10/14/aroostook/ai-data-center-loring-air-force-base/","t":"Maine's 1st AI Data Center Planned for Aroostook County","p":"Bangor Daily News"},{"u":"https://www.bangordailynews.com/2026/03/10/aroostook/aroostook-business/maine-data-center-ban-loring-joam40zk0w/","t":"Maine's Proposed Data Center Ban Could Restrict Facility Planned at Loring","p":"Bangor Daily News"}],"j":"uninc","jc":"Aroostook County","jm":"Limestone town","ju":"approx"},{"id":"millcompute-bates-mill-lewiston-me","n":"MillCompute Bates Mill No. 3 AI Data Center","op":"MillCompute LLC","s":"cancelled","st":"ME","city":"Lewiston","co":"Androscoggin","lat":44.097,"lon":-70.2183,"pre":"approximate","cf":"confirmed","mw":24,"inv":300000000,"ann":"2025-12-12","upd":"2026-10-04","nt":"Proposed to occupy the first two floors (~85,000 sq ft) of Bates Mill No. 3; estimated 20-30 jobs and $300M investment; included a 20-year TIF (90% tax return years 1-10, 85% years 11-20). Phase 2 contemplated an on-site natural gas co-generation system. Rejected unanimously by the Lewiston City Council on 2025-12-17 after sustained public opposition over water/power use and the tax break request.","src":[{"u":"https://www.bangordailynews.com/2025/12/12/central-maine/central-maine-business/lewiston-mill-300-m-ai-data-center/","t":"Lewiston mill $300M AI data center","p":"Bangor Daily News"},{"u":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","t":"Lewiston city council shoots down data center proposal","p":"Maine Public"}],"j":"city","jc":"Androscoggin County","jn":"Lewiston","jd":"city","ju":"approx"},{"id":"sentinel-jay-me","n":"Sentinel Data Centers Androscoggin Mill Campus, Jay","op":"Sentinel Data Centers","s":"cancelled","st":"ME","city":"Jay","co":"Franklin","lat":44.5024,"lon":-70.2175,"pre":"approximate","cf":"reported","mw":82,"inv":550000000,"ann":"2025-01","upd":"2026-10-30","pb":"On-site solar (up to 150MW), Central Maine Power (up to 25MW backup), on-site hydro approved","nt":"Sentinel Data Centers LLC is headquartered in New York City. JGT2 Redevelopment purchased the former Pixelle Specialty Solutions mill in December 2023. ~425,000 sq ft of obsolete mill buildings demolished; paper machines shipped to Pakistan. In June 2026 Sentinel notified JGT2 of intent not to move forward; no permits were issued and no groundbreaking was held. JGT2 is seeking other operators for the site.","src":[{"u":"https://themainemonitor.org/jay-backs-data-center-plan/","t":"Jay Approves Town Meeting Warrant, Backs Data Center Plan","p":"The Maine Monitor"},{"u":"https://www.newscentermaine.com/article/tech/science/environment/jay-select-board-approves-town-meeting-warrant-backs-data-center-plan/97-72e12bda-75de-43fe-99ea-a58f7471ee39","t":"Jay Select Board Approves Town Meeting Warrant, Backs Data Center Plan","p":"News Center Maine"}],"j":"uninc","jc":"Franklin County","jm":"Jay town","ju":"approx"},{"id":"wiscasset-proposed-me","n":"Wiscasset Data Center (Old Ferry Road Site)","op":"Unnamed developer (NDA with town)","s":"proposed","st":"ME","city":"Wiscasset","co":"Lincoln","lat":44.0015,"lon":-69.6553,"pre":"approximate","cf":"reported","ac":200,"inv":5000000000,"ann":"2025-09","upd":"2026-10-22","pb":"Not disclosed","nt":"Coordinates are approximate, based on Wiscasset area near former Maine Yankee site. Developer identity remains undisclosed per NDA. As of March 2026 Lincoln County reallocated ARPA funds to Waldoboro and Newcastle. Land remains undeveloped. The $5 billion investment figure is press-reported, not confirmed. As of October 2026, the Portland Press Herald (13 May 2026) states that \"plans to build a $5 billion data center were made public in September of 2025\". Maine Morning Star (secondary source) could not be consulted as of July 2026. The operator is listed as 'Unnamed developer (NDA with town)' as that is the factual status.","src":[{"u":"https://www.centralmaine.com/2025/11/03/wiscasset-loses-arpa-funding-after-data-center-proposal-confusion/","t":"Wiscasset Loses ARPA Funding After Data Center Proposal, Confusion","p":"Central Maine"},{"u":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","t":"As Data Centers Look to Rural New England, Maine Considers a Moratorium","p":"Maine Morning Star"}],"j":"uninc","jc":"Lincoln County","jm":"Edgecomb town","ju":"approx"},{"id":"123net-dc1-southfield-mi","n":"123NET Southfield DC1","op":"123NET","s":"operational","st":"MI","city":"Southfield","co":"Oakland","lat":42.4716,"lon":-83.238,"pre":"approximate","cf":"confirmed","upd":"2026-10-28","nt":"Carrier-neutral colocation, home of the DET-iX Michigan internet exchange. Operator announcement dated 2025-09-24 (retrieved 2026-09-09) states a 4 MW expansion; that is the increment added, not a facility total, so it is not recorded as the facility's capacity. The announcement states liquid- and air-cooled capacity aimed at GPU clusters and AI inference, hence an AI classification of mixed use for a general-purpose colo that explicitly sells AI capacity. No investment, jobs, or incentive figures are stated. 123NET's own colocation page lists two further Southfield buildings, Southfield Data Center NW (DC2) at 24275 Northwestern Hwy and Southfield Data Center W (DC3) at 24245 Northwestern Hwy; as of October 2026 both are listed separately and are not covered here. Coordinates geocoded from the street address in the announcement; parcel not confirmed.","src":[{"u":"https://www.123.net/news/123net-expands-dc1/","t":"123NET Expands Southfield Data Center to Power AI and High-Density Deployments","p":"123NET"},{"u":"https://www.peeringdb.com/api/fac?state=MI&limit=250","t":"PeeringDB facility registry API — record \"123.NET - DC1 - 24700 Northwestern Hwy.\" registered by 123.Net, LLC., Southfield 48075","p":"PeeringDB"}],"j":"city","jc":"Oakland County","jn":"Southfield","jd":"city","ju":"approx"},{"id":"benton-township-yore-avenue-ai-data-center-mi","n":"Benton Township AI Data Center (Yore Avenue, near Lake Michigan College)","op":"Undisclosed developer","s":"proposed","st":"MI","city":"Benton Charter Township","co":"Berrien","lat":42.0952,"lon":-86.3881,"pre":"approximate","cf":"reported","ac":280,"ann":"2024-04","upd":"2026-10-07","nt":"An unnamed company considered a potential $3 billion AI data center on 280 acres on Yore Avenue near Lake Michigan College (ABC57, April 2024). Local officials cited power from the Cook Plant and Palisades and water for cooling. ABC57 reported that state tax-exemption legislation had to pass before the project could proceed. Baxtel lists it as 'land secured for future development' with the developer unknown. DCD later reported the plans had stalled, but as of October 2026 that article could not be fetched, so the stall is not asserted from it. The $3B figure is a 'potential' value, so it is not recorded as an investment figure. The pin is a point on Yore Avenue near the college (OSM), not a parcel.","src":[{"u":"https://abc57.com/news/jackie","t":"$3 billion A.I. data center potentially heading to Michiana","p":"ABC57"},{"u":"https://baxtel.com/data-center/benton-harbor-proposed","t":"Benton Harbor (Proposed) data center listing","p":"Baxtel"}],"j":"uninc","jc":"Berrien County","jm":"Benton charter township","ju":"approx"},{"id":"hyperscale-data-dowagiac-mi","n":"Hyperscale Data Dowagiac Campus","op":"Hyperscale Data, Inc.","s":"under_construction","st":"MI","city":"Dowagiac","co":"Cass","lat":41.984,"lon":-86.109,"pre":"approximate","cf":"confirmed","mw":340,"ac":83,"upd":"2026-10-28","nt":"Former manufacturing site at 415 East Prairie Ronde Street, Dowagiac; converting from Bitcoin-mining infrastructure toward AI/HPC colocation use, branded by the company as its 'Michigan AI Data Center.' The company's August 2026 strategic outlook presentation describes approximately 30 MW of power energized at the campus, a power figure rather than IT capacity, stated while Bitcoin mining was still running there. The first 20 MW of AI compute capacity under its customer agreement is targeted for operational status in Q4 2026 (TFTC, September 2026). The company is targeting 340 MW. A company release of September 2, 2026 says all Bitcoin miners were turned off effective September 1, 2026 as the site is prepared for AI data center operations, so the AI classification is confirmed rather than mixed-use. Recently completed a 48.5-acre acquisition, bringing the campus to ~83 acres total. Publicly traded company (Hyperscale Data, Inc.) sold ~100 BTC and opened a bitcoin-backed credit facility to fund construction, per its own reporting. Cass County passed a resolution urging more development transparency after resident noise complaints. Coordinates are an approximate Dowagiac city estimate, not parcel-geocoded.","src":[{"u":"https://www.dbusiness.com/daily-news/hyperscale-datas-michigan-ai-data-center-doubles-its-land-holdings","t":"Hyperscale Data's Michigan AI Data Center Doubles its Land Holdings","p":"DBusiness"},{"u":"https://wwmt.com/news/local/ai-data-center-expansion-dowagiac-loud-noise-complaints-residents-southwest-michigan-hyperscale-megawatt-bitcoin-wwmt","t":"'Nothing but a noise trap': Dowagiac residents push back against AI data center expansion","p":"WWMT"}],"j":"city","jc":"Cass County","jn":"Dowagiac","jd":"city","ju":"approx"},{"id":"alterra-marshall-technology-energy-center-mi","n":"Marshall Technology & Energy Center","op":"Alterra Development","s":"proposed","st":"MI","city":"Marshall","co":"Calhoun","lat":42.2723,"lon":-84.9633,"pre":"approximate","cf":"reported","ac":270,"ann":"2025-10-30","upd":"2026-08-25","pb":"proposed on-site gas generation plant","nt":"Data center plus a gas generation plant in Brooks Industrial Park, on wetlands near Brooks Nature Center. 270 acres, 112 of them buildable. The Local Development Finance Authority unanimously authorised the $1.12m land sale on 30 October 2025; due diligence runs to Q3 2026, so nothing is built. Alterra estimates 300-500 jobs — a range, so no jobs figure is recorded. Capacity left undisclosed on purpose: the 1.4 GW figure circulating appears only on aggregator sites.","src":[{"u":"https://wwmt.com/news/local/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water","t":"Data center, gas generation plant proposed in Marshall","p":"WWMT"},{"u":"https://www.woodtv.com/news/calhoun-county/proposed-marshall-data-center-met-with-concerns-from-residents/","t":"Proposed Marshall data center met with concerns from residents","p":"WOOD TV"}],"j":"city","jc":"Calhoun County","jn":"Marshall","jd":"city","ju":"approx"},{"id":"project-cannoli-van-buren-township-wayne-county-mi","n":"Project Cannoli","op":"Google","s":"under_construction","st":"MI","city":"Van Buren Township","co":"Wayne","lat":42.23,"lon":-83.44,"pre":"approximate","cf":"confirmed","mw":1000,"ac":282,"upd":"2026-11-04","nt":"Google confirmed evaluating the site. Coordinates are approximate. Developer: Panattoni Development Co. The township planning commission granted preliminary site plan approval in February 2026 and approved the final site plan 5-1 on October 14, 2026. As of October 2026, early construction was reported underway, and Google expects the facility to begin drawing power by late 2027. The record is listed as under construction.","src":[{"u":"https://planetdetroit.org/2026/06/whitmer-data-center-backlash-2026-election/","t":"Van Buren Township OKs Google data center substation","p":"Planet Detroit"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Wayne County","jm":"Van Buren charter township","ju":"approx"},{"id":"verrus-project-flex-lyon-township-oakland-county-mi","n":"Project Flex","op":"Verrus (Sidewalk Infrastructure Partners)","s":"proposed","st":"MI","city":"Lyon Township","co":"Oakland","lat":42.47,"lon":-83.53,"pre":"approximate","cf":"reported","ac":180,"upd":"2026-10-22","nt":"6 buildings, 1.8M sq ft. Anthropic (maker of Claude) reported as the intended end-user tenant, not confirmed directly by Anthropic. Conditional site plan approval since Sept 2025. Coordinates are approximate.","src":[{"u":"https://www.crainsdetroit.com/technology/cdb-anthropic-projectflex-datacenter-20260414/","t":"Anthropic reported as intended end user of Project Flex data center","p":"Crain's Detroit Business"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Oakland County","jn":"Novi","jd":"city","ju":"approx"},{"id":"stargate-saline-township-mi","n":"Stargate The Barn Campus","op":"OpenAI / Oracle / Related Digital","s":"under_construction","st":"MI","city":"Saline Township","co":"Washtenaw","lat":42.174,"lon":-83.8063,"pre":"approximate","cf":"reported","mw":1400,"ac":250,"inv":16000000000,"ann":"2025-10","upd":"2026-11-04","pb":"grid (100% utility costs paid by Oracle)","nt":"The Michigan Data Center Tracker (baldorilaw.com, retrieved 2026-09-09) lists 'The Barn' campus in Saline Township as 'Under construction · 2026-04'. No site-specific incentive award has been found: Michigan's 2024 data-center sales and use tax exemptions may apply, but no source ties an award to this site, and the MPSC conditions are ratepayer protections, not subsidies.","src":[{"u":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/","t":"Oracle and OpenAI start construction on Stargate campus in Saline Township, Michigan — Data Center Dynamics","p":"Data Center Dynamics"},{"u":"https://www.cnbc.com/2026/06/01/stargate-project-michigan-live-updates.html","t":"Stargate updates: OpenAI, Oracle building Michigan data center — CNBC","p":"CNBC"}],"j":"uninc","jc":"Washtenaw County","jm":"Lodi township","ju":"approx"},{"id":"switch-pyramid-campus-grand-rapids-mi","n":"Switch Pyramid Campus","op":"Switch","s":"operational","st":"MI","city":"Gaines Township","co":"Kent","lat":42.823,"lon":-85.64,"pre":"approximate","cf":"confirmed","mw":320,"ac":138,"inv":5000000000,"ann":"2022","upd":"2026-10-22","pb":"Grid","nt":"Steelcase Pyramid campus, Gaines Township, Kent County MI (south of Grand Rapids; not the city of Wyoming, which is a separate municipality ~5 km north). Total campus target: 1.8M sq ft, 320 MW, ~$5B investment across all phases. Phase 1 (225,000 sq ft white space) and Phase 2 (312,000 sq ft) operational; Phase 3 in planning/early construction as of 2025. Michigan's largest data center by capacity. Coordinates are approximate Pyramid campus location on East Paris Ave, Gaines Township. The campus itself has been open and serving customers since 2017, with buildings added incrementally. Data Center Dynamics reported in November 2024 that Switch was close to completing the second building and planning a third, with construction expected to start \"sooner rather than later\"; as of October 2026, none of the cited sources shows the third building under construction. As of September 2026, no cooling or water source could be retrieved; switch.com/pyramid renders its specs via JavaScript and returned only a headline.","src":[{"u":"https://www.datacenterdynamics.com/en/news/switch-plans-second-expansion-of-pyramid-data-center-campus-in-grand-rapids-michigan/","t":"Switch plans second expansion of pyramid data center campus in Grand Rapids, Michigan","p":"Data Center Dynamics"},{"u":"https://www.switch.com/grand-rapids/","t":"Grand Rapids Data Center - Switch","p":"Switch"}],"j":"uninc","jc":"Kent County","jm":"Gaines charter township","ju":"approx"},{"id":"thor-equities-augusta-township-mi","n":"Thor Equities Augusta Township Data Center (Form8tion)","op":"Thor Equities","s":"cancelled","st":"MI","city":"Augusta Township","co":"Washtenaw","lat":42.163,"lon":-83.72,"pre":"approximate","cf":"reported","ac":810,"inv":1000000000,"ann":"2024","upd":"2026-10-22","pb":"Grid — DTE Energy","nt":"Site north of Milan-Oakville Road, east of Hitchingham Road, Augusta Township, Washtenaw County MI (between Ann Arbor and Monroe). No end user announced; planners cited Google and Microsoft as typical users of this facility type. Form8tion is Thor's digital infrastructure arm (founded March 2023). Capacity not disclosed; at least five large buildings planned. Coordinates are approximate Augusta Township centroid. Augusta Township voters overturned the 522-acre rezoning on 2026-08-04 (about 90% to overturn), so the parcels revert to agricultural residential. Recorded as cancelled because the project's enabling rezoning is gone; Thor Equities has not publicly withdrawn, and the results were unofficial as of 2026-08-05. The cancelled status dated 2026-08-04 corresponds to the Aug. 4 veto referendum on the 522-acre rezoning, and as of September 2026 nothing found indicates a revival, appeal or re-rezoning since. As of October 2026, no cited source gives certified vote totals, so the date and mechanism are confirmed but not the tally.","src":[{"u":"https://www.datacenterdynamics.com/en/news/local-officials-recommend-denial-of-thor-equities-data-center-in-michigan/","t":"Local officials recommend denial of Thor Equities data center in Michigan","p":"Data Center Dynamics"},{"u":"https://planetdetroit.org/2025/08/augusta-data-center-petition/","t":"Can 957 signatures halt a $1 billion data center in Augusta Township?","p":"Planet Detroit"}],"j":"uninc","jc":"Washtenaw County","jm":"York charter township","ju":"approx"},{"id":"umich-lanl-research-computing-ypsilanti-township-mi","n":"U-M / Los Alamos Research Computing Center","op":"University of Michigan (with Los Alamos National Laboratory)","s":"proposed","st":"MI","city":"Ypsilanti","co":"Washtenaw","lat":42.203,"lon":-83.5576,"pre":"approximate","cf":"confirmed","ac":144,"inv":1200000000,"upd":"2026-10-07","nt":"144-acre site on Textile Road near Bridge Road in Ypsilanti Charter Township, far eastern Washtenaw County, near the Huron River. LANL's own announcement states the site will house two computing centers — one for Los Alamos national-security AI research and development and an adjacent academic computing center for U-M faculty, students and partner universities. They are recorded here as a single campus record because both sources describe one adjacent pair on one site. Confirmed absences: neither source states a megawatt capacity ('capacity figures: none disclosed' per LANL), a water or cooling design, or job counts — those fields are omitted rather than estimated. LANL states the funding mix was not finalised at announcement; the $1.2B total and the $100M state grant are Bridge Michigan's figures. The AI classification is confirmed — both sources describe the facility's explicit purpose as AI research. Coordinates are the US Census geocoder's match for the Textile Rd / Bridge Rd intersection named in the sources; the 144-acre parcel boundary is not confirmed.","src":[{"u":"https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/","t":"U-M affirms Ypsilanti $1.2B computing center site; township officials vow fight","p":"Bridge Michigan"},{"u":"https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration","t":"UM, LANL launch Michigan AI research center","p":"Los Alamos National Laboratory"}],"j":"uninc","jc":"Washtenaw County","jm":"Ypsilanti charter township","ju":"approx"},{"id":"amazon-becker-mn","n":"Amazon Becker Data Center (Suspended)","op":"Amazon Web Services","s":"cancelled","st":"MN","city":"Becker","co":"Sherburne","lat":45.397,"lon":-93.876,"pre":"approximate","cf":"confirmed","ac":348,"inv":1000000000,"ann":"2024","upd":"2026-10-30","nt":"Amazon has not officially sold the 348-acre parcel and has not ruled out revisiting the project; the cancelled status reflects indefinite suspension with no restart timeline. Near Xcel Energy's Sherburne County (Sherco) generating station, slated for retirement by 2030. Second major tech retreat from Becker after Google abandoned a $600M project in 2022. As of July 2026, the Star Tribune primary source could not be read; story confirmed by Data Center Dynamics and multiple other outlets.","src":[{"u":"https://www.startribune.com/amazon-suspends-minnesota-data-center-as-lawmakers-plan-to-reduce-big-tech-tax-breaks/601359665","t":"Amazon suspends Minnesota data center as lawmakers plan to reduce Big Tech tax breaks","p":"Star Tribune"},{"u":"https://www.datacenterdynamics.com/en/news/amazon-web-services-suspends-plans-for-minnesota-data-center/","t":"Amazon Web Services suspends plans for Minnesota data center","p":"Data Center Dynamics"}],"j":"city","jc":"Sherburne County","jn":"Becker","jd":"city","ju":"approx"},{"id":"google-hermantown-mn","n":"Google Hermantown Data Center Campus","op":"Google","s":"proposed","st":"MN","city":"Hermantown","co":"St. Louis","lat":46.8023,"lon":-92.2408,"pre":"approximate","cf":"confirmed","mw":700,"ac":403,"ann":"2025-10","upd":"2026-08-25","pb":"grid (Minnesota Power) — 700 MW new clean energy, 300 MW wind, 400 MW storage","nt":"Google confirmed in March 2026 that it is the company behind the 403-acre campus Hermantown approved in October 2025. Scaled back since, from 1.8 million sq ft across four buildings to 1.66 million across three. Five to ten years to full build. The 700 MW figure is the new clean energy Minnesota Power is bringing for it, which is the closest thing to a capacity figure the coverage gives.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-confirms-it-is-behind-403-acre-data-center-campus-in-hermantown-minnesota/","t":"Google confirms it is behind 403-acre data center campus in Hermantown","p":"Data Center Dynamics"},{"u":"https://www.mprnews.org/story/2026/03/03/google-behind-controversial-data-center-proposal-in-hermantown","t":"Google is behind controversial data center proposal in Hermantown","p":"MPR News"}],"j":"city","jc":"St. Louis County","jn":"Hermantown","jd":"city","ju":"approx"},{"id":"google-skyway-pine-island-mn","n":"Google Project Skyway (Pine Island)","op":"Google","s":"permitted","st":"MN","city":"Pine Island","co":"Goodhue","lat":44.2019,"lon":-92.6496,"pre":"approximate","cf":"confirmed","ac":482,"ann":"2026-02","upd":"2026-11-04","pb":"Xcel Energy","nt":"Google's first Minnesota campus, Pine Island (Goodhue County), powered by Xcel Energy; ~250,000 sq ft initial building for AI applications. Electric Service Agreement pending MPUC approval as of Feb 2026 → proposed. The associated 1,900 MW (1,400 MW wind + 200 MW solar + 300 MW storage) is a new clean-energy build-out, not the data center's IT load — DC capacity not disclosed (omitted). Faces a local legal challenge. Coordinates are the Pine Island area centroid.","src":[{"u":"https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota","t":"Xcel Energy to power new Google data center in Minnesota","p":"Xcel Energy"},{"u":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-pine-island/","t":"A new data center in Pine Island, Minnesota","p":"Google"}],"j":"city","jc":"Goodhue County","jn":"Pine Island","jd":"city","ju":"approx"},{"id":"meta-rosemount-mn","n":"Meta Rosemount Data Center","op":"Meta","s":"under_construction","st":"MN","city":"Rosemount","co":"Dakota","lat":44.74,"lon":-93.115,"pre":"approximate","cf":"confirmed","mw":75,"ac":280,"inv":800000000,"ann":"2024-03","upd":"2026-11-04","pb":"Xcel Energy (100% renewable)","nt":"Site is 280 acres of UMore Park (former WWII smokeless powder facility, then Univ. of Minnesota agricultural research land) in Rosemount. Meta's 19th US data center. Coordinates approximate for northern UMore Park area. Additional parcels purchased Feb 2025 via Jimnist LLC for potential expansion; no current build plan on those parcels.","src":[{"u":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","t":"Hello, Rosemount! — Meta Data Centers blog","p":"Meta"},{"u":"https://tcbmag.com/meta-picks-rosemount-for-800m-data-center/","t":"Meta Picks Rosemount for $800M Data Center","p":"Twin Cities Business"}],"j":"city","jc":"Dakota County","jn":"Rosemount","jd":"city","ju":"approx"},{"id":"geronimo-nobles-county-powered-data-park-mn","n":"Nobles County Powered Data Park","op":"Geronimo Power (Brookfield Asset Management subsidiary)","s":"proposed","st":"MN","city":"Worthington","co":"Nobles","lat":43.62,"lon":-95.6,"pre":"approximate","cf":"reported","mw":400,"upd":"2026-10-22","pb":"Plum Creek Wind, Lime Creek Wind Farm, Summit Lake Solar and Storage (Geronimo/National Grid Renewables projects)","nt":"Coordinates are approximate (near Worthington, MN).","src":[{"u":"https://minnesotareformer.com/2026/04/27/minnesotas-long-predicted-data-center-boom-is-on-shaky-ground/","t":"Minnesota's long-predicted data center boom is on shaky ground","p":"Minnesota Reformer"},{"u":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","t":"Nobles County Powered Data Park","p":"Geronimo Power"}],"j":"city","jc":"Nobles County","jn":"Worthington","jd":"city","ju":"approx"},{"id":"t5-minneapolis-1001-third-avenue-mn","n":"T5@Minneapolis (1001 Third Avenue South)","op":"T5 Data Centers (asset owned by a Cloud Capital / Arcapita joint venture since January 2026)","s":"operational","st":"MN","city":"Minneapolis","co":"Hennepin","lat":44.9715,"lon":-93.2703,"pre":"exact","cf":"reported","mw":31,"upd":"2026-09-18","nt":"PeeringDB registers \"T5@Minneapolis\" (T5 Data Centers) at 1001 3rd Ave South, Minneapolis 55404, with coordinates within ~10 m of the OSM \"Sleep Number Building\" polygon. Cloud Capital and Arcapita announced on 2026-01-13/14 the acquisition of a 21 MW Minneapolis data center \"primarily leased on a long-term basis\" to \"a leading provider of sovereign AI and cloud inferencing solutions\", plus a \"planned 10 MW expansion\" to 31 MW; neither release names a street address, so the identification of that asset with this building is reported, not confirmed by the acquirers. The AI classification is set from the acquirers' own description of the anchor tenant's workload.","src":[{"u":"https://www.peeringdb.com/api/fac?state=MN&country=US","t":"PeeringDB facility registry — \"T5@Minneapolis\", T5 Data Centers, 1001 3rd Ave South, Minneapolis MN 55404","p":"PeeringDB"},{"u":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","t":"Cloud Capital — Cloud Capital and Arcapita acquire a 21-megawatt data center in the US with planned expansion (2026-01-13)","p":"Cloud Capital"}],"j":"city","jc":"Hennepin County","jn":"Minneapolis","jd":"city"},{"id":"aws-green-new-florence-mo","n":"AWS Project Green Campus","op":"Amazon Web Services","s":"under_construction","st":"MO","city":"New Florence","co":"Montgomery","lat":38.852,"lon":-91.52,"pre":"approximate","cf":"confirmed","ac":1000,"inv":10000000000,"ann":"2026","upd":"2026-10-22","pb":"Ameren Missouri","nt":"Codename 'Project Green'; application filed via NorthPoint Development, LLC. Two-phase build-out: Phase 1 = 8 data center buildings; Phase 2 = 13 additional buildings (21 total). Located on ~1,000 acres at northeast quadrant of I-70 and Highway 19 interchange near New Florence. Official AWS/Governor Kehoe announcement on June 15, 2026 cited a $10B investment commitment. Earlier county planning documents and initial filings referenced a maximum capital investment ceiling of up to $35B — that figure is a speculative ceiling, not a committed amount. AWS separately announced a 138MW renewable energy project in Missouri; not confirmed as dedicated to this campus. Community investments included in announcement: $3M for county 911/emergency dispatch upgrades, $3M for community programs, $1M for Montgomery County Fairgrounds, $150K community fund, $50K teacher grant. Preserve Montgomery County LLC filed suit in February 2026 alleging ten counts of Missouri Sunshine Law violations (closed-session negotiations, NDAs with Amazon); case pending as of mid-2026. First buildings targeted operational by 2027; full campus potentially complete ~2032. Coordinates are approximate (parcel centroid at I-70 / Hwy 19 NE quadrant). Jobs: KOMU reported ~400 permanent jobs; DCD's coverage of the same $10B announcement cited no specific permanent figure (only 'thousands of construction jobs') — permanent count left unstructured pending firm corroboration.","src":[{"u":"https://www.komu.com/news/midmissourinews/amazon-missouri-officials-announce-10b-montgomery-county-data-center-plan/article_cb50e268-0d98-48e6-9c0a-3dc1978aa2c5.html","t":"Amazon announces $10B Montgomery County data center plan","p":"KOMU"},{"u":"https://www.datacenterdynamics.com/en/news/amazon-commits-10bn-to-data-center-campus-in-montgomery-city-missouri/","t":"Amazon commits $10bn to data center campus in Montgomery County, Missouri","p":"Data Center Dynamics"}],"j":"uninc","jc":"Montgomery County","ju":"approx"},{"id":"cloverleaf-troy-mo","n":"Cloverleaf Troy Campus","op":"Cloverleaf Infrastructure","s":"proposed","st":"MO","city":"Troy","co":"Lincoln","lat":38.9784,"lon":-90.9832,"pre":"approximate","cf":"reported","mw":500,"upd":"2026-10-22","nt":"500 MW full-buildout campus near Troy, Lincoln County (near St. Louis); construction from early 2027. Single-tracker source → confidence reported. Coordinates are the Troy area centroid.","src":[{"u":"https://www.blackridgeresearch.com/blog/latest-list-new-ai-proposed-upcoming-data-center-projects-missouri-usa","t":"List of upcoming data center projects in Missouri","p":"Blackridge Research"}],"j":"city","jc":"Lincoln County","jn":"Troy","jd":"city","ju":"approx"},{"id":"crusoe-warrenton-mo","n":"Crusoe Warrenton Campus","op":"Crusoe","s":"permitted","st":"MO","city":"Warrenton","co":"Warren","lat":38.8125,"lon":-91.1432,"pre":"approximate","cf":"reported","ac":337,"ann":"2025","upd":"2026-10-22","pb":"Ameren Missouri (grid)","nt":"Coordinates approximate. Site address: 22151 NW Service Road, Warrenton MO; north of NW Service Road, west of Hwy. W. Two 805,000 sq ft data center buildings + 40,000 sq ft administration building + 621,250 sq ft Ameren-owned switch yard + 603,200 sq ft Crusoe-owned electrical substation. Crusoe described as its 'fifth campus' in its national AI data center portfolio as of June 2026 per the Crusoe newsroom. Meta signed agreement with Crusoe in June 2026 for approximately 1.6GW of AI computing capacity split across Childress TX and Warrenton MO campuses — per-site split not disclosed; confirms Warrenton as AI anchor customer site (MLQ.ai). The conditional use permit and site plan are approved; land disturbance review and construction permits are still outstanding before groundbreaking. Crusoe committed publicly to seek no real property tax or gross receipt tax abatements; would pursue state incentives only (Mid Rivers Newsmagazine). Developer projected annual property taxes of about $80M, with about $44M to local schools (Mid Rivers Newsmagazine). Construction jobs projected at about 2,500 over a three-year build and permanent tech jobs at about 100 (developer estimates reported by Mid Rivers Newsmagazine, not firm contractual commitments). Crusoe historically used on-site flared natural gas but divested those operations; Warrenton campus is grid-connected via Ameren Missouri — no on-site gas generation reported here. Distinct from the Google/Crusoe 'Goodnight' campus in Armstrong County TX.","src":[{"u":"https://www.datacenterdynamics.com/en/news/crusoe-data-center-could-be-built-west-of-st-louis-missouri/","t":"Crusoe data center could be built west of St. Louis, Missouri","p":"Data Center Dynamics"},{"u":"https://fox2now.com/news/missouri/warrenton-aldermen-approve-data-center-site-plan-near-i-70/","t":"Warrenton aldermen approve data center site plan near I-70","p":"Fox 2 Now"}],"j":"city","jc":"Warren County","jn":"Warrenton","jd":"city","ju":"approx"},{"id":"google-project-mica-kc-northland-mo","n":"Google Project Mica","op":"Google","s":"under_construction","st":"MO","city":"Kansas City","co":"Clay","lat":39.3097,"lon":-94.5845,"pre":"approximate","cf":"confirmed","mw":700,"ac":493,"inv":10000000000,"ann":"2026-02","upd":"2026-10-09","pb":"Evergy (Large Load Power Tariff)","nt":"Five hyperscale data center buildings on 493 acres, northeast of I-435 and US-169 in KC Northland (near Smithville, Clay County). Google committed $1.5M to Smithville School District and $250K to Northland Career Center. Coordinates mark the I-435/US-169 interchange; Port KC places the ~500-acre campus at its northeast corner.","src":[{"u":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","t":"$10B, 500-acre Google campus gets stamp of approval near Smithville","p":"KCTV5"},{"u":"https://www.kshb.com/news/local-news/missouri/kansas-city/google-announces-construction-underway-for-second-data-center-campus-in-kansas-city","t":"Google announces construction underway for second data center campus in Kansas City","p":"KSHB"}],"j":"city","jc":"Clay County","jn":"Kansas City","jd":"city","ju":"approx"},{"id":"google-spade-new-florence-mo","n":"Google Project Spade Campus","op":"Google","s":"under_construction","st":"MO","city":"New Florence","co":"Montgomery","lat":38.791,"lon":-91.508,"pre":"approximate","cf":"confirmed","mw":1200,"ac":934,"ann":"2026-01","upd":"2026-10-28","pb":"Ameren Missouri","nt":"DISTINCT from AWS Project Green Campus: the two are on opposite sides of I-70 (Project Green north; Project Spade south, SE quadrant of the I-70/Hwy 19 interchange) - independently verified via DCD and Columbia Missourian. Site ~934 acres (~780 unincorporated + ~130 in New Florence). Developer: Related Digital. Campus targets 1.2 GW. A $15B figure was announced in May 2026, but its scope is not settled: Data Center Dynamics reports 'Google will invest $15 billion in building infrastructure in Missouri, including a data center in New Florence', while the Missouri Governor's May 2026 release describes 'a new $15 billion investment in building infrastructure in New Florence, Missouri'. Data Center Dynamics describes the campus itself only as a 'multi-billion-dollar' investment, so no investment figure is recorded. Amended from three buildings to two ~800,000 sq ft buildings; first operations targeted 2028. ~2,000 construction jobs and 'hundreds' of permanent jobs are projections (noted here, not recorded as job counts). Coordinates are an approximate site centroid (no verified parcel record).","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-pledges-15bn-investment-in-new-florence-missouri/","t":"Google pledges $15bn investment in New Florence, Missouri","p":"Data Center Dynamics"},{"u":"https://baxtel.com/data-center/google-project-spade-campus","t":"Google Project Spade Campus - Baxtel tracker","p":"Baxtel"}],"j":"uninc","jc":"Montgomery County","jn":"Big Spring","ju":"approx"},{"id":"lambda-kansas-city-mo","n":"Lambda Kansas City AI Supercomputer","op":"Lambda","s":"under_construction","st":"MO","city":"Kansas City","co":"Platte","lat":39.33,"lon":-94.72,"pre":"approximate","cf":"confirmed","mw":100,"ac":16.9,"inv":500000000,"ann":"2025","upd":"2026-11-02","pb":"Evergy","nt":"11155 N. Airworld Dr (former Bank of America campus, ~16.9 acres), Platte County near KCI airport. Launches early 2026 with 24 MW confirmed; >100 MW is a scale-up ceiling (planned figure). Distinct parcels from Google (Project Mica) and Meta's Kansas City sites. Eligible for the Missouri Data Center Sales Tax Exemption (eligibility only — no award amount confirmed; honest-zero). The >$500M figure is a press estimate (notes). Dedicated to a single unnamed AI customer under a multi-year agreement.","src":[{"u":"https://www.datacenterdynamics.com/en/news/ai-cloud-firm-lambda-targets-data-center-deployment-in-kansas-city-missouri/","t":"AI cloud firm Lambda targets data center deployment in Kansas City, Missouri","p":"Data Center Dynamics"},{"u":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","t":"Lambda to build a 100MW AI factory in Kansas City, MO","p":"Lambda"}],"j":"city","jc":"Platte County","jn":"Kansas City","jd":"city","ju":"approx"},{"id":"meta-kansas-city-northland-mo","n":"Meta Kansas City Northland","op":"Meta","s":"operational","st":"MO","city":"Kansas City","co":"Clay","lat":39.247,"lon":-94.705,"pre":"approximate","cf":"confirmed","mw":750,"ac":882,"inv":1000000000,"ann":"2022-03","upd":"2026-10-22","pb":"Evergy (100% renewable matched)","nt":"Located at Golden Plains Technology Park (Diode Ventures development), 801 NW 128th Street, at the northwest corner of I-435 and US-169. Three data center buildings + warehouse, 1.4M sq ft total. Meta's first Missouri data center. Coordinates are approximate for the Golden Plains Technology Park area.","src":[{"u":"https://about.fb.com/news/2025/08/metas-kansas-city-data-center/","t":"Meta's Kansas City Data Center and Upcoming AI-Optimized Data Centers","p":"Meta Platforms"},{"u":"https://www.kcur.org/housing-development-section/2025-08-23/meta-kansas-city-data-center-northland","t":"Meta opens $1 billion Kansas City data center","p":"KCUR"}],"j":"city","jc":"Platte County","jn":"Kansas City","jd":"city","ju":"approx"},{"id":"metrobloks-liberty-mo","n":"Metrobloks Liberty Campus","op":"Metrobloks","s":"proposed","st":"MO","city":"Liberty","co":"Clay","lat":39.2459,"lon":-94.4191,"pre":"approximate","cf":"reported","mw":150,"ac":30,"inv":1400000000,"ann":"2026","upd":"2026-11-02","nt":"$1.4B, 150 MW AI-ready campus in Liberty, Clay County. Coordinates are the Liberty area centroid. Partner: Lincoln Property Company.","src":[{"u":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","t":"Metrobloks announces data center investment in Liberty, Missouri","p":"Metrobloks"},{"u":"https://www.kshb.com/news/local-news/liberty-officials-approve-1-4-billion-in-bonds-and-tax-abatements-for-new-metrobloks-data-center","t":"KSHB (Kansas City)","p":""}],"j":"city","jc":"Clay County","jn":"Liberty","jd":"city","ju":"approx"},{"id":"nebius-independence-mo","n":"Nebius AI Factory (Independence)","op":"Nebius Group","s":"under_construction","st":"MO","city":"Independence","co":"Jackson","lat":39.089,"lon":-94.342,"pre":"approximate","cf":"confirmed","mw":1200,"ac":400,"inv":6600000000,"ann":"2026-03","upd":"2026-11-04","pb":"Independence Power & Light (IPL); Blue Valley Power Plant on-site gas (from Oct 2027)","nt":"Nebius Group's (Nasdaq: NBIS) first gigawatt-scale US data center project. Located in Eastgate Commerce Center, off Little Blue Parkway and Missouri Highway 78 in eastern Independence. Up to 10 buildings planned. Phase 1 operational target Q2 2027; full campus completion 2028–2029. Projected $30–50M annual tax revenue for Independence. Separate Nebius facility exists at former Kansas City Star printing press building ~20 miles west (a different facility). Coordinates approximate for Eastgate Commerce Center in eastern Independence. The $150.6B bond authorization is a Missouri Chapter 100 IDRB structure; bonds are privately issued and owned by Nebius — no city credit exposure.","src":[{"u":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri","t":"Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri","p":"Nebius"},{"u":"https://www.kshb.com/news/local-news/missouri/jackson-county/nebius-breaks-ground-on-45-acre-ai-data-center-in-independence-amid-community-opposition","t":"Nebius breaks ground on AI data center in Independence amid community opposition","p":"KSHB"}],"j":"city","jc":"Jackson County","jn":"Independence","jd":"city","ju":"approx"},{"id":"patmos-kansas-city-mo","n":"Patmos KC Star Building Campus","op":"Patmos Hosting","s":"operational","st":"MO","city":"Kansas City","co":"Jackson","lat":39.0997,"lon":-94.5786,"pre":"approximate","cf":"reported","mw":35,"ac":5,"upd":"2026-10-28","nt":"~$1B redevelopment of the former Kansas City Star building into a ~35 MW data center, Jackson County. Distinct (downtown KC, Jackson County) from the Lambda/Google/Meta Kansas City sites. Single-tracker source → confidence reported. Coordinates are the Kansas City centroid.","src":[{"u":"https://www.blackridgeresearch.com/blog/latest-list-new-ai-proposed-upcoming-data-center-projects-missouri-usa","t":"List of upcoming data center projects in Missouri","p":"Blackridge Research"},{"u":"https://rebusinessonline.com/patmos-receives-100m-c-pace-loan-for-redevelopment-of-kansas-city-star-building-into-data-center/","t":"Patmos Receives $100M C-PACE Loan for Redevelopment of Kansas City Star Building into Data Center","p":"REBusinessOnline"}],"j":"city","jc":"Jackson County","jn":"Kansas City","jd":"city","ju":"approx"},{"id":"lumon-marshfield-mo","n":"Rifle Range Road Data Center","op":"Lumon Solutions","s":"under_construction","st":"MO","city":"Marshfield","co":"Webster","lat":37.3422,"lon":-92.911,"pre":"approximate","cf":"reported","ac":5,"upd":"2026-08-25","nt":"A small AI-ready Tier III facility on a five-acre site on Rifle Range Road in rural Webster County, roughly 70 by 200 feet, closed-loop cooled, a few hundred gallons of water a day by the company's own account. Webster County has no planning and zoning, and commissioners said they learned of the project from Facebook. Small enough that no capacity figure is published.","src":[{"u":"https://sgfcitizen.org/economy-growth/business/residents-oppose-data-center/","t":"Data center project faces opposition in Webster County","p":"Springfield Daily Citizen"},{"u":"https://www.ky3.com/2026/05/11/hundreds-pack-marshfield-mo-meeting-over-planned-ai-data-center/","t":"Hundreds pack Marshfield, Mo., meeting over planned AI data center","p":"KY3"}],"j":"city","jc":"Webster County","jn":"Marshfield","jd":"city","ju":"approx"},{"id":"avaio-taurus-brandon-ms","n":"AVAIO Digital Taurus","op":"AVAIO Digital Partners","s":"under_construction","st":"MS","city":"Brandon","co":"Rankin","lat":32.27,"lon":-89.99,"pre":"approximate","cf":"confirmed","mw":116,"ac":329,"inv":6000000000,"ann":"2025","upd":"2026-10-24","pb":"Entergy Mississippi","nt":"Distinct from AVAIO's 'Leo' campus in Little Rock/Pulaski County AR — do not conflate. Site: East Metropolitan Center Business and Industrial Park, Brandon. Land acreage: AVAIO's own project page and groundbreaking materials cite 329 acres; the August 19 press release cited 175 acres — 329 used as more authoritative per operator's site. Capacity: 116 MW initial via executed ESA with Entergy Mississippi (energized June 2027 per operator site); Entergy guiding an additional 420 MW of grid power available by end of 2030; access to Gulf South Pipeline for up to 500 MW of on-site behind-the-meter thermal generation starting Q2 2027 — total baseload path to over 1 GW. The 116 MW planned figure reflects the executed first-phase ESA only; full buildout remains a projection. Investment: $6B stated without 'up to' qualifier across operator, MDA, and Governor's office sources; Governor's office describes it as the third-largest economic development project in Mississippi history. Jobs: 'at least 60 direct, high-tech jobs' and 'hundreds of indirect jobs ranging from construction to other related industries' — projections, not firm figures; no construction vs permanent breakdown confirmed. Rooftop solar of 20+ MW planned (behind-the-meter). Recycled water and new sewer line extension cited by operator as water infrastructure options. Estimated $23M in ad valorem tax revenue annually per Rankin First (county economic development group). Coordinates approximate (Brandon city center, Rankin County).","src":[{"u":"https://www.prnewswire.com/news-releases/avaio-digital-to-build-new-ai-ready-6-billion-data-center-hub-in-brandon-mississippi-302533141.html","t":"AVAIO Digital Taurus announcement press release","p":"PR Newswire / AVAIO Digital Partners"},{"u":"https://www.avaiodigital.com/developments/brandon-mississippi","t":"AVAIO Digital Taurus official project page","p":"AVAIO Digital"}],"j":"city","jc":"Rankin County","jn":"Brandon","jd":"city","ju":"approx"},{"id":"aws-clinton-hinds-ms","n":"AWS Clinton Data Center","op":"Amazon Web Services","s":"under_construction","st":"MS","city":"Clinton","co":"Hinds","lat":32.3415,"lon":-90.3218,"pre":"approximate","cf":"confirmed","ac":99,"inv":1000000000,"ann":"2026","upd":"2026-10-24","nt":"Hinds County site, distinct from the aggregate record AWS Project Atlas – Madison County Mega Site (Canton), whose own notes name only the two Madison County complexes (Madison County Mega Site near Canton and the Costas Property in Ridgeland) and cite the Hinds County $1B figure only as part of Amazon's $25B statewide total — as of September 2026 it was not otherwise recorded as a facility. Site is the long-vacant former Delphi auto-parts plant in the Clinton Industrial Park, mostly empty since 2009; AWS describes it as the first time it has retrofitted an existing industrial building into a data center at this scale. Coordinates are a geocode of Clinton, MS (city centroid), not of the site; WLBT gives the street address as 1001 Industrial Park Dr., and as of September 2026 no source found gave the industrial-park parcel. As of September 2026, no source found states IT capacity in MW or acreage. WLBT describes the building as a 690,000 square foot facility; an earlier WLBT report gives the structure as 730,000 square feet, according to LoopNet. The Fee-in-Lieu of Taxes agreement, approved by the Clinton Board of Aldermen and the Hinds County Board of Supervisors at special meetings on January 15, 2026, is recorded from WLBT's account of its terms. As of September 2026, no source found gave a dollar value for it: WLBT reports that the city attorney was unaware of a dollar amount, and the City of Clinton page states only that the investment will 'generate millions of dollars in new revenue'. The record is listed as under construction rather than operational: a ribbon-cutting was held 2026-06-12 but Entergy's account describes the project as under development and not yet operational, and a separate groundbreaking was also reported — the sources conflict on whether it has begun serving traffic. Water/cooling: as of September 2026, no source was found for reporting that the Clinton building will not use water. Mississippi Today, republished by DeSoto County News, reports Amazon saying the facility will have a minimal water footprint because it will be air-cooled, using air-cooled chillers, and the water notes record that.","src":[{"u":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","t":"Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs","p":"About Amazon"},{"u":"https://www.entergy.com/blog/amazons-1-billion-investment-in-clinton-celebrated-with-ribbon-cutting","t":"Amazon's $1B investment in Clinton celebrated with ribbon-cutting","p":"Entergy"}],"j":"city","jc":"Hinds County","jn":"Clinton","jd":"city","ju":"approx"},{"id":"aws-costas-ridgeland-ms","n":"AWS Costas Property Campus (Ridgeland)","op":"Amazon Web Services","s":"under_construction","st":"MS","city":"Ridgeland","co":"Madison","lat":32.4002,"lon":-90.1819,"pre":"approximate","cf":"reported","ac":786,"ann":"2024","upd":"2026-09-10","nt":"Independent evidence indicates Canton and Ridgeland are two distinct AWS campuses, not a single project under two names. Mississippi Free Press (2026-08-19), reporting Madison County's denial of AWS's tax-valuation appeal, states directly: 'The county has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland' -- i.e., Madison County's own tax/incentive administration treats these as two separate FILOT agreements, not one. Magnolia Tribune (2024-07-24) gives the physical distinction: the Madison County Mega Site is '927 acres ... located off Highway 22 and Nissan Parkway in Canton,' while the Costas Property is 'an additional 786 acres in Ridgeland ... located along the southern tip of Madison County near Tougaloo College, on the corner of Highland Colony Parkway and West County Line Road' -- roughly 20 miles apart. Both sites are within Madison County (Ridgeland is not a separate county), so the 'Madison County' framing of the aggregate record AWS Project Atlas – Madison County Mega Site (Canton) is not wrong on that count, but it previously combined two separately-incentivized campuses; that record was narrowed to Canton on 2026-09-10. Coordinates are the OSM-tagged traffic-signal node at the actual Highland Colony Parkway / West County Line Road intersection (confirmed against current OpenStreetMap data, not an estimate), not a confirmed parcel boundary -- an approximate pin. Capacity, investment and jobs are not recorded, because every figure found for this project (the $10B investment, the combined MW target, job counts) is stated for the two-site project as a whole; no cited source apportions any of these by site, and apportioning by acreage share would be a fabricated estimate, not a sourced fact.","src":[{"u":"https://magnoliatribune.com/?p=118379","t":"Amazon's venture into Mississippi: A detailed overview","p":"Magnolia Tribune"},{"u":"https://www.mississippifreepress.org/madison-county-denies-amazons-valuation-appeal-for-canton-data-centers-preserving-millions-in-tax-revenue/","t":"Madison County Denies Amazon's Valuation Appeal for Canton Data Centers, Preserving Millions in Tax Revenue","p":"Mississippi Free Press"}],"j":"city","jc":"Hinds County","jn":"Jackson","jd":"city","ju":"approx"},{"id":"aws-project-atlas-madison-county-ms","n":"AWS Project Atlas – Madison County Mega Site (Canton)","op":"Amazon Web Services","s":"operational","st":"MS","city":"Canton","co":"Madison","lat":32.6121,"lon":-90.039,"pre":"approximate","cf":"confirmed","mw":1000,"ac":927,"inv":10000000000,"ann":"2024","upd":"2026-11-04","nt":"Two distinct complexes: Madison County Mega Site (outside Canton) and Costas Property (west of Tougaloo College near County Line Rd, Ridgeland). Amazon's total Mississippi statewide commitment expanded to $25B including subsequent Warren County ($3B) and Hinds County ($1B) announcements. Coordinates are approximate Canton-area centroid. The Veolia water partnership claim was removed: the About Amazon source names Arable (not Veolia) as water replenishment partner; recycled wastewater target of 83M gallons/year by 2027 is confirmed. Narrowed to Canton on 2026-09-10 (maintainer adjudication): this record previously combined two campuses. Madison County's own tax administration treats them as separate — it 'has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland' (Mississippi Free Press, 2026-08-19) — and Magnolia Tribune (2024-07-24) gives the physical split: the Madison County Mega Site is '927 acres ... located off Highway 22 and Nissan Parkway in Canton', while the Costas Property is 'an additional 786 acres in Ridgeland'. The Ridgeland campus is therefore, as of September 2026, tracked separately as AWS Costas Property Campus (Ridgeland), and the land acreage here was reduced from the combined 1,700 to Canton's 927 so the two records do not double-count acreage. The capacity, investment and jobs figures on this record remain program-level figures from the original Project Atlas announcement covering both Madison County campuses; they are left in place here rather than split, because no source apportions them per campus. They should not be summed with AWS Costas Property Campus (Ridgeland), which carries no capacity, investment or jobs figures for this reason. The location was also corrected from an exact pin to an approximate pin: this record's notes already stated the coordinate is a Canton-area centroid, so the exact-pin claim was wrong. The two campuses are treated by Madison County's tax and incentive administration as legally and financially separate: the Madison County Mega Site (927 acres, off Highway 22 and Nissan Parkway, Canton) and the Costas Property (786 acres, Highland Colony Parkway / West County Line Road, Ridgeland), as confirmed by a 2026-08-19 Mississippi Free Press report on Madison County's denial of AWS's Canton tax-valuation appeal: the county 'has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland.' The latitude and longitude (32.6121, -90.039) read as Canton-specific, closer to Canton than to Ridgeland. The combined capacity (1000 MW planned), investment ($10B) and jobs (7,000/1,000) are not apportioned by site: as of September 2026, no source found states a per-site breakdown, and apportioning by acreage share (54%/46%) would be a fabricated estimate. Ridgeland is itself within Madison County, so the aggregate's 'Madison County' framing is not geographically wrong, only combined.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/","t":"AWS confirmed as company behind $10bn Mississippi data center development","p":"Data Center Dynamics"},{"u":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","t":"Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs","p":"About Amazon"}],"j":"city","jc":"Madison County","jn":"Canton","jd":"city","ju":"approx"},{"id":"aws-project-steamboat-warren-county-ms","n":"AWS Project Steamboat – Warren County Data Center Campus","op":"Amazon Web Services","s":"proposed","st":"MS","city":"Vicksburg","co":"Warren","lat":32.3526,"lon":-90.8779,"pre":"approximate","cf":"confirmed","inv":3000000000,"ann":"2025-11-20","upd":"2026-09-09","nt":"Warren County site, distinct from the Madison County aggregate record AWS Project Atlas – Madison County Mega Site (Canton), whose notes cite the Warren County $3B only as part of Amazon's $25B statewide total. Codename 'Project Steamboat'. MPB reports the announcement was made in downtown Vicksburg and other coverage places the campus 'near the new Port of Vicksburg', but no cited source discloses the parcel, road, or acreage; coordinates are a Vicksburg city centroid, an approximate pin. The record is listed as proposed rather than under construction: Amazon's own page still calls it a 'planned investment' and MPB says construction was 'slated to begin in 2026'; no cited source confirms ground has been broken as of 2026-09-09. Jobs: 'at least 200 new jobs at the Amazon data center campus' plus 'more than 300 additional full-time equivalent positions in the Warren County community' — only the 200 direct figure is recorded. No cited source gives a dollar figure for the subsidy, so none is recorded; MPB reports the incentives 'can extend for up to 30 years if AWS keeps meeting investment and job thresholds' and that a portion of Amazon's payments in lieu of property taxes would flow to the Vicksburg Warren School District. The Entergy record Vicksburg Advanced Power Station is the 754 MW gas station on the old Baxter Wilson site in the same county.","src":[{"u":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","t":"Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus","p":"About Amazon"},{"u":"https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/","t":"Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi","p":"Mississippi Public Broadcasting"}],"j":"city","jc":"Warren County","jn":"Vicksburg","jd":"city","ju":"approx"},{"id":"compass-lauderdale-meridian-ms","n":"Compass Datacenters Lauderdale County Hyperscale Campus","op":"Compass Datacenters","s":"under_construction","st":"MS","city":"Meridian","co":"Lauderdale","lat":32.3644,"lon":-88.7037,"pre":"approximate","cf":"confirmed","mw":500,"ac":303,"ann":"2025-01-09","upd":"2026-10-28","pb":"Mississippi Power Company","nt":"Eight-data-center campus over an eight-year buildout at the I-20/59 Industrial Park, Meridian. Groundbreaking Jan 28 2025 (under construction). Mississippi Power to supply ~500 MW via a dedicated substation. Investment omitted: the widely cited $10B is a projected full-occupancy total including future tenants' IT equipment ('an investment of $10 billion, including future tenants' information technology equipment'), not a firm Compass outlay. 'Thousands of jobs' is a projection. The recorded 1,000 construction jobs come from Lauderdale County's July 2026 statement that construction of the campus \"will employ more than 1,000 Mississippi workers\". First confirmed tenant: Corderill LLC ($100M equipment, 20 jobs, April 2026). Coordinates are the Meridian centroid (no parcel coordinates published).","src":[{"u":"https://mississippi.org/news/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","t":"Compass Datacenters Project Generates $10B Investment in Lauderdale County","p":"Mississippi Development Authority"},{"u":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","t":"Compass Datacenters Project Generates $10B Investment - Governor's Office","p":"Office of Governor Tate Reeves"}],"j":"city","jc":"Lauderdale County","jn":"Meridian","jd":"city","ju":"approx"},{"id":"xai-macrohardrr-southaven-ms","n":"MACROHARDRR (xAI Southaven)","op":"xAI","s":"under_construction","st":"MS","city":"Southaven","co":"DeSoto","lat":34.9935,"lon":-90.0342,"pre":"exact","cf":"confirmed","ann":"2025-12-30","upd":"2026-10-21","nt":"The City of Southaven's Mayor's Report of 2026-01-07 says this building \"will become the home of their 3rd data center in the metropolitan area and the 2nd facility in Mississippi along with the renovated power plant at 2875 Stanton Road.\" It is distinct from xAI's power plant at 2875 Stanton Road (per the DeSoto Times and the Mayor's Report). MACROHARDRR retrofits an 810,000 sq ft former warehouse at 2400 Stateline Road. The Mayor's Report identifies it as the building formerly used by GXO; the DeSoto Times and Mississippi Free Press give the same 810,000 sq ft figure. The pin is the centroid of the OpenStreetMap building named \"xAI Macrohardrr\" on Stateline Road West, whose mapped outline measures roughly 810,000 sq ft (derived from the mapped OSM outline), matching the reported size; OpenStreetMap tags it with a Memphis, Tennessee address, which conflicts with the Mississippi address in every source. The DeSoto Times reports that Elon Musk broke the news of the building purchase on X on Dec. 30 (2025). Gov. Tate Reeves' office announced on 2026-01-08 a corporate investment \"exceeding $20 billion\" that \"will create hundreds of permanent jobs throughout DeSoto County\". The Governor's release announcing this data center says the Mississippi Development Authority \"has approved xAI for its Data Center Incentive\" (a sales and use tax exemption \"for all computing and equipment software used by companies certified as data centers by the agency\") and that the City of Southaven and DeSoto County \"are also supporting xAI's projects through fee-in-lieu agreements\". The Mississippi Free Press reports the data center \"will initially employ 145 people\"; the Governor's release says \"hundreds of permanent jobs throughout DeSoto County\". The release ties the exceeding-$20-billion investment to the Southaven project without breaking it down, so no investment figure is recorded for this building. The DeSoto Times reports that xAI purchased two pieces of property (47 and 58 acres) near its power plant at 2875 Stanton Road; that acreage is not clearly attributable to this building's own site, so the land area is omitted here rather than guessed. The Governor's release says that upon completion \"the Southaven data center will increase the company's computing power to nearly 2 gigawatts\", which is a company-wide total, and Musk's post (DeSoto Times) refers to xAI's training compute (\"Will take @xAI training compute to almost 2GW.\"). Neither gives this building's own capacity, so no capacity is recorded. The Governor's release says the company \"expects to begin data center operations in Southaven in February 2026.\" The January 2026 release also says xAI \"has purchased and is retrofitting a building to house the new data center operations\", so the record is under construction. No primary source reports the building operating, so operational is not claimed. The Baxtel aggregator page shows both Under Construction and Operational status badges and the text \"Fully operational with expansion in progress\"; this record follows the Governor's primary-source statement instead. Earlier versions of this site listed this building twice; as of October 2026, those entries are combined here.","src":[{"u":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","t":"Tech leader xAI investing more than $20 billion in Southaven","p":"Office of Governor Tate Reeves"},{"u":"https://www.desototimes.com/news/xai-buys-building-and-additional-land-in-southaven-for-data-center/article_99b4eb95-e5b1-4cd0-8f36-9ab0021b9cb5.html","t":"xAI buys building and additional land in Southaven for data center","p":"DeSoto Times"}],"j":"city","jc":"DeSoto County","jn":"Southaven","jd":"city"},{"id":"prado-ai-jackson-metro-ms","n":"Prado AI / PraCon Global AI Industrial Campus","op":"PraCon Global Investment Group","s":"proposed","st":"MS","city":"Ridgeland","co":"Madison","lat":32.4282,"lon":-90.132,"pre":"approximate","cf":"rumored","ann":"2026-03","upd":"2026-09-09","nt":"Speculative; the record is marked rumored. A proposed AI/semiconductor industrial campus with its own private power plant, before the Mississippi PSC. The developer refused to state capacity MW, investment, acreage, site parcel or timeline, so none is recorded. Prado told Mississippi Today he declined to give the PSC more detail because 'making that information available to the utility companies would take away the project's competitive advantage,' and Prado AI 'is still working on securing all the funding it would need for a project of this size'; the only figure attached to it is Prado's stated long-term goal of 'over $25 billion', which is an aspiration, not an announced investment, and is therefore not recorded as an investment figure. Location: the March PSC filing named Ridgeland, but Prado has since said only 'the Jackson metro area' and declined to say where. The coordinates are a Ridgeland city geocode from the filing and the pin is approximate. The Mississippi Today article is cited via a Wayback snapshot. The project is docketed at the PSC and formally opposed by both of the state's major utilities, which is more than a press rumour. A separate facility, Traceview Advanced Power Station, is also in Ridgeland and is unrelated.","src":[{"u":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","t":"Mississippi developer plans to move forward with data center plans, even as state declines to give ruling (Wayback snapshot 2026-08-19)","p":"Mississippi Today"}],"j":"city","jc":"Madison County","jn":"Ridgeland","jd":"city","ju":"approx"},{"id":"xai-tulane-road-southaven-ms","n":"xAI Tulane Road Data Center (Southaven)","op":"xAI (SpaceXAI)","s":"permitted","st":"MS","city":"Southaven","co":"DeSoto","lat":34.9897,"lon":-90.043,"pre":"approximate","cf":"confirmed","ann":"2026-09-02","upd":"2026-10-07","nt":"xAI's fifth Memphis-area data center: a 660,000 sq ft building on the city's old training-facility property at 8325 Tulane Road, next to the xAI power plant on Stanton Road. xAI got the land in a land swap with Southaven and gave $40 million toward a new city training facility. Ward 2 Alderman Charles Hoots voted no, citing unfinished turbine-noise commitments. The coordinates are the OSM centroid of Tulane Road, not the parcel.","src":[{"u":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","t":"Southaven approves new SpaceXAI data center, fifth location in area","p":"Action News 5"},{"u":"https://www.desototimes.com/news/southaven-approves-new-xai-data-center/article_093ce052-262d-4d77-a0a4-8b9ffe2e09bc.html","t":"Southaven approves new XAI data center","p":"DeSoto Times-Tribune"}],"j":"city","jc":"DeSoto County","jn":"Southaven","jd":"city","ju":"approx"},{"id":"quantica-bsdi-billings-mt","n":"Big Sky Digital Infrastructure Campus","op":"Quantica Infrastructure","s":"proposed","st":"MT","city":"Billings","co":"Yellowstone","lat":45.823,"lon":-108.7,"pre":"approximate","cf":"reported","mw":1000,"ac":5000,"ann":"2025-08","upd":"2026-10-26","pb":"NorthWestern Energy grid + on-site solar, wind, and battery storage","nt":"5,100-acre site in Yellowstone County between Broadview and Billings ('north of Billings'). Shovel-ready powered land; grid power expected 2027. Interconnection application filed May 2026 for 1,100 MW. Backed by EnCap Investments (~$2.7B under management). Construction planned to begin 2026. Coordinates approximate between Billings and Broadview.","src":[{"u":"https://www.datacenterdynamics.com/en/news/encap-backed-quantica-details-plans-for-1gw-campus-in-montana/","t":"EnCap-backed Quantica Details Plans for 1GW Campus in Montana","p":"Data Center Dynamics"},{"u":"https://quanticainfra.com/2025/08/04/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/","t":"Quantica Introduces Big Sky Digital Infrastructure as Its Flagship Montana Platform","p":"Quantica Infrastructure"}],"j":"uninc","jc":"Yellowstone County","ju":"approx"},{"id":"aws-richmond-county-nc","n":"Amazon Web Services Richmond County Data Center Campus","op":"Amazon Web Services","s":"under_construction","st":"NC","city":"Rockingham","co":"Richmond","lat":34.9445,"lon":-79.775,"pre":"approximate","cf":"confirmed","ac":800,"inv":10000000000,"ann":"2025-06","upd":"2026-10-28","nt":"Energy Way Industrial Park, Rockingham, NC. Up to 20 buildings each 200,000-225,000 sq ft at full build. Local county tax breaks apply, and Cardinal & Pine (reporting by Inside Climate News) says Amazon would also receive state sales tax exemptions on certain equipment, the value of which can legally be kept secret. MW capacity not publicly disclosed. Coordinates are Rockingham city centroid. Original secondary source (richmondnc.com/CivicAlerts.aspx?AID=168) was no longer available as of July 2026 and was replaced with Business NC article. A previously recorded powering arrangement was removed: DCD reports the method of powering has not been publicly confirmed.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/","t":"Amazon breaks ground on $10bn data center complex in Richmond County, North Carolina","p":"Data Center Dynamics"},{"u":"https://businessnc.com/amazon-plots-state-record-10b-data-center-project-in-richmond-county/","t":"Amazon plots state record $10B data center project in Richmond County","p":"Business North Carolina"}],"j":"city","jc":"Richmond County","jn":"Rockingham","jd":"city","ju":"approx"},{"id":"apple-maiden-nc","n":"Apple Maiden Data Center (iCloud)","op":"Apple","s":"operational","st":"NC","city":"Maiden","co":"Catawba","lat":35.5886,"lon":-81.2567,"pre":"approximate","cf":"confirmed","ac":183,"ann":"2009","upd":"2026-07-24","pb":"Duke Energy grid + two dedicated 20MW Apple-owned solar farms (Maiden/Conover/Claremont) and a 10MW Bloom Energy biogas fuel cell installation","nt":"Apple's flagship U.S. iCloud data center on Startown Rd near Maiden, Catawba County — Apple's first company-owned data center, operational since 2010, with a large adjacent solar array. Apple's Feb 2025 newsroom names North Carolina among the states where it will 'continue expanding data center capacity' as part of its Apple Intelligence buildout. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Startown Rd address (~183 ac per public reporting); a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/","t":"Apple will spend more than $500 billion in the U.S. over the next four years — names NC among states for continued data-center capacity expansion (Apple Intelligence)","p":"Apple Newsroom"},{"u":"https://www.catawbaedc.org/post/north-carolina-data-center-is-part-of-apple-s-500-billion-expansion-plan-across-the-us","t":"North Carolina data center is part of Apple's $500 billion expansion plan across the US","p":"Catawba County Economic Development Corp"}],"j":"city","jc":"Catawba County","jn":"Maiden","jd":"town","ju":"approx"},{"id":"compass-statesville-nc","n":"Compass Statesville Campus","op":"Compass Datacenters","s":"proposed","st":"NC","city":"Statesville","co":"Iredell","lat":35.7826,"lon":-80.8873,"pre":"approximate","cf":"confirmed","mw":500,"ac":333,"ann":"2025-09","upd":"2026-10-22","pb":"Duke Energy","nt":"333-acre site in Statesville, Iredell County; five buildings, ~500 MW (per JLL marketing), near a Duke Energy substation. Rezoned Sept 2025; Duke's Feb 2026 8-K referenced ~4.5 GW of contracted large load including Compass and Microsoft. Coordinates are the Statesville area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/compass-datacenters-proposes-333-acre-campus-in-statesville-north-carolina/","t":"Compass Datacenters proposes 333-acre campus in Statesville, North Carolina","p":"Data Center Dynamics"},{"u":"https://www.sec.gov/Archives/edgar/data/0001326160/000110465926080476/tm2619723d1_8k.htm","t":"Duke Energy Form 8-K (Feb 2026) — large-load contracts","p":"U.S. SEC / Duke Energy"}],"j":"city","jc":"Iredell County","jn":"Statesville","jd":"city","ju":"approx"},{"id":"deep-river-data-cumnock-lee-county-nc","n":"Deep River Data AI Data Center (Cumnock, Lee County)","op":"Deep River Data","s":"proposed","st":"NC","city":"Cumnock","co":"Lee","lat":35.555,"lon":-79.2378,"pre":"approximate","cf":"reported","ann":"2025-09","upd":"2026-08-29","nt":"Deep River Data is majority-managed by HM Tech, which runs an existing bitcoin mining and ASIC repair facility in Graham, NC. The company says the North Carolina site would serve AI workloads rather than crypto mining. As of the reporting cited, the project is pre-feasibility: nothing has been approved, permitted or built, and no capacity figure has been published. Site is south of U.S. 421 near the Lee–Chatham county line; coordinates are the Cumnock community, not a parcel.","src":[{"u":"https://www.theassemblync.com/business/commercial-natural-gas-well-ai-datacenter/","t":"Natural Gas To Power AI May Be Coming To North Carolina","p":"The Assembly"},{"u":"https://cwfnc.org/nofracklee/","t":"Lee County: No Fracking Data Center","p":"Clean Water for North Carolina"}],"j":"uninc","jc":"Lee County","ju":"approx"},{"id":"digital-realty-charlotte-nc","n":"Digital Realty Moores Chapel Data Center Campus","op":"Digital Realty","s":"permitted","st":"NC","city":"Charlotte","co":"Mecklenburg","lat":35.2422,"lon":-80.9562,"pre":"approximate","cf":"confirmed","mw":400,"ac":156,"ann":"2025-04","upd":"2026-10-22","nt":"12899 Moores Chapel Road, 12 miles west of downtown Charlotte. Two two-story buildings totaling 3 million sq ft across two phases. Site acquired November 2024 for $160 million. If built, would be largest data center in North Carolina. Mecklenburg County Park and Recreation to receive greenway on site. Coordinates are approximate Moores Chapel Road area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/digital-realty-files-to-develop-400mw-data-center-campus-in-charlotte-north-carolina/","t":"Digital Realty files to develop 400MW data center campus in Charlotte, North Carolina","p":"Data Center Dynamics"},{"u":"https://www.govtech.com/products/charlotte-considers-rezoning-for-biggest-data-center-in-n-c","t":"Charlotte Considers Rezoning for Biggest Data Center in N.C. — Government Technology","p":"Government Technology"}],"j":"city","jc":"Mecklenburg County","jn":"Charlotte","jd":"city","ju":"approx"},{"id":"energy-storage-solutions-fayetteville-cumberland-county-nc","n":"Energy Storage Solutions Fayetteville AI Data Center Campus","op":"Energy Storage Solutions","s":"proposed","st":"NC","city":"Fayetteville","co":"Cumberland","lat":35.053,"lon":-78.878,"pre":"approximate","cf":"reported","ann":"2026","upd":"2026-07-16","nt":"Twin project to Kingsboro announced by Energy Storage Solutions; part of a combined ~$38B, two-site NC data-center buildout, each campus with ~a dozen 40,000 sq ft structures and 1,000+ employees. Site-specific details (parcel, acreage, exact coordinates) not yet public; location approximated to the city of Fayetteville.","src":[{"u":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","t":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","p":"Data Center Knowledge"}],"j":"city","jc":"Cumberland County","jn":"Fayetteville","jd":"city","ju":"approx"},{"id":"google-lenoir-nc","n":"Google Lenoir Data Center","op":"Google","s":"operational","st":"NC","city":"Lenoir","co":"Caldwell","lat":35.9002,"lon":-81.5469,"pre":"approximate","cf":"confirmed","inv":1200000000,"ann":"2007","upd":"2026-07-25","pb":"Duke Energy Green Source Rider PPA — 61 MW Rutherford County solar farm (Rutherford Farms, LLC), built specifically to meet Lenoir data center demand","nt":"Google's flagship North Carolina data center in Lenoir, Caldwell County — announced 2007, operational since 2008, one of Google's earliest U.S. sites, expanded since. Per Google's own location page, the initial investment was ~$1.2B, with $4B+ invested in the region and state since. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Lynhaven Dr address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://datacenters.google/locations/lenoir-north-carolina/","t":"Google Lenoir, North Carolina — official location page: announced 2007, opened 2008, ~$1.2B initial / $4B+ cumulative","p":"Google"},{"u":"https://news.duke-energy.com/releases/duke-energy-google-team-up-on-solar-power-project-in-n-c","t":"Duke Energy, Google team up on solar power project in N.C.","p":""}],"j":"city","jc":"Caldwell County","jn":"Lenoir","jd":"city","ju":"approx"},{"id":"hb2k-kings-mountain-cleveland-county-nc","n":"HB2K AI Data Center Campus (Kings Mountain)","op":"HB2K LLC (Honey Badger Development)","s":"proposed","st":"NC","city":"Kings Mountain","co":"Cleveland","lat":35.2451,"lon":-81.3412,"pre":"approximate","cf":"reported","upd":"2026-10-15","nt":"Both sources carry the same WJZY report, so this is single-source. The '150MW-300MW power pathway' is the developer's litigation claim, not a sourced capacity, so capacity is omitted. The land was bought from the Wright family around 2023. No visible development has been reported, and company officials did not respond. Kings Mountain has a data center moratorium; whether it applies to this project has not been clarified. Coordinates are an approximate town-level placement.","src":[{"u":"https://www.cbs17.com/news/north-carolina-news/i-regret-selling-every-day-nc-couple-regrets-selling-family-land-for-data-center-project/amp/","t":"'I regret selling every day': NC couple regrets selling family land for data center project","p":"CBS17 (WJZY/Queen City News)"},{"u":"https://www.newsnationnow.com/us-news/southeast/nc-couple-regret-selling-land-data-center-project/amp/","t":"NC couple regrets selling land for data center project","p":"NewsNation (WJZY)"}],"j":"city","jc":"Cleveland County","jn":"Kings Mountain","jd":"city","ju":"approx"},{"id":"impactdata-greensboro-nc","n":"ImpactData Greensboro","op":"ImpactData","s":"under_construction","st":"NC","city":"Greensboro","co":"Guilford","lat":36.0726,"lon":-79.792,"pre":"approximate","cf":"reported","mw":20,"upd":"2026-10-22","nt":"20 MW facility in Greensboro, Guilford County, targeting mid-2026 completion. Single-tracker source → confidence reported. Coordinates are the Greensboro centroid.","src":[{"u":"https://www.blackridgeresearch.com/blog/latest-list-of-biggest-largest-upcoming-data-centers-north-carolina-united-states-us","t":"List of upcoming data centers in North Carolina","p":"Blackridge Research"}],"j":"city","jc":"Guilford County","jn":"Greensboro","jd":"city","ju":"approx"},{"id":"energy-storage-solutions-kingsboro-edgecombe-county-nc","n":"Kingsboro AI Data Center Campus","op":"Energy Storage Solutions","s":"permitted","st":"NC","city":"Rocky Mount","co":"Edgecombe","lat":35.941,"lon":-77.734,"pre":"approximate","cf":"reported","mw":900,"ac":155,"inv":19200000000,"ann":"2025","upd":"2026-08-15","nt":"$19.2B, 900 MW AI data-center campus on ~155 acres in Kingsboro Business Park between Rocky Mount and Tarboro, Edgecombe County. County cleared the way in Nov 2025 by amending its development ordinance; buildout planned across ~24 phases over 3-5 years. Twin campus announced for Fayetteville.","src":[{"u":"https://www.rockymounttelegram.com/news/local/county-oks-amending-ordinance-to-allow-for-a-data-center-at-kingsboro-business-park/article_64e09f70-9b18-48fd-84a9-a6ec6dae950e.html","t":"County OKs amending ordinance to allow for a data center at Kingsboro Business Park (Rocky Mount Telegram)","p":"Rocky Mount Telegram"},{"u":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","t":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","p":"Data Center Knowledge"}],"j":"uninc","jc":"Edgecombe County","ju":"approx"},{"id":"meta-forest-city-nc","n":"Meta Forest City Data Center","op":"Meta","s":"operational","st":"NC","city":"Forest City","co":"Rutherford","lat":35.317,"lon":-81.826,"pre":"approximate","cf":"confirmed","ac":150,"inv":750000000,"ann":"2010","upd":"2026-10-15","pb":"Portfolio of ~5 NC solar PPAs via Duke Energy (individual project names not confirmed via primary source)","nt":"Meta (Facebook) data center on Social Circle, Forest City, Rutherford County — broke ground 2010, operational ~2012, a multi-parcel campus (parcels owned by 'Andale LLC', a Meta subsidiary confirmed via Meta's SEC 10-K Exhibit 21.1 and the Menlo Park HQ mailing address), with a third facility announced 2015. Meta reports $750M+ invested in North Carolina; the 408 Social Circle parcel alone carries $176.9M assessed building value (built, not land-bank). No site-specific IT-load MW is disclosed. Coordinates are a Rutherford County GIS parcel centroid, held approximate pending a raw-geometry re-pull; a follow-up GIS pass could upgrade precision to exact.","src":[{"u":"https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/","t":"Meta Forest City Data Center info sheet — broke ground 2010, $750M+ invested in North Carolina","p":"Meta Data Centers"},{"u":"https://gis.rutherfordcountync.gov/server/rest/services/Addressing/MapServer/2/query?where=PIN=%271558722267%27&f=json","t":"Rutherford County GIS parcel record (PIN 1558722267, 408 Social Circle — ANDALE LLC, Menlo Park mailing address, $176.9M assessed building value = built)","p":"Rutherford County GIS / Assessor"}],"j":"city","jc":"Rutherford County","jn":"Forest City","jd":"town","ju":"approx"},{"id":"microsoft-person-county-roxboro-nc","n":"Microsoft Person County Mega Park","op":"Microsoft","s":"permitted","st":"NC","city":"Roxboro","co":"Person","lat":36.396,"lon":-78.9828,"pre":"approximate","cf":"confirmed","ac":1385,"ann":"2026","upd":"2026-10-22","pb":"Duke Energy","nt":"1,385-acre Person County Mega Park (Woodsdale township, near Roxboro); ~$26.85M land purchase. Powered by Duke Energy per a Q4-2025 8-K; the campus's MW is in a large-load contract filed under seal (NCUC) — not publicly disclosed (omitted). Coordinates are the Roxboro / Woodsdale area centroid.","src":[{"u":"https://businessnc.com/microsoft-buys-person-county-mega-park-for-27-million/","t":"Microsoft buys Person County Mega Park for $27 million","p":"Business North Carolina"},{"u":"https://www.datacenterdynamics.com/en/news/microsoft-to-start-permitting-for-1385-acre-data-center-campus-in-north-carolina/","t":"Microsoft to start permitting for 1,385-acre data center campus in North Carolina","p":"Data Center Dynamics"}],"j":"city","jc":"Person County","jn":"Roxboro","jd":"city","ju":"approx"},{"id":"natelli-new-hill-nc","n":"Natelli New Hill Digital Campus","op":"Natelli Holdings","s":"cancelled","st":"NC","city":"New Hill","co":"Wake","lat":35.6526,"lon":-79.0033,"pre":"approximate","cf":"reported","mw":300,"ac":200,"upd":"2026-10-22","nt":"Proposed 300 MW digital campus in New Hill, Wake County. Single-tracker source → confidence reported. Coordinates are the New Hill area centroid.","src":[{"u":"https://www.blackridgeresearch.com/blog/latest-list-of-biggest-largest-upcoming-data-centers-north-carolina-united-states-us","t":"List of upcoming data centers in North Carolina","p":"Blackridge Research"},{"u":"https://www.wunc.org/environment/2026-03-05/proposed-data-center-new-hill-digital-campus-wake-county-apex","t":"WUNC — \"Proposed data center in Wake County is withdrawing its application\"","p":""}],"j":"uninc","jc":"Chatham County","ju":"approx"},{"id":"prsm-group-cumberland-county-nc","n":"PRSM Group Cumberland County AI Data Center (undisclosed industrial park)","op":"PRSM Group","s":"proposed","st":"NC","co":"Cumberland","lat":35.0462,"lon":-78.8394,"pre":"approximate","cf":"reported","mw":225,"ac":50,"upd":"2026-09-10","nt":"The developer declined to disclose the site beyond 'an industrial park, not near residences', so coordinates are a Cumberland County-level approximation only. The end user is an unnamed PRSM client, not PRSM itself. Developer said he does not expect the project to advance before a moratorium is enacted.","src":[{"u":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","t":"New Data Center Emerges as Cumberland Considers Moratorium","p":"CityView (Fayetteville, NC)"}],"j":"uninc","jc":"Cumberland County","ju":"approx"},{"id":"pointone-lower-moncure-road-lee-county-nc","n":"PointOne Lower Moncure Road Data Center (Lee County)","op":"PointOne","s":"proposed","st":"NC","city":"Sanford","co":"Lee","lat":35.4878,"lon":-79.1783,"pre":"approximate","cf":"reported","mw":90,"ac":428.85,"inv":900000000,"ann":"2026-06","upd":"2026-09-10","nt":"Applicant of record Jonathon Rhine; property owned by Cary-based Helix Ventures; the campus is reported to be operated by Dallas-headquartered CyrusOne. Phase 1 is roughly 56 acres and 300,000 sq ft of the 428.85-acre application, with a 90 MW IT load. About 150 residents spoke against it at a July 2026 county commissioners meeting. The $900M figure is the reported value of the Phase 1 building, not the whole 430-acre program.","src":[{"u":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/","t":"Lee County to review proposal for PointOne Data Center","p":"Sandhills News"},{"u":"https://rantnc.com/2026/06/08/data-center-proposed-in-northern-lee-county/","t":"Data center proposed in northern Lee County","p":"The Rant (Sanford, NC)"}],"j":"city","jc":"Lee County","jn":"Sanford","jd":"city","ju":"approx"},{"id":"powerhouse-charlotte-nc","n":"PowerHouse Charlotte Campus","op":"PowerHouse Data Centers","s":"under_construction","st":"NC","city":"Charlotte","co":"Mecklenburg","lat":35.2271,"lon":-80.8431,"pre":"approximate","cf":"confirmed","mw":300,"ac":120,"upd":"2026-10-30","nt":"120-acre, ~300 MW campus in Charlotte, Mecklenburg County. Distinct operator/parcel from the separately-tracked Digital Realty Charlotte site. Coordinates are the Charlotte centroid. A 2023 Yahoo News report says PowerHouse wanted to build on \"more than 130 acres\", while the Data Center Dynamics headline says it acquired 120 acres; the record carries 120 acres, and as of October 2026 no readable source explains the difference. Partner: American Real Estate Partners (AREP).","src":[{"u":"https://www.datacenterdynamics.com/en/news/powerhouse-acquires-120-acres-in-charlotte-north-carolina-for-300mw-campus/","t":"PowerHouse acquires 120 acres in Charlotte, North Carolina, for 300MW campus","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Mecklenburg County","jn":"Charlotte","jd":"city","ju":"approx"},{"id":"project-delta-walnut-cove-nc","n":"Project Delta Data Center – Stokes County","op":"Undisclosed (rezoning applicant: Engineered Land Solutions)","s":"permitted","st":"NC","city":"Walnut Cove","co":"Stokes","lat":36.282,"lon":-80.1494,"pre":"approximate","cf":"reported","ac":1800,"ann":"2025-11","upd":"2026-10-30","nt":"Site on US Highway 311 and Tuttle Road near Belews Creek Coal Plant on Dan River. End operator/tenant not publicly identified; rezoning approved for unidentified operator per lawsuit. Rezoning voided April 14, 2026 after court challenge over statutory notice failures. Developer ELS plans to resubmit. Capacity and investment not disclosed. Coordinates are Walnut Cove city centroid.","src":[{"u":"https://www.northcarolinahealthnews.org/2026/03/25/nc-communities-push-back-ai-data-centers-project-delta-lawsuit/","t":"NC communities push back on AI data centers – Project Delta lawsuit","p":"NC Health News"},{"u":"https://www.blackridgeresearch.com/project-profiles/walnut-cove-data-center-project-location-map-status-contractors-latest-updates","t":"Walnut Cove Data Center Project Updates 2026","p":"Blackridge Research"}],"j":"city","jc":"Stokes County","jn":"Walnut Cove","jd":"town","ju":"approx"},{"id":"quiet-data-centers-enfield-halifax-county-nc","n":"Project Q — Quiet Data Centers Enfield (Halifax County)","op":"Quiet Data Centers Halifax Inc.","s":"proposed","st":"NC","city":"Enfield","co":"Halifax","lat":36.18,"lon":-77.6689,"pre":"approximate","cf":"reported","mw":88,"ac":251,"inv":250000000,"ann":"2025-11","upd":"2026-09-10","nt":"County-owned 251-acre industrial site off Trestle Road near U.S. 301 outside Enfield; the data center campus itself is described as roughly 14–15 acres with a 90,000–100,000 sq ft building. Phase 1 about 38 MW, final about 88 MW. Minimum contractual commitment is a $250M taxable investment and 50 permanent jobs; the company said the eventual investment could approach $1 billion — that larger figure is aspirational, not committed.","src":[{"u":"https://www.rrdailyherald.com/news/local/data-center-proposal-draws-questions-concerns-at-public-hearing/article_adb332bd-e1fd-52f6-b8af-32e9a86d475e.html","t":"Data center proposal draws questions, concerns at public hearing","p":"Rocky Mount / Roanoke Rapids Daily Herald"},{"u":"https://www.wral.com/news/local/central-north-carolina-data-center-plans-april-2026/","t":"Data centers on hold: how each county in central NC is handling data center plans (Halifax County, 251-acre site, Quiet Data Centers)","p":"WRAL"}],"j":"city","jc":"Halifax County","jn":"Enfield","jd":"town","ju":"approx"},{"id":"drox-group-rural-hall-forsyth-county-nc","n":"Rural Hall Data Center (The Drox Group)","op":"The Drox Group","s":"cancelled","st":"NC","city":"Rural Hall","co":"Forsyth","lat":36.267,"lon":-80.267,"pre":"approximate","cf":"reported","ac":129,"inv":3000000000,"upd":"2026-10-22","nt":"Coordinates are approximate for Rural Hall, NC.","src":[{"u":"https://www.wfdd.org/politics-government/2026-06-11/planning-board-recommends-denying-rezoning-for-proposed-rural-hall-data-center","t":"Planning board recommends denying rezoning for proposed Rural Hall data center","p":"WFDD"},{"u":"https://www.ruralhallinfo.com/project-iron-spur/","t":"Project Iron Spur — Rezoning Case F-1669","p":"Rural Hall Info"}],"j":"uninc","jc":"Stokes County","ju":"approx"},{"id":"terra-nexus-custer-avenue-fayetteville-cumberland-county-nc","n":"Terra Nexus Custer Avenue Data Center (Fayetteville)","op":"Terra Nexus Ventures","s":"proposed","st":"NC","city":"Fayetteville","co":"Cumberland","lat":35.085,"lon":-78.9772,"pre":"approximate","cf":"reported","ac":180,"ann":"2025-10","upd":"2026-08-29","nt":"Capacity is deliberately omitted: the same publisher reports this project at 200 MW in one story and 300 MW in another, and that conflict is unresolved from the sources read. Reported to include 102 diesel generators and on-site wetlands, sited near the Fayetteville Public Works Commission generation plant and the town of Eastover. Distinct from Terra Nexus's Rockingham (Richmond County) site and from the separately tracked PRSM Group and Energy Storage Solutions Cumberland County proposals.","src":[{"u":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","t":"Data Centers Are Eyeing Fayetteville. Here's How to Learn More","p":"CityView (Fayetteville, NC)"},{"u":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","t":"Data Center Proposal Emerges as County Holds Hearing on Moratorium","p":"CityView (Fayetteville, NC)"}],"j":"city","jc":"Cumberland County","jn":"Fayetteville","jd":"city","ju":"approx"},{"id":"whitefiber-nc1-madison-nc","n":"WhiteFiber NC-1 AI Data Center Campus","op":"WhiteFiber (Bit Digital)","s":"operational","st":"NC","city":"Madison","co":"Rockingham","lat":36.3801,"lon":-79.9692,"pre":"approximate","cf":"confirmed","mw":200,"ac":96,"ann":"2025","upd":"2026-10-28","pb":"Duke Energy","nt":"Operator is WhiteFiber (Bit Digital's AI unit); Nscale is the 40 MW anchor tenant (10-year, ~$865M total contract value = revenue, not capex). ~1M sq ft, up to 150 kW/cabinet, 99 MW secured from Duke Energy, 200 MW eventual site potential (planned figure). As of October 2026, no operational IT capacity is recorded: WhiteFiber's NC-1 page (last updated May 2026) cites 24MW of power expected online in Q4 2025, a power-supply figure rather than IT capacity, and its second-quarter 2026 results state 40 megawatts of contracted IT load and that initial capacity has been delivered, but give no figure for IT capacity in operation. $150M WhiteFiber equity. Madison is in Rockingham County, NC. Coordinates are the Madison town centroid. Property acquired for $45M (2025, from Unifi); the total buildout described as 'over $1B' is conditional on reaching 200 MW -> no investment figure is recorded. WFDD (June 2025) reports that the planned investment of more than $1 billion is \"estimated to generate some 60 jobs with an average salary of $67,000\". Cooling type not publicly disclosed -> no water details are recorded.","src":[{"u":"https://www.datacenterdynamics.com/en/news/nscale-agrees-865m-deal-for-40mw-of-space-at-whitefiber-data-center-in-north-carolina/","t":"Nscale agrees $865m deal for 40MW of space at WhiteFiber data center in North Carolina","p":"Data Center Dynamics"},{"u":"https://www.whitefiber.com/blog/nc-1-data-center","t":"Announcing NC-1: New Flagship Data Center in North Carolina","p":"WhiteFiber"}],"j":"city","jc":"Rockingham County","jn":"Madison","jd":"town","ju":"approx"},{"id":"applied-digital-polaris-forge-1-ellendale-nd","n":"Applied Digital Polaris Forge 1","op":"Applied Digital Corporation","s":"operational","st":"ND","city":"Ellendale","co":"Dickey","lat":46.003,"lon":-98.509,"pre":"approximate","cf":"confirmed","mw":400,"ac":320,"ann":"2025-06","upd":"2026-11-04","pb":"Montana-Dakota Utilities (MDU)","nt":"Campus is 400 MW fully contracted to CoreWeave under ~15-year lease agreements valued at ~$11B total revenue. Three buildings: Building 1 (100 MW) complete Dec 2025; Building 2 (150 MW) had its first 75 MW phase declared Ready for Service in a July 1, 2026 release, bringing live capacity to 175 MW; Building 3 (150 MW) expected 2027. Coordinates are Ellendale city centroid; exact site is northeast of the city. Local jobs are reported only as projections — 'as many as 85 new jobs' (Dec 2024) and up to ~110 total local workforce at full expansion — not confirmed headcounts. As of July 2026, no confirmed total campus capital-expenditure figure was public (the ~$11B CoreWeave figure is 15-year lease revenue, not capex); North Dakota's data-center sales-tax exemption applies but individual award amounts are statutorily confidential. Applied Digital's executive vice president of public affairs and real estate acquisitions said in March 2025 that the first building was about a $1.3 billion investment for the company, with another $4 billion anticipated for the buildings, transformers, chillers and mechanical equipment; because the second amount is anticipated rather than confirmed, no investment figure is recorded. The same executive put the total capital investment on the 320-acre site at about $20 billion, which additionally counts approximately $15 billion the customer was expected to invest.","src":[{"u":"https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with","t":"Applied Digital Announces 250MW AI Data Center Lease With CoreWeave in North Dakota","p":"Applied Digital Corporation"},{"u":"https://www.datacenterdynamics.com/en/news/applied-digital-completes-first-data-center-building-at-north-dakota-campus/","t":"Applied Digital completes first data center building at North Dakota campus","p":"Data Center Dynamics"}],"j":"city","jc":"Dickey County","jn":"Ellendale","jd":"city","ju":"approx"},{"id":"applied-digital-polaris-forge-2-harwood-nd","n":"Applied Digital Polaris Forge 2","op":"Applied Digital Corporation","s":"under_construction","st":"ND","city":"Harwood","co":"Cass","lat":47.02,"lon":-97.025,"pre":"approximate","cf":"confirmed","mw":200,"ac":900,"inv":3000000000,"ann":"2025-08","upd":"2026-11-04","pb":"Cass County Electric Cooperative / Minnkota Power Cooperative","nt":"Two purpose-built facilities totaling more than 1.8 million sq ft. As of the August 2025 announcement, Applied Digital was in advanced negotiations with a U.S.-based investment-grade hyperscaler; no customer or lease value had been publicly confirmed at that point. In October 2025 Applied Digital announced a lease with an unnamed U.S. investment-grade hyperscaler covering 200 MW of critical IT load, approximately $5 billion in total contracted revenue over an estimated 15-year term. The August 2025 announcement described a 280 MW AI factory, and Minnkota Power Cooperative states that the data center is expected to use 280 megawatts at peak, so 280 MW is read as peak electricity demand rather than IT load; the recorded planned capacity is the initial 200 MW of critical IT load that the lease covers in two buildings. The October 2025 release also describes the campus as a 1 GW design, with the tenant holding a first right of refusal on 800 MW more; that expansion potential is not recorded as capacity. Partial operations expected end of 2026; full capacity early 2027. Coordinates are Harwood city centroid; site is approximately 900 acres near this community north of Fargo.","src":[{"u":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","t":"Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus","p":"Applied Digital Corporation"},{"u":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","t":"Minnkota Power Cooperative: Data Center FAQs (Polaris Forge 2)","p":"Minnkota Power Cooperative"}],"j":"uninc","jc":"Cass County","jm":"Berlin township","ju":"approx"},{"id":"applied-digital-polaris-forge-3-oliver-nd","n":"Applied Digital Polaris Forge 3","op":"Applied Digital Corporation","s":"under_construction","st":"ND","city":"Hanover","co":"Oliver","lat":47.111,"lon":-101.426,"pre":"approximate","cf":"confirmed","mw":430,"ann":"2026-05","upd":"2026-10-26","nt":"Distinct 3rd North Dakota site (not the Ellendale or Harwood campuses), south of Hanover near the Hwy 25/31 junction. MDU Resources power deal finalized June 23, 2026. Approximately 200 FTE jobs planned; groundbreaking targeted summer 2026.","src":[{"u":"https://www.valleynewslive.com/2026/07/13/applied-digital-expands-north-dakota-eyes-oliver-county-third-data-center/","t":"Applied Digital expands North Dakota, eyes Oliver County third data center","p":"Valley News Live"},{"u":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","t":"Applied Digital submits rezoning application for data center in Oliver County","p":"KFYR"}],"j":"uninc","jc":"Oliver County","ju":"approx"},{"id":"tachyon9-nixxy-nakota-ai-data-campus-williams-county-nd","n":"Nakota AI Data Campus","op":"Tachyon9 Corp. / Nixxy Inc.","s":"proposed","st":"ND","co":"Williams","lat":48.34,"lon":-103.48,"pre":"approximate","cf":"reported","ac":620,"ann":"2026-06","upd":"2026-10-26","nt":"Proposed AI/HPC campus on roughly 620 acres in Williams County. No town or site has been published, so coordinates are an approximate Williams County point. No development, financing or construction milestones had been announced as of June 2026. The project depends on the Nixxy-Tachyon9 transaction and on financing.","src":[{"u":"https://www.pgjonline.com/news/2026/june/north-dakota-ai-campus-plans-1-gw-of-gas-fired-power","t":"North Dakota AI campus plans 1 GW of gas-fired power","p":"Pipeline & Gas Journal"}],"j":"uninc","jc":"Williams County","jm":"East Fork township","ju":"approx"},{"id":"1623-farnam-omaha-ne","n":"1623 Farnam","op":"1623 Farnam","s":"operational","st":"NE","city":"Omaha","co":"Douglas","lat":41.2578,"lon":-95.9375,"pre":"approximate","cf":"confirmed","upd":"2026-10-28","nt":"Omaha's carrier hotel: a nine-story, ~75,000 sq ft facility with around 8 MW of capacity at 1623 Farnam Street downtown, home to the OmahaIX internet exchange and some 60 carriers. News Press & Gazette Co. subsidiary Berks Group acquired Nebraska Data Centers and the 1623 Farnam carrier hotel in 2018 and established 1623 Farnam LLC, so 'Nebraska Data Centers' as an operator name is historical, not current. Build-out history: a $10 million expansion in 2019 built out the fifth floor, floors six through nine were added in 2021, and the final two data halls completed in June 2025 added 1.5 MW of IT capacity and space for 280 racks. CEO Bill Severn cites 'significant demand from AI workloads, edge deployments, content platforms, and broadband networks'. The company is separately planning an OMA2 campus expansion explicitly aimed at AI and edge infrastructure growth, with no site, size or date disclosed on its own page; it is not listed separately as of August 2026. DCD also reports the facility serves Trump Media & Technology Group; DCD attributes that tenant claim to other reporting, and it is not otherwise recorded. The recorded capacity is the ~8 MW total, not the 1.5 MW increment; no investment figure is recorded, because the only sourced amount is the $10 million 2019 fifth-floor expansion and, as of October 2026, neither cited source gives a total site investment. Coordinates are a street-address approximation.","src":[{"u":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","t":"1623 Farnam adds 1.5MW to Omaha data center in Nebraska — nine-story facility, 'around 8MW of capacity across 75,000 sq ft'; final two data halls and 280 racks; $10M fifth-floor expansion 2019, floors six-nine added 2021; OmahaIX and some 60 carriers","p":"Data Center Dynamics (via Internet Archive)"},{"u":"https://www.1623farnam.com/omaha-edge-data-center/","t":"1623 Farnam Omaha Edge Data Center — 1623 Farnam Street, Omaha NE 68102; access to 60+ carriers and seven top IP transit providers; Omaha IX; planning a future OMA2 campus expansion for AI and edge infrastructure growth","p":"1623 Farnam"}],"j":"city","jc":"Douglas County","jn":"Omaha","jd":"city","ju":"approx"},{"id":"binary-net-vault-lincoln-ne","n":"Binary Net The Vault Data Center","op":"Binary Net","s":"operational","st":"NE","city":"Lincoln","co":"Lancaster","lat":40.8121,"lon":-96.7023,"pre":"approximate","cf":"reported","upd":"2026-09-04","nt":"Downtown Lincoln colocation and hosting provider built inside a former Federal Reserve Bank vault; the operator also references a \"Sharp Annex\" alongside \"The Vault\" without stating whether they are separate buildings. Binary Net acquired Lincoln Data Centers/LDI. No power, floor-area or capacity figure is published by the operator, so none is recorded. Coordinates are a geocode of the operator's stated address. Same class of facility as the already-tracked Omaha colocation records (Scott Data Center, 1623 Farnam, TierPoint, LightEdge, H5), and the first Lincoln colocation site in the dataset.","src":[{"u":"https://www.binary.net/lincolndatacenters/","t":"Binary Net — Lincoln Data Centers","p":"Binary Net"},{"u":"https://dcmap.us/states/nebraska/","t":"Nebraska Data Center Map — Binary.net Lincoln","p":"dcmap.us"}],"j":"city","jc":"Lancaster County","jn":"Lincoln","jd":"city","ju":"approx"},{"id":"crusoe-monolith-hallam-lancaster-ne","n":"Crusoe Hallam Data Center (Monolith Olive Creek campus)","op":"Crusoe","s":"permitted","st":"NE","city":"Hallam","co":"Lancaster","lat":40.5486,"lon":-96.7828,"pre":"approximate","cf":"confirmed","mw":35,"ac":10,"ann":"2026-07","upd":"2026-10-30","nt":"Phase 1 is modular, shipping-container-sized buildings on about 10 acres in the northeast part of Monolith's Olive Creek carbon-black campus (I-2 Heavy Industrial), 35 MW, 15 jobs. A larger Phase 2 parcel east of the campus would need a separate approval. Crusoe Technologies is named as the data center developer; Monolith signed a special permit with Crusoe in July 2026. No construction timeline has been released. This is distinct from the Sagebrush Hallam hyperscale campus and from NPPD's Sheldon and Princeton Road stations. Coordinates are the Monolith Olive Creek plant point from OSM, not the 10-acre parcel.","src":[{"u":"https://www.1011now.com/2026/07/10/monolith-seeks-build-data-center-hallam-application-be-submitted-by-mid-july/","t":"Monolith seeks to build data center in Hallam, application to be submitted by mid-July","p":"1011 NOW (KOLN)"},{"u":"https://www.wowt.com/2026/07/24/hallam-residents-question-monolith-data-center-proposal-packed-town-hall/","t":"Hallam residents question Monolith data center proposal at packed town hall","p":"WOWT"}],"j":"uninc","jc":"Lancaster County","ju":"approx"},{"id":"fnts-omaha-ne","n":"First National Technology Solutions Omaha Data Center","op":"First National Technology Solutions","s":"operational","st":"NE","city":"Omaha","co":"Douglas","lat":41.2614,"lon":-95.9365,"pre":"approximate","cf":"reported","upd":"2026-09-04","nt":"Managed-hosting and colocation data center in downtown Omaha operated by First National Technology Solutions, a subsidiary of First National of Nebraska. Reported at nearly 100,000 sq ft in its current configuration with expansion capability. Power capacity and certifications are not stated on the pages retrieved, so none is recorded — third-party listings give differing address and MW figures. Coordinates are the OpenStreetMap building centroid.","src":[{"u":"https://baxtel.com/data-center/first-national-technology-solutions","t":"First National Technology Solutions Data Center","p":"Baxtel"},{"u":"https://www.openstreetmap.org/api/0.6/way/256728809.json","t":"OpenStreetMap way 256728809 — First National Technical Center, telecom=data_center, operator=First National of Nebraska","p":"OpenStreetMap contributors"}],"j":"city","jc":"Douglas County","jn":"Omaha","jd":"city","ju":"approx"},{"id":"google-nebraska-ai-campus-proposed","n":"Google Nebraska AI Campus (proposed)","op":"Google","s":"proposed","st":"NE","co":"Otoe","lat":40.474,"lon":-96.371,"pre":"approximate","cf":"reported","ann":"2026-03","upd":"2026-10-28","nt":"Exact site is unknown and undisclosed. Tenaska has optioned over 2,600 acres across Gage, Lancaster, Otoe, and Cass Counties in SE Nebraska since December 2025. Coordinates are approximate centroid of the Otoe/Gage County search area. Reported power requirement for the data center is 1,000–3,000 MW, a range; no single planned capacity is recorded. Google has invested $3.5B in Nebraska since 2019 across existing Papillion, Omaha, and Lincoln data centers. Legislative feasibility depends on LB1261; could be operational by 2029 if approved.","src":[{"u":"https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/","t":"Google proposes Nebraska data center requiring more power than all of Lincoln","p":"Flatwater Free Press"},{"u":"https://grist.org/accountability/google-data-center-carbon-capture-nebraska/","t":"Google's data-center boom comes to Nebraska","p":"Grist"}],"j":"uninc","jc":"Johnson County","ju":"approx"},{"id":"google-papillion-ne","n":"Google Papillion Data Center","op":"Google","s":"operational","st":"NE","city":"Papillion","co":"Sarpy","lat":41.1326,"lon":-96.1437,"pre":"approximate","cf":"reported","ac":275,"inv":600000000,"ann":"2019","upd":"2026-10-09","pb":"OPPD Pierce County Energy Center (420 MW solar + 680 MWh battery storage, online 2027), via Google-OPPD carbon-free-energy procurement framework","nt":"Google data center at 14706 Schram Rd, Papillion, Sarpy County — announced Feb 2019 (built under shell entity Fireball Group LLC / 'Project Wizard'), a $600M project on ~275 acres, groundbreaking Oct 2019, operational ~2021. Confirmed by Google's own Nebraska location page (which lists Papillion, Omaha, and Lincoln as Google Nebraska sites). DISTINCT from the separate tracked proposed Google/Tenaska gas-plant project in SE Nebraska (Gage/Otoe area). No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Schram Rd address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://datacenters.google/locations/nebraska/","t":"Google Nebraska — official location page: lists Papillion (2019), Omaha, and Lincoln as Google Nebraska data centers","p":"Google"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Sarpy County","jn":"Papillion","jd":"city","ju":"approx"},{"id":"h5-la-vista-ne","n":"H5 Data Centers Omaha (La Vista)","op":"H5 Data Centers","s":"operational","st":"NE","city":"La Vista","co":"Sarpy","lat":41.166,"lon":-96.075,"pre":"approximate","cf":"confirmed","ac":32,"upd":"2026-10-30","nt":"234,500 sq ft colocation facility on 32 acres at 10917 Harry Watanabe Parkway in La Vista, Sarpy County, with 17.3 MW of N+1 critical capacity, Tier III design, N+1 chillers and N+1 cooling towers, up to 7 on-net carriers and cloud on-ramps to AWS and Azure. The structured figures come from H5's own facility page. The site is widely described in directories as the former Yahoo La Vista data center; H5 is the current operator and Yahoo the original builder. H5's page does not state the build history, so the Yahoo provenance is unconfirmed. Coordinates are a street-address approximation, not a parcel geocode. Classified as mixed use: general-purpose multi-tenant colocation, not a confirmed AI training site.","src":[{"u":"https://h5datacenters.com/omaha-data-center.html","t":"H5 Data Centers Omaha — 10917 Harry Watanabe Pkwy, La Vista NE; 234,500 SF on 32 acres; 17.3 MW N+1 critical capacity; Tier III design; N+1 chillers and cooling towers; up to 7 on-net carriers","p":"H5 Data Centers"},{"u":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","t":"DCD (archived) — names H5 among the operators active in the Omaha data center market alongside TierPoint, LightEdge, Lumen, Cogent and Google","p":"Data Center Dynamics (via Internet Archive)"}],"j":"city","jc":"Sarpy County","jn":"Papillion","jd":"city","ju":"approx"},{"id":"lightedge-papillion-ne","n":"LightEdge Omaha Data Center","op":"LightEdge","s":"operational","st":"NE","city":"Papillion","co":"Sarpy","lat":41.1544,"lon":-96.0428,"pre":"approximate","cf":"reported","upd":"2026-08-14","nt":"LightEdge colocation facility at 1148 American Parkway, Papillion (Sarpy County). Thin record: LightEdge's own page publishes only the address, with no square footage, MW, tier, certifications or build date. Every size and power figure circulating for this site (e.g. '21,377 sq ft, 10,000 sq ft raised floor, 1.0 MW') comes from third-party colocation directories that, as of August 2026, were not consulted or verified, so none of it is recorded. DCD independently names LightEdge as an operator in the Omaha market, which corroborates the operator's presence but adds no site detail. The record is marked reported. Coordinates are a Papillion city-level point, not a geocode of American Parkway, and the map pin should not be trusted until an address geocode is done.","src":[{"u":"https://lightedge.com/data-centers/omaha-data-center/","t":"LightEdge Omaha, NE Colocation Data Center — '1148 American Parkway, Papillion, Nebraska 68046'","p":"LightEdge"},{"u":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/","t":"DCD (archived) — 'Other operators in Omaha include H5, TierPoint, LightEdge, Lumen, Cogent, and Google'","p":"Data Center Dynamics (via Internet Archive)"}],"j":"city","jc":"Sarpy County","jn":"Papillion","jd":"city","ju":"approx"},{"id":"meta-sarpy-springfield-ne","n":"Meta Sarpy Campus (Springfield expansion)","op":"Meta","s":"under_construction","st":"NE","city":"Springfield","co":"Sarpy","lat":41.052,"lon":-96.148,"pre":"approximate","cf":"confirmed","ac":500,"inv":1500000000,"ann":"2022-07","upd":"2026-10-22","nt":"Campus spans Papillion and Springfield, Sarpy County. Existing multi-building campus operational since 2019; ongoing expansion toward a 9-building, 4-million-sq-ft footprint. Meta has invested more than $1.5B at this site since 2017 (confirmed by DCD and multiple sources; a $2.5B total figure appeared in the record but was not supported by any cited source). Planned MW capacity of 2,000 was removed — no source confirms a MW figure for this campus. Springfield buildings were targeted for completion by end 2024; operational status of those buildings as of mid-2026 should be verified against a current source. Coordinates approximate for the Springfield expansion area; original Papillion buildings are slightly northeast.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-to-expand-sarpy-data-center-in-nebraska/","t":"Meta to expand Sarpy data center in Nebraska","p":"Data Center Dynamics"},{"u":"https://www.datacentermap.com/usa/nebraska/papillion/meta-sarpy-data-center/","t":"Meta Sarpy Campus Data Center in Papillion","p":"DataCenterMap"}],"j":"uninc","jc":"Sarpy County","ju":"approx"},{"id":"sagebrush-hallam-hyperscale-campus-lancaster-ne","n":"Sagebrush Hallam Hyperscale Campus (proposed)","op":"Sagebrush Infrastructure Partners","s":"proposed","st":"NE","city":"Hallam","co":"Lancaster","lat":40.545,"lon":-96.7992,"pre":"approximate","cf":"reported","mw":1700,"ac":1400,"ann":"2026-08","upd":"2026-09-16","nt":"Land assemblage only — memorandums of purchase agreement with 13 landowners along Southwest 58th Street just west of Hallam, giving exclusivity windows of roughly six months to four years. Sagebrush Infrastructure Partners LLC was acquired by Tel Aviv-based Stark Power in June 2026 as part of a reported 5.6 GW US development pipeline; the Hallam site is one of five planned hyperscale campuses targeting MISO and SPP territory. Coordinates are an approximation of the reported SW 58th Street assemblage west of Hallam; no parcel map has been published. Distinct from the separate 35 MW Monolith/Crusoe proposal inside the Village of Hallam's zoning jurisdiction.","src":[{"u":"https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/","t":"Data center developers eyeing land near Hallam","p":"1011 NOW (KOLN)"},{"u":"https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/","t":"Hallam landowners face stark choice on data center","p":"Nebraska Public Media"}],"j":"uninc","jc":"Lancaster County","ju":"approx"},{"id":"tierpoint-omaha-bellevue-ne","n":"TierPoint Omaha - Bellevue Data Center","op":"TierPoint","s":"operational","st":"NE","city":"Bellevue","co":"Sarpy","lat":41.153,"lon":-95.925,"pre":"approximate","cf":"reported","upd":"2026-10-22","nt":"Multi-tenant colocation facility at 1001 North Fort Crook Road, Bellevue (Sarpy County): 100,000+ total sq ft with 21,000+ sq ft of raised floor, A-side/B-side power distribution, a 100% uptime SLA, and 10,000 sq ft of business-continuity seating with a 300-seat recovery space. Carrier-class, carrier-neutral, with cloud on-ramps and a 10G wave to five regional TierPoint facilities. Certified SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, ITAR and Data Privacy Framework registered. Capacity is omitted: the only power figure the operator publishes is 'five redundant generators totaling 5.5 MW', which is backup generator nameplate, not IT load, and recording it as facility capacity would overstate the site. Directory listings associate this address with Cosentry, the regional provider TierPoint acquired; none of the cited sources states that, so it is noted rather than asserted. Coordinates are a street-address approximation. The record is marked reported (single source, the operator's own page).","src":[{"u":"https://www.tierpoint.com/data-centers/nebraska/omaha-bellevue/","t":"TierPoint Omaha - Bellevue Data Center — 1001 North Fort Crook Road, Bellevue NE 68005; '100,000+ total square feet, 21,000+ square feet of raised floor space'; 'Five redundant generators totaling 5.5 MW'","p":"TierPoint"}],"j":"city","jc":"Sarpy County","jn":"Bellevue","jd":"city","ju":"approx"},{"id":"tierpoint-omaha-midlands-papillion-ne","n":"TierPoint Omaha - Midlands Data Center","op":"TierPoint","s":"operational","st":"NE","city":"Papillion","co":"Sarpy","lat":41.11,"lon":-96.046,"pre":"approximate","cf":"reported","upd":"2026-08-14","nt":"Multi-tenant colocation facility at 11425 South 84th Street, Papillion (Sarpy County): 63,000+ total sq ft with 15,000+ sq ft of raised floor, A-side/B-side power distribution and a 100% uptime SLA. It holds LEED Gold and Energy Star certifications alongside SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, and ITAR / Data Privacy Framework registration. Capacity is omitted: the only published power figure is 'two 2.25 MW redundant generators', which is backup nameplate rather than IT load. A distinct site from TierPoint's Bellevue facility roughly 8 miles east, with a separate address, size and certifications. Coordinates are a street-address approximation. The record is marked reported (single source, the operator's own page).","src":[{"u":"https://www.tierpoint.com/data-centers/nebraska/omaha-midlands/","t":"TierPoint Omaha - Midlands Data Center — 11425 South 84th Street, Papillion NE 68046; '63,000+ total square feet', '15,000+ square feet of raised floor space'; 'Two 2.25 MW redundant generators'; LEED Gold and Energy Star certifications","p":"TierPoint"}],"j":"uninc","jc":"Sarpy County","ju":"approx"},{"id":"locke-road-micro-data-center-concord-nh","n":"Locke Road Micro Data Center","op":"Granite Municipal Manufacturing & Sales, LLC","s":"proposed","st":"NH","city":"Concord","co":"Merrimack","lat":43.2441,"lon":-71.546,"pre":"approximate","cf":"reported","mw":15,"ac":21,"upd":"2026-10-26","nt":"Northpoint Engineering, LLC is the applicant. Granite Municipal Manufacturing & Sales, LLC owns the land and is developing it; it bought the land in 2024. The parcel is nearly 21 acres, of which about 9.3 are buildable. About 54,780 sq ft of wooded buffer was cleared beforehand. No power capacity or investment figure has been published. The coordinates match the OSM address point for 52 Locke Road; the Census geocoder puts it about 600 m away. Precision is approximate.","src":[{"u":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","t":"Concord plans: micro data center proposed at 52 Locke Road","p":"Concord Monitor"},{"u":"https://www.concordmonitor.com/2026/09/17/citizens-oppose-new-concord-datacenter/","t":"'Small dogs still bite': Proposed micro data center elicits resistance as development advances through application process","p":"Concord Monitor"}],"j":"city","jc":"Merrimack County","jn":"Concord","jd":"city","ju":"approx"},{"id":"a1-data-center-millville-nj","n":"A1 Data Center Campus","op":"A1 Data Center","s":"cancelled","st":"NJ","city":"Millville","co":"Cumberland","lat":39.402,"lon":-75.043,"pre":"approximate","cf":"reported","mw":1400,"ac":66,"upd":"2026-10-22","pb":"Grid — Atlantic City Electric","nt":"1300 Wheaton Ave. Advertised as a speculative 'ready for inquiry' project (2.9M sq ft, a 1.4GW power pathway, 15-yr tax abatement); no tenant was ever confirmed. Coordinates are approximate.","src":[{"u":"https://www.roi-nj.com/2026/05/20/tech/millville-bans-data-centers-rejecting-largest-proposed-facility-in-n-j/","t":"Millville bans data centers, rejecting largest proposed facility in N.J.","p":"ROI-NJ"},{"u":"https://www.a1datacenter.net/","t":"A1 Data Center Campus - developer site","p":"A1 Data Center"}],"j":"city","jc":"Cumberland County","jn":"Millville","jd":"city","ju":"approx"},{"id":"andover-hpc-development-nj","n":"Andover HPC Data Center (former Newton Airport Site)","op":"Andover HPC Development","s":"proposed","st":"NJ","city":"Andover","co":"Sussex","lat":41.0419,"lon":-74.7381,"pre":"approximate","cf":"reported","ac":97,"ann":"2025-08","upd":"2026-10-22","pb":"Grid (undisclosed utility)","nt":"Coordinates are approximate for Andover Township, Sussex County; exact parcel at 248 Stickles Pond Road. Former Newton Airport closed 2013. No capacity MW disclosed. PILOT estimate of $4.5-5.2M annual revenue cited by mayor. Town moving to ban all data centers as of May 2026, but no project has been formally cancelled since no application was filed.","src":[{"u":"https://www.govtech.com/artificial-intelligence/old-new-jersey-airport-could-house-new-ai-data-center","t":"Old New Jersey Airport Could House New AI Data Center","p":"GovTech"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Sussex County","jm":"Andover township","ju":"approx"},{"id":"coreweave-kenilworth-nj","n":"CoreWeave NEST Campus","op":"CoreWeave","s":"under_construction","st":"NJ","city":"Kenilworth","co":"Union","lat":40.6762,"lon":-74.2913,"pre":"approximate","cf":"reported","mw":250,"ac":27,"inv":1760000000,"ann":"2025","upd":"2026-10-30","pb":"on-site power (former Merck campus infrastructure) + PSE&G grid","src":[{"u":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/","t":"CoreWeave begins $1.8B data center project in Kenilworth — Real Estate NJ","p":"Real Estate NJ"},{"u":"https://newjersey.news12.com/ai-data-center-under-construction-in-kenilworth-draws-mixed-reactions-from-residents","t":"AI Data Center Under Construction in Kenilworth draws mixed reactions — News 12 NJ","p":"News 12 New Jersey"}],"j":"city","jc":"Union County","jn":"Kenilworth","jd":"borough","ju":"approx"},{"id":"cyrusone-nym1-somerset-nj","n":"CyrusOne NYM1 (Somerset)","op":"CyrusOne","s":"operational","st":"NJ","city":"Somerset","co":"Somerset","lat":40.538,"lon":-74.5457,"pre":"exact","cf":"reported","upd":"2026-10-09","nt":"Confirmed (July 2026) via a web search listing that links directly to the operator's own Somerset NJ: NYM1 page. AI/HPC (likely): Named as an Intelliscale AI-infrastructure-available site.","src":[{"u":"https://www.cyrusone.com/data-centers/north-america/somerset-nj","t":"CyrusOne facility directory","p":"CyrusOne"},{"u":"https://www.openstreetmap.org/way/460182320","t":"OpenStreetMap way/460182320","p":"OpenStreetMap"}],"j":"uninc","jc":"Somerset County","jn":"Franklin Center","jm":"Franklin township"},{"id":"equinix-ny5-nj","n":"Equinix NY5","op":"Equinix","s":"operational","st":"NJ","city":"Secaucus","co":"Hudson","lat":40.7786,"lon":-74.0723,"pre":"exact","cf":"reported","upd":"2026-09-21","pb":"Grid — PSE&G","nt":"800 Secaucus Road, Secaucus, NJ; distinct from NY7 (osm 95782052) which is in North Bergen. AI/HPC (likely): Named MSP (Options Tech) liquid-cooled high-density AI cage live NY5, Jan 2026.","src":[{"u":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny5","t":"Equinix facility directory","p":"Equinix"},{"u":"https://www.openstreetmap.org/way/193611192","t":"OpenStreetMap way/193611192","p":"OpenStreetMap"}],"j":"city","jc":"Hudson County","jn":"Secaucus","jd":"town"},{"id":"nebius-vineland-nj","n":"Nebius Vineland Data Center","op":"Nebius Group","s":"operational","st":"NJ","city":"Vineland","co":"Cumberland","lat":39.4862,"lon":-74.992,"pre":"approximate","cf":"confirmed","mw":300,"ac":106,"ann":"2025","upd":"2026-10-22","pb":"on-site natural gas (primary, ~85%); Vineland MUA (supplemental, ~15%)","nt":"Phase-1 (~100 MW) completed summer 2025 in approximately 20 weeks from March 2025 announcement; full campus buildout targeting November 2026. Total design capacity cited as 'up to 300 MW' in Nebius press releases; DataOne CEO and local/community coverage consistently cite 350 MW; long-term campus potential described as approaching 1 GW. Coordinates are approximate (site: South Lincoln and Sheridan Avenues, East Vineland; Baxtel lists 805 Sheridan Ave). DataOne is the developer/builder — BSO's data center unit (launched 2024) backed by Ardian; CEO Charles-Antoine Beyney; this is DataOne's first US site (previously Grenoble and Lyon, France). Nebius is the ~10-year tenant; Microsoft GPU infrastructure agreement commencing late 2025 under multi-year AI infrastructure deal. Facility is 100% privately funded; DataOne declined a $6.2M city equipment loan amid community backlash. Distinct from Nebius's Independence, MO (Kansas City) site. NJDEP air permit pending as of early 2026; construction proceeded ahead of final permit issuance. DataOne stated 200+ permanent full-time jobs. As of October 2026, Nebius's project page states roughly 200 permanent on-site jobs and roughly 1,000 jobs during construction.","src":[{"u":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","t":"Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey","p":"Nebius"},{"u":"https://nebius.com/blog/posts/300-mw-new-jersey-and-iceland-regions","t":"We're introducing the 300 MW New Jersey region and expanding to Iceland","p":"Nebius"}],"j":"city","jc":"Cumberland County","jn":"Vineland","jd":"city","ju":"approx"},{"id":"princeton-university-hpcrc-plainsboro-nj","n":"Princeton University High-Performance Computing Research Center (Forrestal Campus)","op":"Princeton University","s":"operational","st":"NJ","city":"Plainsboro","co":"Middlesex","lat":40.3461,"lon":-74.6161,"pre":"exact","cf":"confirmed","ann":"2010-01","upd":"2026-10-26","nt":"A university research-computing data center. Gensler gives 47,000 sq ft in total, including a 12,000 sq ft data center, with Tier II space for administrative services and Tier I for HPC. DCK (2010) described it as 40,000 sq ft over two stories with a possible second phase. It houses general research systems (for example galaxy-formation modeling) and, since 2024, a 300-GPU Nvidia H100 cluster used for Princeton Language and Intelligence (PLI) AI research. That mix is why the record's AI classification is mixed-use. No MW figure is published. Coordinates are the OSM building footprint named 'High Performance Computing Research Center'.","src":[{"u":"https://www.datacenterknowledge.com/supercomputers/princeton-u-to-build-new-hpc-data-center","t":"Princeton U. to Build New HPC Data Center","p":"Data Center Knowledge"},{"u":"https://www.gensler.com/projects/high-performance-research-computing-center-at-princeton","t":"High-Performance Research Computing Center at Princeton University","p":"Gensler"}],"j":"uninc","jc":"Middlesex County","jm":"Plainsboro township"},{"id":"atterix-raton-digital-hub-nm","n":"Atterix Raton Advanced Digital Hub","op":"Atterix LLC","s":"proposed","st":"NM","city":"Raton","co":"Colfax","lat":36.9033,"lon":-104.4392,"pre":"approximate","cf":"reported","mw":50,"ann":"2026-02","upd":"2026-10-17","nt":"Three-phase proposal: Phase 1 would convert a former Kmart on the south side of Raton into a data center drawing up to 5 MW, with later phases at a nearby power station and the city airport over roughly five years, totalling up to 50 MW. Nothing is approved — the feasibility study period ran to early August 2026 and the City Commission must still authorize any development. Atterix was incorporated in Colorado in December 2025.","src":[{"u":"https://www.santafenewmexican.com/news/business/ai-data-center-proposal-in-raton-draws-opposition/article_605c80c8-0a7f-4726-b790-3e2d96f882ed.html","t":"AI data center proposal in Raton draws opposition","p":"The Santa Fe New Mexican"},{"u":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","t":"Raton residents push back on proposed data center plans","p":"KOB 4"}],"j":"city","jc":"Colfax County","jn":"Raton","jd":"city","ju":"approx"},{"id":"new-era-energy-digital-lea-county-data-center-nm","n":"Lea County Data Center","op":"New Era Energy & Digital, Inc.","s":"proposed","st":"NM","city":"Lovington","co":"Lea","lat":32.7,"lon":-103.3,"pre":"approximate","cf":"reported","mw":7000,"ac":3500,"upd":"2026-09-15","nt":"Land-option signed for approximately 3,500 acres near Lovington. Gas (>2GW) plus nuclear (5GW+) powered. First power targeted 2028; still pre-construction.","src":[{"u":"https://www.datacenterdynamics.com/en/news/new-era-plans-7gw-ai-data-center-in-lea-county-new-mexico-powered-by-gas-and-nuclear/","t":"New Era plans 7GW AI data center in Lea County, New Mexico","p":"Data Center Dynamics"},{"u":"https://www.abqjournal.com/business/article_25b63826-6d2c-4b76-9747-e40d9d4d5819.html","t":"New Era Lea County data center coverage","p":"Albuquerque Journal"}],"j":"uninc","jc":"Lea County","ju":"approx"},{"id":"lanl-strategic-computing-complex-los-alamos-nm","n":"Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)","op":"Los Alamos National Laboratory (U.S. Department of Energy / NNSA)","s":"operational","st":"NM","city":"Los Alamos","co":"Los Alamos","lat":35.8755,"lon":-106.319,"pre":"approximate","cf":"reported","upd":"2026-10-17","nt":"A 307,749 sq ft secured supercomputing facility (Nicholas C. Metropolis Center) built around 1999-2001 for $131 million. Computer-floor power was expanded to 24 MW, with the ability to add 10 MW more, per the MEP engineer. It has housed Q, Roadrunner, Trinity, Crossroads and Venado. Venado (2,560 liquid-cooled Nvidia Grace Hopper superchips) was announced at 10 exaflops of peak AI performance, a figure LANL has not confirmed, which supports the mixed-use classification. Coordinates are an approximate point at LANL Technical Area 3, not a confirmed building pin.","src":[{"u":"https://www.bpce.com/project/los-alamos-national-laboratory","t":"Los Alamos National Laboratory Strategic Computing Complex","p":"Bridgers & Paxton Consulting Engineers"},{"u":"https://www.sdxcentral.com/news/los-alamos-national-laboratory-unveils-new-venado-supercomputer-reportedly-capable-of-10-exaflops-of-peak-ai-performance/","t":"Los Alamos National Laboratory unveils new Venado supercomputer reportedly capable of 10 exaflops of peak AI performance","p":"SDxCentral"}],"j":"uninc","jc":"Los Alamos County","ju":"approx"},{"id":"meta-los-lunas-ai-nm","n":"Meta Los Lunas AI Expansion","op":"Meta","s":"under_construction","st":"NM","city":"Los Lunas","co":"Valencia","lat":34.8083,"lon":-106.7296,"pre":"approximate","cf":"confirmed","ac":750,"inv":800000000,"ann":"2024-12","upd":"2026-10-30","nt":"Reported as the first Meta facilities explicitly dedicated to AI/ML workloads. Existing campus is 750 acres. IRBs authorize tax-exempt bond financing for construction materials — the $7.5B per series is the authorized principal ceiling, not a direct cash subsidy. Meta required to invest $350M into expansion by year 10 under agreement. Operating entity: Greater Kudu LLC.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/","t":"Meta planning expansion of Los Lunas data center campus in New Mexico","p":"Data Center Dynamics"},{"u":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/article_809a47fe-d366-11ef-b76e-470988820678.html","t":"Los Lunas Meta Data Center introduces expansion dedicated to AI","p":"News-Bulletin (Valencia County)"}],"j":"city","jc":"Valencia County","jn":"Los Lunas","jd":"village","ju":"approx"},{"id":"stargate-project-jupiter-dona-ana-nm","n":"Stargate Project Jupiter","op":"OpenAI / Oracle / STACK Infrastructure","s":"under_construction","st":"NM","city":"Santa Teresa","co":"Dona Ana","lat":31.8636,"lon":-106.6895,"pre":"approximate","cf":"reported","ac":1400,"inv":50000000000,"ann":"2025-09-23","upd":"2026-11-04","pb":"on-site natural gas microgrid","nt":"No planned data-center capacity is recorded. A 1,000 MW figure for the site describes generation, not data-center capacity: when the county approved the bonds, developers said the microgrid \"would produce 700 to 900 megawatts of power in its first phase, ranging up to one gigawatt\" (Albuquerque Journal, December 2025). Epoch AI models the campus at 2.2 GW of planned capacity.","src":[{"u":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","t":"New Mexico's Project Jupiter data center part of larger Stargate AI initiative — El Paso Matters","p":"El Paso Matters"},{"u":"https://www.datacenterdynamics.com/en/news/groups-sue-to-stall-data-center-project-in-do%C3%B1a-ana-county-new-mexico/","t":"Groups sue to stall data center project in Doña Ana County, New Mexico — Data Center Dynamics","p":"Data Center Dynamics"}],"j":"uninc","jc":"Doña Ana County","jn":"Santa Teresa","ju":"approx"},{"id":"zenith-volts-roswell-chaves-county-data-center-nm","n":"Zenith Volts Roswell / Chaves County Data Center","op":"Zenith Volts Corp.","s":"permitted","st":"NM","city":"Roswell","co":"Chaves","lat":33.14,"lon":-104.52,"pre":"approximate","cf":"confirmed","mw":1240,"ac":300,"inv":11700000000,"upd":"2026-10-17","nt":"Approximately 20 miles south of Roswell. Chaves County Commission approved; 300-acre initial footprint within an 8,500-acre approved site. On-site solar, gas, geothermal, and battery storage. Targets November 2027 operational; approximately 140 FTE jobs.","src":[{"u":"https://www.prnewswire.com/news-releases/zenith-volts-corp-secures-county-approval-for-scalable-data-center-20-miles-south-of-roswell-nm-targeting-operation-by-november-2027-302537746.html","t":"Zenith Volts Corp secures county approval for scalable data center 20 miles south of Roswell, NM","p":"PR Newswire"},{"u":"https://www.datacenterdynamics.com/en/news/zenith-obtains-planning-approval-for-124gw-data-center-project-in-roswell-new-mexico/","t":"Zenith obtains planning approval for 1.24GW data center project in Roswell, New Mexico","p":"Data Center Dynamics"}],"j":"uninc","jc":"Chaves County","ju":"approx"},{"id":"amazon-data-services-reno-storey-county-nv","n":"Amazon Data Services Reno Data Center Campus","op":"Amazon Web Services","s":"under_construction","st":"NV","city":"Sparks","co":"Storey","lat":39.5177,"lon":-119.4794,"pre":"approximate","cf":"confirmed","ann":"2026-01-23","upd":"2026-09-11","nt":"Located in the Tahoe-Reno Industrial Center approximately 15 miles east of Reno, in all or portions of Sections 10, 11, 14 and 15, T19N R22E, MDB&M. NNDA states the project sits at Switch's Citadel Campus; as of September 2026, it is tracked separately here because Amazon Data Services, Inc. holds its own air permit, address and buildings. Coordinates are a street-level approximation from OpenStreetMap's Peru Drive geometry - no parcel-confirmed point was published.","src":[{"u":"https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf","t":"NDEP Notice of Proposed Action - Amazon Data Services, Inc., Class I Air Quality OPTC AP7374-4768, 3800 Peru Drive, Sparks NV","p":"Nevada Division of Environmental Protection"},{"u":"https://www.ndep.nv.gov/uploads/documents/ap7374-4768-directors-review.pdf","t":"NDEP Director's Review and Preliminary Determination - Amazon facility, Storey County, Nevada","p":"Nevada Division of Environmental Protection"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"apple-reno-nv","n":"Apple Reno Data Center (Reno Technology Park)","op":"Apple","s":"operational","st":"NV","city":"Sparks","co":"Washoe","lat":39.5631,"lon":-119.5548,"pre":"approximate","cf":"confirmed","ac":1700,"ann":"2012","upd":"2026-09-24","pb":"Turquoise Solar (61 MWdc / ~50MW AC, inside Reno Technology Park adjacent to the Sparks campus) + Fort Churchill Solar (~20MW, near Yerington), delivered via NV Energy's GreenEnergy Rider PPA structure","nt":"Apple data center at 21505 Reno Technology Parkway W, Sparks, Washoe County — the first data center built at the Reno Technology Park, opened December 2012. Per Apple's July 2024 letter in a Nevada GOED tax-abatement board packet, the campus had grown to four data-center buildings plus a power substation across 1,700 acres, with 200+ staff; Apple committed to further investment (a 2024 expansion capex of ~$742M over 5 years / ~$992M over 10 years is documented in the GOED filing). No site-specific IT-load MW is disclosed. Coordinates are an address-level geocode (ArcGIS, exact-address match); a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf","t":"Apple Inc. Board Packet (Data Center Sales & Use Tax Abatement), July 2024 — Apple's own letter: opened Dec 2012, four buildings + substation across 1,700 acres, 200+ staff","p":"Nevada Governor's Office of Economic Development"},{"u":"https://www.datacenterknowledge.com/hyperscalers/updated-apple-s-reno-data-center-expansion-marches-on","t":"Apple's Reno Data Center Expansion Marches On","p":"Data Center Knowledge"}],"j":"uninc","jc":"Washoe County","ju":"approx"},{"id":"blusky-ai-wells-elko-county-nv","n":"BluSky AI Wells Modular Data Center","op":"BluSky AI Inc.","s":"proposed","st":"NV","city":"Wells","co":"Elko","lat":41.1088,"lon":-114.9564,"pre":"approximate","cf":"reported","ac":2,"ann":"2025-08-28","upd":"2026-09-24","nt":"Modular data service units on concrete pads with fencing, modular office/process facilities and underground utility connections — minimal site improvement rather than a constructed hall. The record is deliberately kept as proposed: the LOI is explicitly non-binding and, as of the Nevada LCB's May 2026 memo, the project was still at LOI stage. No capacity in MW is asserted; 2,700 kVA is the site's existing transformer capacity, not a facility load. Coordinate resolves only to Hacienda Ranch Road in Wells, not to a parcel.","src":[{"u":"https://www.globenewswire.com/news-release/2025/08/28/3140872/29006/en/BluSky-AI-Inc-Announces-Non-Binding-Letter-of-Intent-to-Lease-Strategic-Site-in-Wells-Nevada.html","t":"BluSky AI Inc. Announces Non-Binding Letter of Intent to Lease Strategic Site in Wells, Nevada","p":"GlobeNewswire / BluSky AI Inc."},{"u":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","t":"Memo: Data Centers — Background Information (revised 2026-05-12) — BluSky AI listed as Elko County's sole planned data center, LOI stage","p":"Nevada Legislative Counsel Bureau, Research Division"}],"j":"city","jc":"Elko County","jn":"Wells","jd":"city","ju":"approx"},{"id":"colovore-reno-1-storey-county-nv","n":"Colovore Reno 1 (RN01)","op":"Colovore","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.5341,"lon":-119.4772,"pre":"approximate","cf":"confirmed","ann":"2025-12","upd":"2026-10-28","nt":"Air permit places the project on the southeast corner of Italy Drive and SR 439, about 2.8 miles south of the I-80/439 interchange, in Section 11, T19N, R22E MDB&M (Air Quality Hydrographic Area 83, Tracy Segment). GOED approved tax abatements in August 2026 (NVBEX reports $4.08M; the GOED board packet gives a 'Total Estimated Tax Abatement over 10 yrs.' of $4,076,970, a ten-year estimate, so no subsidy amount is recorded), against a stated $30 million in capital-equipment investment and 10 jobs at an average $59/hour within five years; the $30M is an equipment figure, not total site capex, so it is not recorded as the investment figure. Colovore's September 9, 2026 announcement gives 6 MW for the first data center on the RNO01 campus, which is recorded as the operational capacity, and says a second data center on the campus is under construction with projected completion in February 2027. Other cited figures differ: Colovore's company profile in the GOED board packet gives '16MW in RNO01', and Baxtel's February 2025 groundbreaking report calls RN01 a 20MW site; neither is recorded.","src":[{"u":"https://ndep.nv.gov/uploads/documents/ap7374-5002-directors-review.pdf","t":"Director's review, Class II Air Quality Operating Permit AP7374-5002, Colovore Reno 1 LLC, Storey County","p":"Nevada Division of Environmental Protection, Bureau of Air Pollution Control"},{"u":"https://nevbex.com/2026/08/13/nevada-goed-tax-abatements-nine-companies/","t":"Governor's Office of Economic Development announces tax abatements for nine companies","p":"NVBEX"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"databank-las1-las-vegas-nv","n":"DataBank LAS1","op":"DataBank","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0598,"lon":-115.1471,"pre":"exact","cf":"reported","upd":"2026-08-29","nt":"Carrier-dense edge colocation facility with 2N power redundancy and 11 on-site carriers. The building is mapped in OpenStreetMap as 'DataBank Las Vegas LAS1' at this address, which is how the coordinates were confirmed. A general-purpose colocation site rather than a dedicated AI campus.","src":[{"u":"https://www.databank.com/data-centers/las-vegas/","t":"DataBank Las Vegas LAS1 - 7185 Pollock Drive, 57,364 IT sq ft, 3.35 MW critical IT load","p":"DataBank"}],"j":"uninc","jc":"Clark County","jn":"Paradise"},{"id":"edgecore-reno-campus-storey-county-nv","n":"EdgeCore Reno Data Center Campus","op":"EdgeCore Digital Infrastructure","s":"under_construction","st":"NV","city":"McCarran","co":"Storey","lat":39.543,"lon":-119.4851,"pre":"approximate","cf":"confirmed","mw":216,"ac":56,"ann":"2023-08","upd":"2026-10-14","nt":"Three hyperscale buildings totalling nearly 1 million sq ft at roughly 72 MW each. Sources diverge on framing: the 2023 announcement describes 136 acres in 'north Reno' supporting 400+ MW, while EdgeCore's current location page describes a 56-acre, 216 MW developed phase in the Tahoe-Reno Industrial Center (Storey County). The current page is treated as authoritative for the developed campus; the larger land position is recorded here rather than as capacity.","src":[{"u":"https://edgecore.com/locations/reno-data-center","t":"EdgeCore Reno data center campus - 56 acres, 216 MW critical IT load across three buildings in the Tahoe-Reno Industrial Center","p":"EdgeCore Digital Infrastructure"},{"u":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-development-of-reno-nevada-data-center-campus","t":"EdgeCore Digital Infrastructure announces development of Reno, Nevada data center campus","p":"EdgeCore Digital Infrastructure"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"fleet-data-centers-storey-county-nv","n":"Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)","op":"Fleet Data Centers","s":"under_construction","st":"NV","city":"McCarran","co":"Storey","lat":39.53,"lon":-119.43,"pre":"approximate","cf":"reported","mw":400,"ac":769,"ann":"2026-05","upd":"2026-08-14","nt":"Two adjacent TRIC campuses (South Valley and Peru Ridge) along USA Parkway in Storey County, dual two-story buildings each, ~769-acre combined footprint and a reported combined ~400MW of critical compute plus ~30MW/campus utility power. Fully leased to an unnamed AA-rated, investment-grade tenant (market cap >$3T) under a ~16.4-year triple-net lease; Fleet closed $4.6B in senior secured notes for a 230MW Storey County campus. Groundbreaking May 2026. Coordinates approximate to the TRIC/USA Parkway area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/fleet-data-centers-closes-46bn-in-senior-secured-notes-for-230mw-storey-county-campus/","t":"Fleet Data Centers closes $4.6bn in senior secured notes for 230MW Storey County campus","p":"Data Center Dynamics"},{"u":"https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/","t":"Fleet Data Centers breaks ground on 2 facilities","p":"Northern Nevada Business Weekly"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"google-henderson-nv","n":"Google Henderson Data Center","op":"Google","s":"operational","st":"NV","city":"Henderson","co":"Clark","lat":36.0562,"lon":-115.0425,"pre":"approximate","cf":"confirmed","ac":64,"inv":600000000,"ann":"2019","upd":"2026-10-14","pb":"NV Energy solar + storage deal (~350 MW solar PV, 250-280 MW battery storage) tied to Google's Henderson campus; supplementary Fervo Energy geothermal","nt":"Google data center on West Warm Springs Rd (east of Boulder Highway), Henderson, Clark County — two parcels totaling ~64 acres, groundbreaking July 1 2019, a $600M project ($25.2M in state tax incentives), online 2020. Confirmed by Google's own Henderson location page. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Warm Springs Rd location; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://datacenters.google/locations/henderson-nevada/","t":"Google Henderson, Nevada — official location page (built 2019)","p":"Google"},{"u":"https://lasvegassun.com/news/2019/jul/01/officials-600m-google-facility-boosts-hendersons-p/","t":"Officials: $600M Google facility boosts Henderson's presence — 64 acres on W Warm Springs Rd, July 2019 groundbreaking, online 2020","p":"Las Vegas Sun"}],"j":"city","jc":"Clark County","jn":"Henderson","jd":"city","ju":"approx"},{"id":"jet-ai-moapa-clark-county-nv","n":"Jet.AI Moapa Data Center Campus","op":"Jet.AI Inc.","s":"proposed","st":"NV","city":"Moapa","co":"Clark","lat":36.6674,"lon":-114.585,"pre":"approximate","cf":"reported","mw":50,"ac":20,"ann":"2025-12-23","upd":"2026-09-11","nt":"Proposed joint venture: Choo Choo Express LLC would contribute the land, with an equity promote of roughly 70% Jet.AI / 30% CCE, pending definitive agreements and due diligence. Jet.AI expects to commit approximately $10 million over an anticipated two-year period - a corporate capital commitment, not a site construction figure, so no investment figure is recorded. The site is adjacent to a remediated former coal plant now operating as a 200 MW battery storage facility, with access to transmission, natural gas, fiber and water. Coordinates are the Moapa settlement point from OpenStreetMap; no parcel location was published.","src":[{"u":"https://www.globenewswire.com/news-release/2025/12/23/3209946/0/en/jet-ai-inc-jv-for-50mw-data-center-campus-in-moapa-nevada.html","t":"Jet.AI Inc. JV for 50MW Data Center Campus in Moapa, Nevada","p":"GlobeNewswire / Jet.AI Inc. (NASDAQ: JTAI)"},{"u":"https://dcmap.us/markets/las-vegas/","t":"dcmap.us Las Vegas market listing - Jet.AI Moapa Data Center, Clark County, planned, 50 MW","p":"dcmap.us"}],"j":"uninc","jc":"Clark County","jn":"Moapa Town","ju":"approx"},{"id":"manse-technology-campus-pahrump-nv","n":"Manse Technology Campus","op":"Manse Technology Campus LLC","s":"proposed","st":"NV","city":"Pahrump","co":"Nye","lat":36.1925,"lon":-115.9758,"pre":"approximate","cf":"reported","ac":900,"inv":18400000000,"ann":"2026-07","upd":"2026-09-21","nt":"Formerly referred to as Project Blackjack; sited on the Manse Road corridor near the southern entrance to Pahrump along Highway 160, roughly 1,100 feet from the nearest homes. Developer states $18.4 billion of capital investment at full buildout and $114 million in annual Nye County property taxes; a separate figure of $8.4 billion appeared in other reporting and had not been resolved as of August 2026, so the developer's own $18.4B is recorded. Design features include screening berms, rooftop parapets for sound reduction and a target of roughly 55 dB at the property line. No megawatt capacity has been disclosed. Construction was anticipated to begin in 2027 with a five-year buildout. On August 18, 2026, after a June 2026 county-wide moratorium on new data center applications, the Nye County Commission voted 5-0 to adopt Bill No. 2026-11, which prohibits data center development in the Pahrump Valley (Hydrographic Basin 162); Nevada Current reported that the ban was a blow to the Manse Technology Campus and would effectively prevent the development of any data centers in and around the town of Pahrump. As of October 2026, among the cited sources, none reports the developer withdrawing the project, and the developer's site still describes it as a proposed development, so the status remains proposed.","src":[{"u":"https://mansetechcampus.com/about","t":"About the Project - Manse Technology Campus (capital investment, taxes, jobs, water)","p":"Manse Technology Campus"},{"u":"https://pvc.news/understanding-the-proposed-pahrump-data-center-a-closer-look-at-the-proposal/","t":"Understanding the proposed Pahrump data center: a closer look at the proposal","p":"Pahrump Valley Community News"}],"j":"uninc","jc":"Nye County","jn":"Pahrump","ju":"approx"},{"id":"microsoft-silver-springs-lyon-county-nv","n":"Microsoft Silver Springs Data Center Campus","op":"Microsoft","s":"proposed","st":"NV","city":"Silver Springs","co":"Lyon","lat":39.3736,"lon":-119.2267,"pre":"approximate","cf":"reported","ac":274,"upd":"2026-08-29","nt":"A distinct Microsoft site from the Victory Logistics District land in Fernley that the tracker already carries. Microsoft owns roughly 274 acres in Silver Springs, restructured into three parcels of about 223.18, 32.6 and 18.7 acres. The BLM decision notice for the 345 kV fold names NV Energy as applicant and does not mention Microsoft or a data center; the Microsoft linkage comes from the county proceedings and the Basin and Range Watch summary. No building programme, capacity figure or construction start has been sourced. Coordinates are the Silver Springs reference point, not a parcel.","src":[{"u":"https://citizenportal.ai/articles/7417886/nevada/lyon-county/planning-commission-recommends-approval-of-two-microsoft-substations-in-silver-springs-amid-neighbor-concerns","t":"Planning commission recommends approval of two Microsoft substations in Silver Springs amid neighbor concerns","p":"Citizen Portal"},{"u":"https://www.basinandrangewatch2.org/data-centers","t":"Data Centers - Silver Springs data center and Silver Springs 345 kV transmission line, ROW application September 2024, revised plan of development April 2026","p":"Basin and Range Watch"}],"j":"uninc","jc":"Lyon County","jn":"Silver Springs","ju":"approx"},{"id":"microsoft-fernley-nv","n":"Microsoft Victory Logistics District Campus","op":"Microsoft","s":"proposed","st":"NV","city":"Fernley","co":"Lyon","lat":39.6082,"lon":-119.2169,"pre":"approximate","cf":"reported","ac":300.7,"ann":"2025-04","upd":"2026-10-22","nt":"~300.7-acre land acquisition at the Victory Logistics District in Fernley, Lyon County. Capacity and timeline not yet announced → proposed. Coordinates are the Fernley area centroid.","src":[{"u":"https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/","t":"Microsoft to buy 300 acres in Fernley's Lyon County Victory Logistics District","p":"Nevada Appeal"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Lyon County","jn":"Fernley","jd":"city","ju":"approx"},{"id":"monarch-data-center-yerington-nv","n":"Monarch Data Center","op":"Copia Power","s":"permitted","st":"NV","city":"Yerington","co":"Lyon","lat":38.9855,"lon":-119.163,"pre":"approximate","cf":"confirmed","mw":1000,"ac":505,"ann":"2025-07","upd":"2026-11-04","nt":"Roughly 505 acres in Mason Valley near Yerington; a 4.6 million-square-foot campus with north and south sub-campuses, a battery energy storage system, a natural gas plant, a substation and power lines across two parcels. First phase would provide 150 MW of the 1,000 MW total. Copia Power has one year to file its final PUD. Lyon County is drafting a stricter data center ordinance that will not apply retroactively to Monarch.","src":[{"u":"https://www.kolotv.com/2026/08/07/lyon-county-commissioners-approve-monarch-data-center/","t":"Lyon County Commissioners approve Monarch Data Center","p":"KOLO 8 News Now"},{"u":"https://www.carsonnow.org/08/09/2026/massive-data-center-in-lyon-county-is-one-step-closer-to-being-built","t":"Massive data center in Lyon County is one step closer to being built","p":"Carson Now / The Nevada Independent"}],"j":"city","jc":"Lyon County","jn":"Yerington","jd":"city","ju":"approx"},{"id":"novva-tahoe-reno-storey-county-nv","n":"Novva Tahoe Reno Data Center","op":"Novva Data Centers","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.53,"lon":-119.44,"pre":"approximate","cf":"confirmed","mw":60,"ac":20,"ann":"2025-07-08","upd":"2026-11-04","pb":"NV Energy","nt":"300,000 sq ft, 60 MW data center on a 20-acre campus at 1 Astro Way in the Tahoe-Reno Industrial Center (McCarran / Storey County). Six 10 MW data halls served by an on-campus 100 MW NV Energy substation; water-free direct-to-chip cooling. Coordinates are an approximate TRIC-area geocode (exact parcel point not published).","src":[{"u":"https://www.prnewswire.com/news-releases/novva-data-centers-announces-the-launch-of-tahoe-reno-data-center-302500299.html","t":"Novva Data Centers Announces the Launch of Tahoe Reno Data Center (PR Newswire)","p":"Novva Data Centers / PR Newswire"},{"u":"https://www.datacenterdynamics.com/en/news/american-data-center-operator-novva-launches-facility-in-nevada/","t":"American data center operator Novva launches facility in Nevada (DCD)","p":"Data Center Dynamics"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"powerhouse-reno-storey-county-nv","n":"PowerHouse Reno Campus","op":"PowerHouse Data Centers","s":"under_construction","st":"NV","city":"McCarran","co":"Storey","lat":39.5603,"lon":-119.4991,"pre":"approximate","cf":"reported","mw":65,"ac":49,"ann":"2024-10","upd":"2026-10-28","nt":"Three two-story powered-shell buildings totalling 900,000 sq ft on 49 acres, developed with parent American Real Estate Partners (AREP). The 65 MW figure is the campus figure in PowerHouse's own groundbreaking release; PowerHouse's own Reno campus page separately lists 200 MW of power for the site as of October 2026. The two figures are not reconciled, and the 65 MW figure is the one recorded.","src":[{"u":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center","t":"PowerHouse breaks ground on Reno data center","p":"PowerHouse Data Centers"},{"u":"https://www.powerhousedata.com/data-center/powerhouse-reno","t":"PowerHouse Reno campus page (49 acres, 900,000 SF, Power: 200 MW)","p":"PowerHouse Data Centers"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"switch-apex-industrial-park-north-las-vegas-nv","n":"Switch Apex Industrial Park Land Position","op":"Switch","s":"proposed","st":"NV","city":"North Las Vegas","co":"Clark","lat":36.3291,"lon":-114.9278,"pre":"approximate","cf":"reported","ac":316,"inv":180500000,"upd":"2026-09-10","nt":"This is a land position, not an announced facility. Switch declined to describe its development strategy and reporting indicates North Las Vegas had received no plans or applications for the Apex parcels. The investment figure is the combined recorded land price ($85.5M plus $95M), not a project capex. Apex Industrial Park sits about 25 miles northeast of the Las Vegas Strip near the I-15 / U.S. 93 interchange. Recorded so the site is trackable if a project is filed. Distinct from the Novva 205-acre Apex holding the tracker carries as of September 2026. Public reception as of 2026-09-10: the Las Vegas Review-Journal article (2026-09-10) on the $95M/140-acre land purchase covers the transaction and general Southern Nevada water-usage context but includes no direct quotes from residents, community groups, or elected officials about this specific purchase. No public hearing or reaction is documented in this source.","src":[{"u":"https://www.reviewjournal.com/business/switch-buys-more-land-in-nlv-apex-park-for-95m-3731350/","t":"Las Vegas data-center owner Switch purchased 140 acres in North Las Vegas' Apex Industrial Park for $95M","p":"Las Vegas Review-Journal"},{"u":"https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county","t":"Henderson considers data center pause amid construction boom across Clark County - notes Switch's 300+ acres in Apex Industrial Park","p":"The Nevada Independent"}],"j":"city","jc":"Clark County","jn":"North Las Vegas","jd":"city","ju":"approx"},{"id":"switch-citadel-storey-county-nv","n":"Switch CITADEL Campus","op":"Switch","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.6183,"lon":-119.3732,"pre":"approximate","cf":"confirmed","mw":650,"ac":2000,"ann":"2017","upd":"2026-10-30","pb":"100% renewable (wind + solar)","src":[{"u":"https://www.switch.com/citadel/","t":"Switch CITADEL Campus — Switch.com","p":"Switch"},{"u":"https://www.datacenterknowledge.com/switch/switch-unveils-650-mw-data-center-campus-in-reno-nevada","t":"Switch unveils 650 MW campus in Reno, Nevada — Data Center Knowledge","p":"Data Center Knowledge"}],"j":"uninc","jc":"Washoe County","ju":"approx"},{"id":"switch-evo-ai-factories-las-vegas-nv","n":"Switch EVO AI Factories 1 & 2 (Jones Blvd / 215 Beltway)","op":"Switch","s":"under_construction","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0635,"lon":-115.2238,"pre":"approximate","cf":"reported","upd":"2026-10-14","nt":"Two AI-dedicated buildings, about 199,000 and 228,000 sq ft per Clark County records, at the southwest corner of the Jones Blvd–215 Beltway interchange (listed address W Maule Ave). The pin is approximate: the W Maule Ave segment near Jones Blvd. MW are not disclosed.","src":[{"u":"https://www.switch.com/switch-is-building-ai-factories-in-las-vegas/","t":"Switch is building 'AI factories' in Las Vegas","p":"Switch (republishing Las Vegas Review-Journal)"},{"u":"https://baxtel.com/data-center/switch-evo-ai-factory-2","t":"Baxtel: Switch EVO AI Factory 2 (W Maule Ave)","p":"Baxtel"}],"j":"uninc","jc":"Clark County","jn":"Enterprise","ju":"approx"},{"id":"switch-edge-1-nv","n":"Switch Edge 1","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0591,"lon":-115.2137,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational as a distinct edge-colocation building on Switch's Las Vegas roster. AI/HPC (likely): Switch Las Vegas Core Campus, exascale AI/high-density platform.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Edge 1","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/1017048670","t":"OpenStreetMap way/1017048670","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-las-vegas-10-nv","n":"Switch Las Vegas 10","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0556,"lon":-115.2231,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational on Switch's Las Vegas facility roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Las Vegas 10","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/984796364","t":"OpenStreetMap way/984796364","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-las-vegas-11-nv","n":"Switch Las Vegas 11","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0559,"lon":-115.2141,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational on Switch's Las Vegas facility roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Las Vegas 11","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/617194689","t":"OpenStreetMap way/617194689","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-las-vegas-12-nv","n":"Switch Las Vegas 12","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0617,"lon":-115.2133,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"OSM tag 'Switch12' matches Switch Las Vegas 12, 5325 W. Capovilla Ave, confirmed on baxtel Switch roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://www.datacentermap.com/usa/nevada/las-vegas/switch-las-vegas-12/","t":"Switch facility directory","p":"Switch"},{"u":"https://www.openstreetmap.org/way/172739950","t":"OpenStreetMap way/172739950","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-las-vegas-5-nv","n":"Switch Las Vegas 5","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.1428,"lon":-115.0767,"pre":"exact","cf":"reported","upd":"2026-10-14","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational on Switch's Las Vegas facility roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Las Vegas 5","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/1017460715","t":"OpenStreetMap way/1017460715","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Sunrise Manor"},{"id":"switch-las-vegas-7-nv","n":"Switch Las Vegas 7","op":"Switch","s":"operational","st":"NV","city":"Enterprise","co":"Clark","lat":36.0599,"lon":-115.2102,"pre":"exact","cf":"reported","upd":"2026-10-14","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational on Switch's Las Vegas facility roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Las Vegas 7","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/172739953","t":"OpenStreetMap way/172739953","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-las-vegas-9-nv","n":"Switch Las Vegas 9","op":"Switch","s":"operational","st":"NV","city":"Las Vegas","co":"Clark","lat":36.0557,"lon":-115.2196,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Switch Station 1 & 2 solar (179MW, Apex/Dry Lake SEZ) via NV Energy special renewable tariff","nt":"Confirmed operational on Switch's Las Vegas facility roster. AI/HPC (likely): Core Campus LV: Switch AI Factory Solution, CoreWeave NVIDIA GB300 GPUs.","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Las Vegas 9","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/585998678","t":"OpenStreetMap way/585998678","p":"OpenStreetMap"}],"j":"uninc","jc":"Clark County","jn":"Enterprise"},{"id":"switch-tahoe-reno-1-the-citadel-campus-nv","n":"Switch Tahoe Reno 1 (The Citadel Campus)","op":"Switch","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.5141,"lon":-119.4755,"pre":"exact","cf":"reported","mw":650,"upd":"2026-08-16","pb":"Gigawatt Nevada solar+storage (Citadel behind-the-meter, Storey County) + Switch Station 1 & 2 solar via NV Energy renewable tariff","nt":"Citadel Campus, 1 Superloop Circle, McCarran NV 89434, Storey County. Press (PRNewswire/DCD) cites e-commerce/semiconductor + AI/HPC clients at the campus.","src":[{"u":"https://www.datacentermap.com/usa/nevada/reno/switch-tahoe-reno/","t":"Switch facility directory","p":"Switch"},{"u":"https://www.openstreetmap.org/way/1116775094","t":"OpenStreetMap way/1116775094","p":"OpenStreetMap"}],"j":"uninc","jc":"Storey County"},{"id":"switch-tahoe-reno-2-the-citadel-campus-nv","n":"Switch Tahoe Reno 2 (The Citadel Campus)","op":"Switch","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.5139,"lon":-119.4849,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Gigawatt Nevada solar+storage (Citadel behind-the-meter, Storey County) + Switch Station 1 & 2 solar via NV Energy renewable tariff","nt":"Confirmed operational per PRNewswire groundbreaking release and baxtel roster (Tahoe Reno 2-8).","src":[{"u":"https://baxtel.com/data-centers/switch","t":"Baxtel facility profile — Switch Tahoe Reno 2 (The Citadel Campus)","p":"Baxtel"},{"u":"https://www.openstreetmap.org/way/1116775095","t":"OpenStreetMap way/1116775095","p":"OpenStreetMap"}],"j":"uninc","jc":"Storey County"},{"id":"switch-tahoe-reno-3-the-citadel-campus-nv","n":"Switch Tahoe Reno 3 (The Citadel Campus)","op":"Switch","s":"operational","st":"NV","city":"McCarran","co":"Storey","lat":39.5115,"lon":-119.4833,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Gigawatt Nevada solar+storage (Citadel behind-the-meter, Storey County) + Switch Station 1 & 2 solar via NV Energy renewable tariff","nt":"Named explicitly in Switch's groundbreaking press release for 2nd/3rd Tahoe Reno buildings.","src":[{"u":"https://www.prnewswire.com/news-releases/switch-breaks-ground-on-second-and-third-tahoe-reno-data-centers-following-multi-megawatt-expansions-with-global-e-commerce-and-semiconductor-clients-301177069.html","t":"Switch facility directory","p":"Switch"},{"u":"https://www.openstreetmap.org/way/1320683840","t":"OpenStreetMap way/1320683840","p":"OpenStreetMap"}],"j":"uninc","jc":"Storey County"},{"id":"townsite-solar-2-boulder-city-nv","n":"Townsite Solar 2 Boulder City Data Center","op":"Townsite Solar 2 LLC","s":"permitted","st":"NV","city":"Boulder City","co":"Clark","lat":35.9788,"lon":-114.8338,"pre":"approximate","cf":"reported","mw":167,"ac":88.5,"ann":"2026-04","upd":"2026-11-04","nt":"Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.","src":[{"u":"https://bcnv.org/1174/TS2-Data-Center-Proposal","t":"TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page","p":"City of Boulder City, Nevada"},{"u":"https://www.cleanview.co/data-centers/nevada","t":"Data centers in Nevada - project list (Townsite Solar 2 Boulder City Data Center, Clark County, 170 MW, planned)","p":"Cleanview"}],"j":"city","jc":"Clark County","jn":"Boulder City","jd":"city","ju":"approx"},{"id":"tract-silver-springs-nv","n":"Tract Silver Springs Data Center Park","op":"Tract","s":"proposed","st":"NV","city":"Silver Springs","co":"Lyon","lat":39.407,"lon":-119.229,"pre":"approximate","cf":"reported","mw":1600,"ac":1060,"ann":"2025-09","upd":"2026-10-14","nt":"Master-planned data center park near Silver Springs, Lyon County (near the US-50/USA Parkway corridor east of Reno). ~1,060 acres acquired with approved rezoning and a Lyon County development agreement; buildout capacity up to 1.6GW with an initial 700MW under utility study, planned dry/air-cooled to minimize water use. Land/entitlement stage — proposed, not yet under construction. Coordinates approximate to Silver Springs.","src":[{"u":"https://www.tract.com/news/tract-expands-its-greater-reno-portfolio-closing-on-1060-acres-in-silver-springs-nevada-following-successful-rezoning-and-development-agreement-with-lyon-county/","t":"Tract Expands Its Greater Reno Portfolio, Closing on 1,060 Acres in Silver Springs, Nevada","p":"Tract"},{"u":"https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/","t":"Tract acquires 1,000 acres in Nevada for 1.6GW data center park","p":"Data Center Dynamics"}],"j":"uninc","jc":"Lyon County","jn":"Silver Springs","ju":"approx"},{"id":"tract-virginia-highlands-storey-county-nv","n":"Tract Virginia Highlands Technology Park","op":"Tract","s":"proposed","st":"NV","city":"Lockwood","co":"Storey","lat":39.5071,"lon":-119.6465,"pre":"approximate","cf":"reported","mw":2500,"ac":8590,"upd":"2026-09-24","nt":"Land is positioned between the Tahoe-Reno Industrial Center and the Virginia City Highlands, just southeast of Lockwood, with parcels ranging from 250 to 1,200 acres and existing industrial zoning. This is a land-and-power park with no named tenant or building programme disclosed; the 2,500 MW is Tract's stated site capacity, not a built or contracted figure. Coordinates are the Lockwood reference point, not a parcel boundary. Distinct from Tract's Silver Springs / Sapphire site in Lyon County, which the tracker already carries. Public-reception check (2026-09-10): The 8,590-acre Storey County site (between the Tahoe-Reno Industrial Center and Virginia City Highlands, southeast of Lockwood) was already zoned industrial with data centers as a pre-approved use at acquisition (2024-06-18), consistent with Storey County/TRIC's long-standing industrial-friendly zoning posture. Checked: Tract's own project page and its 2024 acquisition press release -- neither mentions a public hearing, county-official statement, or any resident opposition/support specific to this parcel.","src":[{"u":"https://www.tract.com/project/virginia-highlands/","t":"Virginia Highlands - Tract project page (8,590 acres, 11 parcels, 2,500 MW, owned and in development)","p":"Tract"},{"u":"https://www.cleanview.co/data-centers/nevada","t":"Data centers in Nevada - project list and locations (Tract Virginia Highlands, Storey County, 2,500 MW, planned)","p":"Cleanview"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"vantage-nv1-storey-county-nv","n":"Vantage Data Centers NV1","op":"Vantage Data Centers","s":"under_construction","st":"NV","city":"McCarran","co":"Storey","lat":39.5311,"lon":-119.5904,"pre":"approximate","cf":"confirmed","mw":224,"ac":137,"inv":3000000000,"ann":"2025-07","upd":"2026-11-04","nt":"Located in Tahoe Reno Industrial Center (TRIC), Storey County, NV — same industrial park as Google, Apple, Microsoft, and Switch (CITADEL tracked separately as of July 2026). Four multi-story buildings, 1M+ sq ft. Designed for AI densities 360W–720W per sq ft. Vantage's eighth North American market. Coordinates are approximate TRIC centroid. Primary press release states more than 1,200 individuals employed 'across the construction and ongoing operations' — combined construction + permanent total; that release does not split construction from permanent jobs. As of October 2026, no permanent-jobs figure is recorded: a November 2024 Nevada Governor's Office of Economic Development release projects approximately 10 jobs within five years for a Vantage data center in Storey County, a five-year projection that does not name NV1.","src":[{"u":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/","t":"Vantage Data Centers Invests $3 Billion to Deliver AI Campus in Nevada","p":"Vantage Data Centers"},{"u":"https://www.businesswire.com/news/home/20250715406750/en/Vantage-Data-Centers-Invests-$3-Billion-to-Deliver-AI-Campus-in-Growing-Nevada-Market","t":"Vantage Data Centers NV1 Campus Announcement — BusinessWire","p":"BusinessWire"}],"j":"uninc","jc":"Storey County","ju":"approx"},{"id":"9ldg-niagara-falls-ny","n":"9LDG Niagara AI Data Center","op":"9 Lives Digital Group (9LDG)","s":"proposed","st":"NY","city":"Niagara Falls","co":"Niagara","lat":43.0628,"lon":-79.0175,"pre":"approximate","cf":"reported","ac":22,"inv":100000000,"ann":"2024-08","upd":"2026-10-22","pb":"Hydroelectric (NYPA); 100MW on-site substation","nt":"Coordinates are approximate (3807 Highland Ave, Niagara Falls NY). 9LDG stated it will collaborate with an existing data center developer rather than build independently. Company president Michael Bagley leads a three-person partnership; partners not publicly identified. No prior data center development experience disclosed. As of September 2026, no coverage later than the 2024 acquisition coverage had been found for this specific project (3807 Highland Ave / Globe Metallurgical) in 2025-2026: no permit, no site plan, no construction. 2026 Niagara Falls data-center news is dominated by the separate Niagara Falls Redevelopment / Urbacon 'Niagara Digital Campus' on Falls Street, which is tracked as a different record as of September 2026. As of September 2026, no capacity, water or subsidy figure could be sourced for the 9LDG site. The energy source is recorded as hydro because Data Center Dynamics reports that the site was selected for its availability of electricity, hydropower and water for cooling.","src":[{"u":"https://www.datacenterdynamics.com/en/news/9ldg-plans-ai-data-center-at-niagara-falls/","t":"9LDG Plans AI Data Center at Niagara Falls","p":"Data Center Dynamics"},{"u":"https://www.niagara-gazette.com/news/local_news/falls-firm-fronted-by-convicted-money-launderer-eyeing-north-end-data-center/article_80fca10c-4f5d-11ef-89b1-777f94833d22.html","t":"Falls firm fronted by convicted money launderer eyeing North End data center","p":"Niagara Gazette"}],"j":"uninc","ju":"approx"},{"id":"wf-industrial-yaphank-ny","n":"Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)","op":"WF Industrial (Wildflower)","s":"proposed","st":"NY","city":"Yaphank","co":"Suffolk","lat":40.8322,"lon":-72.93,"pre":"approximate","cf":"reported","mw":176.6,"ac":71,"inv":1000000000,"upd":"2026-11-04","nt":"The cited Long Island Parks article gives the site as 1001 Expressway Drive North in Yaphank; other sources describe the parcel as 'west of Sills Road, north side of the LIE North Service Road'. Coordinates are the Yaphank hamlet centroid (OSM Nominatim), not the parcel -- disclosed here per contract rule H; do not treat as parcel-level precision.","src":[{"u":"https://www.longislandpress.com/2026/07/15/moratorium-data-centers-state/","t":"The debate about data centers as state leaders place moratorium","p":"Long Island Press"},{"u":"https://longisland.news12.com/2026/06/26/proposed-ai-data-center-in-yaphank-meets-opposition-from-residents-and-town-leaders/4dG9mouCvXwvgvC6Mjsvkr","t":"Proposed AI data center in Yaphank meets opposition from residents and town leaders","p":"News 12 Long Island"}],"j":"uninc","jc":"Suffolk County","jn":"Yaphank","jm":"Brookhaven town","ju":"approx"},{"id":"digital-realty-jfk10-manhattan-ny","n":"Digital Realty JFK10 (111 Eighth Avenue)","op":"Digital Realty","s":"operational","st":"NY","city":"New York","co":"New York","lat":40.7414,"lon":-74.0032,"pre":"exact","cf":"confirmed","upd":"2026-07-24","pb":"Grid — Con Edison","nt":"111 Eighth Avenue (the historic Union Inland Terminal #1 / \"Google Building\"; the New York City tax-lot record lists the building as built in 1931), Chelsea, Manhattan — Google owns the building; Digital Realty operates JFK10 as a colocation tenant. 111,000 sq ft (Digital Realty's own figure). A third-party estimate of ~18MW capacity is not confirmed by the operator and is omitted. Major carrier hotel with DE-CIX New York and MegaIX New York peering. As of October 2026, the coordinates fall inside New York City tax lot 1007390001 (111 8 Avenue; Block 739, Lot 1), a lot holding a single building, so the pin marks the building as a whole; the cited sources do not say where inside it JFK10 sits.","src":[{"u":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk10","t":"Digital Realty JFK10 Data Center","p":"Digital Realty"},{"u":"https://oqc.tech/company/newsroom/oqc-quantum-ai-data-centre","t":"OQC, Digital Realty and NVIDIA launch Quantum-AI data centre in New York","p":"Oxford Quantum Circuits"}],"j":"city","jc":"New York County","jn":"New York","jd":"city"},{"id":"empire-ai-beta-buffalo-ny","n":"Empire AI Beta","op":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","s":"operational","st":"NY","city":"Buffalo","co":"Erie","lat":42.8949,"lon":-78.8677,"pre":"approximate","cf":"confirmed","inv":40000000,"ann":"2025-06","upd":"2026-10-28","nt":"New York State-funded public AI supercomputer, the second phase (Beta) of the Empire AI consortium. UB states it is \"housed at the Center of Excellence in Bioinformatics and Life Sciences on the medical campus\"; coordinates are geocoded to that building on the Buffalo Niagara Medical Campus, hence approximate. Described as \"a $40 million NVIDIA-powered supercomputer\" delivering \"an 11-fold increase in AI training capacity, a 40-fold boost in AI inference and an 8-fold expansion in data storage\" versus Alpha. As of 2026-09-09, none of the three retrieved sources states a GPU count, an IT load or any MW figure, a water/cooling detail, an acreage, or a job count for Beta. Empire AI overall is backed by \"over $500 million in public and private funding\"; that is consortium-wide, not this site, so it is not recorded as an investment figure. The Alpha phase (launched 2024, Simons Foundation gift) is also housed at UB and is the predecessor system on the same campus, not a separate site. The permanent Gamma facility is tracked separately as Empire AI Gamma as of September 2026. The governor's office states that the consortium's funding includes \"up to $340 million in state capital funding\"; that is a consortium-wide ceiling covering Empire AI statewide, not attributable to this phase or site, so it is not recorded and not counted against both the Beta and Gamma records. The $40 million Beta award, approved by the Empire State Development board, is recorded as the investment figure. It is a state grant to a public research consortium rather than an incentive to a company, so no subsidy entry is recorded.","src":[{"u":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","t":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","p":"Office of the Governor of New York State"},{"u":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html","t":"Empire AI Beta, housed at UB, now fully online","p":"University at Buffalo (UBNow)"}],"j":"city","jc":"Erie County","jn":"Buffalo","jd":"city","ju":"approx"},{"id":"empire-ai-gamma-buffalo-ny","n":"Empire AI Gamma","op":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","s":"under_construction","st":"NY","city":"Buffalo","co":"Erie","lat":42.8864,"lon":-78.8784,"pre":"approximate","cf":"reported","upd":"2026-09-10","nt":"Empire AI's permanent, full-scale computing facility. Both cited sources say \"Construction continues on Empire AI's permanent, full-scale Gamma facility at UB, which is expected to be completed by the end of 2027\" - hence the under-construction status, but the record is marked reported because neither cited source names a specific building, parcel, or campus (UB has Buffalo and Amherst campuses) and neither gives a construction start date. Coordinates are a Buffalo city-level placeholder, approximate, and not a parcel. As of 2026-09-09, neither source states an MW capacity, a dedicated investment figure for Gamma specifically, an acreage, a job count, or a site-level subsidy agreement. This is the same consortium-wide state capital commitment noted on the Empire AI Beta record -- total backing over $500M incl. private/philanthropic funds, not phase-specific. The cited article names no Gamma-specific dollar figure. The $340m Empire AI consortium-wide state capital commitment is statewide, not Gamma-specific, and the cited source names no Gamma-specific dollar figure. It is not recorded as a site-level subsidy entry, to avoid counting the same state money against two facility records.","src":[{"u":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","t":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","p":"Office of the Governor of New York State"},{"u":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html","t":"Empire AI Beta, housed at UB, now fully online","p":"University at Buffalo (UBNow)"}],"j":"city","jc":"Erie County","jn":"Buffalo","jd":"city","ju":"approx"},{"id":"global-ai-endicott-ny","n":"Global AI Endicott Data Center","op":"Global AI","s":"operational","st":"NY","city":"Endicott","co":"Broome","lat":42.0987,"lon":-76.0494,"pre":"approximate","cf":"reported","mw":100,"upd":"2026-10-26","nt":"Company-reported figures: 16 MW of initial critical IT load at Endicott, with a stated ramp to 100 MW through 2026. The same article gives 250 MW for 2027 and 1 GW of critical capacity by the end of 2029 without naming a site, so those targets are not recorded here. The Unite.AI articles are credited to an AI-generated research agent; every figure is the company's own. The coordinates are at village level; the street address was not confirmed from a fetched source.","src":[{"u":"https://www.unite.ai/global-ai-closes-first-debt-raise-to-expand-sovereign-ai-data-centers/","t":"Global AI Secures $441M Senior Secured Credit Facility to Expand Sovereign AI Data Centers","p":"Unite.AI"},{"u":"https://www.unite.ai/?p=450561","t":"Global AI $441M credit facility (Endicott: 16 MW initial critical IT load, ramp to 100 MW)","p":"Unite.AI"}],"j":"city","jc":"Broome County","jn":"Endicott","jd":"village","ju":"approx"},{"id":"holtec-hi-cloud-indian-point-buchanan-ny","n":"Holtec HI-CLOUD Indian Point data center campus (proposed)","op":"Holtec International (Holtec Decommissioning International)","s":"proposed","st":"NY","city":"Buchanan","co":"Westchester","lat":41.2697,"lon":-73.9519,"pre":"approximate","cf":"reported","mw":200,"ann":"2025-07-31","upd":"2026-10-26","nt":"Concept-stage: Holtec has a NYISO load-study request and a corporate HI-CLOUD announcement but, per its site VP (Dec 2024), 'no offer' and no tenant. Holtec cites up to 2,000 MW of existing grid interconnection, Hudson River access for cooling, dark fiber, and potential future SMR-300 on-site generation. The site sits within Holtec's 240-acre Indian Point decommissioning property; the Village of Buchanan/Town of Cortlandt zoning question is unresolved.","src":[{"u":"https://holtecinternational.com/hh-40-16/","t":"Holtec Announces HI-CLOUD: A Strategic Redevelopment Initiative (Indian Point anchor site, initial 200 MW target)","p":"Holtec International"},{"u":"https://peekskillherald.com/21026/environment/holtec-tells-decommissioning-board-it-wants-to-bring-data-center-to-indian-point/","t":"Holtec tells decommissioning board it wants to bring data center to Indian Point (200 MW NYISO request)","p":"Peekskill Herald"}],"j":"city","jc":"Westchester County","jn":"Buchanan","jd":"village","ju":"approx"},{"id":"guild-ventures-kenwood-commons-albany-ny","n":"Kenwood Commons Technology Campus","op":"Guild Ventures","s":"proposed","st":"NY","city":"Albany","co":"Albany","lat":42.6225,"lon":-73.7601,"pre":"approximate","cf":"reported","ac":76,"upd":"2026-10-28","nt":"Proposed data center inside a mixed-use redevelopment of the 76-acre former Kenwood convent / Doane Stuart School property in Albany. No capacity is recorded: \"Guild Ventures... filed an application with the New York Independent System Operator to use 180MW for the project,\" but the developer told CBS6 the 180 MW is \"a theoretical ceiling for the entire mixed-use development\" at full buildout and not the data center's expected use. Recording 180 as the facility's capacity would therefore be wrong. CBS6 reported in July 2026 that the developer has said the data center could use up to 100 MW; that is a ceiling, not a planned total, and at an August 2026 community meeting the developers said they did not yet know how many megawatts the data center would need (WAMC), so it is not recorded either. WAMC (August 2026) also reports the developers project a 250,000-square-foot data center with 125 to 175 full-time jobs and an online date of December 2028; these are developer projections and no size or job figure is recorded. The Rockefeller Institute's tracker separately describes it as \"a 180 MW data center as part of a mixed-use development\" - that reading conflicts with the developer's own clarification, which is why the record is marked reported. The developer describes the compute component as a \"boutique, edge-scale colocation center\" on \"approximately 5 acres\" of the 76-acre parcel serving hospitals, institutions, nanotech, government services and local employers - hence the mixed-use AI classification. The 76-acre figure is the whole redevelopment parcel, not the data center footprint. As of 2026-09-09, no permits had been submitted to the City of Albany per the reporting retrieved, and the May 2026 CBS6 article gives no investment figure and states no job counts, utility, or IDA/PILOT agreement. The connecting utility, National Grid, is stated in NYISO load queue #1754. Coordinates geocoded to the named Kenwood / Doane Stuart site in Albany, approximate.","src":[{"u":"https://cbs6albany.com/news/local/kenwood-commons-owner-asks-for-180mw-as-part-of-propertys-pitch-now-includes-data-center-doane-stuart-school-guild-datacenter-mixeduse-hyperscale-colocation-technology-sustainability-cooling-grid-redevelopment-nanotech-infrastructure-emissions","t":"Kenwood Commons owner asks for 180MW as part of property's pitch, now includes data center","p":"CBS6 Albany (WRGB)"},{"u":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","t":"Updates on the Cloud: More Moratoriums on Data Centers","p":"Rockefeller Institute of Government"}],"j":"city","jc":"Albany County","jn":"Albany","jd":"city","ju":"approx"},{"id":"niagara-digital-campus-niagara-falls-ny","n":"Niagara Digital Campus","op":"Urbacon Data Centre Solutions","s":"proposed","st":"NY","city":"Niagara Falls","co":"Niagara","lat":43.0885,"lon":-79.0603,"pre":"approximate","cf":"reported","mw":135,"ac":142,"inv":1500000000,"upd":"2026-10-30","pb":"Hydroelectric (NYPA Robert Moses Niagara Power Plant)","nt":"Site is near the historic Adams Power Plant and the NYPA Robert Moses Niagara Power Plant (2,675 MW combined capacity). Phase I planned as ~282,000 sq ft over 24 months from groundbreaking. Economic impact estimated at $2B over 20 years per MRB Group analysis commissioned by NFR. Developed by Niagara Falls Redevelopment (NFR, controlled by Milstein family) in partnership with Urbacon. No status change. The 4 June 2026 City Council vote settled an eminent-domain lawsuit and transferred 10 acres to the city; the mayor states explicitly it was not a data-center approval and that there is no timeline for work to begin. Remains proposed.","src":[{"u":"https://baxtel.com/data-center/urbacon-niagara-digital-campus","t":"Urbacon: Niagara Digital Campus Data Center","p":"Baxtel"},{"u":"https://niagarafallsreporter.com/niagara-falls-can-power-forward-with-data-center-opportunity/","t":"Niagara Falls Can Power Forward With Data Center Opportunity","p":"Niagara Falls Reporter"}],"j":"city","jc":"Niagara County","jn":"Niagara Falls","jd":"city","ju":"approx"},{"id":"nccs-massena-reynolds-ny","n":"North Country Collocation Services Massena Data Center (former Reynolds site)","op":"North Country Collocation Services (NCCS)","s":"proposed","st":"NY","city":"Massena","co":"St. Lawrence","lat":44.979,"lon":-74.73,"pre":"approximate","cf":"confirmed","mw":635,"upd":"2026-10-09","nt":"Possible overlap with an existing record. NCPR states \"the facility would include three buildings totaling nearly 1.5 million square feet at the former Reynolds site, about eight miles outside of the village of Massena and near the bridge to Canada. The operation would consume 635 megawatts of power. That equates to roughly 70% of the power produced at the Moses-Saunders Power Dam. The developer, North Country Collocation Services, or NCCS, presented its plan to the board.\" The former Reynolds Metals plant is the same industrial complex as the 'Alcoa East' site that the existing Coinmint (Massena East / former Alcoa Smelter) crypto-mining record sits on (that record is at 44.9777, -74.7327), and NCPR (October 7, 2026) reports that NYDIG and its affiliate NCCS want to build the data center, captioning a photo of the former Alcoa East site as \"now being acquired by NYDIG\". It is recorded as a separate proposed data center because the three buildings, the 635 MW load and the planning-board proceeding are a distinct new project with a distinct developer entity. Coordinates are an approximate placement on that industrial complex derived from the source's description, not a surveyed parcel. As of 2026-09-09, the sources retrieved stated no investment figure, no job counts, no acreage, no water-use figure, no utility, and no subsidy or IDA agreement. A North Country Public Radio report of October 7, 2026 gives the company's figures of 200 full-time jobs and an estimated 2,000 construction jobs. Reporting elsewhere describes 316 diesel generators on site and a zoning question referred to the Zoning Board of Appeals over whether a large-scale data center is a permitted use in the industrial zone; neither is recorded because, as of September 2026, neither had been verified.","src":[{"u":"https://www.northcountrypublicradio.org/news/story/53469/20260522/massena-town-planning-board-takes-no-action-at-data-center-meeting","t":"Massena Town Planning Board takes no action at data center meeting","p":"North Country Public Radio"},{"u":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","t":"Updates on the Cloud: More Moratoriums on Data Centers","p":"Rockefeller Institute of Government"}],"j":"uninc","jc":"St. Lawrence County","jn":"Akwesasne","jm":"Massena town","ju":"approx"},{"id":"nccs-nydig-massena-ny","n":"North Country Colocation Services Massena Expansion","op":"NYDIG / North Country Colocation Services","s":"proposed","st":"NY","city":"Massena","co":"St. Lawrence","lat":44.929,"lon":-74.893,"pre":"approximate","cf":"reported","ac":355,"upd":"2026-08-25","pb":"hydroelectric (St. Lawrence River)","nt":"Two new data halls on roughly 355 developable acres beside the existing 110-acre site on the legacy Reynolds parcel, three structures of 535,000, 515,000 and 400,000 sq ft. NCCS says the campus would run on already-approved hydro capacity with no new fossil or nuclear generation, and would support AI infrastructure replacing the Bitcoin mining currently on site. The county planning board said the site plan contained more questions than answers.","src":[{"u":"https://www.datacenterdynamics.com/en/news/nydig-looks-to-expand-data-center-at-massena-site-new-york/","t":"NYDIG looks to expand data center at Massena site, New York","p":"Data Center Dynamics"},{"u":"https://www.nny360.com/news/stlawrencecounty/county-planning-board-massena-data-center-site-plan-contains-more-questions-than-answers/article_8cfc5871-eee7-5db0-be86-6bc56f761d5c.html","t":"County Planning Board: Massena data center site plan contains more questions than answers","p":"Watertown Daily Times"}],"j":"city","jc":"St. Lawrence County","jn":"Massena","jd":"village","ju":"approx"},{"id":"ranalli-lysander-ny","n":"Ranalli Lysander Data Center","op":"Ranalli","s":"proposed","st":"NY","city":"Lysander","co":"Onondaga","lat":43.17,"lon":-76.39,"pre":"approximate","cf":"rumored","mw":300,"ac":120,"upd":"2026-10-26","nt":"Early-stage proposal on ~120 acres in Lysander, Onondaga County, with a grid interconnection request of up to 300 MW. Very early stage, known mainly through a grid interconnection request and local news coverage, so the record is marked rumored. Coordinates are the Lysander area centroid. No status change — the status moved away from advancing, not toward it. Lysander adopted a six-month data-center moratorium on 2026-05-07 after organised opposition, so the project remains proposed with no local approval. Community reception is documented as opposition ('Citizens Against Lysander Data Center'). Note the acreage differs between sources (124 acres in the Eagle News piece, 120 in Rockefeller) — not resolved, and a land area is recorded.","src":[{"u":"https://cleanview.co/public/data-centers/new-york/2042/ranalli-lysander-data-center","t":"Ranalli Lysander Data Center","p":"Cleanview"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Onondaga County","jm":"Lysander town","ju":"approx"},{"id":"rpi-center-for-computational-innovations-troy-ny","n":"Rensselaer Center for Computational Innovations (CCI), Rensselaer Technology Park","op":"Rensselaer Polytechnic Institute","s":"operational","st":"NY","city":"Troy","co":"Rensselaer","lat":42.6806,"lon":-73.6972,"pre":"approximate","cf":"confirmed","upd":"2026-10-09","nt":"RPI describes a 22,000 sq ft facility with a 4,500 sq ft machine room at the Rensselaer Technology Park. It hosts the AiMOS supercomputer (14 racks, 252 nodes, 1,512 NVIDIA V100 GPUs), an AiMOSx GPU cluster, Xeon and EPYC clusters, and 11 PB of storage. AiMOS also serves as the test bed for the NYS-IBM Research AI Hardware Center. The AI classification is mixed-use because AI hardware runs alongside co-equal general HPC clusters. The center originated as a $100M RPI-IBM-New York State collaboration. No power figure is published. Coordinates are the Wikipedia point (42°40′50″N 73°41′50″W). It is in the same technology park as, but distinct from, MetLife Information Systems Computer Center, North Greenbush (500 Jordan Road).","src":[{"u":"https://foci.rpi.edu/computing-resources/center-computational-innovations","t":"Center for Computational Innovations: RPI Future of Computing Institute","p":"Rensselaer Polytechnic Institute"},{"u":"https://en.wikipedia.org/wiki/Center_for_Computational_Innovations","t":"Center for Computational Innovations (Wikipedia)","p":"Wikipedia"}],"j":"uninc","jc":"Rensselaer County","jm":"North Greenbush town","ju":"approx"},{"id":"riverview-innovation-tech-campus-tonawanda-ny","n":"Riverview Innovation & Technology Campus","op":"Riverview Innovation & Technology Campus","s":"proposed","st":"NY","city":"Tonawanda","co":"Erie","lat":43.037,"lon":-78.887,"pre":"approximate","cf":"reported","mw":300,"ac":140,"inv":2000000000,"upd":"2026-10-26","pb":"Grid (National Grid); Niagara Power Project + Nine Mile Point Nuclear Station upstream mix","nt":"Site: former Tonawanda Coke Corporation coke-manufacturing plant (operated 1917-2018; TCC bankruptcy), 3875 & 3800 River Road, Town of Tonawanda, Erie County NY - 140 acres. Brownfield developer Jon M. Williams completed acquisition Oct. 10, 2019 and has led an estimated $100M remediation; Honeywell (successor to Allied Chemical/TCC predecessor) also involved. 500,000 sq ft facility proposed. Coordinates are approximate for the River Road parcel. Note: one source names 'Niagara County' but Buffalo News, BTPM, and WBEN independently and consistently identify this as the Town of Tonawanda, Erie County (distinct from the separate City of North Tonawanda in Niagara County) - Erie County used here per majority/independent-source cross-check. No status change. As of June 2026 the SEQRA/site-plan review was paused pending NYISO and National Grid results; no permit or construction approval exists. Remains proposed. Confirmed absence (as of 2026-09-10, reporting dated 2026-07): the Riverview project had not requested any IDA subsidy as of this reporting, and Erie County's executive has said he would not support the county IDA granting it tax breaks.","src":[{"u":"https://www.wkbw.com/news/local-news/northtowns/developer-proposed-2b-ai-data-center-on-river-road-not-on-hold-process-temporarily-delayed","t":"Developer: Proposed $2B AI data center on River Road not on hold, process temporarily delayed","p":"WKBW"},{"u":"https://buffalonews.com/news/local/article_ffa822d3-0899-4379-9924-44f8167b4e75.html","t":"River Road data center on hold amid outcry from residents scarred by Tonawanda Coke fight","p":"Buffalo News"}],"j":"city","jc":"Niagara County","jn":"North Tonawanda","jd":"city","ju":"approx"},{"id":"stream-stamp-alabama-ny","n":"STREAM U.S. Data Centers at STAMP","op":"Stream U.S. Data Centers LLC","s":"proposed","st":"NY","city":"Alabama","co":"Genesee","lat":43.0837,"lon":-78.3936,"pre":"approximate","cf":"confirmed","mw":500,"ac":90,"inv":19460000000,"upd":"2026-10-30","nt":"Proposed three-building hyperscale campus at the Western New York Science, Technology and Advanced Manufacturing Park (STAMP), Town of Alabama, Genesee County - by capital investment the largest data center proposal found for New York as of September 2026. GCEDC states a \"$19.46 billion\" capital investment and \"$285 million in PILOT/host revenues\" for Genesee County, the Town of Alabama and the Oakfield-Alabama Central School District, with a public hearing \"Thursday, March 19 at 7 p.m. at the Town of Alabama Fire Hall, 2230 Judge Road, Basom, NY 14013.\" Investigative Post reports the incentive package as \"$1.46 billion in tax breaks for the creation of 125 jobs,\" of which \"$1.43 billion in sales tax breaks\" and \"a $31 million mortgage tax break\". The planned capacity of 500 MW records the sentence \"Stream has said it will use 500 megawatts of electricity, more than 80 percent of all the power available at the STAMP industrial park\" - this is stated electricity use, not a certified IT load or an interconnection award. Reported figures conflict: (a) acreage - Investigative Post says the campus spans \"over 90 acres at the 1,250-acre industrial park\" and the land area is set to 90; an aggregator listing gives 130 acres and had not been verified as of September 2026, so it is not used. (b) construction jobs - GCEDC's CEO is quoted at \"an additional 1,000 workers temporarily,\" while \"the agency reports on its cost-benefit analysis for the project which says construction will employ more than 16,000\"; the lower, attributed figure is recorded. (c) capital cost has moved from \"$6.3 billion a year ago\" to \"$11 billion\" to \"$19 billion\"; the GCEDC-published $19.46B is used. As of 2026-09-09, no source retrieved states a water withdrawal volume for the campus, a confirmed hydropower allocation (the Tonawanda Seneca Nation letter opposes a prospective allocation, which is not the same as one being granted), or a construction start date - so no energy source is recorded. The AI classification is recorded as likely: the project is universally described as an AI-boom data campus but as of September 2026 no retrieved source stated the workload. Coordinates are geocoded to the Town of Alabama, Genesee County, not to a confirmed parcel. The incentive figure is a requested amount, not a confirmed or awarded PILOT; On July 14, 2026 Gov. Hochul signed an executive order establishing a temporary statewide moratorium on large data centers (50 MW or more), which The Batavian reported could delay construction of the Stream campus. Reporting describes a requested package worth about $1.46bn from the Genesee County IDA for the STAMP site, not an awarded one. Subsidy entries have no granted-versus-requested distinction, so neither the package, its two components, nor the $285 million in PILOT/host revenues under the proposed agreements is recorded as a subsidy entry; doing so would present unawarded money as awarded. As of October 2026, none of the cited sources reports an executed IDA agreement; the Rochester Business Journal described the abatements in June 2026 as still being sought.","src":[{"u":"https://www.gcedc.com/news/article/current/2026/03/05/100160/public-hearing-set-for-stream-us-data-centers-project","t":"Public Hearing Set for STREAM US Data Centers Project","p":"Genesee County Economic Development Center (GCEDC)"},{"u":"https://investigativepost.org/2026/03/18/subsidies-for-stamp-data-center-among-largest-ever/","t":"Subsidies for STAMP data center among largest ever","p":"Investigative Post"}],"j":"uninc","jc":"Genesee County","jm":"Alabama town","ju":"approx"},{"id":"terawulf-lansing-ny","n":"TeraWulf AI Data Center Campus, Lansing","op":"TeraWulf","s":"proposed","st":"NY","city":"Lansing","co":"Tompkins","lat":42.5453,"lon":-76.4968,"pre":"approximate","cf":"confirmed","mw":400,"ac":183,"inv":400000000,"ann":"2025-08","upd":"2026-11-04","pb":"Grid (NYSEG); former coal plant infrastructure","nt":"Site is the former Cayuga Power Plant (coal-fired, retired). NYSDEC water permit application for Cayuga Lake withdrawal was originally filed in 2021 for 'unspecified future use.' Permit dates to 1955 without modern monitoring requirements per opposition. TeraWulf also has a separate cryptomining operation at the Susquehanna site in PA (Nautilus). Operating entity: Cayuga Operating Company (acquired plant). No status change. The April 2026 DEC water-withdrawal/SPDES action is explicitly for the existing power plant's current operations, not the data center; DEC states it is 'not associated with the proposed data center'. As of the sources fetched 2026-09-09 the project remains proposed and had not cleared local site-plan review. Do not read the water permit as a data-center permit.","src":[{"u":"https://www.ithaca.com/news/regional_news/tompkins-county-legislature-urges-state-to-deny-water-permit-for-lansing-data-center/article_1d89f22d-fcd0-43b3-97e2-173e08a483ea.html","t":"Tompkins County Legislature Urges State to Deny Water Permit for Lansing Data Center","p":"Ithaca.com"},{"u":"https://www.cornellsun.com/article/2025/11/tensions-over-terawulf-data-center-in-tompkins-county-grow-with-threatened-lawsuit","t":"Tensions Over TeraWulf Data Center in Tompkins County Grow With Threatened Lawsuit","p":"The Cornell Daily Sun"}],"j":"uninc","jc":"Tompkins County","jn":"South Lansing","jm":"Lansing town","ju":"approx"},{"id":"treetop-east-fishkill-ny","n":"Treetop East Fishkill Data Center (proposed, no application filed)","op":"Treetop Development","s":"proposed","st":"NY","city":"East Fishkill","co":"Dutchess","lat":41.534,"lon":-73.801,"pre":"approximate","cf":"rumored","mw":1000,"upd":"2026-09-09","nt":"Low-certainty record, included because a 1,000 MW load is the largest proposed in New York found as of September 2026. The record is marked rumored and listed as proposed rather than cancelled: the town supervisor confirmed on May 11, 2025 that \"no site plan, special permit application, zoning request, or other development application has been submitted to the town for review,\" and the developer \"has never submitted a formal application for the project nor a site plan\" - yet the project was still described as under evaluation in the NYISO process when the town passed its moratorium on June 25, 2026, so it is not affirmatively dead either. Teaneck, NJ-based Treetop Development is evaluating converting land currently planned for \"a 1,161,515 SF warehouse\" (scaled down to 765,000 square feet in other reporting) into \"a 1,000-megawatt (1-gigawatt) data center.\" The planned capacity of 1000 MW is that stated figure, unconverted. As of 2026-09-09, neither cited source gives a street, parcel, acreage, square footage for the data center itself, investment, job count, water figure, utility, or subsidy agreement; secondary reporting places the site \"off of I-84 and Lime Kiln Road\" but that had not been verified in a cited source as of September 2026, so no street is recorded and coordinates are a town-level placeholder for East Fishkill, Dutchess County.","src":[{"u":"https://cicbca.org/202605-east-fishkill-supervisor-pulls-plug-on-plan-to-build-big-data-center/","t":"East Fishkill Supervisor Pulls Plug On Plan to Build Big Data Center","p":"cicbca.org"},{"u":"https://www.alittlebeaconblog.com/blog/by-unanimous-vote-east-fishkill-town-board-passes-3-year-moratorium-on-data-centers","t":"By Unanimous Vote, East Fishkill Town Board Passes 3 Year Moratorium On Data Centers","p":"A Little Beacon Blog"}],"j":"uninc","jc":"Dutchess County","jm":"East Fishkill town","ju":"approx"},{"id":"turin-hoefler-ilion-ny","n":"Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)","op":"Turin Hoefler Avenue LLC","s":"proposed","st":"NY","city":"Ilion","co":"Herkimer","lat":43.0119,"lon":-75.0357,"pre":"approximate","cf":"confirmed","mw":200,"ac":7.837,"upd":"2026-10-26","nt":"Redevelopment of the former Remington Arms firearms plant, which ceased production in 2024. WKTV: \"Turin Hoefler Avenue LLC submitted a revised application\" to the NYSDEC \"Brownfield Cleanup Program\" in January 2026 for \"Site C,\" a \"7.837-acre parcel,\" with a \"250,000-square-foot AI data center\" as the intended post-remediation use, at \"14 Hoefler Ave., Ilion, NY\"; the site has \"widespread contamination in the soil, especially with heavy metals like arsenic, lead, and copper at levels above state cleanup standards for commercial use\" and \"15 vacant industrial buildings dating to the early 1900s,\" and the developer describes it as a \"fossil-fuel-free, 100% electric site.\" The planned capacity of 200 MW comes from the Rockefeller Institute of Government's tracker entry for the project (\"200 MW\"), not from WKTV, which states no MW figure. County discrepancy: WKTV's article says Oneida County; the Rockefeller Institute says \"Village of Ilion, Herkimer County.\" Ilion is in Herkimer County, so Herkimer is recorded and the WKTV attribution is treated as an error. The 7.837-acre figure is the Brownfield Site C parcel only; trade press describes a larger ~32-acre overall plant site and two 250,000 sq ft buildings, neither of which had been verified against a cited source as of September 2026, so neither is recorded. No permanent-jobs figure is recorded: the source says only that the project \"aims to exceed the 274 positions lost when Remington closed,\" which is an aspiration, not a count. As of 2026-09-09, neither cited source states an investment figure, water/cooling detail, utility, or IDA or PILOT agreement. Because the site is fossil-fuel-free and 100% electric per the developer, no on-site generation is recorded.","src":[{"u":"https://www.wktv.com/news/focus-economy/250-000-square-foot-ai-data-center-planned-for-ilions-remington-site-c/article_ebf3d79e-aeb4-4033-8b0c-558a3749c42e.html","t":"250,000-Square-Foot AI Data Center Planned for Ilion's Remington Site C","p":"WKTV"},{"u":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","t":"Updates on the Cloud: More Moratoriums on Data Centers","p":"Rockefeller Institute of Government"}],"j":"city","jc":"Herkimer County","jn":"Ilion","jd":"village","ju":"approx"},{"id":"5c-group-vultr-prime-ohio-springfield-oh","n":"5C Group / Vultr Data Center (Prime Ohio)","op":"5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)","s":"under_construction","st":"OH","city":"Springfield","co":"Clark","lat":39.8664,"lon":-83.7936,"pre":"approximate","cf":"confirmed","mw":150,"inv":1300000000,"upd":"2026-11-04","nt":"5C Group (formed May 2025 when Hypertec Cloud acquired 5C Data Centers) owns/builds the campus in the Prime Ohio corporate park; Vultr (legal entity The Constant Company, LLC) is the AI/cloud tenant. A separate Ohio Tax Credit Authority approval (December 15, 2025) went to Crusoe Energy Systems LLC for a new data center in the City of Springfield, with a $444.5 million fixed-asset investment and 20 jobs, distinct from The Constant Company approval of October 27, 2025 for this project. As of October 2026 no cited source says whether the Crusoe project is at this campus or at another site in Springfield, so it is not combined with this record and its relationship to this project is unresolved. Capacity: 75 MW disclosed operating load at opening vs. 150 MW max design load (city FAQ) -- both real, tracked field carries the larger design figure. Investment: ~$1.3B total project cost (multi-source) vs. $901.3M JobsOhio incentive-scoped committed investment -- tracked field carries the total-project figure. 120 permanent jobs / >$14M annual payroll disclosed (WYSO); a separate JobsOhio incentive filing cites 20 committed data-infrastructure jobs (narrower, incentive-scoped count). Incentives: ~$95M city enterprise-zone abatement over 15 years; $32M+ state 10-year 50% Ohio Tax Credit Authority credit (Oct 2025) to The Constant Company. Community context: Springfield passed a 6-month moratorium on new data centers and a citizen petition to ban them was launched; Clark County (Jul 2026) restricted data centers to I-2 heavy-industrial zoning, but the county's own zoning administrator noted no I-2 parcels currently exist in county jurisdiction, and Springfield Township (where Prime Ohio sits) zones separately from the county -- this rule change may not directly bind this site.","src":[{"u":"https://www.wyso.org/news/2025-12-09/new-1-3-billion-data-center-in-springfield-expected-to-open-in-early-2026","t":"New $1.3 billion Springfield data center expected to open in early 2026","p":"WYSO"},{"u":"https://www.jobsohio.com/newsroom/news-press/vultr-announces-1-billion-data-center-investment-in-springfield","t":"Vultr Announces $1 Billion Data Center Investment in Springfield","p":"JobsOhio"}],"j":"uninc","jc":"Clark County","jm":"Springfield township","ju":"approx"},{"id":"aws-crosby-court-franklin-county-oh","n":"AWS Crosby Court Campus","op":"Amazon Web Services","s":"operational","st":"OH","city":"Plain City","co":"Franklin","lat":40.1019,"lon":-83.1986,"pre":"approximate","cf":"reported","ac":66.82,"upd":"2026-10-28","nt":"Operational AWS data center on a ~67-acre Vadata Inc parcel at 6685 Crosby Ct, far-northwest Franklin County (Brown Township, Plain City mailing area, in the 'New California' growth corridor near the Union County line) — part of Amazon's AWS US-East-2 (Ohio) build-out. Franklin County Auditor assessed building area 768,498 sq ft (= built); owner Vadata Inc. The auditor land-use class here reads 'Other Industrial Research/Chemical Lab' rather than the 'data center' class used on the nearby Hilliard AWS parcels (an assessment-class quirk; the two Vadata parcels share an identical 768,498 sq ft building figure). Sits ~2 km south of the Amazon Warner Rd and Industrial Pkwy campuses across the line in Jerome Township, Union County. No dedicated second public source specific to 6685 Crosby Ct was found (a similarly-named baxtel 'Crosby Campus' entry documents a different New Albany site and was excluded); the record rests on the Franklin County Auditor parcel record. No site-specific IT-load MW is disclosed. Coordinates are the Franklin County Auditor parcel centroid.","src":[{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'275-000010'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","t":"Franklin County Auditor parcel/GIS record (parcel 275-000010, 6685 Crosby Ct — VADATA INC, assessed building area 768,498 sq ft = built, 66.8 ac)","p":"Franklin County Auditor GIS / Assessor"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Franklin County","jn":"Dublin","jd":"city","ju":"approx"},{"id":"aws-jefferson-township-fayette-oh","n":"AWS Fayette County (Jefferson Township)","op":"Amazon Web Services","s":"under_construction","st":"OH","city":"Jeffersonville","co":"Fayette","lat":39.6534,"lon":-83.5677,"pre":"approximate","cf":"confirmed","ann":"2024-12","upd":"2026-08-05","nt":"AWS's first Ohio campus outside the central-Ohio cluster, in Jefferson Township near I-71 & US-35 (adjacent to the Honda/LG EV battery plant). ~590 acres; $5B AWS investment (part of a larger multi-billion Fayette-area / statewide AWS commitment through 2030), announced Dec 2024 by AWS VP Roger Wehner; 30-year 100% CRA tax exemption approved; construction slated to begin early 2025. Capacity is not disclosed — AWS explicitly withheld building count/MW citing security — so no capacity is recorded (a third-party ~1,800 MW estimate is unverified and not recorded). Coordinates approximate (Jeffersonville / township-level).","src":[{"u":"https://columbusconstruction.org/amazon-web-services-to-build-new-datacenter-campus-in-fayette-county/","t":"Columbus Construction: ~590 acres, I-71 & US-35, $5B, 30-yr 100% CRA exemption, construction slated early 2025","p":"Columbus Construction"},{"u":"https://www.recordherald.com/2024/12/24/aws-officials-confirm-plans-to-invest-5-billion-into-fayette-county-with-new-data-centers/","t":"Record-Herald (2024-12-24): AWS VP Roger Wehner names Jefferson Township as first confirmed locality; $5B by 2030 in a $10B Ohio expansion","p":"Washington Court House Record-Herald"}],"j":"city","jc":"Fayette County","jn":"Jeffersonville","jd":"village","ju":"approx"},{"id":"aws-hayden-run-hilliard-oh","n":"AWS Hayden Run Campus","op":"Amazon Web Services","s":"operational","st":"OH","city":"Hilliard","co":"Franklin","lat":40.0599,"lon":-83.1343,"pre":"approximate","cf":"reported","ac":55.22,"ann":"2015","upd":"2026-10-28","nt":"AWS's first US East (Ohio) region data center — a ~55-acre Vadata Inc campus at 5109-5129 Hayden Run Rd, Hilliard. Broke ground 2015; first building completed ~2018; a multi-building campus that has continued expanding. Franklin County Auditor land-use class 'data center' with 768,498 sq ft of assessed building area (= built/operational); owner Vadata Inc (Amazon's data-center subsidiary). Data-center directories (DC Byte / baxtel) list several numbered Hayden Run buildings (5109/5113/5117/5121/5125) that correspond to buildings within this single county parcel, not separate sites. No site-specific IT-load MW is disclosed. Coordinates are the Franklin County Auditor parcel centroid. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (also Hilliard, Franklin County).","src":[{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-011444'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","t":"Franklin County Auditor parcel/GIS record (parcel 050-011444, 5109-5129 Hayden Run Rd — VADATA INC, land-use class 'data center', assessed building area 768,498 sq ft = built, 55.2 ac)","p":"Franklin County Auditor GIS / Assessor"},{"u":"https://baxtel.com/data-center/amazon-hilliard-5109-hayden-run","t":"Amazon Hilliard 5109 Hayden Run — AWS's first US East (Ohio) region data center; broke ground 2015, built ~2018, fully operational, multi-building campus","p":"Baxtel"}],"j":"city","jc":"Franklin County","jn":"Hilliard","jd":"city","ju":"approx"},{"id":"aws-industrial-parkway-jerome-township-oh","n":"AWS Industrial Parkway Campus (Jerome Township)","op":"Amazon Web Services","s":"operational","st":"OH","city":"Plain City","co":"Union","lat":40.1346,"lon":-83.2124,"pre":"approximate","cf":"reported","ac":86.18,"upd":"2026-10-28","nt":"Operational AWS data center on an ~86-acre Amazon Data Services Inc parcel at 8565 Industrial Pkwy, Jerome Township / Plain City, Union County — part of Amazon's AWS US-East-2 (Ohio) cluster in the Jerome Township / 'New California' corridor first announced Nov 2019 ($200M, ~125 acres at the NW corner of Warner Rd / Industrial Pkwy). As of October 2026, Union County Auditor building records for the parcel list three entries: one built in 2025 (151,305 sq ft) and two built in 2024 (215,144 sq ft each), with a parcel appraised building value of $254.3M. Sits ~2 km north of the Amazon Warner Rd campus (tracked separately as of July 2026) and is distinct from the still-vacant AWS 'Project Cosmos' site ~9 mi north in Marysville (Paris Township). No site-specific IT-load MW is disclosed. The pin lies inside the Union County Auditor parcel polygon, about 100 m from its centroid, and is an approximate pin.","src":[{"u":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500220390010'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","t":"Union County Auditor building record (parcel 1500220390010 / 8565 Industrial Pkwy — Amazon Data Services Inc, building entries built 2024 (215,144 sq ft x2) and 2025 (151,305 sq ft), $254.3M appraised building value, 86.2 ac)","p":"Union County Auditor GIS / Assessor"},{"u":"https://www.marysvillejt.com/news/amazonprimed/","t":"Amazon primed: Technology giant plans $200 million data center in Union County (Nov 2019) — the Jerome Township AWS cluster origin announcement, ~125 ac at NW corner of Warner Rd / Industrial Pkwy","p":"Marysville Journal-Tribune"}],"j":"uninc","jc":"Union County","jm":"Jerome township","ju":"approx"},{"id":"aws-3180-beech-road-new-albany-oh","n":"AWS New Albany (3180 Beech Road)","op":"Amazon Web Services","s":"operational","st":"OH","city":"New Albany","co":"Licking","lat":40.1041,"lon":-82.7509,"pre":"approximate","cf":"reported","ac":106.41,"upd":"2026-10-28","nt":"Operational AWS data center on a ~106-acre Amazon Data Services Inc parcel on Beech Rd NW, New Albany — a second built AWS building on Beech Rd, physically distinct from the tracked '2550 Beech Road' building (AWS New Albany (2550 Beech Road), ~1.1 km south) and from the under-construction ~458-acre Beech/Miller five-building expansion (AWS New Albany (Beech/Miller Road Campus)). Data-center directories label it the 'North Hub'; the 112-acre parcel was bought April 2020 for $21.8M and the building is listed as built 2024 / fully operational. Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial, vs class 300 'Industrial Vacant Land' on the neighboring pre-construction parcels); owner Amazon Data Services Inc. No site-specific IT-load MW is disclosed. Coordinates are the Licking County Auditor parcel centroid (parcel 095-111618-04.000).","src":[{"u":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","t":"Licking County Auditor parcel/GIS record (parcel 095-111618-04.000, Beech Rd NW — Amazon Data Services Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 106.4 ac)","p":"Licking County Auditor GIS / Assessor"},{"u":"https://baxtel.com/data-center/amazon-3180-beech-dc1","t":"Amazon 3180 Beech Rd Campus ('North Hub') — fully operational, built 2024; 112-acre parcel bought April 2020 for $21.8M, distinct from the original 2570 Beech campus and the Beech/Miller expansion","p":"Baxtel"}],"j":"city","jc":"Licking County","jn":"New Albany","jd":"city","ju":"approx"},{"id":"aws-newton-court-new-albany-oh","n":"AWS New Albany (Newton Court)","op":"Amazon Web Services","s":"operational","st":"OH","city":"New Albany","co":"Licking","lat":40.0937,"lon":-82.7299,"pre":"approximate","cf":"reported","ac":92.69,"upd":"2026-10-28","nt":"Operational AWS data center on a ~93-acre Amazon Data Services Inc parcel at 2575 Newton Ct, New Albany (~7 km south of the Beech/Miller cluster) — part of Amazon's AWS US-East-2 (Ohio) footprint. Data-center directories label it '2575 Newton' / 'Tower Ultra', built 2024 / fully operational. Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial); owner Amazon Data Services Inc. Data-center directories list numbered Newton addresses (2575/2675/2775/2875/2975) as separate sites, but only one Amazon-owned parcel (095-112074-00.000) exists at 2575 Newton Ct — the numbered addresses are buildings within this single parcel, not distinct sites. No site-specific IT-load MW is disclosed. Coordinates are the Licking County Auditor parcel centroid.","src":[{"u":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","t":"Licking County Auditor parcel/GIS record (parcel 095-112074-00.000, 2575 Newton Ct — Amazon Data Services Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 92.7 ac)","p":"Licking County Auditor GIS / Assessor"},{"u":"https://baxtel.com/data-center/amazon-2575-newton","t":"Amazon 2575 Newton ('Tower Ultra') — fully operational, built 2024, AWS US East (Ohio) region","p":"Baxtel"}],"j":"city","jc":"Licking County","jn":"New Albany","jd":"city","ju":"approx"},{"id":"aws-project-cosmos-marysville-oh","n":"AWS Project Cosmos","op":"Amazon Web Services","s":"under_construction","st":"OH","city":"Marysville","co":"Union","lat":40.237,"lon":-83.35,"pre":"approximate","cf":"confirmed","ac":55,"inv":1000000000,"ann":"2024-10","upd":"2026-10-22","pb":"Grid (city water supply; non-contact cooling with on-site storage)","nt":"14684 Industrial Parkway, Marysville OH 43040 (Union County, ~30 mi NW of Columbus). Two-building campus totaling ~500,000 sq ft on 55 acres. Also referenced as 'Project Cosmo' (without trailing 's') in DCD. Jobs updated to 50 per Marysville city FAQ ('at least 50 full-time operational jobs'); original record stated 25 from DCD/Amazon initial filing. Construction start updated to early 2026 per city FAQ; DCD had projected August 2025 which appears delayed. Part of AWS's broader $10B+ Ohio infrastructure commitment. Coordinates are approximate Marysville Innovation Park area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-gets-go-ahead-for-data-center-campus-in-marysville-ohio/","t":"AWS gets go-ahead for data center campus in Marysville, Ohio","p":"Data Center Dynamics"},{"u":"https://www.growunioncountyohio.com/media-posts/aws-press-release","t":"Amazon Web Services Press Release - Grow Union County Ohio","p":"Grow Union County Ohio / AWS"}],"j":"city","jc":"Union County","jn":"Marysville","jd":"city","ju":"approx"},{"id":"aws-galaxy-sidney-oh","n":"AWS Project Galaxy — Sidney, OH","op":"Amazon Web Services","s":"under_construction","st":"OH","city":"Sidney","co":"Shelby","lat":40.29,"lon":-84.16,"pre":"approximate","cf":"reported","mw":1500,"inv":3000000000,"ann":"2025","upd":"2026-10-22","pb":"AES Ohio (Dayton Power and Light)","nt":"Codename 'Project Galaxy.' Coordinates approximate (parcel: north of Millcreek Road, west of Vandemark Road, Sidney OH). AES Ohio FERC filing shows phased power ramp: 65 MW at initial operations (Sept 15, 2026 target), 480 MW within one year, 1,500 MW by January 2031 — 1,500 MW taken as planned total capacity. $3B investment described as a firm commitment in the approved development agreement (not 'up to'). AWS has committed an estimated $23B in Ohio data centers through 2029–2030. Baxtel lists a 'West Hub' expansion site associated with this campus. FERC filing lists location as 'Jefferson Township, Ohio'; confirmed as Sidney/Shelby County campus from all other sources.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-secures-tax-break-for-3bn-data-center-campus-in-sidney-ohio/","t":"Amazon secures tax break for $3bn data center campus in Sidney, Ohio","p":"Data Center Dynamics"},{"u":"https://stopohiodatacenters.org/shelby-county","t":"Project Galaxy Amazon Data Center — Shelby County","p":"Stop Ohio Data Centers"}],"j":"city","jc":"Shelby County","jn":"Sidney","jd":"city","ju":"approx"},{"id":"aws-warner-road-jerome-township-oh","n":"AWS Warner Road Campus (Jerome Township)","op":"Amazon Web Services","s":"operational","st":"OH","city":"Plain City","co":"Union","lat":40.1186,"lon":-83.2,"pre":"approximate","cf":"reported","ac":92.78,"upd":"2026-10-28","pb":"Amazon's Ohio wind/solar portfolio is company-wide clean-energy matching (23 wind/solar projects, incl. the Paulding County wind farm), not a site-specific PPA for this campus.","nt":"Operational AWS data center on a ~93-acre Amazon Data Services Inc parcel at 8567 Warner Rd, Jerome Township / Plain City, Union County — part of Amazon's AWS US-East-2 (Ohio) Jerome Township / 'New California' cluster. Jerome Township Trustees rezoned 99.5 acres on the south side of Warner Rd (west of Industrial Pkwy) for an Amazon data center in Feb 2021. Union County Auditor building record: year built 2023-2024, multiple buildings (~214k + 214k + 157k sq ft assessed), $36.7M appraised building value. Sits ~2 km south of the Amazon Industrial Pkwy campus (tracked separately as of July 2026) and ~2 km north of the Amazon Crosby Ct campus across the line in Franklin County. No site-specific IT-load MW is disclosed. The coordinates fall inside the Union County Auditor parcel, about 150 m from the centroid of its mapped polygon, and do not mark a building footprint.","src":[{"u":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500300200000'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","t":"Union County Auditor building record (parcel 1500300200000 / 8567 Warner Rd — Amazon Data Services Inc, year built 2023-2024, multiple buildings ~214k+214k+157k sq ft, $36.7M appraised building value, 92.8 ac)","p":"Union County Auditor GIS / Assessor"},{"u":"https://www.marysvillejt.com/2021/02/20/rezoning-approved-for-amazon-data-center/","t":"Rezoning approved for Amazon data center (Feb 2021) — Jerome Township Trustees rezoned 99.5 acres on the south side of Warner Rd, west of Industrial Parkway, for an Amazon data center","p":"Marysville Journal-Tribune"}],"j":"uninc","jc":"Union County","jm":"Jerome township","ju":"approx"},{"id":"aligned-conesville-oh","n":"Aligned Data Centers – Conesville Industrial Park","op":"Aligned Data Centers","s":"under_construction","st":"OH","city":"Conesville","co":"Coshocton","lat":40.27,"lon":-81.83,"pre":"approximate","cf":"reported","mw":340,"ac":197,"ann":"2025","upd":"2026-10-22","pb":"AEP Ohio (PJM grid)","nt":"Brownfield redevelopment of former AEP Conesville coal plant (reported as 2,000+ MW by Frontier Group of Companies and as 2,300 MW by its chief operating officer at the October 2025 groundbreaking; operational 62 years, closed May 2020). Frontier Group of Companies acquired the plant in 2020 and built the Conesville Industrial Park across ~2,500 acres; Aligned purchased a 197-acre parcel. Aligned describes the project as 'AI/HPC' and 'Gigascale' in its press materials, and this is its third Ohio campus (others: Perkins Township/Sandusky, 96 MW total; Pataskala). Multi-building campus — renderings show up to four buildings; second, third, and fourth buildings referenced at groundbreaking. As of October 2026, Aligned's press release states no capacity figure; the Coshocton County Port Authority executive director said, as reported by the Athens County Independent, that the final buildout will have a capacity of 340 megawatts. Investment described as 'multi-billion dollar' — as of July 2026, no firm figure was confirmed, so no investment figure is recorded. Aligned's press release says the phased development is anticipated to generate 'thousands of construction jobs and hundreds of high-quality, long-term operational roles'. The Athens County Independent reports the Port Authority executive director saying the project is expected to create more than 1,800 jobs during construction, and Aligned saying it will create 149 jobs in the long term. All are projections. Aligned is exploring on-site nuclear power (SMRs) for this campus and nearby Zanesville/Cambridge sites; no agreement confirmed. Coordinates approximate (village-level). Site infrastructure funding note: the Coshocton Port Authority received a $58.7M grant (Ohio Dept of Development All Ohio Future Fund, announced July 21, 2025) for utility upgrades, water/wastewater extensions, and roadway improvements across the broader industrial park — this benefits Aligned indirectly but is not a direct subsidy to Aligned and is therefore not listed under subsidies.","src":[{"u":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/","t":"Aligned Data Centers official press release – Ohio mega-scale AI campus expansion","p":"Aligned Data Centers"},{"u":"https://www.datacenterdynamics.com/en/news/aligned-to-develop-200-acre-data-center-campus-in-coshocton-ohio/","t":"Aligned to develop 200-acre data center campus in Coshocton, Ohio","p":"Data Center Dynamics"}],"j":"city","jc":"Coshocton County","jn":"Coshocton","jd":"city","ju":"approx"},{"id":"aligned-pataskala-licking-oh","n":"Aligned Data Centers — Pataskala","op":"Aligned Data Centers","s":"cancelled","st":"OH","city":"Pataskala","co":"Licking","lat":39.9956,"lon":-82.6743,"pre":"approximate","cf":"confirmed","mw":200,"upd":"2026-09-02","nt":"Blocked 200 MW campus (89 acres, 3 planned buildings, down from 4) at Broad St & Mink St in the Pataskala industrial park, which would have run on on-site Bloom Energy natural-gas fuel cells. The Planning & Zoning Commission voted 5–2 on 2026-06-03 to recommend rejection (staff had recommended approval), and City Council rejected the site plan 7-0 on 2026-08-25. Recorded as cancelled because the city denied the application; note that Aligned itself has not abandoned the project — its general counsel said the company would “reflect and regroup.” A citizen charter amendment banning data centers over 25 MW goes to Pataskala and Granville voters on Nov. 3, 2026. Coordinates approximate (Pataskala city-center).","src":[{"u":"https://freepress.org/article/pataskala-ohio-zoning-votes-down-data-center-application","t":"Columbus Free Press: 80+ acres, Bloom Energy natural-gas fuel cells, 84 cooling units; Planning & Zoning voted the application down 2026-06-03","p":"The Columbus Free Press"},{"u":"https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html","t":"AOL/Newark Advocate: 89 acres, 200 MW, 3 buildings (down from 4), Broad St & Mink St; P&Z voted 5-2 to recommend rejection (staff recommended approval); Council hearing 2026-08-25","p":"AOL / Newark Advocate"}],"j":"city","jc":"Licking County","jn":"Pataskala","jd":"city","ju":"approx"},{"id":"aligned-chillicothe-ross-oh","n":"Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)","op":"Aligned","s":"proposed","st":"OH","city":"Chillicothe","co":"Ross","lat":39.3331,"lon":-82.9824,"pre":"approximate","cf":"reported","inv":1500000000,"ann":"2026-07-02","upd":"2026-10-29","nt":"Part of a multi-tenant redevelopment of the shuttered Pixelle paper mill (closed 2025) alongside Amphibian Aerospace Industries, U.S. Medical Glove Company, and U.S. Box Company. The $1.5B figure is the anticipated investment that the U.S. Paper Mill press release attaches to Aligned's high-performance computing campus (\"The project represents an anticipated $1.5 billion investment\", as quoted by WOSU Public Media), and the Athens County Independent reports a Ross County Chamber of Commerce press release saying that Aligned will invest $1.5 billion. WOSU's own summary instead gives $1.5 billion as the estimated investment across the whole multi-tenant buildout (Amphibian Aerospace Industries, U.S. Medical Glove Company, Aligned and U.S. Box Company), so the sources differ on whether the figure covers only the data-center campus. The developer is named only as \"Aligned\" in the press materials; on 2026-08-12 the Athens County Independent corrected its story, which had called the company Aligned Data Centers, to say \"The company involved is named Aligned, but is not Aligned Data Centers.\" As of October 2026, no cited source says which company this is, so the record carries the press release's name only. No street address specific to the data-center building has been reported; location uses the mill's mailing address as an approximate anchor.","src":[{"u":"https://sciotovalleyguardian.com/2026/07/02/1-5-billion-high-performance-computing-campus-planned-for-former-chillicothe-paper-mill/","t":"$1.5 billion high-performance computing campus planned for former Chillicothe Paper Mill","p":"Scioto Valley Guardian"},{"u":"https://www.wosu.org/2026-07-06/data-center-and-more-new-tenants-expected-for-shuttered-chillicothe-paper-mill-site","t":"Data center and more new tenants expected for shuttered Chillicothe paper mill site","p":"WOSU Public Media"}],"j":"city","jc":"Ross County","jn":"Chillicothe","jd":"city","ju":"approx"},{"id":"aligned-neo-01-oh","n":"Aligned NEO-01","op":"Aligned Data Centers","s":"under_construction","st":"OH","city":"Sandusky (Perkins Township)","co":"Erie","lat":41.4322,"lon":-82.719,"pre":"exact","cf":"reported","mw":96,"upd":"2026-11-04","pb":"Grid — Ohio Edison (FirstEnergy)","nt":"Confirmed via Aligned's Northeast Ohio page and DatacenterDynamics/JobsOhio press coverage; 2509 Hayes Ave, Sandusky, OH; 96MW/200,000 sq ft, under construction, official name NEO-01. AI/HPC (likely): Sandusky NEO-01 on Aligned DeltaFlow/Delta3 AI/HPC design.","src":[{"u":"https://aligneddc.com/northeast-ohio-data-centers/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/383796776","t":"OpenStreetMap way/383796776","p":"OpenStreetMap"}],"j":"uninc","jc":"Erie County","jm":"Perkins township"},{"id":"amazon-perry-township-stark-oh","n":"Amazon Perry Township Data Center","op":"Amazon Web Services","s":"under_construction","st":"OH","city":"Canton","co":"Stark","lat":40.7517,"lon":-81.4,"pre":"approximate","cf":"confirmed","mw":240,"ann":"2026-03","upd":"2026-08-05","nt":"240 MW hyperscale campus on ~105 acres at Faircrest St SW & Kropf Ave SW, Perry Township (Canton). Panattoni bought the land Feb 2025 (Clayco GC); excavation underway; two 220,000 sq ft + two 154,000 sq ft buildings targeted for ~April 2028. Amazon was confirmed as the end-user by the Stark County commission president and Canton's mayor to the Canton Repository after Panattoni initially withheld the tenant. Perry Township approved a 30-year, 75% property-tax abatement in March 2026. Coordinates approximate (township-level). Developer: Panattoni Development Co.","src":[{"u":"https://www.ideastream.org/environment-energy/2026-04-15/some-stark-county-residents-skeptical-of-developers-answers-on-data-center-project","t":"Ideastream: Perry Township data-center project; 240 MW, Panattoni developer, Clayco GC; residents skeptical","p":"Ideastream Public Media"},{"u":"https://bluewaterhealthyliving.com/news/national-news/ohio/open-house-for-perry-township-data-center-sheds-light-on-incoming-user/","t":"Open house sheds light on incoming user (cites Canton Repository confirmation of Amazon as end-user)","p":"Bluewater Healthy Living"}],"j":"uninc","jc":"Stark County","jm":"Canton township","ju":"approx"},{"id":"bitdeer-clarington-oh","n":"Bitdeer Clarington HPC/AI Campus","op":"Bitdeer","s":"under_construction","st":"OH","city":"Clarington","co":"Monroe","lat":39.7748,"lon":-80.8731,"pre":"approximate","cf":"confirmed","mw":570,"upd":"2026-10-22","pb":"AEP Ohio","nt":"Clarington, Monroe County; 570 MW via an AEP Ohio LOA, targeted available by end of Q3 2026. Bitdeer transitioning from bitcoin mining toward HPC/AI. Coordinates are the Clarington area centroid. No Clarington-specific capex, water, or jobs figures are disclosed; Bitdeer's 2026 mining capex guidance is company-wide and excludes AI/HPC. Some cooling/jobs figures in secondary coverage describe Bitdeer's separate Shalersville (Portage County) site, not Clarington.","src":[{"u":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-november-2025-production-and-operations-update","t":"Bitdeer announces November 2025 production and operations update","p":"Bitdeer Technologies Group"},{"u":"https://www.globenewswire.com/news-release/2025/10/14/3166667/0/en/Bitdeer-Announces-September-2025-Production-and-Operations-Update.html","t":"Bitdeer announces September 2025 production and operations update","p":"GlobeNewswire / Bitdeer"}],"j":"uninc","jc":"Monroe County","jm":"Salem township","ju":"approx"},{"id":"bitdeer-shalersville-portage-county-oh","n":"Bitdeer Shalersville Data Center Campus","op":"Bitdeer","s":"proposed","st":"OH","city":"Shalersville Township","co":"Portage","lat":41.199,"lon":-81.245,"pre":"approximate","cf":"reported","mw":750,"ac":257,"inv":300000000,"upd":"2026-09-21","nt":"Turnpike Commerce Center, Shalersville Township, Portage County. Not yet approved — blocked by the township's active data-center moratorium (see community field). Distinct from Bitdeer's other tracked Ohio sites (Clarington, Whitetail Creek/Niles, and Massillon). Tax revenue projections ($2.17M annual increase at phase-1 completion) are Bitdeer's own company projections, not independently confirmed. Coordinates are an approximate geocode of Shalersville Township, not a confirmed parcel pin — no source gave exact site coordinates. Development partner: Geis Development.","src":[{"u":"https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county","t":"Local developer, global tech firm plan major data center project in Portage County","p":"News 5 Cleveland"},{"u":"https://www.news5cleveland.com/news/local-news/oh-portage/data-center-discussion-spans-3-hours-as-shalersville-mulls-257-acre-project","t":"Data center discussion spans 3+ hours as Shalersville mulls 257-acre project","p":"News 5 Cleveland"}],"j":"uninc","jc":"Portage County","jm":"Ravenna township","ju":"approx"},{"id":"cipher-digital-ulysses-center-township-morgan-oh","n":"Cipher Digital Ulysses","op":"Cipher Digital (formerly Cipher Mining)","s":"proposed","st":"OH","co":"Morgan","lat":39.6303,"lon":-81.6469,"pre":"approximate","cf":"reported","mw":200,"ac":195,"ann":"2025-12-23","upd":"2026-08-26","nt":"Site publicly confirmed by Cipher (200MW, 195 acres, AEP Ohio, PJM, Q4 2027 energization) without a stated county; local reporting on a June 2026 public meeting in Center Township, Morgan County ties Cipher Digital to a proposed data center there, matching the same MW/timeline facts. Distinct from a separate Cipher-linked land assembly in Waterford Township, Washington County (see HashWorks Powered Land — Waterford Site).","src":[{"u":"https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm","t":"Cipher's Ulysses Ohio site: 200MW, 195 acres, AEP power, PJM interconnection, Q4 2027 energization","p":""},{"u":"https://www.facebook.com/MorganCountyHerald/posts/last-nights-meeting-regarding-the-proposed-data-center-in-center-township-morgan/1611931394270139/","t":"Morgan County Herald: public meeting on the proposed Cipher Digital data center in Center Township","p":"Morgan County Herald"}],"j":"uninc","jc":"Morgan County","jm":"Center township","ju":"approx"},{"id":"cologix-johnstown-oh","n":"Cologix Johnstown AI-Ready Campus","op":"Cologix","s":"under_construction","st":"OH","city":"Johnstown","co":"Licking","lat":40.15,"lon":-82.68,"pre":"approximate","cf":"confirmed","mw":800,"ac":154,"upd":"2026-11-04","nt":"154 acres; up to 800 MW scalable across eight data centers / 2.0M sq ft (800 MW is a full-buildout potential). The '>$7 billion' figure is a company-wide expansion plan, not a Johnstown-specific committed amount. Coordinates are the Johnstown, Licking County area centroid. The '>$7B' figure is Cologix's company-wide expansion plan; the $1.17B commitment is combined across Johnstown + Orange Township (not split), so no investment figure is recorded. Land: ~$45M for 154 acres (Sept 2024).","src":[{"u":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","t":"Cologix Expands Central Ohio Footprint with Land Acquisition for New AI-Ready 800MW Data Center Campus","p":"Cologix"},{"u":"https://signalohio.org/ohio-approves-last-data-center-exemption-before-moratorium/","t":"Ohio approves last data-center exemption before moratorium","p":"Signal Ohio"}],"j":"city","jc":"Licking County","jn":"Johnstown","jd":"city","ju":"approx"},{"id":"cyrusone-cin2-cincinnati-oh","n":"CyrusOne CIN2 (Cincinnati)","op":"CyrusOne","s":"operational","st":"OH","city":"Cincinnati","co":"Hamilton","lat":39.1028,"lon":-84.5179,"pre":"exact","cf":"confirmed","upd":"2026-10-14","nt":"Cincinnati's primary carrier-hotel / switching facility (originally a Cincinnati Bell data-center carve-out), 143,778 sq ft of technical space, HPC-capable, closed-loop chilled-water cooling. Address and 14 MW confirmed on CyrusOne's own site; the building is independently tagged CyrusOne CIN2 in OpenStreetMap. Distinct from the already-tracked CyrusOne CIN3 in Mason (Warren County).","src":[{"u":"https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio","t":"CyrusOne Cincinnati facility page: address, 14 MW, 143,778 sq ft technical space, closed-loop chilled-water cooling","p":"CyrusOne"},{"u":"https://www.datacentermap.com/usa/ohio/cincinnati/cyrusone-cincinnati/","t":"DataCenterMap listing corroborating CyrusOne CIN2 (7th Street carrier hotel)","p":"DataCenterMap"}],"j":"city","jc":"Hamilton County","jn":"Cincinnati","jd":"city"},{"id":"discover-new-albany-data-center-oh","n":"Discover New Albany Data Center","op":"Discover Properties LLC (Discover Financial Services; owner of record)","s":"operational","st":"OH","city":"New Albany","co":"Franklin","lat":40.1038,"lon":-82.8138,"pre":"exact","cf":"reported","ac":18.97,"upd":"2026-10-14","nt":"Enterprise data center identified from the county's 'data center' land-use class with assessed building area (built). Named by owner of record; current corporate parent was not separately verified as of October 2026. The mixed-use AI classification reflects an enterprise IT facility, not an AI-specific build.","src":[{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","t":"Franklin County Auditor GIS: parcel 222-002056, 7205 E New Albany Condit Rd, DISCOVER PROPERTIES LLC, class 'data center', 100,116 sq ft, 18.97 acres","p":"Franklin County Auditor"}],"j":"city","jc":"Franklin County","jn":"New Albany","jd":"city"},{"id":"edged-columbus-new-albany-oh","n":"Edged Columbus","op":"Edged (an Endeavour company)","s":"operational","st":"OH","city":"New Albany","co":"Franklin","lat":40.1061,"lon":-82.8158,"pre":"exact","cf":"confirmed","ac":14,"inv":246000000,"upd":"2026-10-14","nt":"Operational since its September 10-11, 2025 grand opening. 206,000 sq ft, two-story, 14-acre site with 24 MW of critical (IT) capacity per Edged's own release. Purpose-built for AI training and inference; supports up to 70 kW/rack air-cooled and 200 kW/rack liquid-cooled. Uses the ThermalWorks waterless cooling system (design PUE ~1.15). Adjacent parcel 222-001945 (7270 New Albany-Condit Rd, commercial vacant land) is future expansion land, not part of this operational record.","src":[{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25EDGED%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","t":"Franklin County parcel/GIS record (parcel 222-002127 — EDGED COLUMBUS LLC, 7600 W Campus Blvd, use-class \"data center\")","p":"Franklin County Auditor GIS / Assessor"},{"u":"https://edged.us/news/columbus-grand-opening","t":"Edged US Opens Ultra-Efficient Data Center Built for AI Training and Inference in Ohio's Silicon Heartland","p":"Edged US"}],"j":"city","jc":"Franklin County","jn":"New Albany","jd":"city"},{"id":"google-bosc-lima-oh","n":"Google Project BOSC (Lima)","op":"Google","s":"permitted","st":"OH","city":"Lima","co":"Allen","lat":40.744,"lon":-84.1052,"pre":"approximate","cf":"confirmed","ac":170,"inv":500000000,"ann":"2026-03-16","upd":"2026-10-22","pb":"grid","nt":"Google's third Ohio data center (after New Albany and Lancaster). $500M confirmed capital investment. Codename Project BOSC; pre-announcement land/permit work via Bistrozzi LLC (Delaware shell). Coordinates are the Lima city centroid; the confirmed site is in American Township ~2 mi north of Lima (North Cole Street between Beery and Irvin Roads), ~170 acres. Capacity MW not disclosed. Google's project page states construction anticipated to begin late 2026; ~50 permanent jobs projected per DCD and 'hundreds' of construction jobs - projections, so omitted from jobs. Ohio EPA air-permit application (pending March 2026) covers 115 emergency diesel generators; 36 cooling towers specified. $50M of the investment is earmarked for local road infrastructure, $13.6M for water infrastructure.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500m-data-center-in-lima-ohio/","t":"Google confirmed as company behind $500m data center in Lima, Ohio","p":"Data Center Dynamics"},{"u":"https://www.aedg.org/data-center-updates/google-to-build-data-center-in-lima-ohio-with-500-million-capital-investment/","t":"Google to Build Data Center in Lima, Ohio with $500 Million Capital Investment","p":"Allen Economic Development Group"}],"j":"city","jc":"Allen County","jn":"Lima","jd":"city","ju":"approx"},{"id":"cipher-digital-hashworks-waterford-washington-oh","n":"HashWorks Powered Land — Waterford Site","op":"HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)","s":"proposed","st":"OH","co":"Washington","lat":39.5514,"lon":-81.6494,"pre":"approximate","cf":"rumored","mw":200,"ac":500,"upd":"2026-09-21","nt":"HashWorks Powered Land Waterford LLC has assembled just over 500 acres in Waterford Township and filed for a 25 MGD Muskingum River surface-water withdrawal; local reporting ties the leasing LLCs to Sabre 56 and Cipher Digital for a potential 200MW crypto-mining/HPC/AI facility, but Washington County commissioners stated no deal has been finalized and Cipher's ownership stake is undocumented -- confidence kept at rumored. Distinct site from the Center Township/Morgan County 'Ulysses' project.","src":[{"u":"https://woub.org/2026/05/22/waterford-resident-calls-trustee-step-down-data-center-development/","t":"WOUB: Waterford resident calls for trustee to step down over data center land deals","p":"WOUB Public Media"},{"u":"https://www.newsandsentinel.com/news/community-news/2026/07/waterford-resident-asks-washington-county-commissioners-for-help-regarding-data-center-project/","t":"News and Sentinel: Waterford resident asks Washington County commissioners for help on data center project","p":"News and Sentinel"}],"j":"uninc","jc":"Washington County","jm":"Waterford township","ju":"approx"},{"id":"meta-middleton-township-oh","n":"Meta Bowling Green (Project Accordion)","op":"Meta","s":"under_construction","st":"OH","city":"Bowling Green","co":"Wood","lat":41.432,"lon":-83.701,"pre":"approximate","cf":"confirmed","ac":280,"inv":800000000,"ann":"2025-04","upd":"2026-11-04","pb":"Grid (100% renewable energy matching; Toledo Edison/FirstEnergy utility) plus 350 MW on-site gas generation (Will-Power Apollo facility, OPSB approved Feb 3, 2026)","nt":"715,000 sq ft facility on State Route 582 between SR-25 and I-75, Middleton Township, Wood County OH. Meta's 28th global and 2nd Ohio data center. The Apollo gas plant (OPSB Case No. 25-973-EL-BGN) operates behind-the-meter serving Liames LLC (Meta shell company); not grid-connected. Full capacity from Apollo expected late 2027. Coordinates are approximate Middleton Township centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-outside-toledo-ohio/","t":"Meta to develop data center campus outside Toledo, Ohio","p":"Data Center Dynamics"},{"u":"https://datacenters.atmeta.com/2025/04/hello-bowling-green/","t":"Hello, Bowling Green! - Meta Data Centers","p":"Meta Data Centers"}],"j":"uninc","jc":"Wood County","jm":"Middleton township","ju":"approx"},{"id":"meta-prometheus-new-albany-oh","n":"Meta Prometheus","op":"Meta","s":"under_construction","st":"OH","city":"New Albany","co":"Licking","lat":40.092,"lon":-82.836,"pre":"approximate","cf":"reported","mw":1000,"inv":1500000000,"ann":"2025-11","upd":"2026-10-28","pb":"Nuclear PPAs reportedly with Vistra (Ohio plants) and Oklo (Pike County campus); TerraPower PPA reported but not independently confirmed; on-site gas generation referenced in state permit filings","nt":"Baxtel reports campus as partially operational in 2026 with future phases planned; overall 1 GW build-out still in progress. Site address 1500 Beech Rd NW cited in permit filings but, as of August 2026, not confirmed from independently accessible sources. Nuclear PPA claims partially corroborated (Vistra/Oklo via SEC filings and news; TerraPower unconfirmed). As of October 2026, on-site generation capacity is not recorded. County listed as Licking, consistent with the stopohiodatacenters.org Licking County report, which lists Meta as operational in Licking County; as of October 2026 no page consulted confirms where the Licking/Franklin county line falls along Beech Road, and the map pin is approximate. OPSB approved a 250 MW behind-the-meter gas plant (\"Socrates the Younger,\" Will-Power OH, LLC) on 109 acres at Clover Valley Rd & Harrison Rd NW, New Albany, with the primary consumer named as Sidecat LLC, a Meta affiliate. This is the plant's nameplate generation, not IT load; the record's planned capacity (1,000 MW) is unchanged. Farm and Dairy reports that Socrates North and Socrates South, both 200 MW power plants, are under construction and will also provide power for data centers for Sidecat LLC. Spectrum News 1 (November 2025) quotes New Albany's mayor saying Meta is building two gas-fired power plants right on its facility, without naming them or giving megawatts. As of October 2026, no source found states which plants or how many megawatts serve this campus, so no on-site generation figure is recorded.","src":[{"u":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","t":"World's first gigawatt-scale data center coming to Ohio","p":"Spectrum News 1"},{"u":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","t":"Meta will use nuclear power for its New Albany A.I. data center","p":"NBC4 WCMH-TV"}],"j":"city","jc":"Franklin County","jn":"Columbus","jd":"city","ju":"approx"},{"id":"microsoft-heath-oh","n":"Microsoft Heath Data Center","op":"Microsoft","s":"under_construction","st":"OH","city":"Heath","co":"Licking","lat":40.015,"lon":-82.46,"pre":"approximate","cf":"confirmed","ac":227,"ann":"2024-10","upd":"2026-11-04","pb":"Grid","nt":"Site at 975 Thornwood Dr SW, Heath OH 43056; 227 acres. Part of Microsoft's $1B Licking County three-campus investment alongside Hebron and New Albany. Coordinates are approximate Heath city centroid; exact Thornwood Dr parcel not pinned. The $1B is Microsoft's three-campus Licking County commitment; no Heath-specific capital-investment figure is published (do not derive by subtraction).","src":[{"u":"https://local.microsoft.com/blog/heath-datacenter-construction-updates/","t":"Heath datacenter construction updates - Microsoft Local","p":"Microsoft Local"},{"u":"https://abc6onyourside.com/news/local/heath-columbus-ohio-break-ground-microsoft-data-center-expected-bring-hundreds-jobs-tech-technology-ai-artificial-intelligence-cloud-computing-digital-services","t":"Heath breaks ground on Microsoft data center expected to bring hundreds of jobs","p":"ABC 6 WSYX Columbus"}],"j":"city","jc":"Licking County","jn":"Heath","jd":"city","ju":"approx"},{"id":"microsoft-hebron-oh","n":"Microsoft Hebron Data Center","op":"Microsoft","s":"under_construction","st":"OH","city":"Hebron","co":"Licking","lat":40.01,"lon":-82.5,"pre":"approximate","cf":"confirmed","ac":223,"ann":"2024-10","upd":"2026-11-04","pb":"Grid","nt":"223 acres west of Ohio 79, between North High Street and Canyon Road, Hebron OH 43025. Six-data-center campus planned. Part of Microsoft's $1B Licking County commitment; individual site investment not separately disclosed. Coordinates are approximate Hebron village area. The $1B figure is Microsoft's three-campus Licking County commitment (not disaggregated); an 'up to $3B' Hebron figure appears only in a secondary blog and is not a committed capital-expenditure figure.","src":[{"u":"https://local.microsoft.com/blog/hebron-datacenter-construction-update/","t":"Hebron datacenter construction update - Microsoft Local","p":"Microsoft Local"},{"u":"https://spectrumnews1.com/oh/columbus/news/2026/02/21/microsoft-to-built-data-center-in-hebron--ohio","t":"Microsoft to build data center in Hebron, Ohio","p":"Spectrum News 1"}],"j":"uninc","jc":"Licking County","jm":"Union township","ju":"approx"},{"id":"oregon-industrial-park-data-center-lucas-oh","n":"Oregon Industrial Park Data Center Campus","op":"Capacity LLC","s":"proposed","st":"OH","city":"Oregon","co":"Lucas","lat":41.649,"lon":-83.4614,"pre":"approximate","cf":"reported","mw":500,"upd":"2026-10-29","nt":"Proposed ~168-acre, up-to-8-building data-center campus at Wynn Rd & Corduroy Rd in the Oregon Industrial Park (Toledo area) — as of August 2026, Lucas County's first tracked site. The city assembled parcels for site developer Capacity LLC (~$2–3B, ~500 MW at build-out); in late July 2026 officials publicly named Vantage Data Centers as the prospective developer, but the city administrator said no decisions are finalized and a citizen group ('United Neighbors of Oregon') is petitioning for a November 2026 referendum. The record is marked reported because the prospective developer is not settled and the project is unbuilt; coordinates approximate.","src":[{"u":"https://oregonohio.org/oregon-industrial-park-information-on-data-centers/","t":"City of Oregon official Q&A: ~168 acres at Wynn/Corduroy Rds, up to 8 buildings, ~500 MW at build-out, $2–3B, developer Capacity LLC","p":"City of Oregon, OH"},{"u":"https://www.13abc.com/2026/07/29/oregon-officials-eye-vantage-data-centers-proposed-development-near-wynn-corduroy-roads/","t":"13abc (2026-07-29): Oregon officials name Vantage Data Centers as prospective developer; no decision finalized; citizen referendum petition underway","p":"13abc WTVG"}],"j":"city","jc":"Lucas County","jn":"Oregon","jd":"city","ju":"approx"},{"id":"prologis-mila-trenton-oh","n":"Prologis Project Mila","op":"Prologis","s":"permitted","st":"OH","city":"Trenton","co":"Butler","lat":39.48,"lon":-84.4638,"pre":"approximate","cf":"confirmed","mw":250,"ac":141,"inv":233200000,"ann":"2025-10","upd":"2026-11-04","nt":"Project Mila in Trenton, Butler County (outside Cincinnati): four 220,000 sq ft single-story buildings (880k sq ft total) plus an on-site substation. Planning approved March 2026; construction from fall 2026. Local reporting in 2026 (Journal-News, WYSO) describes a 250-megawatt data center, recorded as planned capacity. Prologis estimates the project will create 120 full-time jobs by December 31, 2035 (Journal-News, WYSO); as an estimate, it is not recorded as a job count. Distinct from Prologis's Newnan, GA campus. Coordinates are the Trenton area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/prologis-details-plans-for-data-center-campus-outside-cincinnati-ohio/","t":"Prologis details plans for data center campus outside Cincinnati, Ohio","p":"Data Center Dynamics"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Butler County","jn":"Trenton","jd":"city","ju":"approx"},{"id":"stack-nal01-new-albany-oh","n":"STACK Infrastructure NAL01 (New Albany)","op":"STACK Infrastructure","s":"operational","st":"OH","city":"New Albany","co":"Franklin","lat":40.07,"lon":-82.8,"pre":"approximate","cf":"reported","upd":"2026-10-14","nt":"STACK's New Albany wholesale data center (NAL01), 40 acres, 60 MW, operational — an established site missing from the tracked New Albany operator list. Confirmed on STACK's own New Albany location page (which does not state a street address, so no street is recorded). Coordinates approximate (New Albany). County recorded as Franklin (New Albany's core incorporated county), but note the New Albany cluster straddles the Franklin/Licking line and STACK's page does not state the county.","src":[{"u":"https://www.stackinfra.com/locations/americas/new-albany/","t":"STACK Infrastructure New Albany page: facility NAL01, 40 acres, 60 MW of scalability, operational","p":"STACK Infrastructure"},{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","t":"Franklin County Auditor GIS: parcel 222-004355, 7300 Souder Rd, SI NAL01A ABS LLC, class 'data center', 115,500 sq ft","p":"Franklin County Auditor"}],"j":"city","jc":"Franklin County","jn":"New Albany","jd":"city","ju":"approx"},{"id":"stargate-lordstown-oh","n":"Stargate Lordstown Campus","op":"OpenAI / SoftBank / Oracle","s":"under_construction","st":"OH","city":"Lordstown","co":"Trumbull","lat":41.1745,"lon":-80.8534,"pre":"approximate","cf":"reported","ann":"2025-09-23","upd":"2026-11-04","nt":"No capacity is recorded for this site alone: the September 2025 announcement said Lordstown and Milam County together \"can scale to 1.5 gigawatts over the next 18 months,\" and gave no Lordstown-only figure. A SoftBank spokesperson said the initial SoftBank/OpenAI data center uses \"a small part\" of the 6.2M-sq-ft site, which also hosts a Foxconn/SoftBank hub manufacturing modular data-center equipment. Crescent Dune LLC (a SoftBank affiliate) acquired the site from Foxconn for $375M (Sept 2025, Trumbull County Auditor). SoftBank's \"up to $3 billion\" is a ceiling covering both manufacturing and the data center — no data-center-only investment figure is confirmed.","src":[{"u":"https://openai.com/index/five-new-stargate-sites/","t":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","p":"OpenAI"},{"u":"https://www.wfmj.com/story/53109325/lordstown-part-of-mammoth-dollar500-billion-artificial-intelligence-data-center-project","t":"Lordstown part of $500B AI data center project — WFMJ","p":"WFMJ"}],"j":"city","jc":"Trumbull County","jn":"Lordstown","jd":"village","ju":"approx"},{"id":"tjx-new-albany-data-center-oh","n":"TJX New Albany Data Center","op":"TJX Companies Inc (owner of record)","s":"operational","st":"OH","city":"New Albany","co":"Franklin","lat":40.104,"lon":-82.8106,"pre":"exact","cf":"reported","ac":11.99,"upd":"2026-10-14","nt":"Enterprise data center identified from the county 'data center' land-use class with assessed building area. Single-sourced. Classified mixed-use: enterprise IT, not AI-specific.","src":[{"u":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=CLASSDSCRP='data+center'&outFields=PARCELID,SITEADDRESS,OWNERNME1,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","t":"Franklin County Auditor GIS: parcel 222-004441, 6595 New Albany Rd East, TJX COMPANIES INC, class 'data center', 84,930 sq ft, 11.99 acres","p":"Franklin County Auditor"}],"j":"city","jc":"Franklin County","jn":"New Albany","jd":"city"},{"id":"vantage-oh1-new-albany-licking-county-oh","n":"Vantage Data Centers OH1","op":"Vantage Data Centers","s":"under_construction","st":"OH","city":"Johnstown","co":"Licking","lat":40.101,"lon":-82.7464,"pre":"exact","cf":"confirmed","mw":192,"ac":70,"inv":2000000000,"upd":"2026-09-10","nt":"3325 Horizon Court, Johnstown — Licking County section of the New Albany International Business Park. Vantage's first Midwest campus and seventh North American market. 3 buildings, 1.5M+ sq ft total, 192MW total planned IT capacity (not yet fully operational). LEED Silver target, part of Vantage's 2030 net-zero operational carbon commitment. Vantage's own press release states OH1 \"will provide secure and reliable infrastructure for cloud technologies and artificial intelligence\" — real operator-stated AI-adjacent marketing (paired with \"cloud,\" not an exclusive/GPU-specific claim), so the AI classification is recorded as likely rather than confirmed.","src":[{"u":"https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/","t":"Vantage Data Centers Breaks Ground on 192MW Campus, Enters Growing Ohio Data Center Market","p":"Vantage Data Centers"},{"u":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-new-albany-data-center-in-ohio/","t":"Vantage breaks ground on New Albany data center in Ohio","p":"Data Center Dynamics"}],"j":"city","jc":"Licking County","jn":"New Albany","jd":"city"},{"id":"vantage-oh2-millersport-fairfield-oh","n":"Vantage Data Centers OH2 (Millersport Campus)","op":"Vantage Data Centers","s":"under_construction","st":"OH","city":"Millersport","co":"Fairfield","lat":39.902,"lon":-82.5324,"pre":"approximate","cf":"confirmed","mw":696,"upd":"2026-11-04","nt":"Vantage's second Ohio campus (distinct from the tracked OH1 in Johnstown), at Lancaster-Newark Rd & Blacklick Rd near Millersport — up to 7 structures incl. 4 data-center buildings, $2.1B, powered by an adjacent natural-gas generation facility; under construction as of mid-2026. Capacity figures diverge: 696 MW on Vantage's own site (used here) vs ~800 MW / 500 acres on a project aggregator — the operator figure is used and the discrepancy flagged. Coordinates approximate (Millersport city-center, not parcel-verified). Public-reception check (2026-09-10): Checked the project's own campus microsite (2026-09-10); it covers only project description and planned economic benefits, with no documented public hearing, resident reaction, or official statement of support/opposition.","src":[{"u":"https://vantagemillersportcampus.com/","t":"Vantage Millersport Campus official site: 352 acres, 696 MW IT capacity, 7 structures (up to 4 data centers), Lancaster-Newark Rd & Blacklick Rd, adjacent natural-gas power, $2.1B+","p":"Vantage Data Centers"},{"u":"https://poweredbywho.com/projects/vantage-millersport-data-center-campus-oh2-ad8f96ad","t":"Powered By Who dossier: ~39.90N/-82.53W city-center pin (no exact address), 500 acres / 800 MW figures, 'under construction' as of 2026-06","p":"Powered By Who"}],"j":"city","jc":"Fairfield County","jn":"Millersport","jd":"village","ju":"approx"},{"id":"bitdeer-whitetail-creek-trumbull-county-oh","n":"Whitetail Creek Data Center","op":"Bitdeer","s":"proposed","st":"OH","city":"Niles / Weathersfield Township","co":"Trumbull","lat":41.19,"lon":-80.77,"pre":"approximate","cf":"reported","upd":"2026-10-22","nt":"1047 Belmont Ave, former Ohio Edison power plant site, straddling Weathersfield Township and Niles. Bitdeer's own business is described as 'cryptocurrency and AI cloud infrastructure.' Distinct from Bitdeer's existing tracked Clarington, OH facility. Coordinates are approximate. Operated via subsidiary Whitetail Creek LLC.","src":[{"u":"https://www.wkbn.com/news/local-news/niles-news/niles-announces-decision-on-proposed-data-center-annexation/","t":"Niles announces decision on proposed data center annexation","p":"WKBN"},{"u":"https://businessjournaldaily.com/bitdeer-eyes-energization-for-weathersfield-project-in-2029/","t":"Business Journal Daily — \"Bitdeer Eyes 'Energization' for Weathersfield Project in 2029\"","p":""}],"j":"city","jc":"Trumbull County","jn":"Niles","jd":"city","ju":"approx"},{"id":"oklahoma-ai-ventures-black-bear-noble-county-ok","n":"Black Bear AI Data Center Campus","op":"Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)","s":"proposed","st":"OK","city":"Perry","co":"Noble","lat":36.2892,"lon":-97.2836,"pre":"approximate","cf":"reported","ann":"2025-04","upd":"2026-09-02","nt":"Flagship campus of the Jericho Energy Ventures / Comstock 50-50 joint venture (Oklahoma AI Ventures LLC), sited on Jericho's ~18,000-acre subsurface portfolio with roughly 60 miles of gas, power and water infrastructure between Oklahoma City and Tulsa. The 8-K names Pawnee and Noble counties and states upwards of 4,000 acres secured for development options; no capacity figure is given by the developer, so none is recorded here. Coordinates are approximate to Perry, the Noble County seat.","src":[{"u":"https://www.jerichoenergyventures.com/aidatacenter","t":"AI Data Centers — Black Bear campus","p":"Jericho Energy Ventures"},{"u":"https://www.sec.gov/Archives/edgar/data/0001299969/000162828026042075/jerichojvpr-finalfor8xk.htm","t":"Comstock Holding Companies Form 8-K exhibit — Oklahoma AI Ventures JV with Jericho","p":"U.S. Securities and Exchange Commission"}],"j":"city","jc":"Noble County","jn":"Perry","jd":"city","ju":"approx"},{"id":"blusky-ai-mulhall-ok","n":"BluSky AI Mulhall Modular Data Center","op":"BluSky AI Inc.","s":"proposed","st":"OK","city":"Mulhall","co":"Logan","lat":36.0647,"lon":-97.4054,"pre":"approximate","cf":"reported","ac":5,"ann":"2025-11-05","upd":"2026-10-16","nt":"The source is a non-binding letter of intent: a 10-year lease with two optional five-year extensions, $4,000/month base rent, and performance-linked payments that rise with installed module capacity (the release gives the top rate at 11 MW of active modules). No capacity is recorded because the sources give pricing tiers, not a built or committed MW figure. Baxtel calls it under construction with a 2027 plan year but cites no source, so it is kept as proposed. The coordinates are the town of Mulhall, not a parcel. As of October 2026, the same operator's other LOI sites are tracked separately.","src":[{"u":"https://markets.financialcontent.com/pennwell.pennenergy/article/nnwire-2025-11-5-investornewsbreaks-blusky-ai-inc-otcid-bsai-executes-loi-to-lease-five-acre-site-in-mulhall-oklahoma-for-modular-ai-data-center-expansion","t":"BluSky AI Inc. executes LOI to lease five-acre site in Mulhall, Oklahoma for modular AI data center expansion","p":"InvestorWire / FinancialContent"},{"u":"https://baxtel.com/data-center/blusky-ai-mulhall-oklahoma","t":"BluSky AI: Mulhall, Oklahoma","p":"Baxtel"}],"j":"city","jc":"Logan County","jn":"Mulhall","jd":"town","ju":"approx"},{"id":"cerebras-oklahoma-city-ok","n":"Cerebras Oklahoma City Data Center","op":"Cerebras Systems","s":"operational","st":"OK","city":"Oklahoma City","co":"Oklahoma","lat":35.4676,"lon":-97.5164,"pre":"approximate","cf":"confirmed","ann":"2025","upd":"2026-10-22","pb":"OG&E","nt":"Colocation tenancy: Cerebras Systems is the AI infrastructure operator; Scale Datacenters is the facility host/colo provider (acquired the 82,000 sq ft building from Expand Energy, formerly Chesapeake Energy, originally built ~2013). Facility address: 512 NW 62nd St (corner of NW 61st/62nd St and N Lee Ave), Oklahoma City. Ribbon cutting September 22, 2025. Houses 300+ CS-3 Wafer Scale Engine systems delivering 44+ exaflops of AI compute. Facility features Tier III-quality infrastructure, tornado and seismic shielding, triple-redundant power stations. Cerebras matches all kWh consumption with renewable energy (REC-based, not on-site generation). OG&E reported as grid utility — consistent with OKC service territory but not explicitly named in Cerebras primary sources. Investment amount not disclosed. Jobs: Cerebras blog references 'hundreds of good-paying jobs' in engineering, IT, and operations plus local college workforce partnerships — no firm headcount confirmed. Coordinates are approximate (dispatch seed); actual facility is at 512 NW 62nd St.","src":[{"u":"https://www.datacenterfrontier.com/hyperscale/article/55273769/cerebras-unveils-six-data-centers-to-meet-accelerating-demand-for-ai-inference-at-scale","t":"Cerebras Unveils Six Data Centers to Meet Accelerating Demand for AI Inference at Scale","p":"Data Center Frontier"},{"u":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s","t":"Cerebras Announces Six New AI Datacenters Across North America and Europe","p":"Cerebras Systems"}],"j":"city","jc":"Oklahoma County","jn":"Oklahoma City","jd":"city","ju":"approx"},{"id":"cloudburst-oklahoma-city-campus-ok","n":"CloudBurst Oklahoma City Campus","op":"CloudBurst Data Centers","s":"under_construction","st":"OK","city":"Oklahoma City","co":"Oklahoma","lat":35.4676,"lon":-97.5164,"pre":"approximate","cf":"reported","mw":200,"upd":"2026-10-16","nt":"200 MW IT load across a planned multi-building campus reported near 2000 S Council Rd. Coordinates are an Oklahoma City centroid approximation. Oklahoma City's 2026 data-center moratorium is reported to have affected the timeline.","src":[{"u":"https://cloudburstdc.com/oklahoma-city/","t":"CloudBurst Data Centers — Oklahoma City campus","p":"CloudBurst Data Centers"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma?","p":"News On 6"}],"j":"city","jc":"Oklahoma County","jn":"Oklahoma City","jd":"city","ju":"approx"},{"id":"core-scientific-muskogee-ok","n":"Core Scientific Muskogee Campus","op":"Core Scientific","s":"under_construction","st":"OK","city":"Muskogee","co":"Muskogee","lat":35.72,"lon":-95.42,"pre":"approximate","cf":"confirmed","mw":1000,"ac":250,"inv":4000000000,"upd":"2026-10-22","nt":"1525 W Smith Ferry Rd, Port Muskogee Industrial Park. Distinct from the existing tracked Google Muskogee County campuses - same county, different developer/site. Coordinates are approximate. CoreWeave is the anchor customer.","src":[{"u":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus","t":"Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus","p":"Core Scientific (investor release)"},{"u":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","t":"Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center (investor press release)","p":""}],"j":"uninc","jc":"Muskogee County","ju":"approx"},{"id":"fluidstack-okmulgee-county-ok","n":"Fluidstack Okmulgee County Data Center","op":"Fluidstack","s":"proposed","st":"OK","city":"Okmulgee","co":"Okmulgee","lat":35.6231,"lon":-95.9605,"pre":"approximate","cf":"confirmed","ac":200,"upd":"2026-10-16","nt":"First tenant is reported to be Jane Street. Fluidstack states it is not seeking local property-tax incentives and has committed to a voluntary 60 dB noise limit at property lines; Fluidstack and Jane Street jointly committed $7 million for local education. Capacity has not been publicly disclosed. Coordinates are an Okmulgee town-centroid approximation.","src":[{"u":"https://www.okmulgeefluidstack.io/","t":"Okmulgee Data Center — official project site","p":"Fluidstack"},{"u":"https://krmg.com/2026/07/21/okmulgee-residents-raise-concerns-during-fluidstack-data-center-open-house/","t":"Okmulgee residents raise concerns during Fluidstack data center open house","p":"KRMG 102.3"}],"j":"city","jc":"Okmulgee County","jn":"Okmulgee","jd":"city","ju":"approx"},{"id":"google-muskogee-county-ok","n":"Google Muskogee County Data Center Campuses","op":"Google","s":"proposed","st":"OK","city":"Council Hill","co":"Muskogee","lat":35.57,"lon":-95.65,"pre":"approximate","cf":"reported","ann":"2025-11","upd":"2026-10-22","pb":"Grid (OG&E)","nt":"Two separate campuses near Summit and Council Hill in Muskogee County. Combined into one record; site-by-site capacity and investment breakdown not publicly available. Coordinates corrected to approximate Council Hill location (35.57°N, 95.65°W); original coordinates (35.65, −95.37) fell near Muskogee city / Summit area rather than Council Hill. Summit campus is located near Muskogee city (~17 miles east). Exact parcels not disclosed. Part of Google's $9B Oklahoma investment announced August 2025.","src":[{"u":"https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma","t":"Google to build two data centers in Muskogee County","p":"NewsOn6"},{"u":"https://okbusinessvoice.com/2025/11/20/google-unveils-plans-for-two-new-data-center-campuses-in-muskogee-county/","t":"Google unveils plans for two new data center campuses in Muskogee County","p":"Oklahoma Business Voice"}],"j":"uninc","jc":"Muskogee County","ju":"approx"},{"id":"google-pryor-ok","n":"Google Pryor Data Center Campus (Mayes County Expansion)","op":"Google","s":"operational","st":"OK","city":"Pryor","co":"Mayes","lat":36.32,"lon":-95.31,"pre":"approximate","cf":"confirmed","inv":4400000000,"ann":"2007-01","upd":"2026-10-22","pb":"Grid (Southwest Power Pool) with renewable PPAs","nt":"Campus operational since 2011; Google's second-largest data center globally per Alphabet CIO Ruth Porat. Four expansions now underway. $5.7B+ invested historically in Oklahoma prior to August 2025 $9B commitment. Expansion capacity and MW not publicly specified. Coordinates are Pryor city center.","src":[{"u":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","t":"Google planning another expansion for Pryor data center","p":"Oklahoma Department of Commerce"},{"u":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","t":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","p":"Data Center Dynamics"}],"j":"city","jc":"Mayes County","jn":"Pryor Creek","jd":"city","ju":"approx"},{"id":"google-stillwater-ok","n":"Google Stillwater Data Center Campus","op":"Google","s":"under_construction","st":"OK","city":"Stillwater","co":"Payne","lat":36.14,"lon":-97.06,"pre":"approximate","cf":"confirmed","ac":400,"inv":3000000000,"ann":"2025-03","upd":"2026-11-04","pb":"Grid (OG&E) with clean energy PPAs","nt":"Campus at intersection of Perkins Road and Richmond Road, north of Stillwater. Coordinates are approximate (city centroid shifted north). Up to 6 data center buildings, each 300,000 sq ft. Phase I targeted for 2027. City Council acceptance of final plat required before recording with Payne County Clerk. Job figures are projections (~30 permanent per phase; construction cited as 'thousands') - not recorded as confirmed counts. Oklahoma's Sec. 1357 data-center sales-tax exemption applies by statute but no Stillwater-specific award amount is published.","src":[{"u":"https://www.okenergytoday.com/2025/11/construction-gets-go-ahead-for-stillwater-data-center/","t":"Construction gets go-ahead for Google Stillwater data center","p":"Oklahoma Energy Today"},{"u":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","t":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","p":"Data Center Dynamics"}],"j":"city","jc":"Payne County","jn":"Stillwater","jd":"city","ju":"approx"},{"id":"host-digital-northeast-oklahoma-ok","n":"Host Digital Northeast Oklahoma Data Center","op":"Host Digital Infrastructure LLC","s":"operational","st":"OK","city":"Tulsa","lat":36.154,"lon":-95.9928,"pre":"approximate","cf":"reported","mw":43,"ann":"2026-08-31","upd":"2026-09-02","nt":"Location unconfirmed: both cited sources place the facility only in 'northeast Oklahoma' and do not name a city; the coordinates recorded here are a provisional approximation for the Tulsa metro and are not parcel- or address-confirmed. Lease terms: ~$1.25bn over a 15-year base take-or-pay term, ~$3.2bn if all renewals are exercised, tenant backstopped by a US investment-grade technology company.","src":[{"u":"https://www.globenewswire.com/news-release/2026/08/31/3353118/0/en/hcwc-announces-host-digital-secures-1-25-billion-15-year-ai-data-center-lease.html","t":"HCWC Announces Host Digital Secures $1.25 Billion, 15-Year AI Data Center Lease","p":"GlobeNewswire / Healthy Choice Wellness Corp."},{"u":"https://usdatacenterprojects.com/oklahoma/host-digital-locks-usd-1-25-billion-15-year-ai-data-center-lease-in-northeast-oklahoma","t":"Host Digital Locks In 15-Year AI Data Center Lease","p":"US Data Center Projects"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"iren-woods-county-ok","n":"IREN Woods County Campus","op":"IREN (Iris Energy)","s":"proposed","st":"OK","city":"Alva","co":"Woods","lat":36.8031,"lon":-98.667,"pre":"approximate","cf":"reported","mw":1600,"ac":2000,"upd":"2026-10-22","pb":"Southwest Power Pool (SPP) grid","nt":"~2,000-acre land bank near Alva, Woods County, with a secured 1.6 GW power allocation on the Southwest Power Pool grid; initial power ramp scheduled for 2028. IREN's land-bank expansion beyond its operational Texas campuses (Childress, Sweetwater). Single-tracker source → confidence reported. Coordinates are the Alva area centroid. Capacity re-sourced 2026-08-08: IREN's own Oklahoma page states \"1,600 MW\", \"2,000 Acres\" and \"2028 Substation Energization\", status \"IN DEVELOPMENT\" — replacing an aggregator listing as the basis for the figure. Public-reception check (2026-09-10): Checked baxtel.com's project profile (2026-09-10) -- it covers only technical/permitting facts (2,000-acre site on the SPP grid) plus one unrelated statewide article (Oklahoma's data-center ratepayer-protection bill, 2026-05-16). No hearing, resident reaction, or local-official statement specific to the Woods County/Alva site was found in this source.","src":[{"u":"https://baxtel.com/data-center/iren-woods-county-oklahoma","t":"IREN Woods County Oklahoma","p":"Baxtel"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Woods County","jn":"Alva","jd":"city","ju":"approx"},{"id":"isocentric-networks-tulsa-ok","n":"Isocentric Networks Tulsa Data Center","op":"Isocentric Networks","s":"operational","st":"OK","city":"Tulsa","co":"Tulsa","lat":36.154,"lon":-95.9928,"pre":"approximate","cf":"reported","upd":"2026-10-16","nt":"Single fetched source. Coordinates are a Tulsa centroid approximation; street address is as published.","src":[{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (Isocentric Networks, 100 W 5th St, Tulsa)","p":"News On 6"},{"u":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","t":"Where are data centers being built across Oklahoma?","p":"News 9"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"lambda-midamerica-industrial-park-chouteau-ok","n":"Lambda MidAmerica Industrial Park Data Center","op":"Lambda","s":"proposed","st":"OK","city":"Chouteau","co":"Mayes","lat":36.1859,"lon":-95.343,"pre":"approximate","cf":"confirmed","ann":"2026-09-27","upd":"2026-10-16","nt":"Lambda announced plans on 2026-09-27 for a data center in the south section of MidAmerica Industrial Park, Mayes County, within the Chouteau-Mazie Public School District tax boundary. Capacity, GPU count, acreage, street address, timeline and total cost are not stated in the sources. The park was selected through a 'reverse RFP' by MidAmerica Industrial Park; Grand River Dam Authority (GRDA) is the power provider and Lambda is to fund the upfront infrastructure needed to serve the project; Cloverleaf Infrastructure was selected by GRDA and MidAmerica to ready the site. Lambda says it will pay 100% of the facility's energy costs and plans to act as a flexible grid customer. Company-stated figures: up to 1,000 construction jobs, up to 100 permanent positions, about $500M in tax revenue over ten years at current rates. Separate from Google's existing Pryor campus, the Google Pryor Data Center Campus (Mayes County Expansion), also in Mayes County. Coordinates are the Chouteau city point (OSM Nominatim), not the site; the sources give no parcel or address.","src":[{"u":"https://lambda.ai/blog/new-lambda-data-center-in-oklahoma","t":"New Lambda data center in Oklahoma","p":"Lambda"},{"u":"https://okcfox.com/news/local/ai-cloud-company-plans-data-center-in-mayes-county","t":"AI cloud company plans data center in Mayes County","p":"KOKH FOX 25"}],"j":"city","jc":"Mayes County","jn":"Chouteau","jd":"town","ju":"approx"},{"id":"meta-anthem-tulsa-ok","n":"Meta Project Anthem — Tulsa","op":"Meta","s":"under_construction","st":"OK","city":"Tulsa","co":"Tulsa","lat":36.14,"lon":-95.88,"pre":"approximate","cf":"confirmed","ac":340,"inv":1000000000,"ann":"2024","upd":"2026-10-28","pb":"Public Service Company of Oklahoma (PSO)","nt":"Codename: Project Anthem (used in TMAPC filings; Meta confirmed publicly April 21, 2026). Meta's 28th US data center and 32nd globally; first in Oklahoma and first built within Tulsa city limits. Anchor tenant at Fair Oaks Innovation Park (a 2,000-acre campus) near 11th Street and Creek Turnpike, East Tulsa. Investment stated as 'more than $1 billion' by Meta — a floor figure only; PartnerTulsa estimates construction costs at ~$800M. The recorded investment is Meta's stated floor of $1 billion; PartnerTulsa's construction-cost estimate is not recorded. Facility size: 2+ million sq ft; completion targeted 2028; general contractor Fortis Construction. No facility-specific MW capacity disclosed; Meta separately adding 1,500+ MW of clean energy to the Oklahoma grid statewide. Jobs: Meta states 'more than 1,000 construction workers will be onsite at the peak of construction' and that the data center 'will support approximately 100 jobs once operational' — approximations from press release, not firm counts; the recorded construction figure of 1,000 is Meta's stated floor, and as of October 2026 no permanent job count is recorded because Meta's 100 is approximate. Phase 2 expansion (375 additional acres west of original parcel, developer Atmoss LLC) proposed but withdrawn March 2026 before city council vote. Coordinates approximate (near 11th St & Creek Turnpike, East Tulsa).","src":[{"u":"https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/","t":"Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma","p":"Meta (about.fb.com)"},{"u":"https://datacenters.atmeta.com/2026/04/hello-tulsa/","t":"Hello, Tulsa! — Meta Data Centers","p":"Meta (atmeta.com)"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"buckley-bros-pawhuska-ok","n":"Pawhuska AI Data Center","op":"Buckley Bros Holdings LLC","s":"proposed","st":"OK","city":"Pawhuska","co":"Osage","lat":36.6698,"lon":-96.3364,"pre":"approximate","cf":"reported","mw":10,"ac":18,"upd":"2026-10-16","nt":"Reported at 8-10 MW; the planned figure recorded here is the upper end of that reported range. Coordinates are a Pawhuska town-centroid approximation, not a parcel-confirmed point.","src":[{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (Pawhuska AI Data Center, Buckley Bros Holdings, 1901 E. Boundary, 8-10 MW)","p":"News On 6"},{"u":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","t":"Where are data centers being built across Oklahoma?","p":"News 9"}],"j":"city","jc":"Osage County","jn":"Pawhuska","jd":"city","ju":"approx"},{"id":"potentia-oklahoma-campus-02-inola-ok","n":"Potentia Oklahoma Campus 02 (Inola)","op":"Potentia, Inc.","s":"proposed","st":"OK","city":"Inola","co":"Rogers","lat":36.1487,"lon":-95.5097,"pre":"approximate","cf":"reported","mw":2000,"ac":1850,"ann":"2026-05","upd":"2026-09-10","nt":"Roughly 1,850 acres in Rogers County bounded by 4190 Road and 4200 Road, adjacent to the Port of Inola and existing high-voltage transmission serving the Sofidel plant. Reporting describes recorded deeds, site clearing and HV substation work, and a Building 1 target of Q2 2027; the 2.0 GW figure comes from a third-party tracker, not the developer. Coordinates are approximate to the town of Inola, not a parcel-confirmed point.","src":[{"u":"https://www.joecrivelli.com/p/the-data-center-coming-to-inola-oklahoma","t":"The Data Center Coming to Inola, Oklahoma: What We Know","p":"Joe Crivelli"},{"u":"https://baxtel.com/data-centers/potentia-inc","t":"Potentia Inc. Data Centers and Colocation — Campus 02 (Oklahoma)","p":"Baxtel"}],"j":"city","jc":"Rogers County","jn":"Inola","jd":"town","ju":"approx"},{"id":"beale-project-clydesdale-tulsa-county-ok","n":"Project Clydesdale","op":"Beale Infrastructure","s":"under_construction","st":"OK","city":"Owasso","co":"Tulsa","lat":36.28,"lon":-95.83,"pre":"approximate","cf":"confirmed","ac":506,"inv":1000000000,"upd":"2026-10-22","nt":"Unincorporated Tulsa County near Owasso (Whirlpool Dr & E 76th St N, adjacent to Cherokee Industrial Park). Formerly known as 'Project Clydesbank.' 4 phases; electric service via PSO. End-tenant ('major data center operator' per a Quartz Mountain Properties LLC affiliate) unnamed. Coordinates are approximate. End-user unnamed.","src":[{"u":"https://constructionreviewonline.com/project-clydesdale-1-billion-data-center-in-tulsa-breaks-ground/","t":"Project Clydesdale: $1 billion data center in Tulsa breaks ground","p":"Construction Review Online"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Tulsa County","jn":"Owasso","jd":"city","ju":"approx"},{"id":"google-spring-sand-springs-ok","n":"Project Spring (Sand Springs)","op":"Google","s":"proposed","st":"OK","city":"Sand Springs","co":"Osage","lat":36.256,"lon":-96.11,"pre":"approximate","cf":"reported","ac":827,"ann":"2025-11","upd":"2026-11-04","pb":"Public Service Company of Oklahoma (PSO)","nt":"Google is identified as the interested purchaser/end-user by Tulsa Flyer, DCD and Public Radio Tulsa, but as of July 2026 there is no standalone Google announcement for this site (developer White Rose Partners is titleholder) - hence the record is marked reported. County: physical property is in Osage County (per the official project site and Osage News); the annexing City of Sand Springs is primarily Tulsa County, and the annexation lawsuit moved from Osage to Tulsa County court. Capacity: trackers allege 500+ MW but no primary source confirms it - omitted. Google's $9B Oklahoma commitment (Aug 2025) is a statewide figure, not project-specific. Up to 3 data-center buildings + one office building; construction targeted 2027, completion 2029 (developer). Jobs are developer projections and the developer's statements differ: as of October 2026 the project website says up to one thousand temporary construction jobs at peak and cites a Virginia study of approximately 50 full-time employees per building in normal operations, while KGOU reported in June 2026 that a White Rose Partners managing partner said at a February 2026 Osage Minerals Council meeting that the project will create 1,000 full-time jobs, so no jobs figure is recorded. A ~$100M/25yr PILOT was cited by the city manager but no executed agreement is confirmed. Coordinates estimated from the site description (near HWY 97 / Rock School Rd), not verified against a parcel record. As of October 2026, the developer's stated address, 5615 OK-97, could not be matched to the pin, so the pin is approximate.","src":[{"u":"https://tulsaflyer.org/2026/01/15/government/post/google-connected-sand-springs-data-center-project/","t":"Google connected to Sand Springs data center project","p":"Tulsa Flyer"},{"u":"https://www.datacenterdynamics.com/en/news/sand-springs-oklahoma-to-consider-project-spring-data-center-proposal/","t":"Sand Springs, Oklahoma, to consider Project Spring data center proposal","p":"Data Center Dynamics"}],"j":"uninc","jc":"Osage County","ju":"approx"},{"id":"rack59-oklahoma-city-ok","n":"RACK59 Data Center","op":"RACK59","s":"operational","st":"OK","city":"Oklahoma City","co":"Oklahoma","lat":35.4676,"lon":-97.5164,"pre":"approximate","cf":"confirmed","upd":"2026-10-22","nt":"No capacity is recorded: the operator's own site advertises 175 MW while third-party listings report ~40 MW, and no filing reconciles the two. Coordinates are an Oklahoma City centroid approximation; the street address is exact.","src":[{"u":"https://rack59.com/","t":"RACK59 Data Center — operator site","p":"RACK59"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (RACK59, 7725 W Reno Ave, ~30,000 sq ft)","p":"News On 6"}],"j":"city","jc":"Oklahoma County","jn":"Oklahoma City","jd":"city","ju":"approx"},{"id":"tierpoint-oklahoma-city-ok","n":"TierPoint Oklahoma City (OKC / OKC2)","op":"TierPoint","s":"operational","st":"OK","city":"Oklahoma City","co":"Oklahoma","lat":35.4676,"lon":-97.5164,"pre":"approximate","cf":"confirmed","upd":"2026-08-19","nt":"Recorded as one campus record: TierPoint lists OKC (4121 Perimeter Center Place) and OKC2 (4114 Perimeter Center Place) as two facilities across the street from each other. Distinct from the tracked TierPoint Tulsa - Archer record. Coordinates are an Oklahoma City centroid approximation.","src":[{"u":"https://www.tierpoint.com/data-centers/oklahoma/","t":"TierPoint Oklahoma data centers (OKC 4121 Perimeter Center Place; OKC2 4114 Perimeter Center Place)","p":"TierPoint"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (TierPoint Oklahoma City 1 & 2)","p":"News On 6"}],"j":"city","jc":"Oklahoma County","jn":"Oklahoma City","jd":"city","ju":"approx"},{"id":"tierpoint-tulsa-state-farm-ok","n":"TierPoint Tulsa - State Farm","op":"TierPoint","s":"operational","st":"OK","city":"Tulsa","co":"Tulsa","lat":36.154,"lon":-95.9928,"pre":"approximate","cf":"confirmed","upd":"2026-08-19","nt":"Second TierPoint Tulsa facility, distinct from the tracked Tulsa - Archer site (322 E. Archer St, downtown). Coordinates are a Tulsa centroid approximation; the street address is exact.","src":[{"u":"https://www.tierpoint.com/data-centers/oklahoma/","t":"TierPoint Oklahoma data centers (Tulsa - State Farm, 12151 E. State Farm Blvd)","p":"TierPoint"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (TierPoint Tulsa - State Farm)","p":"News On 6"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"tulsaconnect-downtown-dc5-tulsa-ok","n":"TulsaConnect Downtown (DC-5)","op":"TulsaConnect","s":"operational","st":"OK","city":"Tulsa","co":"Tulsa","lat":36.154,"lon":-95.9928,"pre":"approximate","cf":"reported","upd":"2026-08-19","nt":"No street address published on the operator's overview page, so location is a Tulsa centroid approximation only. Distinct from DC-3 in east Tulsa.","src":[{"u":"https://www.tulsaconnect.com/data-centers-overview.php","t":"TulsaConnect data centers overview (DC-5 Downtown Tulsa)","p":"TulsaConnect"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (TulsaConnect Downtown DC-5)","p":"News On 6"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"tulsaconnect-east-dc3-tulsa-ok","n":"TulsaConnect East (DC-3)","op":"TulsaConnect","s":"operational","st":"OK","city":"Tulsa","co":"Tulsa","lat":36.154,"lon":-95.9928,"pre":"approximate","cf":"confirmed","upd":"2026-08-19","nt":"Reported as an underground facility. Coordinates are a Tulsa centroid approximation; the street address is exact.","src":[{"u":"https://www.tulsaconnect.com/data-centers-overview.php","t":"TulsaConnect data centers overview (DC-3 East Tulsa, DC-5 Downtown)","p":"TulsaConnect"},{"u":"https://www.newson6.com/tulsa-oklahoma-news/where-are-data-centers-are-being-built-oklahoma-list","t":"What data centers are being built in Oklahoma? (TulsaConnect East DC-3, 4500 S 129th E Ave, underground facility)","p":"News On 6"}],"j":"city","jc":"Tulsa County","jn":"Tulsa","jd":"city","ju":"approx"},{"id":"aligned-pdx-01-or","n":"Aligned PDX-01","op":"Aligned Data Centers","s":"operational","st":"OR","city":"Hillsboro","co":"Washington","lat":45.5541,"lon":-122.9493,"pre":"exact","cf":"reported","ac":27,"upd":"2026-09-02","pb":"Grid — Portland General Electric (PGE), w/ on-site 31MW/62MWh grid-flexibility battery","nt":"Confirmed operational, 27-acre campus at NE 30th Ave & NE Evergreen Rd, Hillsboro, OR. AI/HPC (likely): Hillsboro PDX-01 engineered on high-density AI/HPC cooling design.","src":[{"u":"https://aligneddc.com/hillsboro-data-centers/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/1114969101","t":"OpenStreetMap way/1114969101","p":"OpenStreetMap"}],"j":"city","jc":"Washington County","jn":"Hillsboro","jd":"city"},{"id":"aws-boardman-morrow-county-or","n":"Amazon Boardman Exascale Data Center Campus","op":"Amazon Web Services","s":"proposed","st":"OR","city":"Boardman","co":"Morrow","lat":45.84,"lon":-119.702,"pre":"approximate","cf":"reported","mw":1000,"ac":1300,"ann":"2026-03","upd":"2026-10-22","pb":"Oregon grid (majority hydro); local retail utility PacifiCorp (Pacific Power)","nt":"Amazon confirmed the land purchase ($37M per Morrow County property records, confirmed by multiple news sources) but stated development plans are not final. Planning documents submitted to Morrow County describe a 1 GW exascale campus with 20 buildings across 4 million sq ft; Johnson Economics estimated $8B-$12B total investment. Land previously owned by Threemile Canyon Farms dairy. Distinct from Amazon's existing ~800 acres of operating/under-construction OR facilities. The Lincoln Chronicle source could not be retrieved as of July 2026; the primary claim is supported by the DCD source. The utility is PacifiCorp (Pacific Power), the retail utility, rather than Bonneville Power Administration (wholesale). Coordinates are Boardman city centroid; exact site not publicly confirmed. Johnson Economics' economic-impact analysis (Morrow County Planning Commission, Jan 2025) models the full 1 GW campus at roughly $8 billion investment (potential range $7-12 billion), about 6,400 construction FTE over an eight-year build (~800/year) and about 560 operations FTE, assuming an Oregon Strategic Investment Program (SIP) property-tax abatement — modeled projections for a still-proposed campus, not firm commitments.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-purchases-1300-acres-in-morrow-county-oregon/","t":"Amazon Purchases 1,300 Acres in Morrow County, Oregon","p":"Data Center Dynamics"},{"u":"https://lincolnchronicle.org/oregon-communities-envision-9100-acres-for-new-data-centers-quadrupling-the-industrys-footprint/","t":"Oregon Communities Envision 9,100 Acres for New Data Centers","p":"Lincoln Chronicle / The Oregonian"}],"j":"city","jc":"Morrow County","jn":"Boardman","jd":"city","ju":"approx"},{"id":"crane-pdx01-forest-grove-or","n":"Crane PDX01","op":"Crane Data Centers","s":"under_construction","st":"OR","city":"Forest Grove","co":"Washington","lat":45.5207,"lon":-123.1087,"pre":"approximate","cf":"confirmed","mw":76,"upd":"2026-10-22","nt":"PDX01 data center campus in Forest Grove, Washington County; 76 MW by 2026. Coordinates are the Forest Grove area centroid. Development cost not disclosed (partner: Principal Asset Management) -> no investment figure is recorded. No job counts disclosed -> no job count is recorded. Crane markets property-tax / enterprise-zone incentives, but no signed agreement is on record (statewide Oregon EZ moratorium eff. June 2026) -> no subsidy is recorded.","src":[{"u":"https://www.datacenterdynamics.com/en/news/planning-commission-greenlights-crane-dcs-forest-grove-data-center-in-northwest-oregon-again/","t":"Planning commission greenlights Crane DC's Forest Grove data center in northwest Oregon, again","p":"Data Center Dynamics"},{"u":"https://www.datacenterdynamics.com/en/news/oregons-forest-grove-data-center-gets-city-council-approval-again-again/","t":"Oregon's Forest Grove data center gets City Council approval, again","p":"Data Center Dynamics"}],"j":"city","jc":"Washington County","jn":"Forest Grove","jd":"city","ju":"approx"},{"id":"flexential-portland-hillsboro-4-pdx04-or","n":"Flexential Portland - Hillsboro 4 (PDX04)","op":"Flexential","s":"operational","st":"OR","city":"Hillsboro","co":"Washington","lat":45.5553,"lon":-122.9401,"pre":"exact","cf":"reported","upd":"2026-09-21","nt":"The cited source URL was corrected; the URL originally supplied pointed to the Hillsboro 5 page in error. 4915 NE Starr Blvd, 138,000 sqft, 18MW, fully leased, delivers GPU/CPU-ready environments per press coverage.","src":[{"u":"https://www.flexential.com/data-centers/or/portland/hillsboro4-data-center","t":"Flexential facility directory","p":"Flexential"},{"u":"https://www.openstreetmap.org/way/860433344","t":"OpenStreetMap way/860433344","p":"OpenStreetMap"}],"j":"city","jc":"Washington County","jn":"Hillsboro","jd":"city"},{"id":"google-the-dalles-or","n":"Google The Dalles Data Center Campus","op":"Google","s":"operational","st":"OR","city":"The Dalles","co":"Wasco","lat":45.5975,"lon":-121.1776,"pre":"approximate","cf":"confirmed","inv":1800000000,"ann":"2005","upd":"2026-11-04","pb":"grid (PacifiCorp) + Columbia River hydropower","src":[{"u":"https://en.wikipedia.org/wiki/The_Dalles,_Oregon#Google_data_centers","t":"The Dalles, Oregon — Google data centers (Wikipedia)","p":"Wikipedia"},{"u":"https://www.datacenterdynamics.com/en/news/we-now-know-how-much-water-googles-oregon-data-centers-use-after-city-drops-lawsuit-against-journalists/","t":"We now know how much water Google's Oregon data centers use — Data Center Dynamics","p":"Data Center Dynamics"}],"j":"city","jc":"Wasco County","jn":"The Dalles","jd":"city","ju":"approx"},{"id":"meta-prineville-or","n":"Meta Prineville Data Center Campus","op":"Meta","s":"operational","st":"OR","city":"Prineville","co":"Crook","lat":44.3042,"lon":-120.8515,"pre":"approximate","cf":"confirmed","ac":240,"inv":2000000000,"ann":"2010","upd":"2026-10-30","pb":"grid (PacifiCorp) + wind PPA","src":[{"u":"https://en.wikipedia.org/wiki/Meta_Platforms#Data_centers","t":"Meta Platforms data centers — Wikipedia","p":"Wikipedia"},{"u":"https://sustainability.fb.com/report/2023-sustainability-report/","t":"Meta 2023 Sustainability Report","p":"Meta"}],"j":"city","jc":"Crook County","jn":"Prineville","jd":"city","ju":"approx"},{"id":"sabey-umatilla-or","n":"SDC Umatilla Campus","op":"Sabey Data Centers","s":"under_construction","st":"OR","city":"Umatilla","co":"Umatilla","lat":45.919,"lon":-119.339,"pre":"approximate","cf":"reported","mw":150,"ac":60,"ann":"2023-09","upd":"2026-11-04","pb":"Oregon grid (40% renewable); net-zero by 2029","nt":"Two-building, 714,540 sq ft multi-tenant campus. Groundbreaking originally Q1 2025, revised to 2024 per DCD; in July 2026 Sabey's assistant general manager for the Umatilla campus told the Hermiston Herald that work had been going on at the site since spring. Investment figures conflicting across sources ($520M in one report, ~$950M in another); no investment figure is recorded. Coordinates are Umatilla city centroid. Planned capacity revised from 100 MW to 150 MW: the campus is described as designed to support more than 150 megawatts. Sabey's own materials give a more conservative \"120 MW+\", which is consistent rather than contradictory.","src":[{"u":"https://www.datacenterdynamics.com/en/news/sabey-data-centers-purchases-60-acres-in-umatilla-oregon-for-100mw-facility/","t":"Sabey Data Centers Purchases 60 Acres in Umatilla, Oregon for 100MW+ Facility","p":"Data Center Dynamics"},{"u":"https://www.businesswire.com/news/home/20230914142077/en/Sabey-Data-Centers-to-Build-New-Data-Center-Campus-in-Umatilla-Oregon","t":"Sabey Data Centers to Build New Data Center Campus in Umatilla, Oregon","p":"Business Wire"}],"j":"city","jc":"Umatilla County","jn":"Umatilla","jd":"city","ju":"approx"},{"id":"stack-hillsboro-or","n":"STACK Hillsboro Campus","op":"STACK Infrastructure","s":"proposed","st":"OR","city":"Hillsboro","co":"Washington","lat":45.5229,"lon":-122.9898,"pre":"approximate","cf":"reported","mw":75,"upd":"2026-10-22","nt":"~75 MW STACK campus in Hillsboro, Washington County, targeted 2029. Single-tracker source → confidence reported. Distinct from STACK's Loudoun, VA campus. Coordinates are the Hillsboro area centroid.","src":[{"u":"https://cleanview.co/data-centers/oregon","t":"Oregon data centers","p":"Cleanview"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Washington County","jn":"Hillsboro","jd":"city","ju":"approx"},{"id":"aws-cumulus-salem-township-pa","n":"AWS Cumulus Data Center Campus, Salem Township","op":"Amazon Web Services","s":"under_construction","st":"PA","city":"Salem Township","co":"Luzerne","lat":41.0949,"lon":-76.1452,"pre":"approximate","cf":"confirmed","mw":960,"ac":1200,"inv":650000000,"ann":"2021-07","upd":"2026-10-30","pb":"Nuclear (Susquehanna Steam Electric Station, Talen Energy PPA)","nt":"Adjacent to the 2.5GW Susquehanna Steam Electric Station. FERC blocked a proposed colocation agreement in April 2025, leading to the PPA structure instead. TeraWulf operates a separate Nautilus cryptomining facility (Nautilus) on the same property not included in this record.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/","t":"AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania","p":"Data Center Dynamics"},{"u":"https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon","t":"Talen Energy Expands Nuclear Energy Relationship with Amazon","p":"Talen Energy Investor Relations"}],"j":"uninc","jc":"Luzerne County","jm":"Salem township","ju":"approx"},{"id":"alpha-compute-alpha-energy-01-tioga-county-pa","n":"Alpha Energy 01 Data Center Campus (Tioga County)","op":"Alpha Compute Corp.","s":"proposed","st":"PA","co":"Tioga","lat":41.7742,"lon":-77.2543,"pre":"approximate","cf":"reported","mw":200,"upd":"2026-10-15","nt":"Two contiguous surface parcels (about 155 and 88 acres) plus about 1,800 net Marcellus mineral acres. The $55M purchase price covers land and minerals, not project investment. Initial 200 MW with potential expansion to 1 GW. No township is named, so the pin is the Tioga County centroid. A separate 107-acre Beaver County parcel held for future use is not included.","src":[{"u":"https://finviz.com/news/390946/alpha-compute-secures-47-million-in-seller-financing-for-planned-200mw-pennsylvania-ai-data-center-campus","t":"Alpha Compute Secures $47 Million in Seller Financing for Planned 200MW Pennsylvania AI Data Center Campus","p":"Alpha Compute Corp. (press release via Finviz)"}],"j":"uninc","jc":"Tioga County","jm":"Charleston township","ju":"approx"},{"id":"aws-falls-township-pa","n":"Amazon Web Services Innovation Campus, Falls Township","op":"Amazon Web Services","s":"under_construction","st":"PA","city":"Falls Township","co":"Bucks","lat":40.1545,"lon":-74.7882,"pre":"approximate","cf":"confirmed","ann":"2025-06","upd":"2026-11-04","pb":"Grid (PJM interconnection); supplemental solar planned","nt":"One of two announced Amazon data center sites in Pennsylvania part of the $20B PA AI investment commitment. NorthPoint Development is converting the 1,800-acre former Fairless Works site. Capacity in MW not publicly stated; 2M+ sq ft across 10 structures confirmed.","src":[{"u":"https://www.fallstwp.com/resources/news/article/?id=10070","t":"Amazon to Open Data Center at NorthPoint Development in Falls","p":"Falls Township"},{"u":"https://buckscountybeacon.com/2025/08/not-everyone-is-sold-on-the-benefits-of-amazons-data-center-coming-to-falls-township/","t":"Not Everyone Is Sold on the Benefits of Amazon's Data Center Coming to Falls Township","p":"Bucks County Beacon"}],"j":"uninc","jc":"Bucks County","jm":"Falls township","ju":"approx"},{"id":"ardent-pittsburgh-mckees-rocks-pa","n":"Ardent Data Centers Pittsburgh (McKees Rocks)","op":"Ardent Data Centers (Northern Data Group)","s":"operational","st":"PA","city":"McKees Rocks","co":"Allegheny","lat":40.4646,"lon":-80.081,"pre":"approximate","cf":"reported","mw":20,"ac":7.5,"upd":"2026-09-21","nt":"41,000 sq ft building on 7.5 acres in McKees Rocks, Allegheny County, acquired by Ardent (Northern Data Group) in January 2024 with 5 MW in place and a phased path to 20 MW. Purpose-built for GPU/HPC workloads at 135 kW+ rack densities. Street address is reported by third-party directories as 615 McMichael Road but was not confirmed in the sources cited here, so it is omitted.","src":[{"u":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","t":"Ardent Data Centers, a Northern Data Group company, completes acquisition of Pennsylvania data center","p":"Northern Data Group via PR Newswire"},{"u":"https://www.cleanview.co/data-centers/pennsylvania","t":"Data Centers in Pennsylvania — Project List & Locations (HPC data center, Northern Data, Allegheny, 20 MW)","p":"Cleanview"}],"j":"uninc","jc":"Allegheny County","jm":"Kennedy township","ju":"approx"},{"id":"breaker-street-data-center-jessup-lackawanna-pa","n":"Breaker Street Data Center Campus","op":"Breaker Street Associates LLC (Catalyst Commercial Development)","s":"proposed","st":"PA","city":"Jessup","co":"Lackawanna","lat":41.4712,"lon":-75.5588,"pre":"approximate","cf":"reported","mw":600,"ac":131,"upd":"2026-08-31","nt":"Six structures totalling nearly 1.1 million sq ft, each up to 130 feet tall, on 131 acres on the south side of Breaker Street between Hill Street and the Casey Highway. The developer, a West Conshohocken firm, has separately proposed a 487,000 sq ft data center near Sunnyside Road and Alberigi Drive in Jessup — a different parcel, not recorded here. Distinct from the tracked Triboro Industrial Park record (different developer and parcel in the same borough).","src":[{"u":"https://www.yahoo.com/news/articles/jessup-denies-breaker-street-data-010400301.html","t":"Jessup denies Breaker Street data centers","p":"The Times-Tribune (via Yahoo News)"},{"u":"https://cleanview.co/data-centers/pennsylvania","t":"Data Centers in Pennsylvania — Project List & Locations (Breaker Street, 600 MW)","p":"Cleanview"}],"j":"city","jc":"Lackawanna County","jn":"Jessup","jd":"borough","ju":"approx"},{"id":"coreweave-lancaster-pa","n":"CoreWeave Lancaster Data Center","op":"CoreWeave","s":"proposed","st":"PA","city":"Lancaster","co":"Lancaster","lat":40.0379,"lon":-76.3055,"pre":"approximate","cf":"reported","mw":300,"ac":144,"inv":6000000000,"ann":"2025","upd":"2026-11-04","pb":"grid","src":[{"u":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx","t":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania — CoreWeave","p":"CoreWeave"},{"u":"https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/","t":"CoreWeave plans $6bn data center in Lancaster, Pennsylvania — Data Center Dynamics","p":"Data Center Dynamics"}],"j":"city","jc":"Lancaster County","jn":"Lancaster","jd":"city","ju":"approx"},{"id":"flexential-philadelphia-collegeville-phl01-pa","n":"Flexential Philadelphia - Collegeville (PHL01)","op":"Flexential","s":"operational","st":"PA","city":"Collegeville","co":"Montgomery","lat":40.1522,"lon":-75.4776,"pre":"exact","cf":"reported","upd":"2026-09-21","nt":"101 Troutman Rd, 203,703 sqft, 7MW, NVIDIA DGX-Ready Data Center certified; hosts Penn Advanced Research Computing Center partnership (PRNewswire) - real AI/HPC evidence.","src":[{"u":"https://www.flexential.com/data-centers/pa/philadelphia/collegeville-data-center","t":"Flexential facility directory","p":"Flexential"},{"u":"https://www.openstreetmap.org/way/1178609569","t":"OpenStreetMap way/1178609569","p":"OpenStreetMap"}],"j":"uninc","jc":"Montgomery County","jm":"Upper Providence township"},{"id":"homer-city-energy-campus-pa","n":"Homer City Energy Campus","op":"Homer City Redevelopment","s":"under_construction","st":"PA","city":"Homer City","co":"Indiana","lat":40.5383,"lon":-79.1542,"pre":"approximate","cf":"reported","ac":3200,"inv":10000000000,"ann":"2025-04-02","upd":"2026-10-30","pb":"on-site natural gas (GE Vernova turbines; 4.5 GW on-site generation; data center IT load not separately disclosed)","nt":"EPC contractor: Kiewit. The 4.5 GW figure describes the on-site power plant, not the data center's IT load, which, as of October 2026, the developers have not disclosed. Utility Dive (April 2025) reports, citing the developers, a \"$10 billion\" cost for the generating project.","src":[{"u":"https://www.alleghenyfront.org/homer-city-pennsylvania-gas-plant-data-center-ai/","t":"In Western Pennsylvania, a former coal town gets a gas-fired data center — The Allegheny Front","p":"The Allegheny Front"},{"u":"https://www.axios.com/local/pittsburgh/2026/03/31/homer-city-power-plant-grid-data-centers-pennsylvania","t":"Homer City power plant to boost grid as data-center demand rises — Axios Pittsburgh","p":"Axios"}],"j":"city","jc":"Indiana County","jn":"Homer City","jd":"borough","ju":"approx"},{"id":"iron-city-wells-karthaus-township-clearfield-pa","n":"Iron City Wells A.I. Data Center","op":"Iron City Wells, LLC","s":"permitted","st":"PA","city":"Karthaus Township","co":"Clearfield","lat":41.142,"lon":-78.104,"pre":"approximate","cf":"reported","upd":"2026-09-12","nt":"Application documents are held at DEP's Northcentral Regional Office, 208 West Third Street, Suite 101, Williamsport. Coordinate is a township-centroid geocode; the permit notice does not give a site address. No megawatt rating is stated for the generators, so capacity is not recorded.","src":[{"u":"http://paenvironmentdaily.blogspot.com/2026/01/dep-issues-air-quality-permit-for-15.html","t":"DEP Issues Air Quality Permit For 15 Natural Gas Generators To Power Iron City Wells, LLC Data Center In Karthaus Twp., Clearfield County","p":"PA Environment Digest"}],"j":"uninc","jc":"Clearfield County","jm":"Karthaus township","ju":"approx"},{"id":"powerhouse-pax-carlisle-pa","n":"PAX — Pennsylvania Digital I","op":"PowerHouse Data Centers","s":"under_construction","st":"PA","city":"Carlisle","co":"Cumberland","lat":40.2015,"lon":-77.1889,"pre":"approximate","cf":"confirmed","mw":1350,"ac":700,"ann":"2025-07","upd":"2026-11-04","nt":"'Pennsylvania Digital I' (PAX) in Carlisle, Cumberland County: a ~700-acre, three-campus development delivering 1.35 GW (expandable to 1.8 GW), each campus with six buildings and a 450 MW substation. The $15B is the project value across all three campuses. Near-term 300 MW by Q2 2027. Coordinates are the Carlisle area centroid. The $15B figure is the three-campus JV total, not broken out per campus -> no investment figure is recorded. Pennsylvania's data-center sales-tax exemption eligibility is likely but no confirmed award or LERTA designation was found. Partner: Pennsylvania Data Center Partners.","src":[{"u":"https://www.globenewswire.com/news-release/2025/07/15/3115977/0/en/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania.html","t":"Pennsylvania Data Center Partners and PowerHouse Data Centers launch JV to build 1.35 GW hyperscale campus in Carlisle","p":"GlobeNewswire"},{"u":"https://www.powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania","t":"PA Data Center Partners and PowerHouse launch 1.35 GW Carlisle JV","p":"PowerHouse Data Centers"}],"j":"city","jc":"Cumberland County","jn":"Carlisle","jd":"borough","ju":"approx"},{"id":"panther-creek-hpc-ai-campus-nesquehoning-pa","n":"Panther Creek HPC/AI Data Center Campus","op":"Bitfarms Ltd.","s":"under_construction","st":"PA","city":"Nesquehoning","co":"Carbon","lat":40.8564,"lon":-75.8283,"pre":"approximate","cf":"confirmed","mw":350,"ac":103.95,"ann":"2025-08-05","upd":"2026-11-04","nt":"An HPC/AI data center campus at the Panther Creek waste-coal power plant site in Nesquehoning, Carbon County. In August 2025 Bitfarms engaged T5 Data Centers to provide pre-construction design, development-approval and construction guidance. This is a separate record from the already-tracked Panther Creek plant / crypto-mining operation at the same site, as with the split Homer City generation and campus records. The planned capacity of 350 MW follows Bitfarms' October 2025 financing release, in which Macquarie describes a '350 MW HPC/AI campus', and WFMZ's August 2026 report that, according to the website of Keel Infrastructure (formerly Bitfarms Ltd.), the campus has secured capacity of 350 MW, with possible expansion to 510 MW. As of October 2026, none of the cited sources confirms trade reports of a 350 MW firm power contract by 2028 (scalable toward 500 MW+). A February 2026 report carried by Yahoo Finance states, citing Times News Online, that the Nesquehoning Planning Commission granted a special exception permit; the same report says a $50 million draw in October 2025 accelerated equipment orders and substation construction. In April 2026 the Carbon County Planning Commission recommended conditional rejection of the Carbon Node East Development plan, and the DEP scheduled a public meeting and hearing for August 20, 2026 on the developer's NPDES permit application.","src":[{"u":"https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-announces-partnership-t5-data-centers-advance-hpcai","t":"Bitfarms Announces Partnership with T5 Data Centers to Advance HPC/AI Development at Panther Creek Campus","p":"Bitfarms Ltd."},{"u":"https://paenvironmentdaily.blogspot.com/2025/08/bitfarms-announces-partnership-to.html","t":"Bitfarms Announces Partnership To Develop A.I. Data Center At Panther Creek Waste Coal-Fired Power Plant In Carbon County","p":"PA Environment Digest"}],"j":"city","jc":"Carbon County","jn":"Nesquehoning","jd":"borough","ju":"approx"},{"id":"project-gravity-archbald-lackawanna-county-pa","n":"Project Gravity","op":"Archbald 25 Developer LLC","s":"proposed","st":"PA","city":"Archbald","co":"Lackawanna","lat":41.5,"lon":-75.55,"pre":"approximate","cf":"reported","ac":186,"inv":5000000000,"upd":"2026-10-22","nt":"186 acres, Business Route 6 / Eynon Jermyn Rd. Developer formerly known as Western Hospitality Partners - Jermyn LLC. Up to 6 two-story buildings, 135,000 sq ft each. No tenant signed as of January 2026; removed from PA's Permit Fast Track program May 2026; still awaiting final land development approval. One of three competing proposals in an emerging Lackawanna County cluster (see also Wildcat Ridge and Triboro Industrial Park). Coordinates are approximate.","src":[{"u":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","t":"No tenant yet: Archbald data center developer answers questions about project applications","p":"WVIA"},{"u":"https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/","t":"Plans filed for 1.6 million sq ft data center campus in northeast Pennsylvania","p":"Data Center Dynamics"}],"j":"city","jc":"Lackawanna County","jn":"Archbald","jd":"borough","ju":"approx"},{"id":"project-hazelnut-hazle-township-pa","n":"Project Hazelnut","op":"NorthPoint Development (NP Hazleton Holdings 1 LLC)","s":"proposed","st":"PA","city":"Hazle Township","co":"Luzerne","lat":40.985,"lon":-75.955,"pre":"approximate","cf":"reported","ac":1283,"ann":"2024","upd":"2026-11-04","nt":"Site: Humboldt North Industrial Park, Hazle Township, Luzerne County PA (within a larger ~3,000-acre industrial park); a few miles from Amazon's nuclear-adjacent data center campus (acquired from Talen Energy) - proximity only, AWS is not a confirmed tenant/operator for Project Hazelnut; NorthPoint's own project site names no end-tenant, describing this as a speculative build. Phased: Phase 1 (5 buildings) to begin Q4 2026, Phase 2 (3 buildings) Q1 2028, Phase 3 (7 buildings) Q2 2029. Developer projects ~900-1,300 construction jobs and ~900-950 permanent jobs ($50K-$158K salary range) - not yet delivered, so no job count is recorded; similarly $13.47M in projected county tax revenue over 20 years is a projection, not a subsidy. First surfaced publicly in connection with PA's Permit Fast Track Program (Executive Order 2024-04). NorthPoint's own site explicitly frames this as a general 'data center campus' supporting 'cloud platforms, digital payments, streaming, and healthcare systems' - no AI-specific language found; classified as mixed-use given hyperscale-tier campus scale makes AI workloads plausible even absent explicit branding.","src":[{"u":"https://www.datacenterdynamics.com/en/news/northpoint-proposes-15-building-1280-acre-data-center-campus-in-pennsylvania/","t":"Northpoint proposes 15-building, 1,280-acre data center campus in Pennsylvania","p":"Data Center Dynamics"},{"u":"https://www.foodandwaterwatch.org/2026/06/09/hazle-township-pa-pauses-data-center-development-for-six-months/","t":"Hazle Township, PA Pauses Data Center Development for Six Months","p":"Food & Water Watch"}],"j":"uninc","jc":"Luzerne County","jm":"Hazle township","ju":"approx"},{"id":"renaissance-park-upper-merion-king-of-prussia-pa","n":"Renaissance Park and Innovation Data Center Campus","op":"MLP Ventures","s":"proposed","st":"PA","city":"King of Prussia","co":"Montgomery","lat":40.092,"lon":-75.347,"pre":"approximate","cf":"confirmed","ann":"2026-05","upd":"2026-11-05","nt":"Five separate applications in Upper Merion Township totaling about 4.6 million sq ft, on parcels including 411 Swedeland Road (1.6M sq ft), 2201/2301/2701/2901 Renaissance Blvd (1.9M sq ft), 2100 Renaissance Road (187,000 sq ft) and 3200 Horizon Drive (370,000 sq ft). Applicant entities are affiliated with MLP Ventures founder Brian O'Neill. Filed just before Upper Merion's March 2026 data center ordinance took effect, so reviewed under the prior rules. A company document cited by DeSmog puts campus investment at $35.16 billion; that figure is not independently corroborated, so no investment figure is recorded. Distinct site from MLP Ventures' Plymouth Township proposal.","src":[{"u":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","t":"Proposed King of Prussia data center campus faces renewed scrutiny as review continues","p":"6abc Philadelphia"},{"u":"https://www.desmog.com/2026/08/07/how-pennsylvania-governors-office-helped-push-for-huge-data-centers-in-the-philadelphia-suburbs/","t":"How Pennsylvania Governor's Office Helped Push for Huge Data Centers in the Philadelphia Suburbs","p":"DeSmog"}],"j":"uninc","jc":"Montgomery County","jn":"Swedeland","jm":"Upper Merion township","ju":"approx"},{"id":"keel-scrubgrass-ai-campus-venango-pa","n":"Scrubgrass AI/HPC Data Center Campus","op":"Keel Infrastructure Corp. (formerly Bitfarms)","s":"proposed","st":"PA","city":"Scrubgrass Township","co":"Venango","lat":41.2306,"lon":-79.8517,"pre":"approximate","cf":"reported","ac":650,"upd":"2026-10-15","nt":"Planned HPC/AI redevelopment of the 650-acre Scrubgrass site, with up to about 1.3 GW of potential capacity (not secured). The existing waste-coal plant and bitcoin mining continue on site and, as of October 2026, are tracked separately as the Scrubgrass Generating Plant. Pin reuses that record's approximate point.","src":[{"u":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","t":"Scrubgrass could become area's largest AI data center campus","p":"exploreClarion"},{"u":"https://www.keelinfra.com/campuses/scrubgrass","t":"Scrubgrass Campus","p":"Keel Infrastructure"}],"j":"uninc","jc":"Venango County","jm":"Clinton township","ju":"approx"},{"id":"sentinel-east-whiteland-chester-county-pa","n":"Sentinel East Whiteland Data Center","op":"Sentinel Data Centers","s":"under_construction","st":"PA","city":"East Whiteland Township","co":"Chester","lat":40.041,"lon":-75.545,"pre":"approximate","cf":"reported","mw":300,"ac":100,"upd":"2026-11-04","pb":"Grid — PECO","nt":"Site: 13 S. Bacton Hill Rd, former Foote Mineral Superfund site. Coordinates are approximate for the township.","src":[{"u":"https://cleanview.co/news/data-centers/sentinel-data-centers-announces-300-mw-sentinel-east-whiteland-data-center-in-pa-20260417","t":"Sentinel Data Centers announces 300 MW Sentinel East Whiteland Data Center in PA","p":"CleanView"},{"u":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","t":"Judge denies challenges to East Whiteland data center expansion","p":"Philadelphia Inquirer"}],"j":"uninc","jc":"Chester County","jn":"Frazer","jm":"East Whiteland township","ju":"approx"},{"id":"slate-belt-holdings-upper-mount-bethel-northampton-pa","n":"Slate Belt Holdings Data Center Campus (Upper Mount Bethel)","op":"Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)","s":"proposed","st":"PA","city":"Upper Mount Bethel Township","co":"Northampton","lat":40.9,"lon":-75.13,"pre":"approximate","cf":"reported","ac":754,"upd":"2026-08-31","nt":"Site is roughly 30 miles northeast of Allentown, near Bangor. Land was acquired from River Pointe Logistics in 2026. The developers are challenging Upper Mount Bethel Township's zoning ordinance restrictions on data center use. Coordinates are township-level, not parcel-confirmed.","src":[{"u":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","t":"Talen looks to develop 23-building data center campus in Pennsylvania","p":"BIC Magazine"}],"j":"uninc","jc":"Northampton County","jm":"Upper Mount Bethel township","ju":"approx"},{"id":"allegheny-dc-springdale-cheswick-pa","n":"Springdale Data Center (former Cheswick Generating Station)","op":"Allegheny DC Property Co., LLC","s":"permitted","st":"PA","city":"Springdale","co":"Allegheny","lat":40.5425,"lon":-79.7844,"pre":"approximate","cf":"confirmed","mw":180,"ac":47,"ann":"2025-09","upd":"2026-10-30","nt":"A 565,000 sq ft data center building plus a 200,000 sq ft cooling and facility-management building on the 47-acre former Cheswick Generating Station site in Springdale Borough. Allegheny DC Property Co., LLC is owned by investment firm Davidson Kempner. The proposal states the facility would be used largely for AI development.","src":[{"u":"https://www.wesanews.org/environment-energy/2025-09-29/allegheny-county-springdale-cheswick-data-center-concern","t":"Coal plant to data center: Allegheny County community voices concern","p":"90.5 WESA"},{"u":"https://www.alleghenyfront.org/allegheny-county-springdale-cheswick-power-plant-community-concern/","t":"From coal plant to data center: An Allegheny County community voices concern","p":"The Allegheny Front"}],"j":"city","jc":"Allegheny County","jn":"Springdale","jd":"borough","ju":"approx"},{"id":"tecfusions-keystone-connect-upper-burrell-pa","n":"TECfusions Keystone Connect","op":"TECfusions","s":"proposed","st":"PA","city":"Upper Burrell Township","co":"Westmoreland","lat":40.5817,"lon":-79.705,"pre":"approximate","cf":"confirmed","mw":3000,"ac":1395,"ann":"2025-01-14","upd":"2026-11-04","nt":"Adaptive reuse of the former Alcoa research and development campus in Upper Burrell, Westmoreland County: 1,395 acres, 3 GW planned over a six-year buildout, with 12 MW described as immediately available in existing buildings. Awarded a $2 million Pennsylvania RACP grant. Investment total not disclosed by the developer.","src":[{"u":"https://www.prnewswire.com/news-releases/tecfusions-unveils-massive-1400-acre-data-center-project-in-pennsylvania-revitalizing-former-industrial-plant-302350041.html","t":"TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant","p":"TECfusions via PR Newswire"},{"u":"https://www.cleanview.co/data-centers/pennsylvania","t":"Data Centers in Pennsylvania — Project List & Locations (TECfusions Keystone Connect, Westmoreland, 3,000 MW planned)","p":"Cleanview"}],"j":"city","jc":"Westmoreland County","jn":"Lower Burrell","jd":"city","ju":"approx"},{"id":"tron-usa-ai-campus-titus-station-cumru-berks-pa","n":"TRON USA AI Campus (former Titus Station)","op":"Titus Development Company / Go Energy Group","s":"proposed","st":"PA","city":"Reading","co":"Berks","lat":40.2839,"lon":-75.9372,"pre":"approximate","cf":"reported","mw":200,"ac":196,"upd":"2026-09-25","nt":"The Titus Station coal plant was decommissioned in 2014. Cumru Township adopted a Data Center Overlay District (Ordinance 798) covering the property in April 2026; no land development plan had been filed as of that reporting. Only the announced first phase (200 MW) is recorded — larger long-term figures circulating in developer materials were not confirmed in the cited source. Coordinates are the Cumru Township point, not a parcel-confirmed footprint.","src":[{"u":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","t":"Titus Station redevelopment project in Berks County planned as AI infrastructure campus","p":"Berks Weekly"}],"j":"uninc","jc":"Berks County","jm":"Cumru township","ju":"approx"},{"id":"talen-montour-data-center-campus-montour-county-pa","n":"Talen Energy Montour Data Center Campus","op":"Talen Energy","s":"proposed","st":"PA","city":"Washingtonville","co":"Montour","lat":41.05,"lon":-76.67,"pre":"approximate","cf":"reported","upd":"2026-11-04","nt":"Talen is seeking to rezone approximately 1,000 acres in northern Montour County from agricultural to industrial; the company anticipates about a dozen buildings, each on two to three acres. Acreage figure is the rezoning request area, not a confirmed campus footprint, so no land area is recorded. The request has drawn substantial local opposition over land use, pollution, water and noise. No tenant has been named.","src":[{"u":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","t":"Talen Energy officials address community concerns about rezoning","p":"NorthcentralPA.com"},{"u":"http://paenvironmentdaily.blogspot.com/2026/08/dep-invites-comments-on-air-permit-for.html","t":"DEP Invites Comments On Air Permit For Montour CT Natural Gas Power Plant Expansion In Montour County To Feed Data Centers","p":"PA Environment Digest"}],"j":"uninc","jc":"Montour County","jm":"Derry township","ju":"approx"},{"id":"triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","n":"Triboro Industrial Park / Triboro Commerce Park","op":"Ercor Triboro LLC (Sansone Group)","s":"permitted","st":"PA","city":"Jessup / Olyphant","co":"Lackawanna","lat":41.45,"lon":-75.58,"pre":"approximate","cf":"reported","ac":548,"upd":"2026-10-22","nt":"Jessup/Olyphant border. Converted from a 4-warehouse plan to up to 9 proposed data centers; ~$80M land acquisition; first building targeted 2027. Rezoning/litigation resolved via an Olyphant Borough Council settlement. PPL confirmed a transmission project is being built to serve it but would not name the customer (NDA). One of three competing proposals in the Lackawanna County cluster (see also Project Gravity and Wildcat Ridge). Coordinates are approximate.","src":[{"u":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","t":"PPL Electric Utilities confirms data centers spurred transmission project in Lackawanna County","p":"WVIA"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Lackawanna County","jn":"Olyphant","jd":"borough","ju":"approx"},{"id":"wildcat-ridge-archbald-lackawanna-county-pa","n":"Wildcat Ridge AI Data Center Campus","op":"Cornell Realty Management","s":"proposed","st":"PA","city":"Archbald","co":"Lackawanna","lat":41.51,"lon":-75.54,"pre":"approximate","cf":"reported","mw":1600,"inv":2100000000,"upd":"2026-10-22","nt":"Business Route 6 / Wildcat Rd; 400-574 acres (a range across sources, so no acreage is recorded). 14 three-story buildings, ~17.2M sq ft total. In zoning approval process; developer 'resting its case' as of June 2026. One of three competing proposals in the Lackawanna County cluster (see also Project Gravity and Triboro Industrial Park). Coordinates are approximate.","src":[{"u":"https://www.desmog.com/2026/03/11/data-centers-are-poised-to-engulf-a-pennsylvania-town/","t":"Data centers are poised to engulf a Pennsylvania town","p":"DeSmog"},{"u":"https://www.datacenterdynamics.com/en/news/21bn-data-center-campus-proposed-in-archbald-pennsylvania/","t":"$2.1bn data center campus proposed in Archbald, Pennsylvania","p":"Data Center Dynamics"}],"j":"city","jc":"Lackawanna County","jn":"Archbald","jd":"borough","ju":"approx"},{"id":"ecp-york-2-energy-center-data-center-peach-bottom-york-pa","n":"York 2 Energy Center Data Center","op":"Energy Capital Partners","s":"proposed","st":"PA","city":"Peach Bottom Township","co":"York","lat":39.75,"lon":-76.35,"pre":"approximate","cf":"reported","inv":5000000000,"ann":"2025-07-21","upd":"2026-08-31","nt":"The 828 MW figure is the existing Calpine generating station's capacity, not the data center's IT load — no compute capacity has been published. The $5 billion is the announced site investment; the separately reported $90 billion figure is a statewide multi-company pledge and is not attributed here.","src":[{"u":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","t":"$5B data center coming to York County energy site","p":"Central Penn Business Journal"},{"u":"https://www.yahoo.com/news/articles/heres-where-data-centers-proposed-120559817.html","t":"Here's where data centers have been proposed or discussed in York County — and their status","p":"York Daily Record (via Yahoo News)"}],"j":"uninc","jc":"York County","jn":"Susquehanna Trails","jm":"Peach Bottom township","ju":"approx"},{"id":"hanton-city-smithfield-ri","n":"Hanton City Business Park (data center anchor)","op":"Hanton City Investments LLC","s":"proposed","st":"RI","city":"Smithfield","co":"Providence","lat":41.867,"lon":-71.527,"pre":"approximate","cf":"reported","ann":"2026-05","upd":"2026-10-26","pb":"Grid — Rhode Island Energy (Narragansett)","nt":"No megawatt capacity has been publicly disclosed, so no capacity is recorded. The $59M figure cited in coverage is projected town tax revenue over 30 years, not facility investment, so it is not recorded as investment. Additional coverage (Rhode Island Current, ecoRI News) could not be retrieved as of July 2026 and is not cited; as of October 2026, the cited press coverage is the Ocean State Media and Valley Breeze articles. Coordinates are approximate Smithfield-area coordinates.","src":[{"u":"https://www.oceanstatemedia.org/technology/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban","t":"Proposed data center still looms over Smithfield, even after town council enacts ban","p":"Ocean State Media"},{"u":"https://www.valleybreeze.com/news/smithfield-puts-the-brakes-on-potential-data-center/article_cd279d3e-1bda-4e2e-b3ac-a716d776ab2f.html","t":"Smithfield puts the brakes on potential data center","p":"Valley Breeze"}],"j":"uninc","jc":"Providence County","jm":"Smithfield town","ju":"approx"},{"id":"aib-clt-01-spartanburg-county-sc","n":"CLT-01 Campus (One Blockchain Spartanburg)","op":"AIB Data Centers Inc. (One Blockchain LLC)","s":"operational","st":"SC","city":"Moore","co":"Spartanburg","lat":34.8549,"lon":-82.0127,"pre":"approximate","cf":"confirmed","mw":65,"upd":"2026-10-10","nt":"Operated by One Blockchain LLC, wholly owned by AIB Data Centers Inc. (NYSE American: AIB; renamed from BlockchAIn Digital Infrastructure on 2026-06-25). The 10-Q states an existing 40 MW facility on leased land in Spartanburg County being repurposed into the ~65 MW CLT-01 AI/HPC campus via project entity AIB CLT1 LLC (formed 2026-06-23); revenue today is bitcoin hosting, hence an AI classification of mixed-use. Baxtel reports the address as 389 Tyger River Industrial Drive; that address is not in the SEC filing, so it is recorded here only as a note and the coordinate is the Tyger River Industrial Drive road centroid (approximate, not parcel-confirmed). Same industrial park as the cancelled TigerDC Project Spero record but a different operator and a different, already-built facility.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026089151/ea0301093-10q_aibdata.htm","t":"AIB Data Centers Inc. Form 10-Q for the quarter ended 2026-06-30","p":"U.S. Securities and Exchange Commission (EDGAR)"},{"u":"https://baxtel.com/data-center/blockchain-spartanburg-sc","t":"Baxtel — BlockchAIn: Spartanburg, SC data center","p":"Baxtel"}],"j":"uninc","jc":"Spartanburg County","ju":"approx"},{"id":"dartpoints-greenville-sc","n":"DartPoints Greenville Data Center","op":"DartPoints","s":"operational","st":"SC","city":"Greenville","co":"Greenville","lat":34.8075,"lon":-82.3435,"pre":"approximate","cf":"confirmed","mw":12.5,"inv":125000000,"ann":"2025-11-12","upd":"2026-09-10","nt":"Colocation / edge facility rather than a hyperscale campus, but explicitly positioned by the operator and the state for AI, enterprise and edge workloads. Coordinates are the OSM address point for 78 Global Drive. As of 2026-09-10, per DartPoints' own Greenville location page (dated after this record's 2026-08-26 last update), the status is unchanged: still operational, running continuously since 2007. No utility name or energy-source disclosure was found on the operator's site or in the Nov 2025 / SC Commerce / Greenville EDC press coverage. None of the sources checked (SC Commerce, Greenville EDC, DartPoints' own site) states a land acreage figure for the Greenville site. No FILOT agreement, tax abatement, or other incentive is mentioned in any press source checked (SC Commerce, Greenville EDC press release, Governor's office quote, County Council Chairman's quote) for either the existing facility or the 2025 expansion. This is an absence in press coverage only, not an audited negative at the level of county council minutes (GASB77-grade): as of September 2026, Greenville County's agenda and minutes portal could not be navigated to confirm at that stronger tier, so the question is unresolved, not confirmed clean.","src":[{"u":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","t":"DartPoints expands Greenville County operations","p":"South Carolina Department of Commerce"},{"u":"https://nominatim.openstreetmap.org/search?q=78+Global+Drive%2C+Greenville%2C+SC&format=json&limit=3","t":"OpenStreetMap Nominatim geocode for 78 Global Drive, Greenville, SC","p":"OpenStreetMap"}],"j":"city","jc":"Greenville County","jn":"Greenville","jd":"city","ju":"approx"},{"id":"google-moncks-corner-sc","n":"Google Berkeley County Data Center (Moncks Corner)","op":"Google","s":"operational","st":"SC","city":"Moncks Corner","co":"Berkeley","lat":33.0721,"lon":-80.0391,"pre":"approximate","cf":"confirmed","inv":1300000000,"ann":"2007","upd":"2026-09-21","pb":"Sol Systems/Pine Gate Renewables 225 MW solar + 18 MW battery storage PPA for NC/SC, announced to support Google's regional operations","nt":"Google's flagship South Carolina data center in the Mount Holly / Moncks Corner area of Berkeley County — one of Google's first U.S. data centers, operational since 2007, expanded since. Google states $13B+ invested in South Carolina since 2007 (a statewide figure spanning Berkeley + the Dorchester County sites, not site-specific). Distinct from the Google Ridgeville (Project Dawson) and St. George (Winding Woods) campuses, which are in Dorchester County and tracked separately as of September 2026. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of a disclosed campus address. As of 2026-09-10, Google's own current data-center site still describes the Berkeley County/Moncks Corner facility as one of Google's active South Carolina facilities, consistent with the record being listed as operational. No new capacity, water/cooling, street address, land acreage, jobs, subsidies, or community data was found for this specific site in targeted checks of Santee Cooper's newsroom, generation-projects, board-meetings, IRP, and economic-development pages; Berkeley County's own government site (not retrievable as of September 2026); SC Governor's newsroom; SC Commerce newsroom; scbiz.com; and Google's own site (no per-site address/capacity breakdown -- Google groups all three SC facilities under one page). Santee Cooper's board-meetings page appears to render minutes/agendas via a JS document-management widget, so as of September 2026 its content had not been checked.","src":[{"u":"https://datacenters.google/locations/berkeley-county-south-carolina/","t":"Google Berkeley County, South Carolina — official location page: 'one of our first data centers in the United States', operational since 2007","p":"Google"},{"u":"https://www.datacenterdynamics.com/en/news/google-signs-225mw-solar-energy-deal-with-sol-systems-for-north-south-carolina/","t":"Google signs 225MW solar energy deal with Sol Systems for North & South Carolina","p":""}],"j":"uninc","jc":"Berkeley County","ju":"approx"},{"id":"google-ridgeville-sc","n":"Google Ridgeville Data Center (Project Dawson)","op":"Google","s":"under_construction","st":"SC","city":"Ridgeville","co":"Dorchester","lat":33.096,"lon":-80.3239,"pre":"approximate","cf":"confirmed","ac":231,"ann":"2024-09","upd":"2026-10-28","nt":"Pine Hill Business Campus, Research Center Drive and Highway 17A, Ridgeville. Planned as part of Google's overall $9B SC commitment through 2027 (announced October 2025). MW capacity not disclosed by Google. The September 2024 state announcement does not break investment out by site; $2B is the combined Dorchester County (Ridgeville + St. George) figure. A $510M investment figure appears in a February 2024 Data Center Dynamics report, citing the Post and Courier, on the 231-acre Ridgeville site, which predates that announcement. Live 5 News (WCSC) reported in October 2024 that the $510 million project would build both Dorchester campuses, one in Ridgeville and one in St. George, so it is not settled that $510M is a Ridgeville-only figure, and no investment figure is recorded. As of October 2026, the second Dorchester campus, at Winding Woods Commerce Park, St. George, is listed separately as Google Winding Woods Campus. Coordinates are Ridgeville area centroid. Google's own South Carolina data-center page states a Dorchester County facility 'opens' in 2024, which is difficult to reconcile with this record being listed as under construction as of 2026-08-26. Ridgeville and St. George (Winding Woods, the other Dorchester County Google site in this dataset as of September 2026) are both in Dorchester County and the source does not name which one it refers to, so the statement is not attributed to one site over the other and no status change is asserted. It is also plausible this describes an early operational phase of a multi-phase campus while the overall project legitimately remains listed as under construction. Newer local sources describe both Dorchester County campuses as still being built: the Charleston Regional Development Alliance's October 2025 announcement of Google's $9 billion investment calls them 'projects that are now under active construction', and Dorchester County's data center fact sheet (archived copy captured 29 July 2026) says 'The data centers are being built in phases'. As of October 2026, no source found other than Baxtel, an aggregator, describes the Ridgeville campus as operational, so it remains listed as under construction. As of September 2026, no capacity or jobs data was found for this site in targeted checks of Santee Cooper (newsroom, generation-projects, board-meetings [JS-rendered, not retrievable], IRP and economic-development pages -- none name Google or this project), the SC Governor's newsroom, SC Commerce newsroom, scbiz.com, Post and Courier (not retrievable), Live5/WCSC and ABCNews4/WCIV (client-side search surfaced no results) and the SC PSC docket system (its search requires an interactive form, which could not be submitted).","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-confirms-it-is-behind-project-dawson-data-center-campus-in-south-carolina/","t":"Google confirms it is behind Project Dawson data center campus in South Carolina","p":"Data Center Dynamics"},{"u":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","t":"Google grows South Carolina footprint with new Dorchester County operations – SC Governor press release","p":"SC Governor's Office"}],"j":"city","jc":"Dorchester County","jn":"Ridgeville","jd":"town","ju":"approx"},{"id":"google-winding-woods-st-george-sc","n":"Google Winding Woods Campus","op":"Google","s":"under_construction","st":"SC","city":"St. George","co":"Dorchester","lat":33.1843,"lon":-80.5793,"pre":"approximate","cf":"confirmed","ac":206,"ann":"2024-09","upd":"2026-10-28","nt":"Google's second SC campus, in Winding Woods Commerce Park, St. George, Dorchester County; part of a $9B South Carolina investment (statewide figure — not a single-campus capex). Distinct from Google's Ridgeville, SC campus. IT capacity not disclosed. Coordinates are the St. George area centroid. Google's own site states a Dorchester County 'opens 2024' milestone, the same one noted on the Google Ridgeville Data Center (Project Dawson) record; because St. George/Winding Woods and Ridgeville are both in Dorchester County and the source does not disambiguate, it applies identically here and no status change is asserted. Dorchester County Economic Development's September 26, 2024 release says Google 'broke ground on two new data center campuses in Dorchester County', in Ridgeville and at Winding Woods Commerce Park in St. George; Data Center Dynamics (October 2025) refers to 'the continued construction of its two new campuses in Dorchester County'; the Charleston Regional Development Alliance (October 2025) calls them 'projects that are now under active construction'; and Dorchester County's data center fact sheet (archived copy captured 29 July 2026) says 'The data centers are being built in phases'. As of October 2026, no source found describes the Winding Woods campus as operational, so it remains listed as under construction. As of September 2026, no water/cooling, address, jobs, or subsidies data was found for this site, and no investment figure specific to this campus was found. Live 5 News (WCSC) reported in October 2024 that a $510 million project would build both Dorchester County campuses, one in Ridgeville and one in St. George, and the September 2024 state announcement gives $2 billion for the two campuses combined; whether any part of the $510 million belongs to this campus is not settled, so no investment figure is recorded. Google's own site's '$13B invested in South Carolina since 2007' and 'Google signs 225-megawatt renewable energy deal' (2023) figures are both explicitly not attributed to any single facility by the source itself, so neither is assigned to this site's investment, capacity or energy fields.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-south-carolina-data-centers/","t":"Google to invest $9bn in South Carolina data centers","p":"Data Center Dynamics"},{"u":"https://baxtel.com/data-center/google-winding-woods","t":"Baxtel — Google: Winding Woods Data Center","p":"Baxtel"}],"j":"city","jc":"Dorchester County","jn":"St. George","jd":"town","ju":"approx"},{"id":"meta-aiken-county-sc","n":"Meta Aiken Data Center","op":"Meta","s":"under_construction","st":"SC","city":"Graniteville","co":"Aiken","lat":33.5629,"lon":-81.8287,"pre":"approximate","cf":"confirmed","mw":200,"ac":300,"inv":800000000,"ann":"2024-08","upd":"2026-10-30","nt":"Sage Mill Industrial Park, Graniteville. 715,000 sq ft; Meta's 22nd US data center. Explicitly optimized for AI workloads. Administration building constructed with mass timber. Expected operational spring 2027. Coordinates are Graniteville area centroid. On subsidies: in April 2023 Aiken County Council approved, 7-2, a fee-in-lieu-of-tax agreement and a joint multi-county business/industrial park with Edgefield County for the then code-named 'Project Sabal' (intermediary Starskey LLC), reported by the Aiken Standard; a September 2024 Aiken Standard column reports that the fee-in-lieu agreement between Meta and Aiken County runs for 40 years. No dollar value or ordinance number was found, so the subsidy entry carries no amount.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-plans-800m-data-center-campus-in-aiken-county-south-carolina/","t":"Meta plans $800m data center campus in Aiken County, South Carolina","p":"Data Center Dynamics"},{"u":"https://www.postandcourier.com/aikenstandard/business/meta-aiken-county-data-center-mcmaster/article_aaf0aa0c-64a8-11ef-a8f7-d389d536dea5.html","t":"Facebook owner Meta selects Aiken County for first South Carolina data center","p":"Post and Courier / Aiken Standard"}],"j":"uninc","jc":"Aiken County","jn":"Graniteville","ju":"approx"},{"id":"northmark-spartanburg-sc","n":"NorthMark Spartanburg Computing Center","op":"NorthMark Strategies (Valara Holdings)","s":"under_construction","st":"SC","city":"Spartanburg","co":"Spartanburg","lat":34.9456,"lon":-81.9259,"pre":"approximate","cf":"confirmed","mw":450,"inv":2800000000,"ann":"2025-04","upd":"2026-08-25","pb":"on-site natural gas generation","nt":"A $2.8bn conversion of the old Kohler plant at 4000 S Pine St, which closed in 2024, with initial operations targeted for Q3 2026 and construction running to 2028. Permitted first for 48 MW of gas generation and since applied to go beyond 450 MW; the larger figure is what is pending. Projected at 459,000 gallons of water a day with about 85% lost to evaporation, which is why cooling is recorded as evaporative.","src":[{"u":"https://www.postandcourier.com/spartanburg/news/spartanburg-data-center-northmark-water-power/article_07cc2de8-9eb6-4711-ad7f-90ef8230b158.html","t":"Spartanburg's NorthMark data center by the numbers","p":"The Post and Courier"},{"u":"https://www.wspa.com/news/local-news/company-provides-update-on-data-center-under-construction-in-spartanburg/","t":"Company provides update on data center under construction in Spartanburg","p":"WSPA"}],"j":"city","jc":"Spartanburg County","jn":"Spartanburg","jd":"city","ju":"approx"},{"id":"project-boulder-colleton-county-sc","n":"Project Boulder","op":"Eagle Rock Partners","s":"cancelled","st":"SC","co":"Colleton","lat":32.7,"lon":-80.62,"pre":"approximate","cf":"reported","mw":1000,"ac":860,"upd":"2026-10-30","nt":"Near the ACE Basin (Ashepoo-Combahee-Edisto estuary). Would be South Carolina's first gigawatt-scale data center if built; speculative, no named tenant. Coordinates are approximate.","src":[{"u":"https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/","t":"Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians","p":"SC Daily Gazette"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Colleton County","ju":"approx"},{"id":"srs-ai-data-center-savannah-river-site-sc","n":"Savannah River Site AI Data Center (Amentum)","op":"Amentum","s":"proposed","st":"SC","co":"Barnwell","lat":33.2122,"lon":-81.6224,"pre":"approximate","cf":"reported","mw":1000,"ann":"2026-07-20","upd":"2026-10-28","nt":"NNSA (DOE) announced 2026-07-20 that Amentum was selected to enter negotiations for a phased lease to build a ~1 GW AI data center at the Savannah River Site, paired with ~2 GW of dedicated on-site generation (companion record: Savannah River Site Energy Generation Project (Amentum)). SRS spans Aiken, Barnwell, and Allendale counties, SC. NNSA's solicitation for the site identified 10 tracts totaling 3,103 acres for AI infrastructure projects; as of October 2026 none of the cited sources designates a specific tract, county, or parcel for this project. Coordinates are the SRS site centroid, not a specific tract — precision approximate. The county shown is the one containing that centroid (Barnwell County, per the US Census geocoder, October 2026); it is not a designated project county. Selection for negotiation is not a final lease award; subject to successful negotiation, permitting, and federal safety/security review.","src":[{"u":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","t":"NNSA Selects Amentum for AI Data Center and Energy Project at Savannah River Site","p":"U.S. Department of Energy / NNSA"},{"u":"https://www.nucnet.org/news/amentum-chosen-for-negotiations-on-lease-for-savannah-river-ai-data-centre-7-3-2026","t":"Amentum chosen for negotiations on lease for Savannah River AI data centre","p":"NucNet"}],"j":"uninc","jc":"Barnwell County","ju":"approx"},{"id":"applied-digital-deuel-county-sd","n":"Applied Digital Deuel County AI Campus","op":"Applied Digital Corporation","s":"cancelled","st":"SD","city":"Toronto","co":"Deuel","lat":44.567,"lon":-96.62,"pre":"approximate","cf":"confirmed","mw":430,"ac":300,"ann":"2025","upd":"2026-10-30","nt":"The record is listed as cancelled per Applied Digital's own March 2026 statement (land option to lapse). The 'up to $16 billion' investment and up to 200 jobs were announced figures for the proposal. The investment is recorded in the status history rather than as a structured investment figure, since the project will not proceed; the jobs figure is recorded as 200 permanent jobs from Applied Digital's April 2025 presentation to the Deuel County Commissioners, where KXLG reported the facility was expected to employ around 200 people in permanent roles. The AI classification is marked confirmed — Data Center Dynamics reported it as an AI data center. The Otter Tail Power association reflects the proposed (now abandoned) siting. Deuel County Commission minutes of December 16, 2025 record a 300-acre facility with two buildings.","src":[{"u":"https://www.datacenterdynamics.com/en/news/applied-digital-proposes-multi-billion-dollar-data-center-in-south-dakota/","t":"Applied Digital proposes multi-billion-dollar data center in South Dakota","p":"Data Center Dynamics"},{"u":"https://www.datacenterdynamics.com/en/news/applied-digital-says-data-center-near-toronto-south-dakota-unlikely-to-go-forward/","t":"Applied Digital says data center near Toronto, South Dakota, unlikely to go forward","p":"Data Center Dynamics"}],"j":"uninc","jc":"Deuel County","jm":"Scandinavia township","ju":"approx"},{"id":"gemini-data-center-sioux-falls-sd","n":"Sioux Falls Technology Park (Gemini Data Center)","op":"Gemini Data Center SD LLC","s":"permitted","st":"SD","city":"Sioux Falls","co":"Minnehaha","lat":43.583,"lon":-96.685,"pre":"approximate","cf":"confirmed","mw":500,"ac":164,"ann":"2025","upd":"2026-11-04","pb":"Grid (Xcel Energy; adjacent to Xcel's Split Rock substation)","nt":"The AI classification is likely (not confirmed): Gemini is the land developer, no tenant is signed, and only developer aspiration to attract a hyperscale/AI/neocloud tenant is on record. Capacity (500 MW) and acreage per SiouxFalls.Business; an earlier report cited 160 acres. Coordinates are approximate for the northeast Sioux Falls site. As a developer land project with no signed tenant, its water, subsidy, investment, and job figures remain developer projections only (South Dakota has no state income tax and rejected data-center incentive bills); none of them is recorded pending a confirmed tenant.","src":[{"u":"https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/","t":"Hyperscale data center seeking city approvals to build northeast of Sioux Falls","p":"SiouxFalls.Business"},{"u":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/","t":"Sioux Falls data center developers detail next steps","p":"SiouxFalls.Business"}],"j":"city","jc":"Minnehaha County","jn":"Sioux Falls","jd":"city","ju":"approx"},{"id":"5c-mem01-memphis-tn","n":"5C MEM01 Memphis (former Fred's headquarters)","op":"5C Data Centers","s":"operational","st":"TN","city":"Memphis","co":"Shelby","lat":35.0301,"lon":-89.9369,"pre":"approximate","cf":"reported","ac":59,"inv":152000000,"upd":"2026-10-28","nt":"Conversion of the former Fred's discount-retail headquarters, a multi-storey warehouse and office complex bought by Olymbec in 2019. DCD (2025-05-06), citing WREG, reports plans were submitted to Shelby County in late 2024 to convert 4300 Getwell Road into a data center supporting an initial 15MW IT load in phase one; that 15 MW phase-one figure comes from a late-2024 plan and is not recorded as planned capacity: 5C's own facility table lists 20 MW for 2026, and its 64 MW (2027) and 35 MW (2029+) entries do not say whether they are cumulative or additional, so, as of October 2026, no planned total is recorded. DCD also reported that 5C's own site listed a Memphis facility, MEM01, at 20MW in 2025 and 60MW from 2027; the 60MW figure, second-hand in DCD, is not recorded as capacity. FOX13 (June 2026) reported that 5C's website gave the Memphis site a current capacity of 20 megawatts with plans to expand for 35 megawatts, and, as of October 2026, 5C's facility table lists MEM01 at 20 MW of 2026 capacity; that 20 MW is recorded as operational capacity. The 965,000 sq ft / 59-acre complex figures are Olymbec's, for the whole property, not for the data-center footprint. Quebec firms Adag Group and Hypertec are involved; 5C was subsequently acquired by Hypertec. Confidence is reported. FOX13 reported drone video from January 2026 of construction on the back side of the building, and the Daily Memphian (September 2026) reported that 5C is now operating in 200,000 square feet of the former Fred's space, which is the basis for the operational status. As of September 2026, no source found confirmed permit issuance. Separately, Memphis City Council members led by JB Smiley Jr. introduced a proposed ordinance on 2026-08-16 for a temporary moratorium on new data-center developments citywide, which is context for this site but is not stated to apply to it.","src":[{"u":"https://web.archive.org/web/20250720112541/https://www.datacenterdynamics.com/en/news/5c-plots-data-center-at-former-freds-site-in-memphis-tennessee/","t":"5C plots data center at former Fred's site in Memphis, Tennessee","p":"DataCenterDynamics (archived)"},{"u":"https://wearememphis.com/news/152-million-data-center-coming-to-former-freds-headquarters-advancing-memphis-tech-future/","t":"$152 Million Data Center Coming to Former Fred's Headquarters — investment, jobs and site details from the EDGE filing","p":"We Are Memphis (Greater Memphis Chamber)"}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city","ju":"approx"},{"id":"bitdeer-knoxville-tn","n":"Bitdeer Knoxville AI Datacenter (5101 S. National Drive)","op":"Bitdeer","s":"under_construction","st":"TN","city":"Knoxville","co":"Knox","lat":35.9413,"lon":-83.8361,"pre":"approximate","cf":"reported","mw":86,"ac":9.88,"upd":"2026-09-09","nt":"Existing Bitmain/Bitdeer Bitcoin mining site operational since May 2020 (property acquired 2018 via Commercial Purchase and Sale Agreement with Kemet Foil Manufacturing LLC, 9.88 acres / 77,678 sq ft industrial building). The 20-F discloses an active conversion to AI cloud use: Phase 1 (37MW) targeted Q4 2026, Phase 2 (49MW) targeted Q1 2027, against 86MW total electrical capacity in use as of 2026-03-31. Coordinates are an approximate parcel-area estimate for the South National Drive industrial corridor in Knox County (near APN 110-02627 per public tax-assessment/LoopNet listing); as of July 2026, the exact parcel centroid has not been pinned. Crypto-mining site converting to AI (Bitdeer 20-F): Phase 1 37 MW targeted Q4 2026, Phase 2 49 MW Q1 2027; zero AI capacity live today (the existing 86 MW is legacy mining load being phased out). Status as of 2026-09-09: no change. Bitdeer's own filing still describes the Knoxville AI conversion as in design/build with a Q4 2026 target, so the record stays listed as under construction.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm","t":"Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30","p":"SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123)"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Knox County","ju":"approx"},{"id":"cielo-clarksville-tn","n":"Cielo Montgomery County AI Campus","op":"Cielo Digital Infrastructure","s":"proposed","st":"TN","city":"Clarksville","co":"Montgomery","lat":36.53,"lon":-87.36,"pre":"approximate","cf":"reported","mw":350,"ac":107,"upd":"2026-10-22","pb":"Grid — Clarksville (CDE Lightband)","nt":"~107-acre proposed site, ~350 MW. Distinct operator/parcel from Google's operational Clarksville (Montgomery County) campus. Sourcing is thin (tracker + developer site) → confidence reported. Cielo specializes in power/fiber-ready campus development. Coordinates are the Clarksville area centroid.","src":[{"u":"https://cleanview.co/data-centers/tennessee/2037/cielo-clarksville-data-center","t":"Cielo Clarksville Data Center","p":"Cleanview"},{"u":"https://cieloinfra.com/","t":"Cielo Digital Infrastructure","p":"Cielo Digital Infrastructure"}],"j":"city","jc":"Montgomery County","jn":"Clarksville","jd":"city","ju":"approx"},{"id":"xai-colossus-memphis-tn","n":"Colossus","op":"xAI","s":"operational","st":"TN","city":"Memphis","co":"Shelby","lat":35.0565,"lon":-90.0148,"pre":"approximate","cf":"reported","mw":1200,"inv":12000000000,"ann":"2024","upd":"2026-10-30","pb":"grid (Memphis Light Gas & Water)","nt":"xAI did not obtain a PILOT or any other formally granted incentive for the Memphis site, unlike the usual Memphis path, so no subsidy is recorded, as a known absence rather than an unknown; the site is instead expected to pay more than $30 million in combined Memphis and Shelby County property taxes. A federal Clean Air Act suit filed 2026-04-14 (NAACP v. X.AI Corp. and MZX Tech LLC, No. 3:26-cv-00074, N.D. Miss.) targets xAI's separate 'Colossus Gas Plant' in Southaven, Mississippi (MZX Tech LLC, 2875 Stanton Road South), not this site or CTC Property LLC; it cites this site's turbine history only as background. Permit-level detail for this site's turbines, including that the permit covers 15 turbines on a permanent basis, is in the companion record CTC Property Gas Turbine Plant (Colossus 1).","src":[{"u":"https://en.wikipedia.org/wiki/Colossus_(supercomputer)","t":"Colossus (supercomputer) — Wikipedia","p":"Wikipedia"},{"u":"https://www.reuters.com/technology/artificial-intelligence/musk-says-xai-has-built-worlds-most-powerful-ai-training-cluster-2024-09-24/","t":"Musk says xAI has built world's most powerful AI training cluster — Reuters","p":"Reuters"}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city","ju":"approx"},{"id":"xai-colossus-2-memphis-tn","n":"Colossus 2 (Whitehaven)","op":"xAI","s":"operational","st":"TN","city":"Memphis","co":"Shelby","lat":34.998,"lon":-90.0349,"pre":"approximate","cf":"confirmed","ac":100,"upd":"2026-10-28","nt":"Second, physically separate xAI Memphis site, distinct from the Colossus campus at 3231 Paul R Lowry Road in Boxtown. DCD (2025-03-10) reports xAI affiliate CTC Properties bought three parcels at 5400 Tulane Road in Whitehaven for $80m: an existing 1 million sq ft warehouse plus two adjacent sites totalling 100 acres. The $80m figure is the land purchase price recorded in property records, not total project investment. 5400 Tulane Road (DCD) is the property-record address for the three-parcel, 100-acre assemblage; 5420 Tulane Road (Wikipedia) is the warehouse building itself. No operational capacity is recorded. An S-1 filing describes the first cluster as \"approximately 110,000 GB200 processors, approximately 210 megawatts of compute power\", as quoted by Epoch AI; the figure is stated as approximate, the filing does not define the term, and Epoch AI says it believes \"compute power\" corresponds to GPU server power. Larger figures are stated intentions, not recorded capacity: Memphis Light Gas and Water was asked for a system-impact study for up to 260 MW, xAI's Brent Mayo said the site could host up to 350,000 GPUs, and the widely quoted 1 GW and 2 GW figures are unconfirmed. The gas-turbine power plant reported to serve this site is on Stanton Road in Southaven, Mississippi, and, as of October 2026, is tracked separately as Colossus 2 power station. The pin is the centroid of the OpenStreetMap building tagged \"xAI Macrohard Colossus 2\" (operator xAI, 5420 Tulane Road). It is a crowd-sourced footprint, not a parcel-confirmed point, so its precision is approximate.","src":[{"u":"https://web.archive.org/web/20250517234219/https://www.datacenterdynamics.com/en/news/elon-musks-xai-buys-one-million-sq-ft-site-for-second-memphis-data-center/","t":"Elon Musk's xAI buys 1 million sq ft site for second Memphis data center","p":"DataCenterDynamics (archived)"},{"u":"https://en.wikipedia.org/wiki/Colossus_(data_center)","t":"Colossus (data center)","p":"Wikipedia"}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city","ju":"approx"},{"id":"dcblox-chattanooga-e16th-tn","n":"DC BLOX Chattanooga (807 E 16th Street)","op":"DC BLOX","s":"operational","st":"TN","city":"Chattanooga","co":"Hamilton","lat":35.0315,"lon":-85.2976,"pre":"approximate","cf":"confirmed","mw":1,"upd":"2026-09-21","nt":"Colocation facility DC BLOX has operated at this site since 2017; the Times Free Press calls the 9,000 sq ft windowless building the city's largest data center. DC BLOX vice president Bill Thomson states its maximum power capacity is 1 megawatt and it typically runs at about 20% of that, and that this capacity is not enough to run AI servers — hence the AI classification is mixed-use rather than likely. The 1 MW maximum rating, which DC BLOX's Chattanooga page gives as up to 1MW critical load (as of October 2026), is recorded as both planned and operational capacity; it is a rating, not a measured operating load. Confirmed absences from the same interview (2026-08-23): the site was zoned for light industry and did not require data-center-specific permitting, and DC BLOX has no plans to expand its Chattanooga footprint; its AI-oriented builds are elsewhere in the region. As of October 2026, DC BLOX's Chattanooga page describes the building as 8,000 sq ft initially, expandable up to 16,000 sq ft, and the power as expandable up to 3.5MW; these are stated expansion ceilings rather than an announced expansion, and the 3.5MW is not recorded as capacity. Hamilton County's one-year data-center moratorium covers only unincorporated parts of the county, so it does not reach this site. Coordinates are a geocode of the street address.","src":[{"u":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","t":"Where are data centers in Chattanooga region? Facilities vary widely.","p":"Chattanooga Times Free Press (archived)"},{"u":"https://www.peeringdb.com/api/fac?id=7217","t":"PeeringDB facility 7217 — DC BLOX CHA1, 807 E 16th St, Chattanooga, TN 37408","p":"PeeringDB"}],"j":"city","jc":"Hamilton County","jn":"Chattanooga","jd":"city","ju":"approx"},{"id":"edgeconnex-nas01-nashville-tn","n":"EdgeConneX NAS01 Nashville","op":"EdgeConneX","s":"operational","st":"TN","city":"Nashville","co":"Davidson","lat":36.1449,"lon":-86.7035,"pre":"approximate","cf":"confirmed","upd":"2026-10-28","nt":"Carrier-neutral edge colocation facility, short code EDCNAS01. EdgeConneX's own page states a 42,500 sq ft facility with 9,355 sq ft of raised floor for tenant racks, within 4 miles of downtown Nashville and 4.5 miles of Nashville International Airport, and that NAS01 earned ENERGY STAR certification from the EPA. It does not state a megawatt figure, so no capacity is recorded; Baxtel's power and square-footage fields are behind a paywall. Street address (1841 Air Lane Drive, Building 3) comes from Baxtel, not from the operator page. Cooling is described only as a 30-inch raised/under-floor forced-air plenum with N+1 CRACs; the page does not say how heat is rejected, so the cooling type is unknown. The AI classification is mixed-use: this is general-purpose edge colocation with no stated AI or GPU workload. EdgeConneX states it holds rights to adjacent space for expansion.","src":[{"u":"https://web.archive.org/web/20260802162755/https://www.edgeconnex.com/locations/americas/nashville-tn/","t":"NAS01 Nashville Data Center","p":"EdgeConneX (archived)"},{"u":"https://baxtel.com/data-center/edgeconnex-nashville","t":"EdgeConneX Nashville","p":"Baxtel"}],"j":"city","jc":"Davidson County","jn":"Nashville-Davidson metropolitan government (balance)","jd":"city","ju":"approx"},{"id":"fisk-quantum-leap-nashville-tn","n":"Fisk University Quantum Leap Innovation & Technology Center","op":"Fisk University","s":"proposed","st":"TN","city":"Nashville","co":"Davidson","lat":36.1668,"lon":-86.7973,"pre":"approximate","cf":"confirmed","mw":30,"ac":5,"inv":400000000,"ann":"2026-05","upd":"2026-09-21","nt":"Announced May 2026 as the anchor of Fisk's ~$1 billion \"Quantum Leap\" campus master plan. The 100,000 sq ft Innovation & Technology Center splits into 30,000 sq ft of academic space and a 70,000 sq ft, 30MW technology shell that DCD reports will be set aside for a data-center partner not yet named; the $400m figure is that portion of the project, not the whole master plan. Fisk itself avoids the phrase \"data center\" and calls it an Innovation & Technology Center. Site is five undeveloped acres, a former athletics track just west of Johnson Gymnasium at 17th Avenue North and Herman Street in the 37208 ZIP. Still awaiting Nashville Metropolitan Planning Commission approval as of the sources' dates, so status is proposed. Coordinates are a geocode of Herman Street within 37208, not a parcel; no source states lat/lon. No subsidy agreement is mentioned in either source.","src":[{"u":"https://web.archive.org/web/20260819034031/https://www.datacenterdynamics.com/en/news/fisk-university-looks-to-build-data-center-in-nashville-tennessee/","t":"Fisk University looks to build data center in Nashville, Tennessee","p":"DataCenterDynamics (archived)"},{"u":"https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/","t":"What to know about the data center planned for Nashville HBCU Fisk University's campus","p":"WSMV 4 Nashville"}],"j":"city","jc":"Davidson County","jn":"Nashville-Davidson metropolitan government (balance)","jd":"city","ju":"approx"},{"id":"google-montgomery-county-tn","n":"Google Montgomery County Data Center","op":"Google","s":"operational","st":"TN","city":"Clarksville","co":"Montgomery","lat":36.5288,"lon":-87.3636,"pre":"approximate","cf":"confirmed","ac":1300,"inv":600000000,"ann":"2015","upd":"2026-10-22","nt":"Address: 1000 Boolean Dr, Clarksville, TN 37040 (former Hemlock Semiconductor site). Coordinates are approximate for that site. Google reports $2.5B+ total Tennessee investment since 2018 but facility-level investment is $600M. 30% veteran workforce. Correction: Original announcement was December 2015 (not 2018); facility opened November 2019 (not 2022).","src":[{"u":"https://tnecd.com/news/governor-haslam-commissioner-boyd-announce-google-to-locate-new-data-center-in-clarksville/","t":"Governor Haslam Announces Google to Locate New Data Center in Clarksville","p":"Tennessee Department of Economic & Community Development"},{"u":"https://clarksvillenow.com/local/google-officially-opens-clarksville-montgomery-county-data-center/","t":"Google officially opens Clarksville-Montgomery County data center","p":"ClarksvilleNow"}],"j":"city","jc":"Montgomery County","jn":"Clarksville","jd":"city","ju":"approx"},{"id":"meta-gallatin-tn","n":"Meta Gallatin Data Center Campus","op":"Meta","s":"operational","st":"TN","city":"Gallatin","co":"Sumner","lat":36.3884,"lon":-86.4369,"pre":"approximate","cf":"confirmed","mw":300,"ac":900,"inv":1500000000,"ann":"2022","upd":"2026-10-22","nt":"Campus coordinates are city-centroid approximation for Gallatin, TN. Up to 12 data halls planned on 900+ acres per DPR Construction (general contractor). Meta is deploying AI GPU clusters in waterproof tent structures (rapid deployment structures) at this campus to accelerate capacity ahead of permanent building construction.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-brings-data-centers-in-tents-to-gallatin-tennessee/","t":"Meta brings data centers in tents to Gallatin, Tennessee","p":"Data Center Dynamics"},{"u":"https://www.weku.org/amsn/2025-11-25/tennessee-has-60-data-centers-nashville-probably-has-more-than-you-think","t":"Tennessee has 60 data centers; Nashville probably has more than you think","p":"WEKU / NPR"}],"j":"city","jc":"Sumner County","jn":"Gallatin","jd":"city","ju":"approx"},{"id":"xai-minihard-memphis-tn","n":"Minihard","op":"xAI","s":"under_construction","st":"TN","city":"Memphis","co":"Shelby","lat":34.9995,"lon":-90.0429,"pre":"approximate","cf":"reported","inv":659000000,"upd":"2026-09-13","nt":"Not a renamed or duplicate variant of Colossus 2 (Whitehaven), tracked separately as of September 2026. That record is the original ~1M sq ft converted warehouse purchase (Whitehaven, operational). Minihard is a separate, new-construction building on the same broader Tulane Road campus -- As of October 2026 Baxtel's Minihard entry describes 'a planned $659 million investment in a new four-story, 312,000-square-foot building on Tulane Road,' and its Colossus 2 text says the purchase 'includes an existing warehouse,' and Wikipedia independently names it 'a denser \"Minihard\" building under construction at ~5414 Tulane Road,' as distinct from both Colossus 2 and from the Southaven, MS 'Macrohardrr' site (out of state, excluded). Status also differs: Colossus 2 is operational; Minihard is under construction. Press reporting (not independently consulted as of September 2026) also puts the building at 75 ft on a 79-acre permit parcel with ~220,000 GB300 GPUs; no cited source states those figures, so they are omitted. Coordinates are an OSM address point for 5414 Tulane Road (Nominatim returns category=place / type=house at 34.9994934,-90.0429461), not a mapped building footprint -- an earlier version of this note, corrected 2026-09-13, described it as a building way. Precision is therefore approximate, not exact: the point locates the street address, not this building. As of October 2026, the Colossus 2 (Whitehaven) record is pinned to the centroid of the OpenStreetMap building tagged \"xAI Macrohard Colossus 2\", about 755m from this point, so this address point does not sit on that building.","src":[{"u":"https://en.wikipedia.org/wiki/Colossus_(data_center)","t":"Colossus (data center) - Wikipedia","p":""},{"u":"https://baxtel.com/data-center/xai-colossus-2-bldg1","t":"xAI: Colossus 2 Bldg1 Data Center - Baxtel","p":""}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city","ju":"approx"},{"id":"neural-nexus-memphis-tn","n":"Neural Nexus Innovation District","op":"Legacy Power Capital","s":"proposed","st":"TN","city":"Memphis","co":"Shelby","lat":35.1428,"lon":-90.05,"pre":"approximate","cf":"reported","inv":9400000000,"upd":"2026-09-13","nt":"Announced 2025-12-10 (per the Chamber press release dateline: 'MEMPHIS, TN. Wednesday, December 10, 2025'). Located on 'two full city blocks' in downtown Memphis described both as 'adjacent to FedExForum and Beale Street' and 'across from AutoZone Park' (Downtown Memphis Commission) -- these are the same downtown block cluster, but no street address or parcel has been published, so this pin uses the AutoZone Park landmark centroid, disclosed as approximate. Total project investment is reported as $9.4B in the Downtown Memphis Commission's headline; as of October 2026 the Chamber release states no dollar figure. That release describes a mixed-use development with office, residential and retail space and sovereign cloud computing capabilities, and as of October 2026 neither cited page mentions a hotel; a separate reported first-phase figure of ~$400M and ~70MW of power (seen in secondary aggregation, not independently fetched as of September 2026) is omitted pending verification against a primary source. Site is the former location of The Walk development on Union Avenue.","src":[{"u":"https://memphischamber.com/blog/press-release/legacy-power-capital-announces-neural-nexus-innovation-district-in-downtown-memphis/","t":"Legacy Power Capital Announces \"Neural Nexus\" Innovation District in Downtown Memphis - Greater Memphis Chamber","p":"Greater Memphis Chamber"},{"u":"https://downtownmemphis.com/post/downtown-memphis-to-get-94-billion-neural-nexus-mixed-use-development","t":"Downtown Memphis to Get $9.4 Billion \"Neural Nexus\" Mixed-Use Development","p":"Downtown Memphis Commission"}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city","ju":"approx"},{"id":"ornl-oak-ridge-leadership-computing-facility-tn","n":"Oak Ridge Leadership Computing Facility (Frontier supercomputer)","op":"Oak Ridge National Laboratory (UT-Battelle for the U.S. Department of Energy)","s":"operational","st":"TN","city":"Oak Ridge","co":"Roane","lat":35.9295,"lon":-84.3106,"pre":"approximate","cf":"confirmed","upd":"2026-09-21","nt":"DOE Office of Science user facility housing Frontier (exascale HPC used for simulation and AI training/analysis) and, from 2028, the Discovery supercomputer for the DOE Genesis Mission. Facility power draw and floor area are not stated on the fetched pages, so no capacity is asserted. Distinct from the tracked DOE Oak Ridge Reservation AI data center lease sites.","src":[{"u":"https://www.olcf.ornl.gov/frontier/","t":"Frontier — Oak Ridge Leadership Computing Facility (delivered 2021, early operations 2022; HPE Cray EX, AMD EPYC/Instinct; 1.6 EF peak)","p":"Oak Ridge Leadership Computing Facility / ORNL"},{"u":"https://www.openstreetmap.org/node/10648552506","t":"OpenStreetMap node 10648552506: 'Frontier (supercomputer)', operator Oak Ridge National Laboratory, telecom=data_center","p":"OpenStreetMap"}],"j":"city","jc":"Roane County","jn":"Oak Ridge","jd":"city","ju":"approx"},{"id":"doe-oak-ridge-reservation-ai-data-centers-tn","n":"Oak Ridge Reservation AI Data Center Sites (DOE land lease)","op":"U.S. Department of Energy","s":"proposed","st":"TN","city":"Oak Ridge","co":"Roane","lat":35.9353,"lon":-84.3924,"pre":"representative_multi_site","cf":"confirmed","ann":"2025-09","upd":"2026-09-09","nt":"DOE's Offices of Environmental Management and Science issued a Request for Proposal on 2025-09-30 (published the week of 2025-10-13 per FedScoop) seeking U.S. companies to build, own and operate AI data centers and/or energy generation on the Oak Ridge Reservation under one or more long-term ground leases funded entirely by the lessee. Two sites are named in the DOE release: one at the East Tennessee Technology Park and one on land adjacent to Oak Ridge National Laboratory. This is recorded as a single record with the pin at a representative point for a multi-site project, geocoded to the East Tennessee Technology Park, because DOE names two sites but publishes no design, footprint, or capacity for either; splitting it would duplicate a record with no site-specific facts. ORNL itself geocodes to 35.9301332, -84.3119307. Confirmed absences as of 2026-09-09: no lessee has been selected, no capacity, investment, footprint or timeline is stated, and applicants — not DOE — are responsible for securing utility interconnection agreements and all permitting. The operator field records DOE as the landowner and solicitor, not as the eventual data-center operator, which is unknown. Oak Ridge is one of four federal sites DOE identified for AI infrastructure. Distinct from Kairos Power Hermes 2 (tracked separately as of September 2026), which is a separate NRC-licensed reactor project at Oak Ridge.","src":[{"u":"https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge","t":"U.S. Energy Department Seeks Proposals for AI Data Centers, Energy Projects at Oak Ridge","p":"U.S. Department of Energy, Office of Environmental Management"},{"u":"https://fedscoop.com/energy-rfp-oak-ridge-ai-data-centers/","t":"Energy seeks proposals for AI data centers at Oak Ridge","p":"FedScoop"}],"j":"city","jc":"Roane County","jn":"Oak Ridge","jd":"city","ju":"approx"},{"id":"project-river-data-center-bradley-county-tn","n":"Project River Data Center","op":"Wright Brothers Construction","s":"proposed","st":"TN","city":"Cleveland","co":"Bradley","lat":35.3314,"lon":-84.8686,"pre":"approximate","cf":"reported","ac":850,"inv":7300000000,"ann":"2026-08","upd":"2026-09-09","pb":"Project River Energy Campus","nt":"The data-center tenant is not confirmed. Wright Brothers Construction CEO Mitchell Simpson told Mix 104.1 WCLE on 2026-08-26 that the power plant is certain but its offtaker is not: \"We definitely know we're developing a power plant... We don't know what it's going to power yet... It potentially could be a data center, but it very well could be something else,\" naming advanced manufacturing, robotics and semiconductor manufacturing as alternatives, before adding that with that much power \"it's very likely going to be that.\" The company's own 2026-08-26 release describes the campus as \"anchored by an on-site power plant and data center.\" The record is marked reported for that reason. Roughly 850 acres of privately-owned Wright family land west of I-75 and north of Old Lower River Road NW, along the Hiwassee River in northern Bradley County near I-75 Exit 33, submitted for rezoning and annexation into the City of Cleveland on 2026-08-25. The $11.3bn headline is the whole campus; $7.3bn is the data-center portion as itemised in press coverage. Groundbreaking is not expected until end of 2027 and the build is phased over 60 months. Coordinates are a geocode of Lower River Road NW, not the parcel; no source states lat/lon. No state or local incentive agreement is named in any of the three sources.","src":[{"u":"https://projectriver.energy/","t":"Project River — An Industrial Energy Campus That Supplies Itself","p":"Wright Brothers Construction"},{"u":"https://www.chattanoogan.com/2026/8/26/522510/Proponents-Of-Bradley-County-Project.aspx","t":"Proponents Of Bradley County Project With Large-Scale Data Center Cite Tax Benefits","p":"Chattanoogan.com"}],"j":"uninc","jc":"Bradley County","ju":"approx"},{"id":"stem-practice-sycamore-view-memphis-tn","n":"The STEM Practice Sycamore View AI Data Center","op":"Golden Acquisitions / The STEM Practice","s":"under_construction","st":"TN","city":"Memphis","co":"Shelby","lat":35.1616,"lon":-89.8597,"pre":"exact","cf":"reported","mw":9,"ac":1.5,"upd":"2026-09-21","nt":"Reported 2026-01-13: 'Nate Golden of Golden Acquisitions' is purchasing the building at 1341 Sycamore View and working with The STEM Practice, described as 'a tech company that works with Oracle,' to build a modular AI data center ('will be modular instead' of a hyperscale build like xAI's Colossus). Timeline per the source: 'the plan is to have part of the data center running by May 1.' Data Center Dynamics (January 15, 2026) reports that the existing four-story building, built in 1983, is set on a 1.5-acre parcel, that the first phase of the 38,500-square-foot data center could be live by May 2026, and that the site could offer up to 9MW at full build-out; it also reports Golden saying on LinkedIn that the Memphis site is one of four Tennessee data center locations slated to open in May 2026. The 9MW full build-out figure is recorded as planned capacity and the 1.5-acre parcel as the land area. A secondary aggregator (datacentermap.com, not independently fetched as of September 2026) reports the same figures and states this is one of four planned STEM Practice sites in Tennessee. Coordinates are an OSM-mapped building way at the exact street address.","src":[{"u":"https://www.actionnews5.com/2026/01/14/another-ai-data-center-coming-memphis-sources-say/","t":"Another AI data center coming to Memphis, sources say","p":"Action News 5 (WMC)"},{"u":"https://web.archive.org/web/20260116165108/https://www.datacenterdynamics.com/en/news/data-center-acquired-in-memphis-set-to-serve-oracle-cloud-partner/","t":"Data center acquired in Memphis, set to serve Oracle cloud partner (DCD, Jan 15, 2026; archived copy): 1341 Sycamore View Road, 1.5-acre parcel, 38,500 sq ft, up to 9 MW at full build-out","p":"Data Center Dynamics"}],"j":"city","jc":"Shelby County","jn":"Memphis","jd":"city"},{"id":"aligned-dfw-01-tx","n":"Aligned DFW-01","op":"Aligned Data Centers","s":"operational","st":"TX","city":"Plano","co":"Collin","lat":33.0093,"lon":-96.6766,"pre":"exact","cf":"reported","upd":"2026-09-01","nt":"Confirmed operational on Aligned's Dallas directory page; address 2800 Summit Ave, Plano, TX 75074. AI/HPC (likely): Dallas DFW-01: Aligned DeltaFlow/Delta3 high-density AI/HPC platform.","src":[{"u":"https://aligneddc.com/dallas-data-centers/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/483286527","t":"OpenStreetMap way/483286527","p":"OpenStreetMap"}],"j":"city","jc":"Collin County","jn":"Plano","jd":"city"},{"id":"aligned-dfw-03-tx","n":"Aligned DFW-03","op":"Aligned Data Centers","s":"operational","st":"TX","city":"Mansfield","co":"Tarrant","lat":32.5498,"lon":-97.0749,"pre":"exact","cf":"reported","ac":27,"upd":"2026-09-01","nt":"Confirmed operational; 3801 Britton Rd, Mansfield, TX; 27-acre campus. AI/HPC (likely): Mansfield DFW-03 on Aligned adaptive high-density AI/HPC platform.","src":[{"u":"https://aligneddc.com/dallas-data-centers/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/1443620406","t":"OpenStreetMap way/1443620406","p":"OpenStreetMap"}],"j":"city","jc":"Tarrant County","jn":"Mansfield","jd":"city"},{"id":"aligned-project-caprock-hale-county-tx","n":"Aligned Data Centers Project Caprock","op":"Aligned Data Centers","s":"under_construction","st":"TX","city":"Abernathy","co":"Hale","lat":33.84,"lon":-101.84,"pre":"approximate","cf":"confirmed","mw":540,"ac":313,"ann":"2026-04","upd":"2026-10-30","pb":"Grid (Xcel Energy); dedicated electrical infrastructure funded by Aligned","nt":"Six facilities totaling 1.65 million sq ft across 313 acres. Largest data center groundbreaking in West Texas at time of announcement. TeraWulf separately targeting a data center campus in Abernathy for Fluidstack. Coordinates corrected: Abernathy TX is at approximately 33.84°N, 101.84°W; original record had longitude −101.55 which is ~15 miles east of the city.","src":[{"u":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","t":"Aligned breaks ground on Project Caprock 540 MW campus in Hale County","p":"Aligned Data Centers"},{"u":"https://www.globenewswire.com/news-release/2026/04/09/3271435/0/en/Aligned-Data-Centers-Breaks-Ground-on-Project-Caprock-a-Sustainable-540-MW-Next-Generation-Data-Center-Campus-in-Northwest-Texas.html","t":"Aligned Data Centers breaks ground on Project Caprock 540 MW campus in Northwest Texas","p":"GlobeNewswire"}],"j":"uninc","jc":"Hale County","ju":"approx"},{"id":"big-digital-energy-10netzero-hood-county-tx","n":"Big Digital Energy–10NetZero Hood County AI Data Center Campus","op":"Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)","s":"proposed","st":"TX","co":"Hood","lat":32.4419,"lon":-97.7647,"pre":"approximate","cf":"confirmed","mw":311,"ac":50,"upd":"2026-09-08","nt":"Repurposing a power-ready ~50-acre industrial site (30,000+ sq ft of existing structures, 17 MW operational grid power, on-site gas pipelines) into an AI/HPC datacenter campus; acquisition completed 2026-07-20. AI datacenter build-out itself has not yet begun.","src":[{"u":"https://www.globenewswire.com/news-release/2026/07/20/3329715/0/en/Big-Digital-Energy-and-10NetZero-Complete-Acquisition-of-Hood-County-Texas-Site.html","t":"Big Digital Energy and 10NetZero Complete Acquisition of Hood County, Texas Site","p":"GlobeNewswire"},{"u":"https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm","t":"Big Digital Energy SEC exhibit re: Hood County / DFW-area site LOI","p":"SEC EDGAR"}],"j":"uninc","jc":"Hood County","ju":"approx"},{"id":"blockchain-digital-infrastructure-collin-county-tx","n":"BlockchAIn Collin County AI GPU Hosting Site","op":"BlockchAIn Digital Infrastructure, Inc.","s":"under_construction","st":"TX","co":"Collin","lat":33.1972,"lon":-96.6398,"pre":"approximate","cf":"reported","upd":"2026-08-25","nt":"AI GPU hosting site under construction, targeted Q3 2027 completion, within the DFW metro data center corridor.","src":[{"u":"https://baxtel.com/data-center/blockchain-collin-county-tx","t":"BlockchAIn: Collin County, TX Data Center","p":"Baxtel"}],"j":"city","jc":"Collin County","jn":"McKinney","jd":"city","ju":"approx"},{"id":"blockchain-digital-infrastructure-reeves-county-tx","n":"BlockchAIn Reeves County AI GPU Hosting Site","op":"BlockchAIn Digital Infrastructure, Inc.","s":"proposed","st":"TX","co":"Reeves","lat":31.4229,"lon":-103.4933,"pre":"approximate","cf":"reported","upd":"2026-08-25","nt":"Future AI GPU hosting site in the planning stage, West Texas (ERCOT West Hub), targeted Q3 2028 completion.","src":[{"u":"https://baxtel.com/data-center/blockchain-reeves-county-tx","t":"BlockchAIn: Reeves County, TX Data Center","p":"Baxtel"}],"j":"city","jc":"Reeves County","jn":"Town of Pecos","jd":"city","ju":"approx"},{"id":"cipher-barber-lake-colorado-city-tx","n":"Cipher Barber Lake Campus","op":"Cipher Digital","s":"under_construction","st":"TX","city":"Colorado City","co":"Mitchell","lat":32.3954,"lon":-100.8687,"pre":"approximate","cf":"confirmed","mw":300,"ac":587,"inv":1733000000,"upd":"2026-10-22","nt":"587-acre Barber Lake site near Colorado City, Mitchell County; ~300 MW HPC/AI under a Fluidstack/Google lease; Phase I targeted Sept 2026. Coordinates are the Colorado City area centroid. Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/","t":"Cipher Mining acquires more than 500 acres across two sites in Texas for crypto and HPC use","p":"Data Center Dynamics"},{"u":"https://www.quiverquant.com/news/Cipher+Mining+Inc.+Announces+$1.4+Billion+Offering+of+Senior+Secured+Notes+for+Barber+Lake+Facility+Construction","t":"Cipher Mining Inc. — Proposed $1.4B Senior Secured Notes Offering press release (SEC 8-K exhibit, via Quiver Quantitative reproduction)","p":""}],"j":"city","jc":"Mitchell County","jn":"Colorado City","jd":"city","ju":"approx"},{"id":"cipher-black-pearl-wink-tx","n":"Cipher Black Pearl Campus","op":"Cipher Digital","s":"under_construction","st":"TX","city":"Wink","co":"Winkler","lat":31.751,"lon":-103.1607,"pre":"approximate","cf":"confirmed","mw":300,"ann":"2025-11","upd":"2026-10-28","nt":"~300 gross MW HPC/AI campus near Wink, Winkler County, under a 15-year AWS lease; Phase I targeted Q4 2026. Cipher transitioning crypto → HPC/AI. Coordinates are the Wink area centroid. Cipher Mining (Nasdaq: CIFR) financed Black Pearl via ~$2.0B senior secured notes (Black Pearl Compute LLC, Feb 2026) plus a ~$232.5M equity reimbursement (~$2.23B implied total, inferred across two instruments), so no investment figure is recorded; the $5.5 billion that Yahoo Finance reports for the 15-year AWS lease is contracted lease value, not capex. No jobs figures disclosed, so no job count is recorded. As of July 2026, the HPC/AI cooling architecture is undisclosed, so no water data is recorded. No confirmed public subsidy surfaced. Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://baxtel.com/data-center/cipher-digital-black-pearl","t":"Cipher Digital Black Pearl","p":"Baxtel"},{"u":"https://www.prnewswire.com/news-releases/engie-teams-up-with-cipher-mining-to-power-texas-data-center-302454171.html","t":"ENGIE teams up with Cipher Mining to power Texas data center (up to 300 MW wind PPA)","p":"PR Newswire"}],"j":"city","jc":"Winkler County","jn":"Wink","jd":"city","ju":"approx"},{"id":"cipher-mclennan-county-tx","n":"Cipher McLennan HPC Data Center","op":"Cipher Digital","s":"proposed","st":"TX","city":"Waco","co":"McLennan","lat":31.4741,"lon":-96.9626,"pre":"approximate","cf":"reported","mw":500,"ac":300,"ann":"2024-10","upd":"2026-08-16","nt":"Cipher's McLennan HPC/AI data center site in central Texas (McLennan County, the Waco area). Targeted capacity up to 500 MW; estimated energization 2028. Cipher entered an option agreement in October 2024 and exercised the option to acquire the special-purpose entity in February 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (McLennan County / Waco geocode; specific parcel not disclosed). Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","t":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — McLennan Site, central Texas, targeted capacity up to 500 MW, energize 2028; option exercised Feb 2026","p":"U.S. SEC (EDGAR)"},{"u":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","t":"Waco Bridge — 'Second Waco-area data center proposal troubles residents' (citing McLennan County clerk records)","p":""}],"j":"uninc","jc":"McLennan County","ju":"approx"},{"id":"cipher-mikeska-mcculloch-county-tx","n":"Cipher Mikeska HPC Data Center","op":"Cipher Digital","s":"proposed","st":"TX","city":"Brady","co":"McCulloch","lat":31.1317,"lon":-99.3349,"pre":"approximate","cf":"reported","mw":500,"upd":"2026-11-05","nt":"Cipher's Mikeska HPC/AI data center site, in West Texas outside Brady (McCulloch County). Targeted capacity up to 500 MW; estimated energization 2027-2028. Cipher exercised its option to acquire the ground lease/purchase rights in February 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Brady, TX geocode). Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","t":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Mikeska Site, West Texas, targeted capacity up to 500 MW, energize 2028; option to purchase exercised Feb 2026","p":"U.S. SEC (EDGAR)"},{"u":"https://baxtel.com/data-center/cipher-mining-mikeska","t":"Baxtel — Cipher Mikeska data center (500 MW, outside Brady, Texas)","p":"Baxtel"}],"j":"city","jc":"McCulloch County","jn":"Brady","jd":"city","ju":"approx"},{"id":"cipher-milsing-huntsville-walker-tx","n":"Cipher Milsing HPC Data Center","op":"Cipher Digital","s":"proposed","st":"TX","city":"Huntsville","co":"Walker","lat":30.7235,"lon":-95.5508,"pre":"approximate","cf":"reported","mw":500,"ac":187,"upd":"2026-11-05","nt":"Cipher's Milsing HPC/AI data center site near Huntsville, Texas (Walker County, northeast of Houston); ~187 acres. Targeted capacity up to 500 MW; estimated energization 2028-2029 (aggregators list a 2027 target). Cipher entered an option agreement in October 2024 and exercised the option in December 2025. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Huntsville, TX geocode). Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","t":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Milsing Site, East Texas, targeted capacity up to 500 MW, energize 2028-2029; option exercised Dec 2025","p":"U.S. SEC (EDGAR)"},{"u":"https://baxtel.com/data-center/cipher-mining-milsing","t":"Baxtel — Cipher Milsing data center (~187 acres, Huntsville, Texas, outside Houston)","p":"Baxtel"}],"j":"city","jc":"Walker County","jn":"Huntsville","jd":"city","ju":"approx"},{"id":"cipher-reveille-cotulla-la-salle-tx","n":"Cipher Reveille HPC Data Center","op":"Cipher Digital","s":"proposed","st":"TX","city":"Cotulla","co":"La Salle","lat":28.4359,"lon":-99.2351,"pre":"approximate","cf":"reported","mw":70,"upd":"2026-07-17","nt":"Cipher's Reveille HPC/AI data center site in Cotulla, Texas (La Salle County). ERCOT interconnection approval up to 70 MW with room for expansion; targeted energization 2027. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Cotulla, TX geocode). Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","t":"Cipher Digital (Cipher Mining) FY2025 Form 10-K — Reveille Site, located in Cotulla, Texas, ERCOT interconnection up to 70 MW, energize 2027","p":"U.S. SEC (EDGAR)"},{"u":"https://baxtel.com/data-center/cipher-digital-reveille-tx","t":"Baxtel — Cipher Reveille, Cotulla, Texas data center","p":"Baxtel"}],"j":"city","jc":"La Salle County","jn":"Cotulla","jd":"city","ju":"approx"},{"id":"cipher-stingray-andrews-county-tx","n":"Cipher Stingray HPC Data Center","op":"Cipher Digital","s":"under_construction","st":"TX","city":"Andrews","co":"Andrews","lat":32.3187,"lon":-102.5457,"pre":"approximate","cf":"reported","mw":100,"ac":250,"ann":"2024-11","upd":"2026-07-25","nt":"Cipher's Stingray HPC/AI data center site, ~250 acres in Andrews County, Texas (west of the city of Andrews). Conditional ERCOT interconnection approval up to 100 MW; targeted energization H1/Q2 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline. Cipher rebranded from Cipher Mining to Cipher Digital during its pivot to hyperscale HPC/AI hosting. Coordinates approximate (Andrews, TX geocode; exact parcel not confirmed). Cipher Mining was renamed Cipher Digital.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","t":"Cipher Digital (Cipher Mining) FY2025 Form 10-K (filed 2026-02-24) — Stingray Site, West Texas, conditional ERCOT interconnection up to 100 MW, energize H1 2026","p":"U.S. SEC (EDGAR)"},{"u":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/","t":"DCD — Cipher acquires Stingray, 250 acres in Andrews County (west of Andrews), 100 MW front-of-the-meter, energize Q2 2026","p":"Data Center Dynamics"}],"j":"city","jc":"Andrews County","jn":"Andrews","jd":"city","ju":"approx"},{"id":"cleanspark-austin-county-tx","n":"CleanSpark Austin County AI Data Center Campus","op":"CleanSpark, Inc.","s":"proposed","st":"TX","co":"Austin","lat":29.9508,"lon":-96.2661,"pre":"approximate","cf":"confirmed","mw":285,"ac":271,"ann":"2025-10-29","upd":"2026-08-25","nt":"First of CleanSpark's two announced Greater Houston-area sites (see also the separate Brazoria County campus). No city/address disclosed anywhere in the filing — company language is only 'positioned between Houston and Austin'; Austin County (seat Bellville) fits that framing, so coordinates are an approximate county reference point, not a parcel. Targeting energization of >200 MW in H1 2027. Explicitly framed by named CleanSpark executives (CBO, SVP of AI Data Centers) as an AI/HPC campus, not continued bitcoin mining or generic cloud — clears the tracker's evidence bar for an AI classification. Combined with the separate Brazoria County campus, CleanSpark cites 'more than 890 MW of aggregate potential utility capacity' in the greater Houston area.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/827876/000119312525254934/clsk-20251029.htm","t":"CleanSpark, Inc. Form 8-K, filed 2025-10-29 (Item 8.01)","p":"SEC EDGAR"},{"u":"https://www.sec.gov/Archives/edgar/data/827876/000119312525254934/clsk-ex99_1.htm","t":"CleanSpark Exhibit 99.1 press release: AI Data Center in Greater Houston","p":"CleanSpark, Inc."}],"j":"city","jc":"Austin County","jn":"Bellville","jd":"city","ju":"approx"},{"id":"cleanspark-brazoria-county-tx","n":"CleanSpark Brazoria County (Second Texas) Campus","op":"CleanSpark, Inc.","s":"proposed","st":"TX","co":"Brazoria","lat":29.1694,"lon":-95.431,"pre":"approximate","cf":"reported","mw":300,"ac":155,"ann":"2026-01-14","upd":"2026-10-30","nt":"CleanSpark's second announced Houston-area AI/HPC campus (see also the separate Austin County campus, ~890 MW aggregate potential combined). No city or street address is disclosed in any source found as of August 2026; the coordinates are an approximate reference point at the Brazoria County seat (Angleton, TX), not a parcel location. 447 acres is disclosed as an 'up to' ceiling. An additional 300 MW (to a 600 MW total) is described as a potential future expansion, not yet ERCOT-approved or contracted. No named AI/HPC tenant or GPU lease is disclosed for this specific site (unlike CleanSpark's Sandersville, GA site), so the AI classification is likely rather than confirmed. As of August 2026, no raw SEC 8-K had been located for this transaction; it is sourced to CleanSpark's own press release and investor-relations pages, independently corroborated by trade press (DataCenterDynamics, The Energy Mag). Katten (March 2026) describes the acquisition of approximately 155 acres, with rights to acquire an additional adjacent approximate 437 acres.","src":[{"u":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","t":"CleanSpark Expands Texas Footprint with Major Power Acquisition Near Houston","p":"PR Newswire (CleanSpark, Inc.)"},{"u":"https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Expands-Texas-Footprint-with-Major-Power-Acquisition-Near-Houston-to-Support-Scaled-AI-and-HPC-Development/default.aspx","t":"CleanSpark Expands Texas Footprint (issuer IR copy)","p":"CleanSpark, Inc."}],"j":"city","jc":"Brazoria County","jn":"Angleton","jd":"city","ju":"approx"},{"id":"cloudburst-san-marcos-tx","n":"CloudBurst San Marcos GigaCenter","op":"CloudBurst Data Centers","s":"under_construction","st":"TX","city":"San Marcos","co":"Hays","lat":29.88,"lon":-97.94,"pre":"approximate","cf":"reported","mw":1200,"ac":706,"inv":14500000000,"ann":"2025-11","upd":"2026-11-04","pb":"On-site natural gas (Energy Transfer Oasis Pipeline, up to 1.2 GW behind-the-meter)","nt":"706-acre campus spanning Hays and Guadalupe counties; coordinates use San Marcos city area as centroid. Developed with Evolve Holdings as construction manager. 10-12 hyperscale buildings totaling ~3 million sq ft planned. Tenant not publicly confirmed. Investment total not confirmed in available sources; $14.5B figure removed as unsupported. Guadalupe County commissioners rejected a $500M abatement 3-2 on Feb 24, 2026, then approved a revised abatement on April 21, 2026; county records peg total campus investment at $14.5B (Hays County, home to 77.5 of the 220 abated acres, took no abatement action).","src":[{"u":"https://www.datacenterdynamics.com/en/news/cloudburst-breaks-ground-on-gigawatt-scale-data-center-campus-in-texas/","t":"CloudBurst breaks ground on gigawatt-scale data center campus in Texas","p":"Data Center Dynamics"},{"u":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","t":"CloudBurst and Evolve break ground on 1.2 GW flagship AI campus in Central Texas","p":"eVOLVE Inc."}],"j":"city","jc":"Hays County","jn":"San Marcos","jd":"city","ju":"approx"},{"id":"comanche-circle-sailfish-hood-county-tx","n":"Comanche Circle","op":"Sailfish Digital Ventures (SDV)","s":"proposed","st":"TX","city":"Tolar","co":"Hood","lat":32.35,"lon":-97.83,"pre":"approximate","cf":"reported","ac":2600,"upd":"2026-10-22","nt":"Near Vistra's Comanche Peak Nuclear Plant. Developer states a 5GW total pipeline across 9 campuses; a later, scaled-back figure puts Comanche Circle plus two smaller Sailfish projects combined at 'up to 3 gigawatts' - given conflicting figures, no single capacity figure is recorded here. Conditional county approval Jan 2026; construction targeted late 2026. No hyperscaler tenant confirmed - speculative developer-led land assembly. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/","t":"Sailfish plans multi-gigawatt data center park outside DFW, Texas","p":"Data Center Dynamics"},{"u":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","t":"Hood County rejects data center development pause","p":"Texas Tribune"}],"j":"uninc","jc":"Hood County","ju":"approx"},{"id":"core-scientific-austin-tx","n":"Core Scientific Austin Data Center (Austin 1)","op":"Core Scientific","s":"operational","st":"TX","city":"Austin","co":"Travis","lat":30.214,"lon":-97.622,"pre":"approximate","cf":"confirmed","mw":200,"ac":38,"upd":"2026-09-21","src":[{"u":"https://www.businesswire.com/news/home/20240603752657/en/Core-Scientific-to-Provide-Approximately-200-MW-of-Infrastructure-to-Host-CoreWeave%E2%80%99s-High-Performance-Computing-Services-Capturing-Significant-AI-Compute-Opportunity","t":"Core Scientific to Provide Approximately 200 MW of Infrastructure to Host CoreWeave's High-Performance Computing Services","p":"BusinessWire"},{"u":"https://corescientific.com/high-density-data-centers/austin-tx/","t":"Data Center Austin TX | High-Density Infrastructure","p":"Core Scientific (operator site)"}],"j":"uninc","jc":"Travis County","jn":"Hornsby Bend","ju":"approx"},{"id":"core-scientific-denton-tx","n":"Core Scientific Denton Data Center (Denton 1)","op":"Core Scientific","s":"under_construction","st":"TX","city":"Denton","co":"Denton","lat":33.1932,"lon":-97.1276,"pre":"approximate","cf":"confirmed","mw":260,"inv":1200000000,"upd":"2026-08-16","src":[{"u":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","t":"Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site","p":"Core Scientific IR (BusinessWire-syndicated)"},{"u":"https://baxtel.com/data-center/core-scientific-denton-tx","t":"Core Scientific: Denton, TX Data Center","p":"Baxtel"}],"j":"city","jc":"Denton County","jn":"Denton","jd":"city","ju":"approx"},{"id":"core-scientific-pecos-tx","n":"Core Scientific Pecos AI Campus","op":"Core Scientific","s":"under_construction","st":"TX","city":"Pecos","co":"Reeves","lat":31.44,"lon":-103.58,"pre":"approximate","cf":"confirmed","upd":"2026-10-28","nt":"High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately as of July 2026). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> no investment figure is recorded. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).","src":[{"u":"https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus","t":"Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus","p":"Core Scientific Inc."},{"u":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","t":"Core Scientific announces Q4 FY2025 results","p":"Core Scientific"}],"j":"uninc","jc":"Reeves County","ju":"approx"},{"id":"crusoe-blue-energy-victoria-tx","n":"Crusoe Victoria AI Factory","op":"Crusoe","s":"proposed","st":"TX","city":"Victoria","co":"Victoria","lat":28.8053,"lon":-97.0036,"pre":"approximate","cf":"reported","mw":1500,"ann":"2025-10","upd":"2026-10-22","pb":"On-site generation (Blue Energy: gas bridge → nuclear)","nt":"Crusoe-developed AI factory campus at the Port of Victoria, powered by Blue Energy (natural-gas bridge as early as 2028, nuclear targeted ~2031). Distinct from Crusoe's Stargate Abilene campus. ~1.5 GW planned. Coordinates are the Victoria area centroid.","src":[{"u":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","t":"Blue Energy and Crusoe partner to develop nuclear-powered AI data center","p":"Crusoe"},{"u":"https://www.crossroadstoday.com/news/local-news/data-centers-spark-debate-in-victoria-county-commissioners-court/article_41cfcf09-e3db-421c-80ea-e99b83ec699d.html","t":"Crossroads Today — Data centers spark debate in Victoria County Commissioners Court","p":""}],"j":"city","jc":"Victoria County","jn":"Victoria","jd":"city","ju":"approx"},{"id":"crusoe-lancium-childress-tx","n":"Crusoe–Lancium Childress AI Data Center Campus (Project Hyper)","op":"Crusoe / Lancium","s":"proposed","st":"TX","city":"Childress","co":"Childress County","lat":34.4265,"lon":-100.204,"pre":"approximate","cf":"reported","mw":1000,"ac":270,"upd":"2026-11-04","nt":"A 1 GW AI campus on 270 acres owned by Lancium. Crusoe designs, builds and operates it. TDLR lists start dates of 7/6/2026 (DC1) and 10/5/2026 (DC3), with completion in 2028. Construction start has not been independently confirmed. The tenant is described only as a leading hyperscale technology company. The coordinates are the Childress city point.","src":[{"u":"https://www.tdlr.texas.gov/TABS/Projects/TABS2027000824","t":"TDLR TABS2027000824 - Project Hyper - Childress (Childress DC1, LLC)","p":"Texas Department of Licensing and Regulation"},{"u":"https://www.tdlr.texas.gov/TABS/Projects/TABS2027000835","t":"TDLR TABS2027000835 - Project Hyper - Childress (Childress DC3, LLC)","p":"Texas Department of Licensing and Regulation"}],"j":"city","jc":"Childress County","jn":"Childress","jd":"city","ju":"approx"},{"id":"cyrusone-dfw3-dfw5-allen-tx","n":"CyrusOne DFW3-DFW5 (Allen)","op":"CyrusOne","s":"operational","st":"TX","city":"Allen","co":"Collin","lat":33.1385,"lon":-96.66,"pre":"exact","cf":"reported","mw":50,"ac":90,"upd":"2026-09-21","pb":"Gexa Energy (wind + solar PPA)","nt":"Confirmed 90-acre, 3-building, 50MW campus at Allen, TX (largest DC development in the state per operator page). AI/HPC (likely): Allen campus marketed for AI training, HPC, multi-cloud.","src":[{"u":"https://www.cyrusone.com/data-centers/north-america/allen-texas","t":"CyrusOne facility directory","p":"CyrusOne"},{"u":"https://www.openstreetmap.org/way/590213771","t":"OpenStreetMap way/590213771","p":"OpenStreetMap"}],"j":"city","jc":"Collin County","jn":"Allen","jd":"city"},{"id":"cyrusone-sat2-sat4-san-antonio-tx","n":"CyrusOne SAT2-SAT4 (San Antonio)","op":"CyrusOne","s":"operational","st":"TX","city":"San Antonio","co":"Bexar","lat":29.4709,"lon":-98.673,"pre":"exact","cf":"reported","upd":"2026-09-21","nt":"OSM label 'San Antonio II' resolved to SAT2-SAT4 campus (9554 Westover Hills Blvd / 9655 Raba Dr). AI/HPC (likely): HPC spec: over 1,000 watts/sqft in designated areas.","src":[{"u":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","t":"CyrusOne facility directory","p":"CyrusOne"},{"u":"https://www.openstreetmap.org/way/509611438","t":"OpenStreetMap way/509611438","p":"OpenStreetMap"}],"j":"city","jc":"Bexar County","jn":"San Antonio","jd":"city"},{"id":"data-city-energy-abundance-laredo-tx","n":"Data City, Texas","op":"Energy Abundance Development Corporation","s":"proposed","st":"TX","city":"Laredo","co":"Webb","lat":27.5306,"lon":-99.4803,"pre":"approximate","cf":"rumored","mw":5000,"ac":50000,"upd":"2026-09-10","nt":"Early-stage developer announcement (Mar 21 2025) for a 5 GW behind-the-meter data center hub on ~50,000 acres near Laredo (Webb County), targeting large AI workloads with direct-to-chip liquid cooling. Phase 1 stated as 300 MW / ~1M sq ft in 2026, scaling to 5 GW / 15M+ sq ft. Highly speculative: primary source is a single promotional press release; no permit, interconnection, or construction evidence located. Coordinate anchored on Laredo. Public-reception check (2026-09-10): Checked the operator's launch press release and one regional business-journal writeup (2026-09-10); both cover only the developer's technical vision (50,000-acre, off-grid/islanded from ERCOT) with no mention of a public hearing, Laredo city/county government reaction, or resident feedback. No community-reception record found in either source.","src":[{"u":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","t":"Energy Abundance announces Data City, Texas (press release, Mar 21 2025)","p":"PR Newswire / Energy Abundance Development Corporation"},{"u":"https://www.datacenterdynamics.com/en/news/5gw-data-center-with-behind-the-meter-hydrogen-power-planned-for-laredo-texas/","t":"Up to 5GW data center with behind-the-meter hydrogen power promised for Laredo, Texas","p":"Data Center Dynamics"}],"j":"city","jc":"Webb County","jn":"Laredo","jd":"city","ju":"approx"},{"id":"edged-dallas-irving-tx","n":"Edged Dallas (Irving)","op":"Edged Energy","s":"operational","st":"TX","city":"Irving","co":"Dallas","lat":32.8212,"lon":-96.917,"pre":"approximate","cf":"reported","upd":"2026-10-28","nt":"Edged's April 2024 announcement says the facility at 505 N Wildwood Drive \"will deliver 24 MW of critical capacity\"; DataCenterNews US reported on 16 January 2026 that Edged US opened the first Edged Dallas facility in January 2025. The operator cites a portfolio-average PUE of 1.15 and a 74% reduction in energy overhead against a 1.58 global average. DataCenterNews US reported on 16 January 2026 that Irving City Council unanimously approved a second 24 MW building on the same campus, with groundbreaking expected in the second quarter of 2026; that expansion is not recorded here.","src":[{"u":"https://edged.us/news/edged-dallas-irving","t":"Edged Continues North American Expansion with New, Ultra-Efficient, AI Ready Data Center in Irving, Texas","p":"Edged Energy"},{"u":"https://datacenter.news/story/edged-gains-approval-for-second-waterless-ai-data-centre","t":"Edged gains approval for second waterless AI data centre","p":"DataCenterNews US"}],"j":"city","jc":"Dallas County","jn":"Irving","jd":"city","ju":"approx"},{"id":"energy-vault-snyder-scurry-county-tx","n":"Energy Vault Snyder AI Campus","op":"Energy Vault, Inc.","s":"under_construction","st":"TX","city":"Snyder","co":"Scurry","lat":32.7138,"lon":-100.9112,"pre":"approximate","cf":"reported","mw":500,"ann":"2026-07-27","upd":"2026-09-08","nt":"Phased buildout: ~8 MW initial phase, ~25 MW phase two, with up to 500 MW long-term expansion planned. Uses Crusoe Spark modular data center units under a commercial agreement with Crusoe Cloud. Target commercial operation Q1 2027.","src":[{"u":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","t":"Energy Vault breaks ground on AI Data Center Campus in Snyder, Texas","p":"US Data Center Projects"}],"j":"city","jc":"Scurry County","jn":"Snyder","jd":"city","ju":"approx"},{"id":"flexential-dallas-plano-tx","n":"Flexential Dallas - Plano","op":"Flexential","s":"operational","st":"TX","city":"Plano","co":"Collin","lat":33.007,"lon":-96.6664,"pre":"exact","cf":"reported","upd":"2026-09-21","nt":"Gen 4, 261,400+ sqft, up to 80kW+/cabinet liquid cooling - distinct site from Richardson. AI/HPC (confirmed): CoreWeave 13MW liquid-cooled high-density GPU deployment, up to 80kW/rack.","src":[{"u":"https://www.flexential.com/data-centers/tx/dallas/plano-data-center","t":"Flexential facility directory","p":"Flexential"},{"u":"https://www.openstreetmap.org/way/650412346","t":"OpenStreetMap way/650412346","p":"OpenStreetMap"}],"j":"city","jc":"Collin County","jn":"Plano","jd":"city"},{"id":"fluidstack-abernathy-tx","n":"Fluidstack Abernathy AI Campus","op":"Fluidstack","s":"under_construction","st":"TX","city":"Abernathy","co":"Hale","lat":33.84,"lon":-101.84,"pre":"approximate","cf":"confirmed","mw":168,"ac":120,"ann":"2026","upd":"2026-11-04","nt":"~120-acre campus in Abernathy (Hale/Lubbock counties). Distinct from the separately-tracked Aligned 'Project Caprock' Abernathy campus (313 acres, different operator/parcel). 168 MW critical IT load (240 MW gross). Google-backed via a ~$1.3B lease obligation backstop. The frequently cited $9.5B is 25-year contracted revenue, not capex (in notes only). Note: the Anthropic lease associated with this deal is at TeraWulf's Justified/Hawesville KY campus, not Abernathy. Coordinates are the Abernathy town centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/terawulf-and-fluidstack-to-develop-texas-data-center-in-google-backed-deal/","t":"TeraWulf and Fluidstack to develop Texas data center in Google-backed deal","p":"Data Center Dynamics"},{"u":"https://investors.terawulf.com/news-events/press-releases/detail/142/","t":"TeraWulf announces Anthropic lease at Justified Data Campus and sale of majority interest in Abernathy JV to Fluidstack","p":"TeraWulf Inc."}],"j":"uninc","jc":"Hale County","ju":"approx"},{"id":"fort-spunky-pacifico-energy-hood-county-tx","n":"Fort Spunky","op":"Pacifico Energy","s":"proposed","st":"TX","co":"Hood","lat":32.42,"lon":-97.78,"pre":"approximate","cf":"reported","mw":100,"ac":862,"upd":"2026-10-22","nt":"862 acres, across the Brazos River from the Pecan Plantation community. Water draw up to 20,000 gal/day. Coordinates are approximate.","src":[{"u":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","t":"Texas data centers: Hood County, local control, rural water and power","p":"Texas Tribune"},{"u":"https://www.kbtx.com/2026/06/02/eight-data-centers-threaten-transform-this-small-texas-county-local-officials-say-they-have-no-power-stop-them/","t":"KBTX: Eight data centers threaten to transform this small Texas county (Fort Spunky name, 862 acres, 100MW grid request, water-permit lawsuit)","p":""}],"j":"uninc","jc":"Hood County","ju":"approx"},{"id":"galaxy-helios-dickens-county-tx","n":"Galaxy Helios Data Center Campus","op":"Galaxy Digital","s":"operational","st":"TX","city":"Afton","co":"Dickens","lat":33.72,"lon":-100.84,"pre":"approximate","cf":"confirmed","mw":1630,"ac":2200,"ann":"2026-01","upd":"2026-11-04","pb":"ERCOT grid","nt":"Built by Argo Blockchain as a ~180 MW Bitcoin-mining facility in 2022; sold to Galaxy Digital in Dec 2022 amid the crypto-market downturn. Galaxy converted the site to AI/HPC hosting for CoreWeave under a 15-year lease signed March 28, 2025. CoreWeave is the anchor tenant using the campus for large-scale AI model training. Phase I (133 MW critical IT load / 200 MW gross) is complete and operational; further phases toward the 1.63 GW approved total remain under construction. Location is near Afton, Dickens County (West Texas). Original site was 160 acres; campus has since expanded to 2,200+ acres across multiple phases. Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/galaxy-secures-approval-for-more-than-800mw-at-helios-campus-in-texas/","t":"Galaxy secures 1.6 GW ERCOT approval at Helios campus in Texas","p":"Data Center Dynamics"},{"u":"https://convergedigest.com/coreweave-locks-in-800-mw-at-galaxys-helios-campus-in-texas/","t":"CoreWeave locks in 800 MW at Galaxy Helios campus in Texas","p":"Converge Digest"}],"j":"uninc","jc":"Dickens County","ju":"approx"},{"id":"google-armstrong-county-tx","n":"Goodnight Campus","op":"Google / Crusoe","s":"under_construction","st":"TX","city":"Claude","co":"Armstrong","lat":34.973,"lon":-101.367,"pre":"approximate","cf":"confirmed","mw":933,"ac":350,"ann":"2024","upd":"2026-10-22","pb":"mixed","nt":"Campus name: Goodnight, near the town of Claude, TX (known address: 10001 Lima Rd, Claude, TX 79019). Coordinates approximate (county parcel area). Developed by Crusoe Energy via entity GN DC1, LLC (Delaware LLC, 255 Filmore St., Denver, CO 80206); Google is the hyperscale tenant/customer, confirmed publicly November 2025. Tax abatement agreement was signed with GN DC1, LLC in late 2024 without publicly naming the tenant. Google confirmed the Crusoe partnership but had not signed an offtake agreement for the on-site gas plant as of early 2026; negotiations on power amounts still ongoing per Google spokesperson. Planned IT capacity: Phase 1 described in tax abatement agreement as 'anticipated to consume up to 530 MW,' 4 buildings each with 4 x 25 MW data halls, on approximately 350 acres; Phase 2 (possible additional 3+ buildings) reported at up to ~500 MW additional; combined full build-out reported as 1 GW+ — all capacity figures are 'up to' ceilings from permit and abatement documents, not firm contracted amounts. Project was scaled back from an original 7-building plan (October 2025 local reporting); 4 buildings with construction permits from TDLR as of early 2026; Crusoe described 3-4 buildings as likely; grading on additional parcels suggests total program may reach 5+ buildings. First phase expected online 2026; initial county PILOT payment expected June/July 2026. The $40B Google Texas investment is a statewide commitment through 2027 covering multiple sites (Armstrong County, Haskell County, Ellis County) with no site-specific investment figure disclosed by Google. A $29B campus investment figure appeared in Aterio/Crusoe reporting — this is a projected ceiling, not a firm committed amount, so it is not recorded as an investment figure. Distinct from Google's separate Haskell County TX site and Red Oak (Ellis County) TX sites — do not conflate. Building 3 is scheduled for completion 2026-08-01; Building 4 is due March 2027. Nothing at the campus is yet described as operational.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/","t":"Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027","p":"Data Center Dynamics"},{"u":"https://e360.yale.edu/digest/google-natural-gas-data-center","t":"Google to Use Natural Gas to Power Massive Data Center in Texas","p":"Yale Environment 360"}],"j":"uninc","jc":"Armstrong County","ju":"approx"},{"id":"google-haskell-county-tx","n":"Google Haskell County Data Center Campus","op":"Google","s":"under_construction","st":"TX","city":"Haskell","co":"Haskell","lat":33.1576,"lon":-99.7337,"pre":"approximate","cf":"confirmed","ann":"2025-11-14","upd":"2026-10-22","pb":"solar","nt":"Two data center buildings at one Haskell County site; treated as a single campus record. Announced Nov 14 2025 as part of Google's $40B Texas investment through 2027 (which also covers Armstrong County and a Wilbarger County/Vernon site); no Haskell-specific investment figure disclosed, so no investment figure is recorded (the $40B is a Texas-wide aggregate). Data-center IT capacity in MW not publicly disclosed. One building is co-located with the Quantum Clean Energy Project (Intersect Power, acquired by Google March 2026): 640 MW solar PV + 1.3 GWh battery storage, scheduled operational June 2026 - this is energy-project capacity, not data-center IT load. Job figures cited in press (1,200 construction / up to 11 permanent) come from the co-located Intersect energy project, not the data center, so they are noted here rather than recorded as job counts. Coordinates are the Haskell city centroid (no parcel-level GPS found).","src":[{"u":"https://www.texastribune.org/2025/11/14/texas-google-data-centers-ai/","t":"Google data centers totaling $40 billion coming to Texas","p":"Texas Tribune"},{"u":"https://gov.texas.gov/news/post/governor-abbott-google-announce-40-billion-investment-in-texas","t":"Governor Abbott, Google Announce $40 Billion Investment In Texas","p":"Office of the Texas Governor"}],"j":"city","jc":"Haskell County","jn":"Haskell","jd":"city","ju":"approx"},{"id":"google-meitner-pampa-tx","n":"Google Meitner Energy Center","op":"Google","s":"under_construction","st":"TX","city":"Pampa","co":"Gray","lat":35.5365,"lon":-100.9609,"pre":"approximate","cf":"confirmed","ann":"2026","upd":"2026-10-28","pb":"Co-located on-site generation (Intersect Power)","nt":"Data center co-located with new energy generation, spanning Gray and Roberts counties near Pampa. Part of Google's ~$40B Texas commitment; Google took a stake in Intersect Power. IT capacity not disclosed. Coordinates are the Pampa area centroid. NewsChannel 10 (January 2026) calls it a $3 billion project, quoting the mayor; As of October 2026, the Intersect announcement states no project cost, so no investment figure is recorded. The same report says the data center will employ \"up to 30 workers or more per building\" across three planned buildings; the facility is not yet operational, so no job count is recorded.","src":[{"u":"https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties","t":"Google and Intersect deepen Texas roots with new data center and energy investments in Gray and Roberts Counties","p":"Intersect Power"},{"u":"https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/","t":"Google launches 1 GW+ co-located data center and generation complex in Texas Panhandle","p":"POWER Magazine"}],"j":"city","jc":"Gray County","jn":"Pampa","jd":"city","ju":"approx"},{"id":"google-red-oak-tx","n":"Google Red Oak Campus","op":"Google","s":"operational","st":"TX","city":"Red Oak","co":"Ellis","lat":32.5163,"lon":-96.8011,"pre":"approximate","cf":"confirmed","ac":166,"inv":330000000,"ann":"2023-09","upd":"2026-10-22","nt":"Google's second Dallas-Fort Worth campus. First building operational late 2025; second building under construction as of Nov 2025 per Mayor Stanfill. 166 acres at FM 664 (Ovilla Rd) and SH 342; shell entity Alamo Mission LLC used in Ellis County negotiations. The recorded investment figure is only the $330M confirmed initial investment; the frequently cited $600M+ is a multi-phase projection. Capacity in MW not publicly disclosed. Google pledged a $150,000 STEM grant to Red Oak ISD; grid reinforcements estimated ~$72M. Part of Google's broader $40B Texas commitment. Coordinates are the Red Oak town centroid (no parcel GPS confirmed). The 2018 abatement's scope vs the separate Midlothian campus is not fully disambiguated in the public record.","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-announces-plans-for-red-oak-data-center-campus-in-texas/","t":"Google announces plans for Red Oak data center campus in Texas","p":"Data Center Dynamics"},{"u":"https://datacenters.google/locations/texas/","t":"Texas - Google Data Center Location","p":"Google"}],"j":"city","jc":"Ellis County","jn":"Red Oak","jd":"city","ju":"approx"},{"id":"google-wilbarger-vernon-tx","n":"Google Wilbarger County Campus","op":"Google","s":"under_construction","st":"TX","city":"Vernon","co":"Wilbarger","lat":34.1551,"lon":-99.294,"pre":"approximate","cf":"confirmed","ann":"2026","upd":"2026-10-22","nt":"Air-cooled data center near Vernon, Wilbarger County — a Google/AES 'power-first' initiative. Part of Google's broader Texas expansion. IT capacity not disclosed. Coordinates are the Vernon area centroid.","src":[{"u":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","t":"A new data center in Wilbarger County, Texas","p":"Google"}],"j":"city","jc":"Wilbarger County","jn":"Vernon","jd":"city","ju":"approx"},{"id":"hut8-beacon-point-robstown-tx","n":"Hut 8 Beacon Point AI Campus","op":"Hut 8","s":"under_construction","st":"TX","city":"Robstown","co":"Nueces","lat":27.7897,"lon":-97.6689,"pre":"approximate","cf":"confirmed","mw":352,"ac":525,"inv":4250000000,"ann":"2026-05","upd":"2026-11-04","nt":"1 GW site near Robstown, Nueces County; Phase 1 = a 15-year, 352 MW IT lease. The $9.8B base-term contract value is revenue, not capex. Delivery targeted Q3 2027. Coordinates are the Robstown area centroid. Hut 8 declined to confirm any tax abatement and the Nueces County Judge said the county's abatement policy was out of date, so none could have been granted; no subsidy is recorded. The investment figure records the $4.25B non-recourse project-bond financing for Phase 1 construction (352 MW + substation), distinct from the $9.8B lease contract value; the ~$17B combined Phase 1-2 figure is a projection.","src":[{"u":"https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html","t":"Hut 8 commercializes first phase of 1 GW Beacon Point AI data center campus with 15-year, 352 MW IT lease","p":"Hut 8 Corp."},{"u":"https://www.prnewswire.com/news-releases/hut-8-announces-pricing-of-4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data-center-project-302792238.html","t":"Hut 8 prices $4.25 billion of senior secured notes for Beacon Point data center project","p":"PR Newswire / Hut 8 Corp."}],"j":"city","jc":"Nueces County","jn":"Robstown","jd":"city","ju":"approx"},{"id":"iren-horizon-childress-tx","n":"IREN Horizon — Childress, TX","op":"IREN (Iris Energy)","s":"under_construction","st":"TX","city":"Childress","co":"Childress","lat":34.4276,"lon":-100.2046,"pre":"approximate","cf":"confirmed","ac":576,"ann":"2025","upd":"2026-10-28","pb":"ERCOT","nt":"Separate site from IREN Sweetwater (Nolan/Fisher County — do not conflate). IREN's Childress page lists 750 MW as the campus's total power capacity, which is not IT capacity (a Baxtel profile says Childress \"reached 750 MW operational\"; that figure is not adopted here); the AI/Microsoft Horizon 1–4 build-out comprises four 50 MW IT (75 MW gross) liquid-cooled data halls = 200 MW IT total, targeting end-2026 delivery. NewsChannel 10 (May 2026) also reports that IREN will add 100 megawatts of new liquid-cooled data centers and retrofit another 250 megawatts of existing capacity. Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — operational, and IREN announced on August 13, 2026 that Microsoft had accepted it (per the Northwise Project); Horizons 2–4 remain under construction as of mid-2026. Coordinates approximate (county seat area). Site is a 576-acre freehold parcel with on-site 345 kV substations connecting directly to ERCOT. Investment for Horizon 1–4 reported as $300–350M (range; not a firm figure — not recorded as the investment figure). Microsoft contract ($9.7B total, 5-year through ~2031) covers NVIDIA GB300 Blackwell Ultra GPU cloud services; 20% upfront prepayment funded capex. Dell Technologies hardware supply agreement: $5.8B. IREN also holds a separate NVIDIA cloud services contract at Childress. Rack density 130–200 kW per rack; projected PUE 1.05–1.10. IREN Community Grants Program distributes $250,000 annually to the Childress area.","src":[{"u":"https://www.datacenterdynamics.com/en/news/iren-plans-75mw-liquid-cooled-ai-data-center-in-texas/","t":"IREN plans 75MW liquid-cooled AI data center in Texas","p":"Data Center Dynamics"},{"u":"https://iren.com/data-centers/childress","t":"Childress Data Center — 750MW AI-Optimised Facility","p":"IREN (official)"}],"j":"city","jc":"Childress County","jn":"Childress","jd":"city","ju":"approx"},{"id":"iren-sweetwater-tx","n":"IREN Sweetwater Campus","op":"IREN (Iris Energy)","s":"under_construction","st":"TX","city":"Sweetwater","co":"Nolan","lat":32.4707,"lon":-100.4059,"pre":"approximate","cf":"confirmed","mw":2000,"ac":2200,"ann":"2025","upd":"2026-10-22","pb":"ERCOT grid","nt":"Two-site campus: Sweetwater 1 (1,400 MW, ~1,700 acres) substation energized May 1, 2026 via 345kV ERCOT connection; data centers commissioning in phases. Sweetwater 2 (600 MW, ~500 acres, Fisher County, near Hamlin TX, ~28 miles from SW1) targeted energization late 2027 per IREN (some sources cite 2028). Direct fiber loop planned between sites for single 2 GW compute hub with <10ms latency to Dallas. Coordinates are approximate (Sweetwater city center, Nolan County seat). As of October 2026, the county is not settled by the cited pages: Data Center Dynamics places both sites outside Sweetwater in Fisher County, and no cited page that names IREN places Sweetwater 1 in Nolan or Jones County. IREN's $9.7B Microsoft contract (Nov 2025) and $3.4B NVIDIA contract (May 2026) are company-wide deals currently deployed at Childress, TX campus (Horizon 1-4); the NVIDIA partnership press release specifically names Sweetwater as the flagship future deployment site for NVIDIA DSX factory architecture. No confirmed customer contracts specific to Sweetwater site as of 2026-07-07. IREN was in Sweetwater since 2022 as a Bitcoin mining site; HPC/AI pivot announced October 2024.","src":[{"u":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-announces-successful-energization-sweetwater-1","t":"IREN Announces Successful Energization of Sweetwater 1","p":"IREN investor relations"},{"u":"https://www.globenewswire.com/news-release/2026/05/01/3286213/0/en/iren-announces-successful-energization-of-sweetwater-1.html","t":"IREN Announces Successful Energization of Sweetwater 1 (May 1, 2026)","p":"GlobeNewswire"}],"j":"city","jc":"Nolan County","jn":"Sweetwater","jd":"city","ju":"approx"},{"id":"ionic-digital-cedarvale-barstow-tx","n":"Ionic Digital Cedarvale Facility","op":"Ionic Digital (leased to Nscale)","s":"under_construction","st":"TX","city":"Barstow","co":"Ward County","lat":31.4618,"lon":-103.3949,"pre":"approximate","cf":"reported","mw":234,"upd":"2026-11-04","nt":"Ionic leased the site's full 234 MW to Nscale on a 10-year triple-net lease of about $2B, announced in October 2025. The site hosts Nscale hardware for Microsoft AI services, about 104,000 Nvidia GB300 GPUs. Microsoft can add another 700 MW from late 2027. The exact phase status is unclear, and the coordinates are the town point.","src":[{"u":"https://backend.theenergymag.com/?p=10188","t":"Nscale Wins $14B Microsoft AI Deal, Secures Texas Site via Lease with Ionic Digital","p":"The Energy Mag"},{"u":"https://baxtel.com/data-center/nscale-cedarvale","t":"Neocloud Data Center (Cedarvale)","p":"Baxtel"}],"j":"city","jc":"Ward County","jn":"Barstow","jd":"city","ju":"approx"},{"id":"lambda-aligned-plano-tx","n":"Lambda Plano AI Data Center (Aligned DFW-04)","op":"Lambda","s":"under_construction","st":"TX","city":"Plano","co":"Collin","lat":33.0198,"lon":-96.6989,"pre":"approximate","cf":"confirmed","mw":100,"ann":"2026","upd":"2026-10-22","nt":"Lambda to occupy the ~$700M Aligned DFW-04 data center under construction in Plano, Collin County; 2026 target. Distinct from Lambda's Chicago and Kansas City sites. Coordinates are the Plano area centroid.","src":[{"u":"https://www.devx.com/daily-news/lambda-cloud-to-occupy-aligned-data-center/","t":"Lambda Cloud to occupy Aligned data center in Plano","p":"DevX"}],"j":"city","jc":"Collin County","jn":"Plano","jd":"city","ju":"approx"},{"id":"msb-matrix-center-sulphur-springs-tx","n":"Matrix Data Center Campus (The Matrix Center)","op":"MSB Global Services","s":"under_construction","st":"TX","city":"Sulphur Springs","co":"Hopkins","lat":33.1384,"lon":-95.6011,"pre":"approximate","cf":"confirmed","mw":3000,"ac":1600,"inv":18000000000,"ann":"2025","upd":"2026-08-25","pb":"on-site natural gas generation","nt":"Built on the former Thermo lignite coal mine southeast of the town, land Luminant donated to the city after the mine closed in 2018. 30 buildings planned. The 3 GW and building count are the developer's own; the $18bn and the job numbers are the city manager's, on the record to KLTV. Acreage is disputed — KLTV reports over 1,600 acres, the developer's page says more than 16,000; the smaller independently reported figure is used. 307 resident reports named this town while the registry held no entry.","src":[{"u":"https://www.kltv.com/2025/10/01/work-underway-massive-ai-data-center-sulphur-springs/","t":"Work underway on massive AI data center in Sulphur Springs","p":"KLTV"},{"u":"https://www.ketk.com/news/local-news/30-ai-data-centers-to-be-built-at-sulphur-springs-campus/","t":"30 AI data centers to be built at Sulphur Springs campus","p":"KETK"}],"j":"city","jc":"Hopkins County","jn":"Sulphur Springs","jd":"city","ju":"approx"},{"id":"meta-el-paso-tx","n":"Meta El Paso AI Data Center Campus","op":"Meta","s":"under_construction","st":"TX","city":"El Paso","co":"El Paso","lat":31.81,"lon":-106.55,"pre":"approximate","cf":"confirmed","mw":1000,"ac":1000,"inv":10000000000,"ann":"2025-10","upd":"2026-11-04","pb":"Grid (El Paso Electric, renewable-matched); 366 MW McCloud gas plant proposed","nt":"Campus located in far Northeast El Paso near Texas-New Mexico state line on approximately 1,000 acres; coordinates are approximate city-area centroid, exact parcel not publicly identified. Meta's third Texas data center. Campus can scale to 1 GW. Construction jobs figure (4,000) reflects updated peak estimate from March 2026 $10B expansion announcement.","src":[{"u":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","t":"Meta breaks ground on El Paso AI-optimized data center","p":"Meta"},{"u":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","t":"Meta boosts El Paso investment from $1.5B to $10B","p":"CNBC"}],"j":"city","jc":"El Paso County","jn":"El Paso","jd":"city","ju":"approx"},{"id":"meta-fort-worth-tx","n":"Meta Fort Worth Data Center","op":"Meta","s":"operational","st":"TX","city":"Fort Worth","co":"Tarrant","lat":32.9844,"lon":-97.2618,"pre":"approximate","cf":"reported","ac":200,"inv":1500000000,"ann":"2015","upd":"2026-09-21","pb":"Shannon Wind Farm (204 MW, Clay County TX) via Oncor interconnection","nt":"Meta (Facebook) data center at 4500 Like Way, Fort Worth, Tarrant County (near TX-170 and Park Vista Blvd) — broke ground 2015, began serving traffic in 2017, on a ~200-acre campus, heavily expanded since (with an announced AI-driven expansion). DISTINCT from Meta's tracked El Paso, TX campus. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Like Way address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://baxtel.com/data-center/facebook-fort-worth","t":"Facebook Fort Worth Data Center — 4500 Like Way, opened 2017, ~200 acres, fully operational","p":"Baxtel"},{"u":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","t":"Fort Worth Data Center info sheet","p":"Meta Data Centers"}],"j":"city","jc":"Tarrant County","jn":"Fort Worth","jd":"city","ju":"approx"},{"id":"meta-temple-tx","n":"Meta Temple Data Center","op":"Meta","s":"operational","st":"TX","city":"Temple","co":"Bell","lat":31.1399,"lon":-97.3813,"pre":"approximate","cf":"confirmed","ac":386,"inv":1200000000,"ann":"2022-03","upd":"2026-08-26","nt":"Three-building greenfield campus of more than 750,000 sq ft of data center and administrative space. JE Dunn lists the project status as completed. Meta reported $1.7m in direct funding to Bell County schools and nonprofits, including a $400,000 grant announced at the opening.","src":[{"u":"https://www.kwtx.com/2026/07/22/meta-goes-live-temple-with-12-billion-ai-data-center/","t":"Meta goes live in Temple with $1.2 billion AI data center","p":"KWTX"},{"u":"https://jedunn.com/projects/meta-temple-data-center/","t":"Meta Temple Data Center — project page (general contractor)","p":"JE Dunn Construction"}],"j":"city","jc":"Bell County","jn":"Temple","jd":"city","ju":"approx"},{"id":"microsoft-pecos-tx","n":"Microsoft Pecos Data Center Campus","op":"Microsoft","s":"proposed","st":"TX","city":"Pecos","co":"Reeves","lat":31.42,"lon":-103.49,"pre":"approximate","cf":"confirmed","mw":2000,"ac":7000,"ann":"2026-06","upd":"2026-10-22","pb":"Behind-the-meter natural gas plant (Chevron/Energy Forge One, up to 2.67 GW; GE Vernova turbines)","nt":"7,000-acre campus in Reeves County. Natural gas plant investment estimated at $7B separate from campus construction. No groundbreaking date reported as of July 2026; coordinates are Pecos city center as exact parcel not disclosed.","src":[{"u":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","t":"Microsoft announces Pecos data center campus","p":"Microsoft"},{"u":"https://www.datacenterdynamics.com/en/news/microsoft-plans-2gw-data-center-campus-in-pecos-texas/","t":"Microsoft plans 2 GW data center campus in Pecos, Texas","p":"Data Center Dynamics"}],"j":"city","jc":"Reeves County","jn":"Town of Pecos","jd":"city","ju":"approx"},{"id":"microsoft-san-antonio-expansion-tx","n":"Microsoft San Antonio SAT89/SAT90 Data Centers","op":"Microsoft","s":"under_construction","st":"TX","city":"Castroville","co":"Medina","lat":29.35,"lon":-98.88,"pre":"approximate","cf":"reported","inv":765000000,"ann":"2025-05","upd":"2026-10-22","pb":"Grid (CPS Energy / renewable-matched)","nt":"Two single-story facilities (SAT89 and SAT90), each 244,700 sq ft, along US Hwy 90 in Medina County. Part of Microsoft's broader San Antonio campus (operating since 2005). $765M investment covers the two new buildings; broader expansion including Texas Research Park adds another $1B. Coordinates are approximate Castroville area centroid; exact parcel not publicly identified. Completion target corrected to July 2027 per permit filings. Tax abatements for SAT89/SAT90 are shielded under Texas competitive-information law (a Chapter 312 abatement is confirmed only for the earlier SAT82 building); site-specific job counts are unpublished (an earlier SAT82 building cited ~50 permanent / ~1,500 construction).","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-data-center-campus-outside-san-antonio/","t":"Microsoft files for data center campus outside San Antonio","p":"Data Center Dynamics"},{"u":"https://www.datacenters.com/news/microsoft-s-1-5-billion-data-center-expansion-in-san-antonio","t":"Microsoft $1.5 billion data center expansion in San Antonio","p":"Datacenters.com"}],"j":"city","jc":"Medina County","jn":"Castroville","jd":"city","ju":"approx"},{"id":"nexus-hubbard-campus-hill-county-tx","n":"Nexus Hubbard Data Center & Power Campus","op":"Nexus Data Centers","s":"under_construction","st":"TX","city":"Hubbard","co":"Hill","lat":31.824,"lon":-96.7762,"pre":"approximate","cf":"reported","mw":612,"ac":2000,"upd":"2026-08-25","nt":"612 MW first-phase data center campus on ~2,000 acres on the outskirts of Hubbard (Hill County), between Highway 171 and County Road 3369; behind-the-meter natural gas generation. Led by CEO/managing partner Ivan Van der Walt. TCEQ air permit applications filed Dec 2025 (183046, PSDTX1700, GHGPSDTX269); ~500 MW targeted online late 2026; publicly stated eventual full-buildout target ~7.7 GW. No end-user customer publicly identified. Coordinate anchored on the city of Hubbard; exact parcel not confirmed.","src":[{"u":"https://www.datacenterdynamics.com/en/news/600mw-natural-gas-powered-data-center-campus-proposed-in-hubbard-texas/","t":"600MW natural gas-powered data center campus proposed in Hubbard, Texas","p":"Data Center Dynamics"},{"u":"https://nexus-datacenter.com/","t":"Nexus Data Centers — Hubbard Data Center & Power Project, Hill County TX","p":"Nexus Data Centers"}],"j":"uninc","jc":"Hill County","ju":"approx"},{"id":"poolside-project-horizon-pecos-county-tx","n":"Poolside Project Horizon AI Campus","op":"Poolside AI","s":"proposed","st":"TX","co":"Pecos","lat":30.8938,"lon":-102.8796,"pre":"approximate","cf":"reported","mw":2000,"ac":568,"upd":"2026-11-04","nt":"2 GW AI training campus on a 568-acre parcel of the Mitchell family's Longfellow Ranch in Pecos County, near Fort Stockton. Coordinate anchored on Fort Stockton (nearest named town in coverage); exact parcel not publicly disclosed. CoreWeave was original anchor tenant (15-year, 250 MW lease, 40,000 Nvidia GB300 GPUs) but terminated the lease by early April 2026 after Poolside's Series C funding round failed to close; site reported idle as of mid-2026. CoreWeave (the announced anchor tenant) mutually terminated its agreement for Project Horizon after Poolside failed to stand up its first GPU cluster on schedule, and Poolside's associated ~$2B Nvidia-led funding round also fell through. As of late July 2026 Poolside was seeking a replacement partner (reportedly including Google) for up to 400MW, with no anchor tenant signed as of that reporting. As of October 2026, the status remains proposed and the planned capacity is the 2 GW announced in October 2025, not a figure from the replacement-partner talks; the originally announced 2GW/CoreWeave deal no longer stands as described.","src":[{"u":"https://poolside.ai/blog/announcing-project-horizon","t":"Poolside — Announcing Project Horizon: a 2 GW AI campus in Texas","p":"Poolside"},{"u":"https://www.datacenterdynamics.com/en/news/ai-startup-poolside-teams-up-with-coreweave-on-2gw-data-center-in-texas/","t":"AI startup Poolside teams up with CoreWeave on 2GW data center in Texas","p":"Data Center Dynamics"}],"j":"city","jc":"Pecos County","jn":"Fort Stockton","jd":"city","ju":"approx"},{"id":"powerhouse-uhland-caldwell-county-tx","n":"PowerHouse Caldwell County Data Center","op":"PowerHouse Data Centers","s":"proposed","st":"TX","city":"Uhland","co":"Caldwell","lat":29.87,"lon":-97.85,"pre":"approximate","cf":"reported","ac":500,"upd":"2026-10-28","nt":"Within the larger Caldwell Valley Technology Park megasite near Austin/San Antonio - a distinct operator/parcel from Tract's own land holding in the same park (1,515 acres bought in May 2025 and expanded to nearly 3,000 acres in January 2026; Tract Caldwell Valley Technology Park, tracked separately as of July 2026); the two should not be conflated. As of October 2026, no cited source states a capacity for PowerHouse's own site: the 4 GW figure is Tract's for the whole park, so it is not recorded as capacity. PowerHouse has filed a petition to move the site from Town of Uhland jurisdiction to Caldwell County jurisdiction (lighter TX zoning authority at the county level). Coordinates are approximate.","src":[{"u":"https://www.datacenterdynamics.com/en/news/powerhouse-looking-to-build-500-acre-data-center-near-austin-texas/","t":"PowerHouse looking to build 500-acre data center near Austin, Texas","p":"Data Center Dynamics"},{"u":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","t":"PowerHouse plans Austin suburb data center, moves to skirt city control","p":"Bisnow"}],"j":"city","jc":"Caldwell County","jn":"San Marcos","jd":"city","ju":"approx"},{"id":"powerhouse-provident-grand-prairie-tx","n":"PowerHouse Grand Prairie Campus","op":"PowerHouse Data Centers","s":"under_construction","st":"TX","city":"Grand Prairie","co":"Ellis","lat":32.62,"lon":-97.02,"pre":"approximate","cf":"confirmed","mw":1800,"upd":"2026-10-28","nt":"1.8 GW DFW-area campus (Grand Prairie): 24 buildings across three phases with an on-site 1.8 GW switchyard. Grand Prairie spans Dallas/Tarrant/Ellis counties; the campus is in the Ellis County (southern) portion. Coordinates reflect the southern Grand Prairie / Ellis County zone. Provident cited 'at least $5B in direct construction impact' over the multi-year build-out (Bisnow) and ~$300M for one 360,000-sq-ft building (Dallas Innovates) - neither a confirmed campus capex pledge -> no investment figure is recorded. Ellis County adopted Chapter 312 abatement guidelines (~Oct 2025, $50M threshold); no executed abatement agreement for this campus was found.","src":[{"u":"https://www.datacenterdynamics.com/en/news/powerhouse-and-provident-to-develop-18gw-campus-in-dfw-texas/","t":"PowerHouse and Provident to develop 1.8GW campus in DFW, Texas","p":"Data Center Dynamics"},{"u":"https://www.bisnow.com/national/news/data-center/provident-powerhouse-partner-on-768-acre-texas-data-center-campus-127465","t":"Provident, PowerHouse partner on 768-acre Texas data center campus","p":"Bisnow"}],"j":"city","jc":"Dallas County","jn":"Grand Prairie","jd":"city","ju":"approx"},{"id":"prime-dfw01-01-tx","n":"Prime DFW01-01","op":"Prime Data Centers","s":"operational","st":"TX","city":"Dallas","co":"Dallas","lat":32.838,"lon":-96.8784,"pre":"exact","cf":"reported","upd":"2026-07-24","nt":"Confirmed via https://primedatacenters.com/locations/dallas/ — DFW01-01 at 1515 Round Table Dr, Dallas, TX, operational, 8MW/107,000 sq ft, enterprise multi-tenant. Kept as the canonical entry for this facility name; see osm_id 1461896928 (dropped as duplicate). AI/HPC (likely): Prime's own DFW01-01 Dallas tech sheet lists this specific building's 'Performance: AI-ready' and 'Cooling: Closed air loop and liquid'.","src":[{"u":"https://primedatacenters.com/locations/dallas/","t":"Prime Data Centers facility directory","p":"Prime Data Centers"},{"u":"https://www.openstreetmap.org/way/465032380","t":"OpenStreetMap way/465032380","p":"OpenStreetMap"}],"j":"city","jc":"Dallas County","jn":"Dallas","jd":"city"},{"id":"rcm-hill-project-aquila-hill-county-tx","n":"Project Aquila","op":"RCM Hill, LLC","s":"proposed","st":"TX","co":"Hill","lat":32.03,"lon":-97.13,"pre":"approximate","cf":"confirmed","mw":1235,"ac":800,"upd":"2026-10-22","nt":"Unincorporated Hill County, near Hillsboro, ~55 mi south of Fort Worth. $80M+ land acquisition. A $61.75M ERCOT 'Batch Zero' capacity deposit was due July 24, 2026. Coordinates are approximate.","src":[{"u":"https://www.kwtx.com/2026/05/28/illegal-under-texas-law-data-center-developer-files-lawsuit-against-hill-county-moratorium/","t":"Data center developer files lawsuit against Hill County moratorium","p":"KWTX"},{"u":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","t":"KWTX: Hill County Commissioners Court rescinds moratorium on data center in the wake of lawsuit","p":""}],"j":"uninc","jc":"Hill County","ju":"approx"},{"id":"ampz-project-lufkin-tx","n":"Project Lufkin","op":"Amp Z (AmpZ Champion Data Center Holdings)","s":"proposed","st":"TX","city":"Lufkin","co":"Angelina","lat":31.3229,"lon":-94.729,"pre":"approximate","cf":"reported","mw":2100,"ac":1000,"upd":"2026-08-25","nt":"More than 1,000 acres on the old Southland Paper Mill property on State Highway 103 west of Lufkin, near Paper Mill Creek and the Neches River; the mill shut in 2009. Phased from roughly 175 MW in 2026 to 1.1 GW by 2028 and ultimately 2.1 GW, which is recorded as planned capacity. Still in planning with no deal finalised.","src":[{"u":"https://www.texastribune.org/2026/07/09/data-center-backlash-east-texas/","t":"A data center proposed at a quiet corner of East Texas leaves a community bracing for a boom","p":"The Texas Tribune"},{"u":"https://lufkindailynews.com/news/local/ai-data-center-planned-on-1-000-acres-at-former-southland-paper-mill-site/article_ff9e97bf-361d-5649-835b-68a75818bd94.html","t":"AI data center planned on 1,000+ acres at former Southland Paper Mill site","p":"The Lufkin Daily News"}],"j":"city","jc":"Angelina County","jn":"Lufkin","jd":"city","ju":"approx"},{"id":"fermi-matador-amarillo-tx","n":"Project Matador","op":"Fermi America","s":"under_construction","st":"TX","city":"Amarillo","co":"Carson","lat":35.396,"lon":-101.543,"pre":"approximate","cf":"reported","ac":5769,"ann":"2025","upd":"2026-10-22","pb":"on_site_gas","nt":"11GW is the long-term ceiling for the HyperGrid campus; near-term company targets include 1GW by end of 2026 and 2.3GW first-phase delivery — these are company goals, not firm commitments. Land acreage reported variously (5,769 acres per DCD July 2025 and 5,855 acres per other sources; later company materials cite 7,570 acres on 7,570 acres); using 5,769 as the earliest confirmed figure, sourced from the gas turbine acquisition announcement. Coordinates approximate (seed-provided; site in Carson County ~12 miles NE of Amarillo, adjacent to DOE Pantex Plant). Fermi America co-founded January 2025 by former Texas Governor and U.S. Energy Secretary Rick Perry, Toby Neugebauer (CEO, departed April 2026 after being fired 'without cause'), and Griffin Perry. IPO raised $682M on Nasdaq under ticker FRMI (October 2025), valuing company at ~$19B at opening; market cap collapsed to ~$3.4B by April 2026 after leadership exits and loss of anchor tenant ($150M LOI canceled December 2025). Company organized as a REIT; had zero revenue at IPO. Investment: equipment financing commitments exceed $600M ($500M MUFG turbine warehouse + $200M Keystone/Cape facility); projected total project cost $70–90B is a range/projection, not a firm figure — not recorded as an investment figure. Jobs: 50,000+ projected across campus lifetime — projection only, not recorded as a job count. Nuclear campus name in NRC COLA filings: 'President Donald J. Trump Advanced Energy and Intelligence Campus'; publicly marketed as Project Matador / HyperGrid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas/","t":"Fermi America acquires 600MW of gas turbines for 11GW AI mega campus in Amarillo, Texas","p":"Data Center Dynamics"},{"u":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","t":"Fermi America Makes Initial Draw on $200M Equipment Facility to Accelerate 2.3GW Delivery","p":"PR Newswire"}],"j":"uninc","jc":"Carson County","ju":"approx"},{"id":"rellis-data-research-center-bryan-brazos-county-tx","n":"RELLIS Data and Research Center","op":"ThisWay Global, Inc.","s":"under_construction","st":"TX","city":"Bryan","co":"Brazos","lat":30.6013,"lon":-96.3589,"pre":"approximate","cf":"reported","mw":73,"ac":25,"inv":700000000,"upd":"2026-11-04","nt":"$700M data center on Texas A&M System-owned land at the RELLIS Campus in Bryan; originally developed as RELLIS Campus Data and Research Center LLC starting 2021 (delayed by bankruptcy and Winter Storm Uri fallout), tax abatement and project ownership transferred to ThisWay Global, Inc. on 2026-08-18 (Brazos County 4-0) after Texas A&M System Regents and City of Bryan approvals. WTAW reporting describes the site as already under construction.","src":[{"u":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","t":"Brazos County commissioners approve new owner for RELLIS data center","p":"KBTX"},{"u":"https://baxtel.com/news/thisway-global-plans-73mw-ai-and-hpc-data-center-in-bryan-texas","t":"ThisWay Global plans 73MW AI and HPC data center in Bryan, Texas","p":"Baxtel"}],"j":"city","jc":"Brazos County","jn":"College Station","jd":"city","ju":"approx"},{"id":"rowan-temple-tx","n":"Rowan Project Temple","op":"Rowan Digital Infrastructure","s":"under_construction","st":"TX","city":"Temple","co":"Bell","lat":31.0982,"lon":-97.3428,"pre":"approximate","cf":"confirmed","mw":300,"ac":700,"inv":700000000,"ann":"2026","upd":"2026-11-04","nt":"300 MW campus in Temple, Bell County; operations targeted 2027. Distinct from Rowan's Frederick, MD campus, tracked separately as of July 2026. Coordinates are the Temple area centroid. Rowan's January 5, 2026 announcement states a minimum $700M investment and projects approximately 600 construction jobs and more than 40 permanent positions.","src":[{"u":"https://rowan.digital/news/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/","t":"Rowan powers Texas growth as construction begins on 300 MW Temple data center","p":"Rowan Digital Infrastructure"},{"u":"https://www.templetx.gov/community/faq__data_center_development_.php","t":"City of Temple - Data Center Development FAQ (closed-loop cooling, 4,000 gpd cap)","p":"City of Temple"}],"j":"city","jc":"Bell County","jn":"Temple","jd":"city","ju":"approx"},{"id":"serverfarm-houston-hou-tx","n":"Serverfarm Houston AI Campus (HOU1 / HOU2)","op":"Serverfarm","s":"proposed","st":"TX","city":"Houston","co":"Harris","lat":29.7867,"lon":-95.3899,"pre":"approximate","cf":"reported","mw":500,"ac":250,"ann":"2024","upd":"2026-08-25","nt":"500 MW planned across HOU1 and HOU2 on 250 acres bought in 2024, pre-leased and aimed at hyperscale AI demand, funded out of the $3bn credit facility Serverfarm closed with 23 institutional lenders in December 2025. Independent coverage is thinner here than for the rest of this file — one trade outlet plus the operator — and sources are inconsistent about whether the campus is Houston proper or the CTX campus at Hockley in Waller County about 40 miles northwest, so treat the location as the metro rather than a pinned site.","src":[{"u":"https://www.datacenterdynamics.com/en/news/serverfarm-files-to-build-two-more-data-centers-in-houston-texas/","t":"Serverfarm files to build two more data centers in Houston, Texas","p":"Data Center Dynamics"},{"u":"https://www.serverfarmllc.com/blog/serverfarm-hou1-and-hou2-ai-campuses-for-near-term-capacity-and-phased-development-of-scale-out-sustainable-data-centers/","t":"Serverfarm HOU1 and HOU2 — AI campuses","p":"Serverfarm"}],"j":"city","jc":"Harris County","jn":"Houston","jd":"city","ju":"approx"},{"id":"skybox-houston-one-tx","n":"Skybox Houston One","op":"Skybox Datacenters","s":"operational","st":"TX","city":"Katy","co":"Harris","lat":29.8029,"lon":-95.7553,"pre":"exact","cf":"reported","ac":20,"upd":"2026-11-04","nt":"26MW, 96,129 SF, 20-acre campus at 22000 Franz Rd, Katy TX. Page explicitly describes it as home to some of the world's densest HPC compute environments serving oil & gas and cloud/HPC users, with DoubleDense cooling up to 1000W/SF immersion — real HPC evidence. AI/HPC (mixed-use): Skybox markets Houston as home to some of the world's densest HPC environments with DoubleDense immersion cooling up to 1000 W/PSF; its own news page confirms a named Skybox Houston I HPC immersion deployment (Shell Energy). A Green Revolution Cooling customer page calls it Element Critical's Skybox Datacenters facility; as of October 2026 the operator's own page names only Skybox Datacenters. The 1.2 MW on that customer page is Shell's immersion-cooled compute load, not the facility's capacity.","src":[{"u":"https://www.skyboxdatacenters.com/locations/skybox-houston","t":"Skybox Datacenters official facility page","p":"Skybox Datacenters"},{"u":"https://www.openstreetmap.org/way/714776107","t":"OpenStreetMap way/714776107","p":"OpenStreetMap"}],"j":"city","jc":"Harris County","jn":"Houston","jd":"city"},{"id":"soluna-project-grace-silverton-tx","n":"Soluna Project Grace","op":"Soluna Holdings","s":"under_construction","st":"TX","city":"Silverton","co":"Briscoe","lat":34.4692,"lon":-101.3082,"pre":"approximate","cf":"reported","mw":2,"upd":"2026-08-03","src":[{"u":"https://www.solunacomputing.com/news/siemens-partnership/","t":"Soluna and Siemens Collaborate to Solve GPU Power Swings in Behind-the-Meter AI","p":"Soluna Computing"},{"u":"https://baxtel.com/data-center/soluna-project-grace","t":"Soluna: Project Grace Data Center","p":"Baxtel"}],"j":"city","jc":"Briscoe County","jn":"Silverton","jd":"city","ju":"approx"},{"id":"soluna-project-kati-willacy-tx","n":"Soluna Project Kati","op":"Soluna Holdings","s":"operational","st":"TX","city":"Raymondville","co":"Willacy","lat":26.4804,"lon":-97.7836,"pre":"approximate","cf":"confirmed","mw":166,"ann":"2025-09","upd":"2026-11-04","pb":"ERCOT grid","nt":"Rio Grande Valley, Willacy County; 166 MW clean computing in two phases (scaling toward 300+ MW — in notes), ERCOT-approved, Phase 1 live early 2026. Coordinates are anchored to Raymondville (county seat); the exact parcel is unspecified.","src":[{"u":"https://www.businesswire.com/news/home/20250911683738/en/Soluna-Breaks-Ground-on-its-Largest-Site-to-Date-Project-Kati","t":"Soluna Breaks Ground on its Largest Site to Date, Project Kati","p":"Soluna Holdings"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"city","jc":"Willacy County","jn":"Raymondville","jd":"city","ju":"approx"},{"id":"stargate-abilene-tx","n":"Stargate Abilene","op":"OpenAI / Oracle / Crusoe","s":"operational","st":"TX","city":"Abilene","co":"Taylor","lat":32.5001,"lon":-99.784,"pre":"approximate","cf":"reported","mw":1200,"ac":1100,"ann":"2025-01-21","upd":"2026-11-04","pb":"grid (AEP Texas) and on-site gas turbines","nt":"Also known as the Lancium Clean Campus. Lancium announced the site in December 2021 as a Clean Compute Campus that would host Bitcoin mining and other energy-intensive applications; Crusoe has since built an eight-building AI campus on it. Oracle gives the campus as 1,100 acres; the 2021 announcement gave about 800. Epoch AI describes the AI chips as owned by Oracle and used by OpenAI. Taylor Central Appraisal District's 2026 roll (Texas appraises property as of 1 January) lists Lancium entities as owners of the land, buildings and campus substations; Crusoe-managed entities as owners of each building's \"MEP\" accounts; and Oracle America as owner of computer equipment for \"BUILDING 1 & 2\" only, valued at $3.43 billion. Business Insider reported in July 2025 that Crusoe \"has committed to spending up to $3.5 billion to build the data center site in exchange for its property tax abatement\"; that is a commitment under the abatement agreements, not a reported project cost, so no investment figure is recorded here. Crusoe, Blue Owl Capital and Primary Digital Infrastructure describe the campus as funded by a \"$15 billion joint-venture\" (May 2025); the release does not split the figure into debt and equity or state a total project cost. Newmark said it arranged a $7.1 billion construction loan, led by JP Morgan, for the second phase. Crusoe gives the eight buildings \"a total power capacity of 1.2 gigawatts\"; Oracle describes its 618 MW for six buildings as \"75% of total capacity\", without saying what kind of capacity; Epoch AI projects 843 MW of IT power for the campus by Q4 2026. The operational capacity shown is Oracle's figure for capacity \"delivered to the customer\" as of 2026-09-10. Oracle did not say whether it is IT load, and \"delivered\" is Oracle's word, not an observation of running hardware. Crusoe expected the second phase to finish in mid-2026 (March 2025) and later \"by the end of 2026\" (March 2026). A separate 900 MW Crusoe campus for Microsoft (two buildings and an onsite power plant, the first building expected to be energized in mid-2027) is being built on adjacent land and is not part of this record; Epoch AI reported in April 2026 that OpenAI had reversed plans to expand this site. Construction-workforce figures conflict widely across sources and are not repeated here. Coordinates are the approximate centre of the eight data halls outlined on Epoch AI's satellite map of the campus (retrieved 2026-10-16).","src":[{"u":"https://openai.com/index/announcing-the-stargate-project/","t":"Announcing the Stargate Project — OpenAI","p":"OpenAI"},{"u":"https://en.wikipedia.org/wiki/Stargate_LLC","t":"Stargate LLC — Wikipedia","p":"Wikipedia"}],"j":"uninc","jc":"Taylor County","ju":"approx"},{"id":"stargate-milam-county-tx","n":"Stargate Milam County Campus","op":"OpenAI / SoftBank (SB Energy)","s":"under_construction","st":"TX","co":"Milam","lat":30.852,"lon":-96.972,"pre":"approximate","cf":"reported","mw":1200,"ac":595,"inv":470000000,"ann":"2025-09-23","upd":"2026-10-30","pb":"on-site natural gas microgrid","src":[{"u":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","t":"OpenAI Stargate: where the US sites stand — Epoch AI","p":"Epoch AI"},{"u":"https://openai.com/index/five-new-stargate-sites/","t":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","p":"OpenAI"}],"j":"city","jc":"Milam County","jn":"Cameron","jd":"city","ju":"approx"},{"id":"switch-the-rock-round-rock-tx","n":"Switch: The Rock (Round Rock)","op":"Switch","s":"under_construction","st":"TX","city":"Round Rock","co":"Williamson","lat":30.488,"lon":-97.6725,"pre":"exact","cf":"reported","mw":185,"upd":"2026-11-04","pb":"ERCOT grid via Oncor; company-wide '100% renewable' pledge with no site-specific PPA found","nt":"Land purchase from Dell + rezoning approved per DCD and Round Rock city government release; project is Switch's 5th 'Prime' campus, not yet reported as fully operational. AI/HPC (likely): The Rock: exascale data center campus for hyperscale/high-density.","src":[{"u":"https://www.datacenterdynamics.com/en/news/switch-granted-planning-permission-for-data-center-in-round-rock-texas/","t":"Switch facility directory","p":"Switch"},{"u":"https://www.openstreetmap.org/way/1493169641","t":"OpenStreetMap way/1493169641","p":"OpenStreetMap"}],"j":"city","jc":"Williamson County","jn":"Round Rock","jd":"city"},{"id":"tesla-cortex-2-giga-texas-austin-tx","n":"Tesla Cortex 2.0 AI Training Cluster (Giga Texas)","op":"Tesla","s":"under_construction","st":"TX","city":"Austin","co":"Travis","lat":30.2223,"lon":-97.6171,"pre":"approximate","cf":"reported","mw":500,"upd":"2026-09-21","pb":"Bluebonnet Electric Cooperative grid + on-site rooftop solar","nt":"Dedicated, purpose-built AI training data center on the north side of Tesla's Giga Texas campus (unincorporated Travis County), separate from and adjacent to the original Cortex cluster. Trains neural networks for Full Self-Driving and the Optimus robot program; uses Nvidia GPUs. First ~250 MW targeted online with a full ~500 MW buildout targeted mid-2026; construction began early 2025. Coordinate is the Giga Texas campus point; Cortex 2.0 is a specific building on that campus.","src":[{"u":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","t":"Cortex 2.0: Tesla's new supercomputer at Giga Texas","p":"Interesting Engineering"},{"u":"https://www.notateslaapp.com/news/2215/a-look-at-teslas-new-ai-training-center-at-giga-texas-video","t":"A Look at Tesla's New AI Training Center at Giga Texas","p":"Not a Tesla App"}],"j":"uninc","jc":"Travis County","jn":"Hornsby Bend","ju":"approx"},{"id":"tcdc-ector-county-tx","n":"Texas Critical Data Centers (TCDC)","op":"Sharon AI + New Era Energy & Digital (joint venture)","s":"proposed","st":"TX","co":"Ector","lat":31.87,"lon":-102.54,"pre":"approximate","cf":"reported","mw":250,"ac":438,"upd":"2026-10-22","pb":"Thunderhead Energy Solutions (behind-the-meter gas) + ERCOT grid interconnection","nt":"Potential to scale beyond 1GW (ceiling, not a confirmed committed figure). Power partners Thunderhead Energy Solutions and Mawgan Capital (behind-the-meter gas generation); GlobeLink providing dark fiber. Phased: first 100MW segment targeted online by December 2026, remaining 150MW roughly 6 months later. Coordinates are approximate (Odessa area).","src":[{"u":"https://www.datacenterdynamics.com/en/news/tcdc-signs-loi-to-acquire-an-additional-203-acres-for-offgrid-data-center-campus-in-ector-county-texas/","t":"TCDC signs LOI to acquire an additional 203 acres for off-grid data center campus in Ector County, Texas","p":"Data Center Dynamics"},{"u":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","t":"Sharon AI: Sharon AI Completes Phase One Engineering for Flagship AI Data Center Campus JV in Texas (Thunderhead Energy Solutions 250MW behind-the-meter agreement, SB6/grid interconnection plan)","p":""}],"j":"uninc","jc":"Ector County","jn":"West Odessa","ju":"approx"},{"id":"tract-caldwell-valley-uhland-tx","n":"Tract Caldwell Valley Technology Park","op":"Tract","s":"proposed","st":"TX","city":"Uhland","co":"Caldwell","lat":29.9499,"lon":-97.7889,"pre":"approximate","cf":"confirmed","mw":2000,"ac":1515,"ann":"2025-05","upd":"2026-10-22","pb":"Blue Bonnet Electric Cooperative","nt":"1,515-acre megasite in Caldwell County (Uhland area, between Austin and San Antonio); over 2 GW at full buildout (expansion toward ~4 GW is a ceiling — in notes), initial 360 MW utility delivery H1 2028 via Blue Bonnet Electric Cooperative. Land acquisition closed May 2025 (pre-construction). Coordinates are the Uhland area centroid.","src":[{"u":"https://www.tract.com/news/tract-closes-acquisition-of-1515-acres-in-caldwell-county-texas-for-multi-gigawatt-data-center-technology-park/","t":"Tract closes acquisition of 1,515 acres in Caldwell County, Texas for multi-gigawatt data center technology park","p":"Tract"},{"u":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","t":"Muskin | Elam Group — 1,500-acre data center campus, 800 jobs confirmed for small town in Caldwell County","p":""}],"j":"city","jc":"Caldwell County","jn":"Uhland","jd":"city","ju":"approx"},{"id":"vantage-frontier-shackelford-county-tx","n":"Vantage Frontier Campus","op":"Vantage Data Centers","s":"under_construction","st":"TX","co":"Shackelford","lat":32.7272,"lon":-99.2987,"pre":"approximate","cf":"reported","mw":1400,"ac":1200,"ann":"2025","upd":"2026-10-30","pb":"on-site natural gas microgrid (Voltagrid)","src":[{"u":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","t":"Vantage Data Centers Unveils Plans for Frontier, a $25B Mega-campus in Texas — Vantage","p":"Vantage Data Centers"},{"u":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","t":"Vantage breaks ground on Texas gigawatt data center campus for OpenAI — Data Center Dynamics","p":"Data Center Dynamics"}],"j":"city","jc":"Shackelford County","jn":"Albany","jd":"city","ju":"approx"},{"id":"blusky-ai-delta-millard-county-ut","n":"BluSky AI Delta Data Center","op":"BluSky AI Inc.","s":"proposed","st":"UT","city":"Delta","co":"Millard","lat":39.3502,"lon":-112.5766,"pre":"approximate","cf":"reported","mw":50,"ac":25,"upd":"2026-08-25","nt":"A specific 25-acre BluSky AI parcel and building within the already-tracked Creekstone Energy Delta Gigasite campus — as of August 2026, tracked separately because it is a distinct operator/tenant with its own land agreement, consistent with how this tracker distinguishes co-located operators elsewhere. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Millard County Commissioner Bill Wright is on the record (Utah Business, Nov 2025) extending the county's standing \"no special treatment\" statement to name Creekstone Energy's Delta Gigasite — where BluSky AI holds a 50 MW agreement — specifically: \"the county did not give either development any special treatment or incentives to bring the historic data centers to the area.\" Delta City's own Boards and Commissions page lists no Community Reinvestment Agency or Redevelopment Agency among its active public bodies. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","src":[{"u":"https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223","t":"BluSky AI Inc. Signs Letter of Intent to Acquire 25 Acres with up to 50 MW of Capacity in Strategic Expansion","p":"GlobeNewswire (via Manila Times)"},{"u":"https://www.utahbusiness.com/industry/2025/11/05/data-center-creekstone-energy-joule-capital-partners-millard-county-fillmore/","t":"Millard County commissioner on data-center incentives — Creekstone Energy / BluSky AI Delta Gigasite named","p":"Utah Business"}],"j":"city","jc":"Millard County","jn":"Delta","jd":"city","ju":"approx"},{"id":"blusky-ai-milford-ut","n":"BluSky AI Milford Campus","op":"BluSky AI Inc.","s":"proposed","st":"UT","city":"Milford","co":"Beaver","lat":38.3936,"lon":-113.0111,"pre":"approximate","cf":"reported","mw":9.3,"ac":51.6,"upd":"2026-08-25","nt":"BluSky AI's first secured modular 'SkyMod' site, distinct from its Nephi (Juab County) and Delta (Millard County) sites already/also tracked; 51.6 acres leased from Wild Mustang Ventures LLC. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. BluSky AI's own SEC-filed Form 8-K and the underlying Ground Lease with Option to Purchase (Wild Mustang Ventures, LLC, June 30, 2025) were read directly and contain no property-tax, abatement, tax-increment-financing, or PILOT provisions. Neither Milford City (four active public bodies, none a CRA/RDA) nor Beaver County has a Community Reinvestment Agency or Redevelopment Agency; Milford City's own \"Economic Development\" link points off-site to a county tourism page, not an incentive program. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","src":[{"u":"https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520","t":"BluSky AI Inc. Secures First Site with 9.3MW to Launch Flagship Data Center in Central, Utah","p":"GlobeNewswire (via Manila Times)"},{"u":"https://www.sec.gov/Archives/edgar/data/1416090/000109690625001096/imii-20250626.htm","t":"BluSky AI Inc. Form 8-K (filed July 7, 2025) — Milford, Beaver County power and ground-lease terms","p":"U.S. Securities and Exchange Commission (EDGAR)"}],"j":"city","jc":"Beaver County","jn":"Milford","jd":"city","ju":"approx"},{"id":"blusky-ai-nephi-ut","n":"BluSky AI Nephi SkyMod Site","op":"BluSky AI Inc.","s":"permitted","st":"UT","city":"Nephi","co":"Juab","lat":39.7102,"lon":-111.8363,"pre":"approximate","cf":"confirmed","mw":4,"ac":0.375,"upd":"2026-11-02","nt":"Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy found. Nephi City's Community Reinvestment Agency fund is tied to a hotel project area rather than this site, and no CRA participation agreement naming this project was located. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing. Recorded as no-evidence-found rather than a fully closed absence: the Nephi project-area budget PDF did not return readable text on retrieval.","src":[{"u":"https://natlawreview.com/press-releases/blusky-ai-inc-signs-letter-intent-lease-strategic-site-nephi-utah-modular-ai","t":"BluSky AI Inc. Signs Letter of Intent to Lease Strategic Site in Nephi, Utah for Modular AI Infrastructure Expansion","p":"National Law Review (company press release, September 2025)"},{"u":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf","t":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","p":"Kem C. Gardner Policy Institute, University of Utah"}],"j":"city","jc":"Juab County","jn":"Nephi","jd":"city","ju":"approx"},{"id":"creekstone-delta-ut","n":"Creekstone Energy Delta Gigasite","op":"Creekstone Energy","s":"under_construction","st":"UT","city":"Delta","co":"Millard","lat":39.3527,"lon":-112.5777,"pre":"approximate","cf":"reported","mw":10000,"ac":1143,"inv":17000000000,"ann":"2025-12","upd":"2026-10-22","pb":"On-site natural gas + utility-scale solar (SITLA lease) + nuclear planned","nt":"Claims to be world's largest planned AI data center campus at 20M sq ft. 1,143 acres owned; 13,000-acre SITLA lease for solar (largest solar lease in Utah history — record previously stated 30,000 acres, corrected to 13,000 acres per March 2026 BusinessWire announcement and multiple independent sources). Initial customer BluSky AI allocated up to 50MW. Adjacent to Intermountain Power Project. 10GW is full-buildout target; first 300MW gas delivery H1 2027. Coordinates at Delta city centroid; site is southeast of Delta.","src":[{"u":"https://www.datacenterdynamics.com/en/news/zeo-energy-to-supply-280mw-of-power-for-creekstone-energys-up-to-10gw-data-center-campus-in-millard-county-utah/","t":"Zeo Energy to supply 280MW for Creekstone's 10GW Delta Gigasite","p":"Data Center Dynamics"},{"u":"https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/","t":"Creekstone Energy Commits $17B to Millard County — Utah Governor's Office","p":"Utah Governor's Office of Economic Development"}],"j":"city","jc":"Millard County","jn":"Delta","jd":"city","ju":"approx"},{"id":"cyrusone-dugway-proving-ground-tooele-county-ut","n":"CyrusOne Dugway Proving Ground Data Center","op":"CyrusOne","s":"proposed","st":"UT","co":"Tooele","lat":40.2,"lon":-112.93,"pre":"approximate","cf":"reported","ac":1201,"inv":2000000000,"upd":"2026-10-22","pb":"Grid — PacifiCorp","nt":"Conditionally selected, currently in exclusive negotiations with the US Army (not finalized); expected completion ~2029. Would be CyrusOne's first Utah facility, developed in partnership with Carlyle. Framed as AI-driven Army infrastructure ('AI is a strategic asset... force multiplier' per the Army Secretary) rather than marketed as a standalone AI-brand product. Coordinates are approximate. In exclusive negotiations with the US Army as of the cited source. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. — structural, not merely unresearched: Dugway Proving Ground is U.S. Army-owned federal land in unincorporated Tooele County, which sits outside any county/municipal property-tax roll, so a Title 17C Community Reinvestment Agency increment or abatement is not possible here regardless of county policy. Any public-sector instrument would be a federal Army real-estate arrangement, not a local or state subsidy, and the site remains in exclusive negotiations, not a finalized agreement. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","src":[{"u":"https://www.army.mil/article/291360/army_reaches_conditional_agreement_with_private_industry_for_hyperscaled_data_centers","t":"Army reaches conditional agreement with private industry for hyperscaled data centers","p":"Army.mil"},{"u":"https://www.datacenterdynamics.com/en/news/us-army-taps-carlyle-and-cyrusone-to-develop-data-centers-on-army-owned-land/","t":"US Army taps Carlyle and CyrusOne to develop data centers on Army-owned land","p":"Data Center Dynamics"}],"j":"uninc","jc":"Tooele County","ju":"approx"},{"id":"joule-millard-county-ut","n":"Joule Energy and Data Center Campus","op":"Joule Capital Partners","s":"under_construction","st":"UT","city":"Holden","co":"Millard","lat":39.1072,"lon":-112.165,"pre":"approximate","cf":"reported","mw":4000,"ac":4000,"ann":"2025-10","upd":"2026-10-22","pb":"On-site Caterpillar G3520K gas generators; nuclear planned post-2030","nt":"Founders Mark McDougal and David Gray converting family 4,000-acre alfalfa farm near Holden. Described by founders as largest private project in Utah history. Partnership with Caterpillar for generator sets; MOU with EnergySolutions for nuclear feasibility study. Part of Governor Cox's Operation Gigawatt initiative. Site at 4,800+ ft elevation for cooling efficiency. Coordinates approximate for Holden, Millard County. Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy. Millard County commissioners are quoted on the record stating the county \"did not give either development any special treatment or incentives\", and no Millard County CRA/RDA public body is registered on the Utah Public Notice Website. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 sales-tax exemption is self-executing, so no site-level award document exists to find.","src":[{"u":"https://www.abc4.com/news/central-utah/groundbreaking-millard-county-data-center/","t":"Groundbreaking held for Joule data center campus in Millard County","p":"ABC4 Utah"},{"u":"https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/","t":"Why this coming data center in Millard County is so unique","p":"Deseret News"}],"j":"uninc","jc":"Millard County","ju":"approx"},{"id":"meta-eagle-mountain-ut","n":"Meta Eagle Mountain Data Center Campus","op":"Meta","s":"operational","st":"UT","city":"Eagle Mountain","co":"Utah","lat":40.3138,"lon":-111.9697,"pre":"approximate","cf":"confirmed","ac":500,"inv":1500000000,"ann":"2018","upd":"2026-11-04","pb":"grid (Rocky Mountain Power) + renewable PPAs","src":[{"u":"https://baxtel.com/data-center/meta-eagle-mountain-utah-campus","t":"Meta Eagle Mountain Utah Campus — Baxtel","p":"Baxtel"},{"u":"https://greatsaltlakenews.org/latest-news/salt-lake-tribune/can-utah-become-a-data-center-hub-without-draining-its-water-supply","t":"Can Utah become a data center hub without draining its water supply? — Great Salt Lake Collaborative / Salt Lake Tribune","p":"Salt Lake Tribune"}],"j":"city","jc":"Utah County","jn":"Eagle Mountain","jd":"city","ju":"approx"},{"id":"qts-eagle-mountain-ut","n":"QTS Eagle Mountain Data Center Campus","op":"QTS Data Centers","s":"under_construction","st":"UT","city":"Eagle Mountain","co":"Utah","lat":40.3155,"lon":-111.9847,"pre":"approximate","cf":"reported","mw":200,"ac":193,"inv":6000000000,"ann":"2023","upd":"2026-11-04","pb":"grid (Rocky Mountain Power); water-free cooling","nt":"Groundbreaking was October 2025; the third of three initial buildings topped out (structural completion) on 2026-04-20. Not yet operational; no delivery date confirmed.","src":[{"u":"https://eaglemountain.gov/qts-begins-construction-on-new-datacenter-campus-in-eagle-mountain/","t":"QTS begins construction on new datacenter campus in Eagle Mountain — Eagle Mountain City","p":"Eagle Mountain City"},{"u":"https://utahnewsdispatch.com/2026/04/17/eagle-mountain-193-acre-data-center-campus-is-set-to-be-done-this-year-with-big-water-promises/","t":"Eagle Mountain 193-acre data center campus set to be done this year — Utah News Dispatch","p":"Utah News Dispatch"}],"j":"city","jc":"Utah County","jn":"Eagle Mountain","jd":"city","ju":"approx"},{"id":"stratos-box-elder-ut","n":"Stratos AI Data Center Campus","op":"O'Leary Digital","s":"proposed","st":"UT","city":"Lucin","co":"Box Elder","lat":41.5,"lon":-113.5,"pre":"approximate","cf":"reported","mw":9000,"ann":"2026-04","upd":"2026-10-28","pb":"On-site natural gas (Ruby Pipeline) + planned solar array","nt":"Hansel Valley and Locomotive Valley, western Box Elder County near Lucin, UT. The project area was about 40,000 acres as approved in spring 2026 (Utah News Dispatch); on June 4, 2026, O'Leary wrote that the company would remove 19,430 acres in and around the Locomotive Springs area and another 620 acres, cutting the area roughly in half (KUER). As of October 2026, no current total area is recorded. 60 planned data centers on initial 10,000-acre phase. 9GW is full-buildout figure; Phase 1 ~3GW. Total cost projected $100B+ at full buildout; only $20M invested as of mid-2026. Designed by Gensler. Environmental permitting via Utah DEQ expected to take ~2 years. MIDA oversight provides state-level approval authority. Coordinates are approximate for western Box Elder County; exact site boundaries unpublished. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Box Elder County's own Stratos Project Fact Sheet states directly: \"No County funds are required to build the project. All funds will come from the developers and private investors.\" A May 2026 MIDA interlocal agreement covers land-use and permitting review governance (a development review committee, subdivision/site-plan requirements), not a tax-increment or abatement arrangement, and MIDA's own project-area records — which could confirm or rule out a tax-increment component — were unreachable when checked in September 2026 (mida.utah.gov redirected to an unrelated login page). Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","src":[{"u":"https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet","t":"Stratos Project Fact Sheet — Box Elder County","p":"Box Elder County, UT"},{"u":"https://utahnewsdispatch.com/2026/05/19/renderings-show-massive-data-center-box-elder-utah-permits-could-take-years/","t":"Renderings show Stratos data center but permits could take years","p":"Utah News Dispatch"}],"j":"uninc","jc":"Box Elder County","ju":"approx"},{"id":"valar-atomics-nvidia-orangeville-ai-data-center-ut","n":"Valar Atomics / Nvidia Nuclear-Powered AI Data Center (Orangeville)","op":"Valar Atomics","s":"proposed","st":"UT","city":"Orangeville","co":"Emery","lat":39.2272,"lon":-111.0535,"pre":"approximate","cf":"reported","mw":30,"upd":"2026-11-02","nt":"Early-stage: the companies are 'considering' the project, and the reactor needs an NRC license before it can sell commercial power. This would be a data center next to the tracked Ward 250 test reactor (valar-atomics-ward-250-orangeville-ut), which is a separate power_generation record. The pin is the Orangeville town point.","src":[{"u":"https://www.deseret.com/u-s-world/2026/07/01/valar-atomics-nvidia-milestone/","t":"Valar Atomics, Nvidia milestone","p":"Deseret News"}],"j":"city","jc":"Emery County","jn":"Orangeville","jd":"city","ju":"approx"},{"id":"aws-mattermeade-caroline-va","n":"AWS Mattermeade Tech Campus","op":"Amazon Web Services","s":"proposed","st":"VA","city":"Bowling Green","co":"Caroline","lat":38.044,"lon":-77.3527,"pre":"approximate","cf":"confirmed","mw":770,"ac":1143,"ann":"2025","upd":"2026-11-05","nt":"1,143 acres across Caroline & Spotsylvania counties, SE of the I-95 / Mudd Tavern Rd interchange; 11 two-story data center buildings plus an office. Amazon is 'seeking to develop a minimum of 770 MW by 2027'. Recorded as proposed (federal permit application filed / public-comment stage as of early 2025). Coordinates are the Bowling Green / Woodford area centroid.","src":[{"u":"https://www.datacenterdynamics.com/en/news/amazon-requests-permit-for-11-building-data-center-campus-in-caroline-county-virginia/","t":"Amazon requests permit for 11-building data center campus in Caroline County, Virginia","p":"Data Center Dynamics"},{"u":"https://www.datacenterfrontier.com/cloud/article/33006046/amazon-plans-major-data-center-expansion-in-virginias-spotsylvania-county","t":"Data Center Frontier — AWS Spotsylvania/Caroline campuses incl. Orrock (1,078 ac spanning both counties)","p":"Data Center Frontier"}],"j":"city","jc":"Caroline County","jn":"Bowling Green","jd":"town","ju":"approx"},{"id":"aligned-iad-01-va","n":"Aligned IAD-01","op":"Aligned Data Centers","s":"operational","st":"VA","city":"Ashburn","co":"Loudoun","lat":39.0136,"lon":-77.4706,"pre":"exact","cf":"reported","upd":"2026-09-01","pb":"Grid — Dominion Energy Virginia","nt":"Ashburn campus confirmed operational (IAD-01, 370,000 sq ft, 60MW) via Aligned press/case study pages; generic candidate name mapped to the first/flagship building. AI/HPC (likely): Ashburn IAD-01 supports AI/HPC/GPU via adaptive high-density design.","src":[{"u":"https://aligneddc.com/northern-virginia-data-centers/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/793622740","t":"OpenStreetMap way/793622740","p":"OpenStreetMap"}],"j":"uninc","jc":"Loudoun County","jn":"Ashburn"},{"id":"aligned-iad-03-va","n":"Aligned IAD-03","op":"Aligned Data Centers","s":"operational","st":"VA","city":"Ashburn","co":"Loudoun","lat":38.9886,"lon":-77.4408,"pre":"exact","cf":"reported","upd":"2026-09-01","pb":"Grid — Dominion Energy Virginia","nt":"IAD-03 confirmed via Aligned's own location page; 430,000 sq ft, 72MW, phase one delivered Fall 2023. AI/HPC (likely): Sterling IAD-03 supports high/variable-density AI/HPC.","src":[{"u":"https://aligneddc.com/location/iad-03-data-center/","t":"Aligned facility directory","p":"Aligned"},{"u":"https://www.openstreetmap.org/way/1276518684","t":"OpenStreetMap way/1276518684","p":"OpenStreetMap"}],"j":"uninc","jc":"Loudoun County"},{"id":"amazon-devlin-tech-park-va","n":"Amazon Devlin Technology Park","op":"Amazon Web Services","s":"permitted","st":"VA","city":"Bristow","co":"Prince William","lat":38.724,"lon":-77.558,"pre":"approximate","cf":"confirmed","ac":188.5,"inv":700000000,"ann":"2025-11","upd":"2026-10-22","nt":"$700M land purchase is among the highest ever for undeveloped land in the US. Zoning allows up to 3.5 million sq ft of data center space and three substations. Adjacent to Microsoft's Bristow campus parcel. Coordinates approximate for northwest corner of Devlin and Linton Hall roads.","src":[{"u":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","t":"Amazon buys 189 acres in Prince William tech park for $700M","p":"Virginia Business"},{"u":"https://www.datacenterdynamics.com/en/news/amazon-pays-700m-for-planned-data-center-site-in-virginias-prince-william-county-report/","t":"Amazon pays $700M for planned data center site in Virginia's Prince William County","p":"Data Center Dynamics"}],"j":"uninc","jc":"Prince William County","ju":"approx"},{"id":"digital-realty-aurora-ai-factory-manassas-va","n":"Aurora AI Factory","op":"Digital Realty","s":"under_construction","st":"VA","city":"Manassas","co":"Prince William","lat":38.7509,"lon":-77.4753,"pre":"approximate","cf":"reported","mw":96,"ann":"2025-10-28","upd":"2026-09-09","nt":"Nvidia's 'Aurora AI factory', built by Digital Realty on an existing Digital Realty site near Nokesville Road and Prince William Parkway. Billed as the first facility built to a new industry certification for flexible power, developed by Nvidia with Emerald AI, EPRI and grid operator PJM, and deploying Emerald AI's Emerald Conductor software to shift AI workloads in response to grid conditions. Operator is recorded as Digital Realty (owner/builder); Nvidia is the named tenant. The record is listed as under construction because, as of September 2026, no source consulted confirms it has entered service, only that operations were 'slated for' the first half of 2026.","src":[{"u":"http://web.archive.org/web/20260215011608/https://www.datacenterdynamics.com/en/news/nvidia-to-deploy-emerald-ais-orchestration-software-at-96mw-aurora-data-center-in-manassas-virginia/","t":"Nvidia to deploy Emerald AI's orchestration software at 96MW Aurora data center in Manassas, Virginia","p":"Data Center Dynamics (via Internet Archive)"}],"j":"city","jc":"Manassas city","jn":"Manassas","jd":"city","ju":"approx"},{"id":"stack-berry-hill-va","n":"Berry Hill / Southern Virginia Megasite","op":"STACK Infrastructure","s":"proposed","st":"VA","city":"Berry Hill","co":"Pittsylvania","lat":36.68,"lon":-79.35,"pre":"approximate","cf":"confirmed","ac":2990,"inv":73500000000,"ann":"2026-03","upd":"2026-11-05","nt":"Performance agreement sets a minimum investment of at least $73.5B over 30 years (at least 2,050 jobs); parallel reporting cites a ~$100B project scope. ~2,990 acres of the Southern Virginia Megasite; land deal ~$737.8M. The recorded investment figure is the agreement's minimum, at least $73.5 billion (Virginia Business, May 2026). The March 2026 draft agreement carried $73 billion and 2,050 jobs over 30 years (Cardinal News); Virginia Business puts the company's planned investment at about $100 billion over three decades, and Cardinal News describes the final document as outlining $100 billion and 2,500 jobs. The $100 billion figure is a planned total and is not recorded.","src":[{"u":"https://www.datacenterdynamics.com/en/news/stack-commits-735bn-investment-into-data-center-campus-in-berry-hill-virginia/","t":"STACK commits $73.5bn investment into data center campus in Berry Hill, Virginia","p":"Data Center Dynamics"},{"u":"https://cardinalnews.org/2026/06/30/stack-infrastructure-says-its-moving-forward-with-ai-data-center-in-pittsylvania/","t":"STACK Infrastructure says it's moving forward with AI data center in Pittsylvania","p":"Cardinal News"}],"j":"uninc","jc":"Pittsylvania County","ju":"approx"},{"id":"powerhouse-chirisa-chester-va","n":"Chirisa Technology Park — Richmond (Chester)","op":"PowerHouse Data Centers","s":"under_construction","st":"VA","city":"Chester","co":"Chesterfield","lat":37.3554,"lon":-77.4416,"pre":"approximate","cf":"confirmed","mw":120,"upd":"2026-11-04","nt":"Chester, Chesterfield County — first phase of a Blue Owl / Chirisa / PowerHouse JV: initial 50 MW (2025) → 120 MW facility, with a ~1 GW eventual plan. $600M construction loan closed. Distinct parcel from Google's Midlothian (Chesterfield) campus. Coordinates are the Chester area centroid. The $600M is a construction loan (financing) and the $5B is the multi-site JV total - neither is this campus's capex -> no investment figure is recorded. 800-1,200 jobs projected over 5-7 years spanning construction and operations -> no job count is recorded. Virginia law bars per-company data-center subsidy disclosure -> no subsidy is recorded. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.","src":[{"u":"https://www.prnewswire.com/news-releases/blue-owl-chirisa-technology-parks-and-powerhouse-data-centers-announce-first-phase-of-5-billion-joint-venture-development-partnership-302233967.html","t":"Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers announce first phase of $5 billion JV development partnership","p":"PowerHouse Data Centers"},{"u":"https://www.prnewswire.com/news-releases/chirisa-technology-parks-and-powerhouse-data-centers-to-launch-next-generation-hyperscale-campus-in-chesterfield-county-302259869.html","t":"Chirisa Technology Parks and PowerHouse launch hyperscale campus in Chesterfield County","p":"PR Newswire"}],"j":"uninc","jc":"Chesterfield County","jn":"Chester","ju":"approx"},{"id":"cleanarc-ruther-glen-va","n":"CleanArc VA1","op":"CleanArc Data Centers","s":"under_construction","st":"VA","city":"Ruther Glen","co":"Caroline","lat":37.9374,"lon":-77.4837,"pre":"approximate","cf":"confirmed","mw":900,"inv":3000000000,"ann":"2025-11","upd":"2026-11-04","nt":"900 MW flagship campus in Ruther Glen, Caroline County, phased into the mid-2030s (the November 2025 groundbreaking release targets the first 300 MW online in 1Q 2027; an earlier Data Center Dynamics report had said 200 MW by Q3 2026). Distinct operator/parcel from the AWS Mattermeade campus (also Caroline County). Coordinates are the Ruther Glen area centroid. The recorded investment is the confirmed $3B first-phase pledge (VEDP); the ~$8.8B full-buildout figure is a projection and is excluded.","src":[{"u":"https://www.datacenterdynamics.com/en/news/cleanarc-gets-green-light-for-600mw-data-center-campus-in-caroline-county-virginia/","t":"CleanArc gets green light for data center campus in Caroline County, Virginia","p":"Data Center Dynamics"},{"u":"https://www.vedp.org/press-release/2025-11/cleanarc-caroline","t":"CleanArc Data Centers invests $3 billion in Caroline County","p":"Virginia Economic Development Partnership"}],"j":"uninc","jc":"Caroline County","ju":"approx"},{"id":"cloudhq-manassas-mcc-va","n":"CloudHQ Manassas MCC Campus","op":"CloudHQ","s":"under_construction","st":"VA","city":"Manassas","co":"Prince William","lat":38.7196,"lon":-77.4982,"pre":"approximate","cf":"confirmed","mw":382,"ac":100,"ann":"2024","upd":"2026-10-30","nt":"Seven-building campus; 382 MW total planned critical IT load; 96 MW currently available. Coordinates sourced directly from CloudHQ website (38.71955, -77.49819). Connects via Manassas Fiber Highway to CloudHQ's MDC campus.","src":[{"u":"https://cloudhq.com/campus/mcc-campus/","t":"CloudHQ MCC Campus — Manassas, Virginia","p":"CloudHQ"},{"u":"https://www.datacenterfrontier.com/cloud/article/11430643/cloudhq-unveils-massive-new-manassas-data-center","t":"CloudHQ Unveils Massive New Manassas Data Center — Data Center Frontier","p":"Data Center Frontier"}],"j":"uninc","jc":"Prince William County","jn":"Buckhall","ju":"approx"},{"id":"coresite-va1-reston-va-va","n":"CoreSite VA1 - Reston, VA","op":"CoreSite","s":"operational","st":"VA","city":"Reston","co":"Fairfax","lat":38.9506,"lon":-77.3645,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Grid — Dominion Energy Virginia","nt":"Confirmed exact match: 12100 Sunrise Valley Drive, Reston, VA 20191. AI/HPC (likely): CoreSite offers liquid cooling capabilities at VA1 (Northern Virginia).","src":[{"u":"https://www.coresite.com/data-center/va1-reston-va","t":"CoreSite facility directory","p":"CoreSite"},{"u":"https://www.openstreetmap.org/way/79298926","t":"OpenStreetMap way/79298926","p":"OpenStreetMap"}],"j":"uninc","jc":"Fairfax County","jn":"Reston"},{"id":"coresite-va3-reston-va-va","n":"CoreSite VA3 - Reston, VA","op":"CoreSite","s":"operational","st":"VA","city":"Reston","co":"Fairfax","lat":38.9483,"lon":-77.3724,"pre":"exact","cf":"reported","upd":"2026-07-24","pb":"Dominion Energy 100% Renewable Energy Program (solar, hydroelectric, biomass; VA3-specific green tariff)","nt":"Part of confirmed 3-facility Reston campus (986,000+ sq ft total) per directory + VA1 page cross-reference. AI/HPC (confirmed): NVIDIA DGX-Ready certified; named liquid-cooled GPU/NVIDIA deployments.","src":[{"u":"https://www.coresite.com/data-center/va3-reston-va","t":"CoreSite facility directory","p":"CoreSite"},{"u":"https://www.openstreetmap.org/way/79818498","t":"OpenStreetMap way/79818498","p":"OpenStreetMap"}],"j":"uninc","jc":"Fairfax County","jn":"Reston"},{"id":"culpeper-brandy-station-va","n":"Culpeper Acquisitions Brandy Station Campus (denied)","op":"Culpeper Acquisitions LLC","s":"cancelled","st":"VA","city":"Brandy Station","co":"Culpeper","lat":38.5095,"lon":-77.8863,"pre":"approximate","cf":"reported","ann":"2024","upd":"2026-10-30","src":[{"u":"https://www.datacenterwatch.org/report","t":"Data Center Watch — Blocked and Delayed Projects Report","p":"Data Center Watch"},{"u":"https://fortune.com/2026/05/18/communities-are-blocking-billions-in-data-centers-big-tech-has-wagered-1-trillion-otherwise/","t":"Communities are blocking billions in data centers — Fortune","p":"Fortune"}],"j":"uninc","jc":"Culpeper County","ju":"approx"},{"id":"dc-blox-henrico-county-va","n":"DC Blox Henrico County Campus (withdrawn)","op":"DC BLOX","s":"cancelled","st":"VA","co":"Henrico","lat":37.5532,"lon":-77.4543,"pre":"approximate","cf":"confirmed","mw":50,"ann":"2024","upd":"2026-10-30","pb":"Grid — Dominion Energy Virginia","src":[{"u":"https://heatmap.news/politics/data-center-cancellations-2025","t":"Scoop: Local Pushback, Canceled Data Centers Surged in 2025 — Heatmap News","p":"Heatmap News"},{"u":"https://www.datacenterwatch.org/report","t":"Data Center Watch — Blocked and Delayed Projects Report","p":"Data Center Watch"}],"j":"city","jc":"Richmond city","jn":"Richmond","jd":"city","ju":"approx"},{"id":"edgecore-shannon-hill-louisa-va","n":"EdgeCore Shannon Hill Data Center Campus","op":"EdgeCore Digital Infrastructure","s":"proposed","st":"VA","co":"Louisa","lat":37.836,"lon":-77.988,"pre":"approximate","cf":"reported","mw":1100,"ac":697,"inv":17000000000,"ann":"2025-06-24","upd":"2026-11-04","nt":"697-acre / 3.9M sq ft high-density campus in Shannon Hill Regional Business Park, Louisa County, less than 1 mile from I-64 Exit 148 (Shannon Hill). Coordinates are an approximate geocode of the Shannon Hill interchange, not a parcel-confirmed point. Public reception, as of 2026-09-10: Shannon Hill Regional Business Park was rezoned for tech-sector use in 2019, years before EdgeCore's 2025 project announcement, so the campus is permitted by-right and did not trigger a new public rezoning hearing. A July 2025 Louisa County opposition wave (see North Creek Technology Campus (NCTC)) explicitly named EdgeCore Shannon Hill as a separate, not-yet-controversial project at that time. No hearing record, resident objection, or support statement specific to Shannon Hill was found. DCD's original announcement piece could not be read as of September 2026; search-indexed coverage confirms the by-right/2019-rezoning status.","src":[{"u":"https://www.datacenterdynamics.com/en/news/edgecore-to-develop-11gw-data-center-in-louisa-county-virginia/","t":"EdgeCore to develop 1.1GW data center in Louisa County, Virginia","p":"Data Center Dynamics"},{"u":"https://virginiabusiness.com/17b-louisa-county-data-center-edgecore/","t":"EdgeCore to invest $17B in Louisa County data center campus","p":"Virginia Business"}],"j":"uninc","jc":"Goochland County","ju":"approx"},{"id":"equinix-ashburn-va","n":"Equinix Ashburn Campus (DC1–DC15)","op":"Equinix","s":"operational","st":"VA","city":"Ashburn","co":"Loudoun","lat":39.0437,"lon":-77.4875,"pre":"approximate","cf":"confirmed","ann":"1999","upd":"2026-10-30","pb":"grid (Dominion Energy) + renewable PPAs","src":[{"u":"https://en.wikipedia.org/wiki/Ashburn,_Virginia#Data_centers","t":"Ashburn, Virginia — Data centers (Wikipedia)","p":"Wikipedia"},{"u":"https://sustainability.equinix.com/wp-content/uploads/2022/04/GU_IBX-Sustainability-Quick-Reference_EN-LTR-1.pdf","t":"Equinix IBX Sustainability Quick Reference Guide","p":"Equinix"}],"j":"uninc","jc":"Loudoun County","jn":"Ashburn","ju":"approx"},{"id":"corscale-gainesville-crossing-va","n":"Gainesville Crossing Digital Campus (GCDC)","op":"Corscale Data Centers (Patrinely / USAA Real Estate)","s":"under_construction","st":"VA","city":"Gainesville","co":"Prince William","lat":38.78,"lon":-77.62,"pre":"approximate","cf":"confirmed","mw":300,"ac":130,"upd":"2026-10-22","pb":"Dominion Energy","nt":"~130-acre campus on Interstate 66; ~306 MW via an on-site Dominion substation. Distinct from the QTS/Compass 'PW Digital Gateway' site (~2,100 acres at Pageland Lane; tracked separately as of July 2026) — which QTS terminated in July 2026. Capacity recorded at 300 MW per the DCD primary source (a 326 MW figure also circulates). Coordinates are the Gainesville area centroid. The only confirmed money figure is the ~$74.5M 2020 land purchase (a real-estate transaction, not construction capex) -> no investment figure is recorded; no headcount is disclosed; the VA sales-and-use tax exemption is eligibility-gated with no public award.","src":[{"u":"https://www.datacenterdynamics.com/en/news/new-hyperscale-developer-corscale-is-behind-300mw-gainesville-crossing-campus-in-prince-william-county/","t":"New hyperscale developer Corscale is behind 300MW Gainesville Crossing campus in Prince William County","p":"Data Center Dynamics"},{"u":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","t":"Digital Gateway data center project dies after final developer withdraws appeal","p":"WTOP"}],"j":"uninc","jc":"Prince William County","jn":"Gainesville","ju":"approx"},{"id":"google-arcola-loudoun-va","n":"Google Arcola Data Center (Loudoun County)","op":"Google","s":"operational","st":"VA","city":"Sterling","co":"Loudoun","lat":38.9432,"lon":-77.5253,"pre":"approximate","cf":"reported","ac":91,"ann":"2017","upd":"2026-07-24","pb":"Dominion Energy grid delivery; AES has a 500 MW wind/solar/hydro/battery carbon-free-power contract for Google's Loudoun County facilities generally, but not confirmed specific to the Arcola site","nt":"Google data center at 42575 Arcola Blvd in the Arcola area of Loudoun County (Northern Virginia 'Data Center Alley') — the ~91-acre 'Arcola Center' parcel was purchased in 2017 for $58M (a land cost, not total capex), and the ARA1A building is operational (built 2020 per baxtel). DISTINCT from Google's tracked Chester and Midlothian (Richmond-area) Virginia campuses. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Arcola Blvd address; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://baxtel.com/data-center/google-dulles-arcola-center","t":"Google Dulles / Arcola Center — 42575 Arcola Blvd, Sterling VA, fully operational, built 2020","p":"Baxtel"},{"u":"https://www.datacenterfrontier.com/cloud/article/11430462/google-buys-two-data-center-sites-in-northern-virginia","t":"Google buys two data center sites in Northern Virginia — 91-acre Arcola Center parcel, $58M (Nov 2017)","p":"Data Center Frontier"}],"j":"uninc","jc":"Loudoun County","jn":"Arcola","ju":"approx"},{"id":"google-loch-midlothian-va","n":"Google Project Loch","op":"Google","s":"permitted","st":"VA","city":"Midlothian","co":"Chesterfield","lat":37.454,"lon":-77.71,"pre":"approximate","cf":"confirmed","ac":340,"ann":"2025-08-28","upd":"2026-11-04","nt":"Codename Project Loch; land acquired via shell entity Aeris Investments LLC (~$29M for ~340 acres). Site: 750 Watkins Centre Pkwy (Watkins Centre South), west of Rt 288 and south of Rt 60, near Westchester Commons. Three data-center buildings planned, each with a dedicated on-site substation. Google stated in Aug 2025 it has no near-term plans to develop Loch. Capacity MW not disclosed. A fixed tax-rate agreement with Chesterfield County for the data-center equipment rate is recorded as a program label with no dollar value, because no readable cited source states one, and as of October 2026 the agreement text has not been found. Coordinates are an approximate site centroid (address-derived, not GPS-verified).","src":[{"u":"https://www.datacenterdynamics.com/en/news/google-files-for-data-center-campus-outside-richmond-virginia/","t":"Google files for data center campus outside Richmond, Virginia","p":"Data Center Dynamics"},{"u":"https://richmondbizsense.com/2025/08/28/chesterfield-scores-a-google-trifecta-tech-giant-reveals-ties-to-3-massive-sites-across-the-county/","t":"Chesterfield scores a Google trifecta: ties to 3 sites across the county","p":"Richmond BizSense"}],"j":"uninc","jc":"Chesterfield County","ju":"approx"},{"id":"iron-mountain-white-oak-henrico-va","n":"Iron Mountain White Oak Technology Park Campus","op":"Iron Mountain","s":"proposed","st":"VA","city":"Henrico","co":"Henrico","lat":37.556,"lon":-77.427,"pre":"approximate","cf":"confirmed","mw":200,"ac":66,"inv":1000000000,"ann":"2024-11","upd":"2026-10-30","nt":"6110 Technology Creek Drive, Henrico County (Richmond metro area). White Oak Technology Park has fiber connections and subsea cables to three continents. Henrico County passed stricter data center requirements June 2025, including 500-foot tree buffer near residential. The investment figure is stated as 'more than $1 billion' — treated as floor.","src":[{"u":"https://www.datacenterdynamics.com/en/news/iron-mountain-acquires-66-acres-outside-richmond-for-200mw-data-center-campus/","t":"Iron Mountain acquires 66 acres outside Richmond for 200MW data center campus","p":"Data Center Dynamics"},{"u":"https://www.henricocitizen.com/iron-mountain-to-build-data-center-in-henricos-white-oak-technology-park/","t":"Iron Mountain to build data center in Henrico's White Oak Technology Park","p":"Henrico Citizen"}],"j":"city","jc":"Richmond city","jn":"Richmond","jd":"city","ju":"approx"},{"id":"microsoft-bristow-mnz03-va","n":"Microsoft Bristow Data Center Campus (MNZ03)","op":"Microsoft","s":"operational","st":"VA","city":"Bristow","co":"Prince William","lat":38.728,"lon":-77.56,"pre":"approximate","cf":"reported","ac":83,"ann":"2021","upd":"2026-10-22","nt":"Microsoft does not publicly disclose data center locations; sourced from public property records and third-party tracking databases. 8008 Devlin Road, Bristow. Adjacent to Amazon's Devlin Technology Park parcel and within Prince William County's Data Center Opportunity Zone Overlay District. Coordinates approximate. Status updated to operational per Baxtel (year built 2025); as of July 2026, datacentermap.com could not be independently read.","src":[{"u":"https://www.datacentermap.com/usa/virginia/bristow/microsoft-8008-devlin-rd/","t":"Microsoft 8008 Devlin Rd Data Center — Datacentermap.com","p":"Datacentermap.com"},{"u":"https://baxtel.com/data-center/microsoft-mnz03","t":"Microsoft MNZ03 Data Center — Baxtel","p":"Baxtel"}],"j":"uninc","jc":"Prince William County","ju":"approx"},{"id":"tract-mountain-road-technology-park-hanover-va","n":"Mountain Road Technology Park","op":"Tract","s":"cancelled","st":"VA","co":"Hanover","lat":37.6935,"lon":-77.5363,"pre":"approximate","cf":"confirmed","mw":900,"ac":427,"ann":"2025-10","upd":"2026-11-04","nt":"Tract (with Marchetti Properties, via Valco Hanover County 4 LLC) sought to rezone ~427 acres from A1 Agricultural to M1 at 13074 Mountain Road / 12517 Winns Church Road (US Route 33) on the Hanover-Henrico line near the Chickahominy River — five data center buildings, up to three substations, hundreds of MW of demand. Aligned with Hanover's Route 33 Gateway Small Area Plan. Distinct from Tract's Tuckahoe Technology Park in Goochland County. Coordinates are an approximate geocode of the Route 33 / Mountain Road corridor in western Hanover near the Henrico line.","src":[{"u":"https://richmondbizsense.com/2025/10/30/data-center-developer-tract-proposes-mountain-road-tech-park-in-western-hanover-county/","t":"Data center developer Tract proposes Mountain Road Tech Park in western Hanover County","p":"Richmond BizSense"},{"u":"https://www.datacenterdynamics.com/en/news/tracts-430-acre-data-center-rejected-by-local-officials-in-hanover-county-virginia/","t":"Tract's 430-acre data center rejected by local officials in Hanover County, Virginia","p":"Data Center Dynamics"}],"j":"uninc","jc":"Hanover County","ju":"approx"},{"id":"powerhouse-95-spotsylvania-va","n":"PowerHouse 95","op":"PowerHouse Data Centers","s":"under_construction","st":"VA","city":"Spotsylvania","co":"Spotsylvania","lat":38.17,"lon":-77.66,"pre":"approximate","cf":"reported","mw":800,"ac":145,"ann":"2024","upd":"2026-10-22","nt":"Campus located at approximately 4189 Turner Ct, Spotsylvania County, VA along the I-95/Hwy 17 corridor; coordinates are approximate. Three 300 MW substations planned (800 MW total); first substation delivering 150 MW targeted for Q4 2025. Up to 8 buildings, 3.5 million sq ft. Phased delivery Q3 2025–Q4 2027. Joint venture between PowerHouse/AREP and Harrison Street. Harrison Street managing director explicitly cited 'high-powered computing, AI, and other advancements' as the demand driver for this campus class, supporting likely AI classification. Named tenant not disclosed. Dominion Energy utility attribution is inferred from service territory: Dominion's Tributary 230 kV project was approved by Virginia SCC (June 30, 2024) specifically to serve growing Spotsylvania data center demand; PH95 press materials do not name the utility directly. Investment amount, job figures, and water draw not disclosed in any sourced press materials. Joint venture: American Real Estate Partners (AREP) and Harrison Street.","src":[{"u":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","t":"PowerHouse breaks ground on 800MW data center campus in Spotsylvania County, Virginia","p":"PowerHouse Data Centers (press release)"},{"u":"https://www.powerhousedata.com/news/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus","t":"PowerHouse Data Centers announces purchase of 145 acres in Spotsylvania, VA for PowerHouse 95 campus","p":"PowerHouse Data Centers (press release)"}],"j":"uninc","jc":"Spotsylvania County","ju":"approx"},{"id":"powerhouse-ctp-02-va","n":"PowerHouse CTP-02","op":"PowerHouse Data Centers","s":"under_construction","st":"VA","city":"Chester","co":"Chesterfield","lat":37.3606,"lon":-77.3257,"pre":"exact","cf":"reported","mw":50,"upd":"2026-11-04","nt":"50MW build-to-suit at Chirisa Technology Parks' Meadowville Technology Parkway campus (Chesterfield County), JV of PowerHouse, Chirisa, and Blue Owl Real Estate; broke ground 2024/2025, CoreWeave is the confirmed GPU/AI-cloud tenant (28MW deal Sept 2023 plus this expansion). PowerHouse's own portfolio page lists 'CTP-02 and CTP-03' as a platform entry; baxtel independently corroborates PowerHouse CTP-02 as a named facility at this campus. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.","src":[{"u":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","t":"Bisnow: CoreWeave data center at CTP's Richmond-area (Meadowville) campus lands $600M loan","p":"PowerHouse Data Centers (JV with Chirisa Technology Parks and Blue Owl Real Estate)"},{"u":"https://www.openstreetmap.org/way/1449347339","t":"OpenStreetMap way/1449347339","p":"OpenStreetMap"}],"j":"uninc","jc":"Chesterfield County"},{"id":"prince-william-digital-gateway-va","n":"Prince William Digital Gateway","op":"QTS / Compass Datacenters","s":"cancelled","st":"VA","city":"Gainesville","co":"Prince William","lat":38.8,"lon":-77.68,"pre":"approximate","cf":"confirmed","ac":2100,"ann":"2021","upd":"2026-10-22","nt":"Would have been largest data center campus in the world at over 22 million sq ft across approximately 2,000-2,100 acres (per WTOP). Cancellation is landmark precedent on Virginia public-notice requirements. Coordinates are approximate for Pageland Lane corridor. As of 2026-09-10, the record was accurate and current: QTS's July 2, 2026 Virginia Supreme Court petition withdrawal (by GW Acquisition Co., LLC and GW Acquisition Co. I, LLC) is reflected in the status history; no further developments were found after that.","src":[{"u":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","t":"Digital Gateway data center project dies after final developer withdraws appeal","p":"WTOP News"},{"u":"https://www.datacenterdynamics.com/en/news/officials-in-virginias-prince-william-county-drop-support-for-qtscompass-digital-gateway-data-center-project/","t":"Officials in Prince William County drop support for QTS/Compass Digital Gateway data center project","p":"Data Center Dynamics"}],"j":"uninc","jc":"Prince William County","ju":"approx"},{"id":"qts-white-oak-technology-park-ii-henrico-va","n":"QTS White Oak Technology Park II (RIC5)","op":"QTS Data Centers","s":"permitted","st":"VA","city":"Sandston","co":"Henrico","lat":37.49,"lon":-77.27,"pre":"approximate","cf":"confirmed","ac":622,"ann":"2024-03","upd":"2026-11-04","nt":"622-acre QTS expansion in Sandston/eastern Henrico adjacent to the existing White Oak Technology Park; conceptual plans show as many as 13 data center buildings (approved development plan ~7), on ~236 developed acres with ~386 acres open space. Distinct from Iron Mountain's White Oak campus. QTS is separately advancing a ~1,100-acre / 17-building expansion of its Henrico hub.","src":[{"u":"https://www.datacenterdynamics.com/en/news/henrico-county-approves-622-acre-rezoning-request-for-data-centers-in-virginia/","t":"Henrico County approves 622-acre rezoning request for data centers in Virginia","p":"Data Center Dynamics"},{"u":"https://www.henricocitizen.com/articles/conceptual-plan-shows-13-data-centers-on-622-acre-sandston-site/","t":"Conceptual plan shows 13 data centers on 622-acre Sandston site","p":"The Henrico Citizen"}],"j":"uninc","jc":"Henrico County","ju":"approx"},{"id":"stack-nova-loudoun-va","n":"STACK NVA Loudoun 144MW Hyperscale Campus","op":"STACK Infrastructure","s":"permitted","st":"VA","city":"Ashburn","co":"Loudoun","lat":39.04,"lon":-77.49,"pre":"approximate","cf":"confirmed","mw":144,"ac":122,"ann":"2025-02","upd":"2026-10-22","nt":"122-acre campus, two 72 MW buildings, near Dulles Airport / Evergreen Mills Rd. Announced Feb 2025. Distinct from Equinix's separately-branded Ashburn portfolio. Powered by an on-site substation with a 100%-renewable commitment. Coordinates are the Ashburn/Dulles area centroid.","src":[{"u":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","t":"STACK Infrastructure Expands Loudoun County Footprint with 144MW Hyperscale Campus","p":"STACK Infrastructure"},{"u":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd","t":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","p":"Oak Ridge National Laboratory (ORNL) / HIFLD"}],"j":"uninc","jc":"Loudoun County","jn":"Ashburn","ju":"approx"},{"id":"sabey-intergate-ashburn-building-a-va","n":"Sabey Intergate.Ashburn (Building A)","op":"Sabey Data Centers","s":"under_construction","st":"VA","city":"Ashburn","co":"Loudoun","lat":39.0145,"lon":-77.48,"pre":"exact","cf":"reported","mw":54,"upd":"2026-07-24","pb":"Grid — Dominion Energy Virginia","nt":"Per June 2025 Business Wire release, Building A (21735 Red Rum Drive) broke ground as the final phase of the Ashburn campus expansion; expected operational 2026, will be Sabey's first 3-story DC at 54MW total campus capacity. AI/HPC (likely): Sabey's own Ashburn page markets Building A as air/liquid/hybrid-cooled and '>100 kW per Rack - Capable of handling high-density deployments' with liquid cooling enabled.","src":[{"u":"https://www.businesswire.com/news/home/20250624907578/en/Sabey-Data-Centers-Breaks-Ground-on-Final-Phase-of-Ashburn-Campus-Expansion","t":"Sabey Data Centers facility directory","p":"Sabey Data Centers"},{"u":"https://www.openstreetmap.org/way/793888427","t":"OpenStreetMap way/793888427","p":"OpenStreetMap"}],"j":"uninc","jc":"Loudoun County","jn":"Ashburn"},{"id":"solis-arx-progress-park-wythe-va","n":"Solis Arx Progress Park Data Center Campus","op":"Solis Arx","s":"proposed","st":"VA","city":"Max Meadows","co":"Wythe","lat":36.958,"lon":-80.899,"pre":"approximate","cf":"reported","ann":"2025-12-05","upd":"2026-11-04","nt":"Solis Arx (owner-operator; AI-compute tenant reported as Fluidstack) plans a phased AI data center campus on a 99-acre tract in Wythe County's Progress Park, ~15 minutes from Wytheville, served by Appalachian Power and Wytheville water. Coordinates are an approximate geocode of Progress Park (Max Meadows / Fort Chiswell area off I-81), not a parcel-confirmed point.","src":[{"u":"https://cardinalnews.org/2025/12/05/data-center-campus-announced-for-wythe-county/","t":"Data center campus announced for Wythe County","p":"Cardinal News"},{"u":"https://www.wytheco.org/418/Solis-Arx","t":"Solis Arx Digital Infrastructure Project at Progress Park","p":"Wythe County, VA (government)"}],"j":"uninc","jc":"Wythe County","ju":"approx"},{"id":"tract-tuckahoe-technology-park-goochland-county-va","n":"Tuckahoe Technology Park","op":"Tract","s":"proposed","st":"VA","co":"Goochland","lat":37.68,"lon":-77.68,"pre":"approximate","cf":"reported","mw":900,"ac":872,"inv":3000000000,"upd":"2026-10-22","nt":"Eastern Goochland County, west of West Creek Business Park; 13 parcels, up to 7 development areas/buildings. $3B+ construction spending projected over a 5-7 year buildout. Pre-application for a conditional-use permit filed June 10, 2026 - the first project under Goochland's new Technology Overlay District. Coordinates are approximate.","src":[{"u":"https://virginiabusiness.com/tract-planning-872-acre-data-center-campus-in-goochland/","t":"Tract planning 872-acre data center campus in Goochland","p":"Virginia Business"},{"u":"https://www.wtvr.com/news/local-news/data-center-goochland-june-11-2026","t":"Tract submits application for Tuckahoe Technology Park in Goochland","p":"WTVR"}],"j":"uninc","jc":"Goochland County","ju":"approx"},{"id":"vantage-stafford-va4-va","n":"Vantage Data Centers VA4 Stafford Campus","op":"Vantage Data Centers","s":"under_construction","st":"VA","co":"Stafford","lat":38.44,"lon":-77.44,"pre":"approximate","cf":"confirmed","mw":192,"ac":82,"inv":2000000000,"ann":"2025-11","upd":"2026-10-22","nt":"Vantage's fourth Virginia campus; approximately 40 miles south of Washington DC in Stafford County (Fredericksburg region). Coordinates are county-centroid approximation — specific site address not confirmed in sources. Groundbreaking held November 6, 2025; DPR Construction engaged as GC.","src":[{"u":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","t":"Vantage Data Centers Invests $2B in Fredericksburg Virginia Region","p":"Vantage Data Centers"},{"u":"https://virginiabusiness.com/vantage-data-centers-2b-stafford-campus/","t":"Vantage Data Centers to invest $2B on Stafford campus","p":"Virginia Business"}],"j":"uninc","jc":"Stafford County","jn":"Embrey Mill","ju":"approx"},{"id":"wise-innovation-hub-wise-va","n":"Wise Innovation Hub (OASIS)","op":"Wise Innovation Hub Venture LLC","s":"proposed","st":"VA","co":"Wise","lat":36.99,"lon":-82.53,"pre":"approximate","cf":"reported","ann":"2025-12","upd":"2026-10-28","pb":"Red Post Energy Group (Maverick Project)","nt":"Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power. As of July 2026, named end-users had not been disclosed. Cardinal News (February 2026) reports nine data-center buildings of about 240,000 sq ft each, each needing about 50 MW of power, with on-site gas generation that could scale to 500 or 600 MW. As of October 2026, no cited source states a total data-center capacity, so none is recorded.","src":[{"u":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","t":"Data center complex with gas power plant planned for Wise County","p":"Cardinal News"},{"u":"https://virginiabusiness.com/wise-data-center-developers-explore-hydrogen-power/","t":"Data center developers seek on-site energy in Wise","p":"Virginia Business"}],"j":"uninc","jc":"Wise County","ju":"approx"},{"id":"uvm-vacc-south-burlington-vt","n":"Vermont Advanced Computing Center (VACC), University of Vermont","op":"University of Vermont","s":"operational","st":"VT","city":"South Burlington","co":"Chittenden","lat":44.4486,"lon":-73.1468,"pre":"approximate","cf":"reported","upd":"2026-10-29","nt":"UVM's on-campus research HPC data center. The university built it about 20 years ago with redundant power, cooling and networking. UVM places it 'in the sprawling South Burlington technology park'. Clusters: BlueMoon (88 CPU nodes, 12,584 cores), DataMountain, a Secure Cluster, and IceCore, an AI-focused GPU cluster with 104 NVIDIA H200 and 48 RTX Pro 6000 GPUs, funded by a $2.1M NSF grant in 2025. The exact building is not published. The coordinates are PeeringDB's point for 530 Community Drive in the same technology park, a representative point only. No MW capacity is published.","src":[{"u":"https://www.uvm.edu/cems/news/icecore-advances-new-era-discovery-uvm","t":"IceCore advances a new era of discovery at UVM (Dec 10, 2025)","p":"University of Vermont CEMS"},{"u":"https://www.uvm.edu/vacc/cluster-specs","t":"VACC cluster specifications","p":"University of Vermont"}],"j":"city","jc":"Chittenden County","jn":"South Burlington","jd":"city","ju":"approx"},{"id":"aws-wallula-gap-walla-walla-wa","n":"AWS Wallula Gap Campus","op":"Amazon Web Services","s":"proposed","st":"WA","city":"Wallula","co":"Walla Walla","lat":46.0726,"lon":-118.9135,"pre":"approximate","cf":"confirmed","ac":134,"inv":5000000000,"ann":"2024-10","upd":"2026-11-04","nt":"~$4.8B campus near Wallula, Walla Walla County; operator reported (not officially confirmed) to be AWS, so the record was marked reported. Coordinates are the Wallula area centroid. Operator confirmed as Amazon Data Services when the Port of Walla Walla amended the buyer from Advance Phase LLC to Amazon Data Services (Feb 12, 2026 commission vote; >550 acres for >$36M land) — the record was then marked confirmed. The reported ~$4.8B (DCD) / ~$5B (local) campus figure is an estimate across ~4 phases, not a firm pledge, so no investment figure is recorded. Port projects ~720 direct+indirect jobs at full build-out of its four-phase, 16-building concept (projection), so no jobs figure is recorded; Amazon's FAQ for the three-building application projects 120-150 full-time positions. The application before Walla Walla County (the Amazon Attalia Data Center Campus) covers three buildings of about 220,000 sq ft each on a 134-acre parcel, smaller than the Port's concept, so the land area recorded is that parcel. As of October 2026 no cited source states a capacity figure for the campus, so no planned capacity is recorded. Eligible for Washington's rural-county server-equipment sales/use-tax exemption (RCW 82.08.986) but no DOR certificate is confirmed, so no subsidy is recorded. Amazon's August 2026 community materials describe the cooling as outside air about 93% of the year, with water-based cooling (water-soaked pads) for about 7%, and give the cooling-water source as a new non-potable Columbia River supply system being developed with the Port of Walla Walla, with potable groundwater from the utility as temporary cooling water for about a year while that system is built.","src":[{"u":"https://www.datacenterdynamics.com/en/news/aws-likely-behind-48bn-data-center-in-walla-walla-washington/","t":"AWS likely behind $4.8bn data center in Walla Walla, Washington","p":"Data Center Dynamics"},{"u":"https://www.tricitiesbusinessnews.com/articles/amazon-wallula-gap","t":"Port of Walla Walla names Amazon Data Services as Wallula Gap buyer","p":"Tri-Cities Area Journal of Business"}],"j":"uninc","jc":"Walla Walla County","ju":"approx"},{"id":"bitdeer-wenatchee-pangborn-wa","n":"Bitdeer Wenatchee (Pangborn) Data Center","op":"Bitdeer","s":"under_construction","st":"WA","city":"East Wenatchee","co":"Douglas","lat":47.4139,"lon":-120.2093,"pre":"approximate","cf":"confirmed","mw":13,"upd":"2026-10-30","nt":"Bitdeer's Washington datacenter, referred to as \"Pangborn, Washington\" in its SEC filings (Pangborn Memorial Airport is in Douglas County, East Wenatchee) and as \"Wenatchee, Washington\" by aggregators. Originally deployed for Bitcoin mining in May 2018; 13 MW electrical capacity in use as of March 31, 2026. Bitdeer is converting the site to AI cloud use: AI datacenter design documents and building-permit applications submitted, core equipment being delivered, planned to begin with an NVIDIA GB300 cluster; dismantling of the crypto mining datacenter began March 2026 with conversion completion targeted for Q4 2026. Classified as a data center (mid-conversion to AI), consistent with the tracked Bitdeer Knoxville TN conversion. Coordinates approximate (Pangborn area, Douglas County). Distinct from Bitdeer's tracked Ohio (Massillon/Clarington/Niles/Shalersville), Texas (Rockdale) and Tennessee (Knoxville) sites. Public-reception check (2026-09-10): Checked Bitdeer's own SEC 20-F annual report (2026-09-10); it mentions Wenatchee, WA only twice (as a mining-to-AI-datacenter conversion site, and as a single-supplier electricity contract location), with no discussion of community reception, hearings, or local reaction.","src":[{"u":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm","t":"Bitdeer Technologies Group FY2025 Form 20-F (filed 2026-04-30) — Item 4.D Property: Pangborn, Washington datacenter, 13 MW, operational May 2018, being converted to AI cloud (GB300 cluster; permits submitted; crypto dismantling began March 2026; target Q4 2026)","p":"U.S. Securities and Exchange Commission (EDGAR)"},{"u":"https://www.datacentermap.com/usa/washington/wenatchee/bitdeer-wenatchee-washington/","t":"Data Center Map — Bitdeer Wenatchee, Washington (13 MW)","p":"Data Center Map"}],"j":"uninc","jc":"Douglas County","ju":"approx"},{"id":"energizer-ii-data-center-goodnoe-hills-klickitat-wa","n":"Energizer II Data Center (BPA L0702)","op":"Savion (Shell Energy subsidiary), per BPA application documents","s":"proposed","st":"WA","co":"Klickitat","lat":45.7755,"lon":-120.801,"pre":"approximate","cf":"reported","mw":1000,"upd":"2026-10-30","nt":"This is a queue position, not an award. Savion says preliminary feasibility work is underway.","src":[{"u":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html","t":"Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)","p":"The Goldendale Sentinel"},{"u":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","t":"Spokesman-Review: Energizer II described as AI data center in application documents (Oct 7, 2026)","p":"The Spokesman-Review / Washington State Standard"}],"j":"uninc","jc":"Klickitat County","ju":"approx"},{"id":"krambu-newport-wa","n":"Krambu Eastern Washington (Newport)","op":"Krambu","s":"operational","st":"WA","city":"Newport","co":"Pend Oreille","lat":48.1834,"lon":-117.0424,"pre":"approximate","cf":"reported","upd":"2026-10-12","nt":"Blockchain and AI computing plus hosting/colocation. The tracker's ~10 MW is an estimate and is not recorded as capacity. Current operation is not confirmed by a 2025-26 primary source.","src":[{"u":"https://www.spokanejournal.com/articles/2019-having-survived-crypto-winter-krambu-thrives","t":"Spokane Journal of Business: Having survived crypto winter, Krambu thrives (Feb 13, 2020)","p":"Spokane Journal of Business"},{"u":"https://dcmap.us/states/washington/","t":"dcmap.us Washington data center map (Krambu Eastern Washington, Newport, operational, ~10 MW est.)","p":"dcmap.us"}],"j":"city","jc":"Pend Oreille County","jn":"Newport","jd":"city","ju":"approx"},{"id":"microsoft-east-wenatchee-wa","n":"Microsoft East Wenatchee Data Center","op":"Microsoft","s":"operational","st":"WA","city":"East Wenatchee","co":"Douglas","lat":47.4078,"lon":-120.2077,"pre":"approximate","cf":"reported","mw":180,"ac":340,"ann":"2022","upd":"2026-07-24","pb":"Grid — PUD No 1 of Douglas County","nt":"Microsoft Azure data center campus on Urban Industrial Way near Pangborn Memorial Airport, East Wenatchee, Douglas County — first building operational (grand opening Dec 2022), additional buildings under construction, on ~340 acres. Under a Douglas County PUD Schedule 4 power-delivery agreement, Microsoft is contracted for up to 180 MW at full build-out (KPQ, citing the PUD agreement); the first building's permit was valued at $409M (Wenatchee World). DISTINCT from Microsoft's tracked Malaga campus, which is across the Columbia River in Chelan County (served by Chelan County PUD). Coordinates are an approximate geocode of the Urban Industrial Way corridor; a county-parcel pass could upgrade precision to exact.","src":[{"u":"https://www.wenatcheeworld.com/business/new-douglas-county-microsoft-data-center-launches-with-party-tour/article_95ce41dc-7267-11ed-ab98-af7c94439b63.html","t":"New Douglas County Microsoft data center launches — Urban Industrial Way, 340.22 acres, $409M first-building permit, grand opening Dec 2022","p":"Wenatchee World"},{"u":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/","t":"Douglas County PUD, Microsoft Enter Power Delivery Agreement — up to 180 MW (Schedule 4), 180MW substation","p":"KPQ"}],"j":"uninc","jc":"Douglas County","ju":"approx"},{"id":"microsoft-malaga-wa","n":"Microsoft Malaga Campus","op":"Microsoft","s":"under_construction","st":"WA","city":"Malaga","co":"Chelan","lat":47.23,"lon":-120.2,"pre":"approximate","cf":"confirmed","mw":288,"ac":102.5,"ann":"2023-03","upd":"2026-10-30","pb":"Chelan County PUD hydropower (carbon-free)","nt":"Three-building campus at 5375 Malaga Alcoa Highway; two additional buildings possible by 2027 on demand. As of July 2026, the 288 MW figure came from secondary aggregator Cleanview; as of October 2026, it also appears in Columbia Riverkeeper's February 2026 report, which lists Chelan County's data center capacity as 24 MW existing / 288 MW planned and says Chelan PUD agreed to supply up to 288 MW to Microsoft over a 15-year period, and in The Wenatchee World's report on the June 2025 power contract, which says the PUD's infrastructure will help provide up to 288 megawatts from 2026 to 2040; both describe it as power the PUD will supply. Primary sources (DCD, Microsoft) do not specify MW capacity. Construction of first building began June 2023 per Microsoft Local blog; the original status history incorrectly dated the under-construction status to 2024-05. Expected operational 2026. Coordinates approximate for Malaga area on Malaga Alcoa Highway. A Building-1 permit cites ~72 peak-shift staff (a single-building figure, not a facility employment total); no confirmed total campus capital-expenditure figure is public. As of 2026-08-08, no citable operational date exists. Microsoft's own Malaga project page gives a first-phase construction window concluding in early 2026 but states plainly that \"Completion of construction does not indicate datacenter operation/availability\", and publishes no energization or service date. Secondary reporting that the first building would be \"powered in August and fully operational by late 2026\" is forward-looking and does not change the status, which remains under construction. Microsoft's own Quincy/Central Washington community page states it \"operates datacenters in Quincy and is developing new datacenters in Malaga and East Wenatchee\" — positively confirming the site is not yet operational.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-plans-three-data-centers-in-malaga-washington/","t":"Microsoft Plans Three Data Centers in Malaga, Washington","p":"Data Center Dynamics"},{"u":"https://local.microsoft.com/blog/malaga-datacenter-project-overview/","t":"Malaga Datacenter Project Overview","p":"Microsoft Local"}],"j":"uninc","jc":"Kittitas County","ju":"approx"},{"id":"pnnl-ai-data-center-richland-wa","n":"PNNL AI Data Center","op":"Battelle Memorial Institute (Pacific Northwest National Laboratory)","s":"proposed","st":"WA","city":"Richland","co":"Benton","lat":46.348,"lon":-119.279,"pre":"approximate","cf":"reported","mw":2,"upd":"2026-10-30","nt":"Battelle, which operates PNNL for the Department of Energy, issued a request for information for an on-premises next-generation AI compute data center to train and operationalize large language models for scientific and national government missions. Roughly 2 MW at a possible 2028 launch, with potential future expansion to about 40 MW. This would be DOE-funded and DOE-operated, not a private operator building on federal land. No construction decision has been made — this is an RFI-stage proposal only. Coordinates are an approximate geocode of the PNNL campus in Richland. Public-reception check (2026-09-10): Checked The Spokesman-Review's coverage (2026-09-10) of this DOE Genesis Mission-linked project; it covers technical specs and funding, with no resident, community-group, or elected-official reaction documented.","src":[{"u":"https://www.spokesman.com/stories/2026/apr/26/ai-data-center-with-a-different-mission-being-cons/","t":"AI data center with a different mission being considered in Tri-Cities","p":"The Spokesman-Review"},{"u":"https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers","t":"DOE eyes PNNL to 'power the AI revolution'","p":"Tri-Cities Area Journal of Business"}],"j":"city","jc":"Benton County","jn":"Richland","jd":"city","ju":"approx"},{"id":"apricus-west-plains-spokane-wa","n":"West Plains Large-Load Data Center","op":"Apricus Energy Solutions","s":"proposed","st":"WA","city":"Spokane","co":"Spokane","lat":47.6669,"lon":-117.4333,"pre":"approximate","cf":"rumored","mw":500,"upd":"2026-08-25","nt":"Avista confirmed a nonbinding agreement with a large-load customer needing about 125 MW in 2029 rising to 500 MW by 2032 — more than half the power used by every home and business in Spokane County — then paused negotiations in June 2026 to seek broader policy and community alignment. Avista could not name the customer or the site under the agreement; residents' public records requests surfaced California-based Apricus Energy Solutions and a West Plains location. Confidence is 'rumored' for exactly that reason: the operator is inferred from public records, not announced.","src":[{"u":"https://www.spokesman.com/stories/2026/jul/24/spokane-county-leaders-held-unknown-discussions-wi/","t":"Spokane County leaders held unknown discussions with data center developer","p":"The Spokesman-Review"},{"u":"https://www.spokesman.com/stories/2026/jun/12/avista-puts-data-center-negotiations-on-pause/","t":"Avista puts data center negotiations on pause","p":"The Spokesman-Review"}],"j":"city","jc":"Spokane County","jn":"Spokane","jd":"city","ju":"approx"},{"id":"viridian-apecs-janesville-wi","n":"APECS Data Center Campus (Former GM Assembly Plant)","op":"Viridian Acquisitions LLC","s":"proposed","st":"WI","city":"Janesville","co":"Rock","lat":42.6633,"lon":-89.0206,"pre":"approximate","cf":"confirmed","mw":800,"ac":250,"inv":8000000000,"ann":"2025-11","upd":"2026-08-18","nt":"Redevelopment of the 250-acre former General Motors assembly plant (demolished 2019), a DNR-cleanup brownfield. Two configurations are under evaluation: an 11-building data center campus or an 8- or 9-building hyperscale campus, drawing up to 800 MW. Utility is Alliant Energy. The end user has not been disclosed. Coordinates are the geocoded former GM plant site, not a parcel-confirmed footprint.","src":[{"u":"https://www.wpr.org/news/janesville-data-center-abandoned-gm-site","t":"Janesville moves forward with data center plans for abandoned GM site","p":"Wisconsin Public Radio"},{"u":"https://baxtel.com/data-center/apecs-data-center-campus","t":"APECS Data Center Campus — project record","p":"Baxtel"}],"j":"city","jc":"Rock County","jn":"Janesville","jd":"city","ju":"approx"},{"id":"cassville-grant-county-wi","n":"Cassville Data Center Campus (Undisclosed Developer)","op":"Undisclosed (major tech company, NDA not signed)","s":"cancelled","st":"WI","city":"Cassville","co":"Grant","lat":42.716,"lon":-91.007,"pre":"approximate","cf":"reported","ac":500,"inv":1000000000,"ann":"2024-12","upd":"2026-10-22","pb":"Grid — Alliant Energy","nt":"Coordinates are Cassville city centroid; proposed site was ~400-500 acres in the town of Cassville. Grant County ED director confirmed company 'people will recognize' but declined to name it. Energy requirement estimated at 400-500 MW (per Wisconsin Watch, citing economic development director estimate). Investment range $1B-$2B; the recorded investment represents the floor. Town vote was April 16, 2026: 44-0 to ban data centers (ordinance lasts up to two years). Developer went silent post-vote and was reportedly considering Indiana and North Dakota sites.","src":[{"u":"https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/","t":"Another $1 billion Wisconsin data center eyed in Grant County town of Cassville","p":"Wisconsin Watch"},{"u":"https://pbswisconsin.org/news-item/another-billion-dollar-wisconsin-data-center-is-eyed-for-cassville-in-grant-county/","t":"Another billion-dollar Wisconsin data center is eyed for Cassville in Grant County","p":"PBS Wisconsin"}],"j":"uninc","jc":"Clayton County","jm":"Buena Vista township","ju":"approx"},{"id":"dpo-wisconsin-rapids-hpc-wi","n":"DPO Wisconsin Rapids AI Computing Facility","op":"Digital Power Optimization","s":"proposed","st":"WI","city":"Wisconsin Rapids","co":"Wood","lat":44.3918,"lon":-89.8229,"pre":"approximate","cf":"reported","inv":200000000,"ann":"2025-01-23","upd":"2026-10-28","nt":"Pre-development funded by an investor consortium led by Salutem Capital; Stantec providing engineering support. As of October 2026, the announcement gives no exact street address or acreage; BizTimes Milwaukee reports plans for \"approximately 10 acres of land in Wisconsin Rapids\", located \"near downtown Wisconsin Rapids along Highway 34\". Coordinates are the Wisconsin Rapids city geocode. As of October 2026, the cited sources are the announcement and a BizTimes Milwaukee report that attributes the project to a company announcement, so no independent reporting is cited and the record is marked reported. The announcement says the project \"will enable up to 20 megawatts of AI computing\"; as a ceiling, that is not recorded as planned capacity.","src":[{"u":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","t":"DPO Launches $200 Million AI Data Center Development in Partnership with Billerud","p":"PR Newswire / Digital Power Optimization"},{"u":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","t":"Data center developer plans $200 million project in Wisconsin Rapids (up to 20 MW, ~10 acres, power from Consolidated Water Power Company, 50-year land lease)","p":"BizTimes Milwaukee"}],"j":"city","jc":"Wood County","jn":"Wisconsin Rapids","jd":"city","ju":"approx"},{"id":"menomonie-data-center-wi","n":"Menomonie Data Center Campus","op":"Undisclosed (Balloonist LLC)","s":"proposed","st":"WI","city":"Menomonie","co":"Dunn","lat":44.8769,"lon":-91.9193,"pre":"approximate","cf":"reported","ac":324,"ann":"2025-07","upd":"2026-11-04","pb":"Xcel Energy","nt":"End operator undisclosed behind Balloonist LLC (a Delaware foreign LLC). Multiple outlets note Balloonist's Delaware address and registered agent match prior Meta data-center SPV patterns, but no source names Meta or any operator - recorded as undisclosed. A council member said the end user is 'one of the top tech giants' without naming them. The record is listed as proposed rather than permitted: the original I-1 rezoning was superseded by a January 2026 I-4 ordinance; no building permits were ever issued. Proposed investment up to $1.6B and 50-75 FTE jobs are developer projections (not recorded as firm fields). No MW capacity disclosed. Site: ~324 acres along County Highway B (annexed from Town of Red Cedar Aug 2025). Coordinates are the Menomonie centroid. The likely AI-specific classification rests on hyperscale scale + 'tech giant' attribution, not an explicit AI-workload statement.","src":[{"u":"https://wtmj.com/news/2025/12/23/a-look-back-at-wisconsins-year-of-the-data-center/","t":"Wisconsin's Year of the Data Center","p":"WTMJ"},{"u":"https://volumeone.org/articles/2025/08/26/370164-tech-giant-is-considering-16-billion-data-center-dunn-county","t":"Tech Giant Considering $1.6B Data Center in Dunn County","p":"Volume One"}],"j":"city","jc":"Dunn County","jn":"Menomonie","jd":"city","ju":"approx"},{"id":"meta-beaver-dam-wi","n":"Meta Beaver Dam Data Center Campus","op":"Meta","s":"under_construction","st":"WI","city":"Beaver Dam","co":"Dodge","lat":43.457,"lon":-88.837,"pre":"approximate","cf":"confirmed","mw":220,"inv":1000000000,"ann":"2025-11","upd":"2026-10-22","pb":"Alliant Energy (100% renewable)","nt":"Coordinates are approximate city centroid for Beaver Dam; exact site is Alliant Energy Beaver Dam Commerce Park (Wisconsin's largest certified development-ready site). 700,000+ sq ft campus. Meta's 26th US data center. AI workloads are the stated purpose.","src":[{"u":"https://datacenters.atmeta.com/2025/11/hello-beaver-dam/","t":"Hello, Beaver Dam! — Meta Data Centers blog","p":"Meta"},{"u":"https://www.constructiondive.com/news/meta-mortenson-beaver-dam-wisconsin-data-center/806211/","t":"Meta taps Mortenson for $1B Wisconsin data center","p":"Construction Dive"}],"j":"city","jc":"Dodge County","jn":"Beaver Dam","jd":"city","ju":"approx"},{"id":"microsoft-kenosha-wi","n":"Microsoft Kenosha Data Center Campus","op":"Microsoft","s":"proposed","st":"WI","city":"Kenosha","co":"Kenosha","lat":42.537,"lon":-87.89,"pre":"approximate","cf":"confirmed","ac":240,"inv":35000000,"ann":"2025-01","upd":"2026-10-22","nt":"Coordinates approximate for NW quadrant of I-94/Hwy 142 intersection, Kenosha County. Land was already properly zoned for data center operations per DCD; Navix Engineering filed November 2024 permit application for four-building campus. Site is 6 miles south of Microsoft's Mount Pleasant facility; part of Microsoft's broader Wisconsin investment commitment. No building permit issued as of Jan 2025.","src":[{"u":"https://www.datacenterdynamics.com/en/news/microsoft-acquires-240-acres-in-kenosha-wisconsin-for-data-center-development/","t":"Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development","p":"Data Center Dynamics"},{"u":"https://www.areadevelopment.com/newsItems/2-1-2025/microsoft-kenosha-wisconsin.shtml","t":"Microsoft Plans Kenosha, Wisconsin, Data Center Operations","p":"Area Development"}],"j":"city","jc":"Kenosha County","jn":"Pleasant Prairie","jd":"village","ju":"approx"},{"id":"microsoft-mount-pleasant-wi","n":"Microsoft Mount Pleasant Data Center Campus","op":"Microsoft","s":"operational","st":"WI","city":"Mount Pleasant","co":"Racine","lat":42.7209,"lon":-87.9023,"pre":"approximate","cf":"reported","mw":1000,"ac":1575,"inv":3300000000,"ann":"2025-01","upd":"2026-11-04","pb":"grid (We Energies) + planned renewables","src":[{"u":"https://news.microsoft.com/source/2024/05/08/microsoft-announces-3-3-billion-investment-in-wisconsin-to-spur-artificial-intelligence-innovation-and-economic-growth/","t":"Microsoft announces $3.3 billion investment in Wisconsin (Mount Pleasant campus)","p":"Microsoft"},{"u":"https://www.jsonline.com/story/money/business/2025/01/09/microsoft-data-center-racine-county/77568940007/","t":"Microsoft data center coming to Racine County, Wisconsin — Milwaukee Journal Sentinel","p":"Milwaukee Journal Sentinel"}],"j":"city","jc":"Racine County","jn":"Mount Pleasant","jd":"village","ju":"approx"},{"id":"netsonic-green-bay-wi","n":"Netsonic Green Bay Data Center","op":"Netsonic (Dynamic Ventures LLC)","s":"operational","st":"WI","city":"Green Bay","co":"Brown","lat":44.5155,"lon":-87.995,"pre":"approximate","cf":"reported","upd":"2026-10-22","nt":"Carrier-neutral colocation facility operating in Green Bay since 1996, veteran-owned. The operator advertises nearly 4 MW of available power capacity on 1200-amp 480-volt service, 60 tons of redundant Liebert cooling, N+1 power, an on-site generator with roughly 96 hours of runtime, and a 9,000+ sq ft expansion. Services span standard colocation, AI/GPU high-density colocation and ASIC miner hosting at $0.075/kWh. Figures are operator-published and not independently verified, so no capacity value is recorded. Coordinates are a best-effort geocode of the street address.","src":[{"u":"https://www.netsonic.net/datacenter.php","t":"Green Bay, WI Datacenter — Colocation, Backup and Disaster Recovery","p":"Netsonic"}],"j":"city","jc":"Brown County","jn":"Green Bay","jd":"city","ju":"approx"},{"id":"qts-dane-county-deforest-wi","n":"QTS Dane County Hyperscale Campus (DeForest)","op":"QTS Data Centers","s":"cancelled","st":"WI","city":"DeForest","co":"Dane","lat":43.2428,"lon":-89.3401,"pre":"approximate","cf":"confirmed","ac":650,"ann":"2025-10-30","upd":"2026-10-28","pb":"Alliant Energy","nt":"Cancelled: QTS withdrew Jan 28-29 2026 after DeForest found the proposal not feasible and the Village Board signaled a 7-0 rejection of the required annexation; WI DOA found the 1,572.5-acre annexation petition not in the public interest. Active footprint was 650 acres (five buildings). Capacity omitted: no source discloses facility IT load; the 750 MW figure was a grid renewable-energy-credit commitment via Alliant, not the campus draw. Investment omitted: the $12B figure is secondary press only (QTS said 'multibillion-dollar') and unrealized. Projected 5,000+ construction and 'hundreds' of permanent jobs were never realized (project cancelled). The $50M community commitment was a QTS-to-county pledge, not a government subsidy. Coordinates are the DeForest centroid.","src":[{"u":"https://qtsdatacenters.com/news/qts-advances-plans-for-state-of-the-art-data-center-campus-and-announces-50-million-community-commitment-for-dane-county/","t":"QTS advances plans for Dane County campus - official press release","p":"QTS Data Centers"},{"u":"https://spectrumnews1.com/wi/milwaukee/news/2025/10/30/qts-data-centers-dane-county","t":"QTS plans multibillion-dollar data center campus in Dane County","p":"Spectrum News 1 Wisconsin"}],"j":"city","jc":"Dane County","jn":"DeForest","jd":"village","ju":"approx"},{"id":"stargate-port-washington-wi","n":"Stargate Lighthouse Campus","op":"Vantage Data Centers","s":"under_construction","st":"WI","city":"Port Washington","co":"Ozaukee","lat":43.3882,"lon":-87.8753,"pre":"approximate","cf":"reported","mw":902,"ac":672,"inv":15000000000,"ann":"2025","upd":"2026-10-30","pb":"70% renewable (solar + wind + battery) + grid","nt":"The planned 902 MW is the campus's IT capacity, per Data Center Knowledge (December 2025).","src":[{"u":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","t":"OpenAI, Oracle, and Vantage Data Centers Announce Stargate Site in Wisconsin — Vantage","p":"Vantage Data Centers"},{"u":"https://www.datacenterknowledge.com/data-center-construction/vantage-breaks-ground-on-15b-stargate-campus-in-wisconsin","t":"Vantage Breaks Ground on $15B Stargate Campus in Wisconsin — Data Center Knowledge","p":"Data Center Knowledge"}],"j":"city","jc":"Ozaukee County","jn":"Port Washington","jd":"city","ju":"approx"},{"id":"stonebridge-pacific-columbia-county-wi","n":"Stonebridge Pacific AI Data Center (Columbia County)","op":"Stonebridge","s":"cancelled","st":"WI","city":"Pacific","co":"Columbia","lat":43.55,"lon":-89.4,"pre":"approximate","cf":"reported","inv":10000000000,"ann":"2025-10","upd":"2026-08-04","nt":"Proposed AI data center ~35 miles north of Madison in the Town of Pacific, Columbia County. At $10 billion it would have been among the largest data centers proposed in Wisconsin, with 400 permanent jobs and a planned 2027 opening. The proposal was dropped in 2026 after the developer declined a public review process. Coordinates are an approximate town-level centroid.","src":[{"u":"https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/","t":"A $10 billion data center proposal vanished after a local official told the developer the process would have to unfold in public","p":"Wisconsin Watch"},{"u":"https://urbanmilwaukee.com/2026/08/03/10-billion-data-center-proposal-in-central-wisconsin-dropped-to-avoid-public-process/","t":"$10 Billion Data Center Proposal in Central Wisconsin Dropped to Avoid Public Process","p":"Urban Milwaukee"}],"j":"uninc","jc":"Columbia County","jm":"Pacific town","ju":"approx"},{"id":"pch-wi-holdings-wisconsin-rapids-wood-county-wi","n":"Wisconsin Rapids Data Center","op":"PCH WI Holdings LLC","s":"proposed","st":"WI","city":"Wisconsin Rapids","co":"Wood","lat":44.39,"lon":-89.82,"pre":"approximate","cf":"reported","mw":150,"ac":209,"upd":"2026-10-22","nt":"950 Fourth Ave N, former paper mill site. Developer reportedly affiliated with PNK Group USA. Conditional use permit application filed with the city April 30, 2026. Scale/investment not yet disclosed. Coordinates are approximate.","src":[{"u":"https://wausaupilotandreview.com/2026/05/17/who-is-the-developer-of-the-proposed-wisconsin-rapids-data-center/","t":"Who is the developer of the proposed Wisconsin Rapids data center?","p":"Wausau Pilot & Review"},{"u":"https://whsm.com/news/2026/10/15/wisconsin-rapids-data-center-faces-key-council-decision-october-20","t":"Wisconsin Rapids Data Center Faces Key Council Decision October 20","p":"WHSM"}],"j":"city","jc":"Wood County","jn":"Wisconsin Rapids","jd":"city","ju":"approx"},{"id":"penzance-bedington-berkeley-county-wv","n":"Bedington Campus","op":"Penzance Management","s":"proposed","st":"WV","co":"Berkeley","lat":39.554,"lon":-77.882,"pre":"approximate","cf":"confirmed","mw":600,"ac":548,"inv":4000000000,"ann":"2026-02","upd":"2026-10-28","nt":"Falling Waters District, Berkeley County WV eastern panhandle — adjacent to Maryland border. 1.9 million sq ft at full buildout. Penzance (DC/NoVA developer) is also developing a Fairfax County VA campus reportedly pre-leased to Amazon. Coordinates approximate for Falling Waters area. As of 2026-09-10, status was unchanged (proposed). The most recent coverage found (wvgazettemail article, published 2026-02-28, updated 2026-09-04) reports no groundbreaking, permit, or construction start yet; a tenant announcement was still described as pending later in 2026. The street address remains unresolved: governor.wv.gov, WV Division of Economic Development, SEDC, and county/trade press coverage all describe only '548 acres in the Falling Waters District of Berkeley County' with no house number or parcel ID; Berkeley County GIS/assessor records could not be reached as of September 2026, so no street address is recorded rather than one approximated. As of 2026-09-10 the Governor's office states explicitly that no state funding was used for Bedington Campus. HB 2014's revenue-sharing formula (50% Personal Income Tax Reduction Fund / 30% host county / 10% all counties per capita / 5% Electric Grid Stabilization and Security Fund / 5% Economic Enhancement Grant Program) is a distribution of the taxes the facility itself will generate, not an incentive granted to the facility, so it is not recorded as a subsidy. As of September 2026, no county-level PILOT or abatement agreement was found in the sources checked (governor.wv.gov, WV DED, SEDC).","src":[{"u":"https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact","t":"Governor Morrisey Announces $4 Billion Private Investment in WV's First High Impact Intelligence Center","p":"WV Office of the Governor"},{"u":"https://westvirginiawatch.com/2026/02/26/d-c-based-real-estate-firm-investing-4b-for-new-data-center-development-in-berkeley-county-wv/","t":"D.C.-based real estate firm investing $4B for new data center development in Berkeley County, WV","p":"West Virginia Watch"}],"j":"uninc","jc":"Washington County","ju":"approx"},{"id":"irs-enterprise-computing-center-kearneysville-wv","n":"IRS Enterprise Computing Center (Martinsburg Computing Center)","op":"Internal Revenue Service","s":"operational","st":"WV","city":"Kearneysville","co":"Berkeley","lat":39.3986,"lon":-77.9163,"pre":"approximate","cf":"confirmed","upd":"2026-09-15","nt":"Long-running federal data center, referred to interchangeably as the Martinsburg Computing Center and the Kearneysville Enterprise Computing Center; the IRS exhibit gives the main building as 379,200 GSF occupied 1999, plus 165,000 GSF of annex space. AI classification is mixed-use, not confirmed: the facility's primary workload is tax processing and it houses the IRS Master File, but a February 2025 procurement covers an NVIDIA DGX B200 SuperPOD of 31 systems for the Research, Applied Analytics and Statistics division's Compliance Data Warehouse. The Intercept noted at the time that the hardware \"has not yet been purchased or installed,\" so installation is not asserted here. DOE awarded a $2.2 million AFFECT grant toward an energy savings performance contract at the site. Coordinates are the OSM point for the IRS building, not a parcel survey. No capacity, cooling or water figures are published, so those fields are omitted.","src":[{"u":"https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc","t":"IRS procurement technical exhibit — Martinsburg Computing Center: \"Main Building: 250 Murall Drive, Kearneysville, WV Occupied 1999 379,200 GSF\"","p":"Internal Revenue Service"},{"u":"https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc","t":"CX-032001: Internal Revenue Service Martinsburg Enterprise Computing Center ESPC (DOE AFFECT grant, NEPA categorical exclusion)","p":"U.S. Department of Energy"}],"j":"uninc","jc":"Berkeley County","ju":"approx"},{"id":"nscale-monarch-mason-county-wv","n":"Monarch Compute Campus","op":"Nscale","s":"under_construction","st":"WV","city":"Point Pleasant","co":"Mason","lat":38.87,"lon":-82.1,"pre":"approximate","cf":"confirmed","mw":2000,"ac":2250,"inv":20000000000,"ann":"2026-03","upd":"2026-10-29","nt":"Nscale backed by $2B NVIDIA investment. Microsoft LOI covers 430,000 Vera Rubin NVL72 GPUs in multi-year framework agreement. 8 GW ceiling for full site; the planned capacity reflects 2028 phase target of 2 GW. Acquired from AIPCorp (Fidelis New Energy / 8090 Industries). Coordinates are approximate for north of Point Pleasant, Mason County. As of September 2026, no PILOT or county tax-abatement agreement was found in any source checked; the project is instead reported as making community donations ($450,000 combined to Mason County Sheriff's Dept, EMS and the Economic Development Authority in April 2026; $500,000 to Mason County Schools reported August 2026) rather than receiving incentives. As of September 2026, no precise street address could be resolved. Multiple sources place the site 'north of Point Pleasant along WV-62 near Camp Conley' in Mason County, but no source gives a house number or parcel ID, so no street address is recorded rather than one approximated from a road name.","src":[{"u":"https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory","t":"Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW NVIDIA Vera Rubin at WV AI Factory Campus","p":"Nscale"},{"u":"https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/","t":"Nscale acquires 8GW Monarch Compute Campus; Microsoft signs on for 1.35GW","p":"Data Center Dynamics"}],"j":"uninc","jc":"Mason County","ju":"approx"},{"id":"noaa-environmental-security-computing-center-fairmont-wv","n":"NOAA Environmental Security Computing Center (NESCC)","op":"National Oceanic and Atmospheric Administration","s":"operational","st":"WV","city":"Fairmont","co":"Marion","lat":39.4849,"lon":-80.1427,"pre":"approximate","cf":"reported","upd":"2026-10-11","nt":"Federal research-computing center in the I-79 High Technology Park, Marion County. Home of NOAA's Hera HPC system; a $100M NOAA HPC system named Rhea is planned for the site to support AI/ML weather, ocean and climate modeling. NOAA's own fact sheet (noaa.gov) could not be retrieved as of September 2026, so the 54,000 sq ft and $27.6M-establishment figures reported elsewhere are not used. Pin is the city centroid — the exact park parcel is not published in the cited source.","src":[{"u":"https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/","t":"NOAA's $100M Rhea supercomputer coming to Fairmont, boosting West Virginia tech growth","p":"West Virginia Press Association"},{"u":"https://nominatim.openstreetmap.org/search?q=Fairmont%2C+Marion+County%2C+West+Virginia&format=json&limit=1","t":"OpenStreetMap Nominatim geocode for Fairmont, Marion County, WV","p":"OpenStreetMap"}],"j":"city","jc":"Marion County","jn":"Fairmont","jd":"city","ju":"approx"},{"id":"lunavi-cheyenne-wy","n":"Lunavi Cheyenne Data Center","op":"Lunavi","s":"operational","st":"WY","city":"Cheyenne","co":"Laramie","lat":41.11,"lon":-104.78,"pre":"approximate","cf":"reported","mw":8,"upd":"2026-10-22","nt":"Colocation facility at 340 Progress Circle, Cheyenne. 5 MW available with stated ability to expand to 8 MW; critical IT load 4 MW; average PUE 1.17, low 1.05. Formerly Green House Data. Ownership caveat: Fifteenfortyseven Critical Systems Realty markets a Cheyenne facility (CHWY1) with a matching 42,000 sq ft building and ~5 MW on-site, so the same building may be owned by 1547 and operated/marketed by Lunavi; only one record is held here to avoid a duplicate, with Lunavi named as operator on the strength of its own current first-party listing. No subsidy is recorded: the Wyoming Business Council materials describe Lunavi as a driver of the exemption's co-location amendments, not as a certified recipient. Coordinates approximate the street address.","src":[{"u":"https://www.lunavi.com/data-centers/cheyenne","t":"Lunavi Cheyenne Data Center","p":"Lunavi"},{"u":"https://www.1547realty.com/data-center/cheyenne-wy-chwy1/","t":"Cheyenne WY | CHWY1","p":"Fifteenfortyseven Critical Systems Realty"}],"j":"uninc","jc":"Laramie County","jn":"Fox Farm-College","ju":"approx"},{"id":"meta-cheyenne-wy","n":"Meta Cheyenne Data Center","op":"Meta","s":"under_construction","st":"WY","city":"Cheyenne","co":"Laramie","lat":41.099,"lon":-104.769,"pre":"approximate","cf":"confirmed","mw":109,"ac":960,"inv":800000000,"ann":"2024-07","upd":"2026-10-22","pb":"Black Hills Energy grid with planned renewable additions","nt":"715,000 sq ft campus at High Plains Business Park, Meta's 25th global data center. Originally Project Cosmo. Optimized for AI workloads with new H-departed design. Expected operational 2027. Coordinates approximate for High Plains Business Park in SE Cheyenne. As of July 2026, the energy notes do not include an on-site nuclear claim (the Meta-TerraPower PPA is portfolio-wide grid delivery, not an on-site Cheyenne plant) or an unverified $1.2B solar claim. As of October 2026, Enbridge's May 2026 announcement states that Enbridge expects to invest approximately US$1.2 billion in the first phase of its Cowboy Project near Cheyenne (365 MW of solar generation and a 200MW/1600MWh battery energy storage system) to support Meta's data center operations; Industrial Info Resources (May 2026) says the facility will support Meta's Project Cosmo and puts the first phase's estimated total investment value at around $650 million. Cheyenne LEADS is the source for the 1,000 construction jobs figure.","src":[{"u":"https://www.datacenterdynamics.com/en/news/meta-officially-announces-data-center-in-cheyenne-wyoming/","t":"Meta Officially Announces Data Center in Cheyenne, Wyoming","p":"Data Center Dynamics"},{"u":"https://cheyenneleads.org/meta-announces-new-data-center-a-major-investment-in-cheyenne-wyoming/","t":"Meta Announces New Data Center, a Major Investment, in Cheyenne, Wyoming","p":"Cheyenne LEADS"}],"j":"city","jc":"Laramie County","jn":"Cheyenne","jd":"city","ju":"approx"},{"id":"microsoft-cheyenne-expansion-wy","n":"Microsoft Cheyenne Mega-Campus Expansion","op":"Microsoft","s":"permitted","st":"WY","city":"Cheyenne","co":"Laramie","lat":41.09,"lon":-104.79,"pre":"approximate","cf":"reported","ac":3200,"ann":"2026-04","upd":"2026-10-22","pb":"Black Hills Energy (LPCS tariff); hydrogen fuel cell backup pilot completed with Caterpillar","nt":"Described by Microsoft as a 'multi-gigawatt multi-decade ecosystem.' The 400 MW initial-target figure that appeared in the prior record was not found in either cited source and has been removed pending a citable source (neither the Microsoft newsroom announcement nor Cowboy State Daily mentions a specific MW figure). Separate from existing Cheyenne campus (since 2012) and the HR Ranch Road construction underway 2025-2026. Coordinates approximate for Bison Business Park / SE Cheyenne area.","src":[{"u":"https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/","t":"Microsoft Announces Intent to Expand Datacenter Operations in Cheyenne","p":"Microsoft"},{"u":"https://cowboystatedaily.com/2026/04/14/microsoft-to-triple-its-cheyenne-data-center-footprint-with-3-200-acre-land-buy/","t":"Microsoft to Triple Its Cheyenne Data Center Footprint With 3,200-Acre Land Buy","p":"Cowboy State Daily"}],"j":"city","jc":"Laramie County","jn":"Cheyenne","jd":"city","ju":"approx"},{"id":"tallgrass-project-jade-cheyenne-wy","n":"Project Tembo","op":"Google","s":"under_construction","st":"WY","city":"Cheyenne","co":"Laramie","lat":41.12,"lon":-104.82,"pre":"approximate","cf":"reported","mw":2700,"ac":716,"inv":17000000000,"ann":"2026-01","upd":"2026-11-04","pb":"On-site natural gas (Tallgrass Cheyenne Power Hub)","nt":"Switchgrass Industrial Park, Hwy 85 south of Cheyenne, Laramie County - geographically distinct from Meta (Project Cosmo) and Microsoft's Cheyenne campuses. 716-acre campus. Originally announced at 1.8GW as 'Project Jade' with an undisclosed hyperscale client (Crusoe Energy as builder); Crusoe exited June 2026. On 2026-07-08, Google was publicly revealed as owner/operator via subsidiary Jupiter Star Holdings, and the project was renamed 'Project Tembo'; capacity confirmed at 2.7GW with an ultimate ceiling of up to 10GW. The Cheyenne Power Hub on-site natural-gas plant supplies power (Tallgrass Energy; Black Hills Energy co-invested). ~$50B total project figure remains a projection. Completion targeted 2031.","src":[{"u":"https://www.datacenterdynamics.com/en/news/crusoe-gets-go-ahead-for-18gw-data-center-campus-and-power-plant-in-cheyenne-wyoming/","t":"Crusoe gets go-ahead for 1.8GW data center campus and power plant in Cheyenne, Wyoming","p":"Data Center Dynamics"},{"u":"https://cowboystatedaily.com/2026/06/11/partner-pulling-out-doesnt-slow-huge-2-7gw-cheyenne-project-jade-data-center/","t":"Partner pulling out doesn't slow huge 2.7GW Cheyenne Project Jade data center","p":"Cowboy State Daily"}],"j":"city","jc":"Laramie County","jn":"Cheyenne","jd":"city","ju":"approx"},{"id":"prometheus-hyperscale-evanston-wy","n":"Prometheus Hyperscale Atlas Industrial Park Data Center Campus","op":"Prometheus Hyperscale","s":"permitted","st":"WY","city":"Evanston","co":"Uinta","lat":41.27,"lon":-110.81,"pre":"approximate","cf":"confirmed","mw":1250,"ac":506,"inv":16000000000,"ann":"2026-05","upd":"2026-09-14","nt":"506-acre 'Atlas Industrial Park' campus about 8-12 miles east of Evanston near the Silver Eagle refinery on County Road 180, south side of I-80 (Section 13, T15N R119W). Approved for 1.25GW initial IT capacity with a stated development path to 5GW; only the confirmed initial figure is recorded here.","src":[{"u":"https://www.prnewswire.com/news-releases/prometheus-hyperscale-secures-unanimous-conditional-use-permit-approval-from-uinta-county-commissioners-302803665.html","t":"Prometheus Hyperscale Secures Unanimous Conditional Use Permit Approval from Uinta County Commissioners","p":"PR Newswire"},{"u":"https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-secures-planning-approval-for-gigawatt-data-center-campus-in-wyoming/","t":"Prometheus Hyperscale secures planning approval for gigawatt data center campus in Wyoming","p":"Data Center Dynamics"}],"j":"uninc","jc":"Uinta County","ju":"approx"},{"id":"prometheus-hyperscale-casper-wy","n":"Prometheus Hyperscale Falls Ranch Data Center Campus","op":"Prometheus Hyperscale","s":"proposed","st":"WY","city":"Glenrock","co":"Converse","lat":42.87,"lon":-106.15,"pre":"approximate","cf":"reported","mw":1500,"ac":940,"inv":500000000,"ann":"2025-10","upd":"2026-10-17","nt":"1.5GW campus proposed on the Falls Ranch property spanning the Natrona/Converse county line near I-25, roughly 10 miles east of Casper. Site plan still in flux as of July 2026, with developers weighing an alternate parcel south of I-25; targeted operational by 2028.","src":[{"u":"https://cowboystatedaily.com/2025/10/09/casper-lands-massive-1-5-gigawatt-data-center-project-on-nearby-ranch/","t":"Casper Lands Massive 1.5-Gigawatt Data Center Project on Nearby Ranch","p":"Cowboy State Daily"},{"u":"https://oilcity.news/community/business/2025/10/10/prometheus-hyperscale-plans-data-hall-energy-infrastructure-in-natrona-county/","t":"Prometheus Hyperscale plans data hall, energy infrastructure in Natrona County","p":"Oil City News"}],"j":"uninc","jc":"Natrona County","ju":"approx"},{"id":"related-digital-cheyenne-wy","n":"Related Digital Cheyenne Data Center Campus","op":"Related Digital","s":"under_construction","st":"WY","city":"Cheyenne","co":"Laramie","lat":41.13,"lon":-104.735,"pre":"approximate","cf":"confirmed","mw":302,"ac":115,"inv":1200000000,"ann":"2025-10-07","upd":"2026-10-17","nt":"115-acre campus in the Cheyenne Business Parkway; up to 302 MW of critical IT capacity across the full campus. CoreWeave is the anchor tenant under a long-term lease for 88 MW of critical IT capacity — the 88 MW is the leased slice, not the campus total. Phase I projected to generate over $250 million in tax revenue to Wyoming and Cheyenne in its first 15 years. Coordinates approximate the Cheyenne Business Parkway, not a parcel-confirmed point.","src":[{"u":"https://www.related-digital.com/news/related-digital-breaks-ground-on-302-mw-data-center-campus-in-cheyenne-wyoming","t":"Related Digital Breaks Ground on 302 MW Data Center Campus in Cheyenne, Wyoming","p":"Related Digital"},{"u":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","t":"Wyoming Business Council program & service catalog, materials prepared for the Joint Minerals Committee (June 2026) — Data Center Sales Tax Exemption recipients","p":"Wyoming Business Council / Wyoming Legislature"}],"j":"city","jc":"Laramie County","jn":"Cheyenne","jd":"city","ju":"approx"}]}